HomeMy WebLinkAboutHARMONY TECH. PARK THIRD FILING, SECOND REPLAT (CUSTOM BLENDING) - PDP/FDP - FDP130021 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESPage 1
May 22, 2013
Harmony Technology Park Third Filing Second Replat
Custom Blending
Statement of Planning Objectives
This proposal is for a combined PDP/Final Plan submittal for Custom Blending located at
3461 Precision Drive in the Harmony Technology Park Third Filing. Currently, the existing
Custom Blending building is located on Lot 2, which contains 3 acres. The existing building is
approximately 31,700 square feet. The proposal consists of a +/- 35,000 sq. ft expansion to
the east, which would take up a portion of Lot 3. A replat is included with the development
review process.
Uses surrounding the property consist of the following:
South: Fossil Ridge High School and a detention pond
West: Vacant Land -Lot 1, Harmony Technology Park Third Filing, First Replat
North: Vacant Land – Lot 2, Harmony Technology Park, Second Filing
East: Vacant Land - Lot 4, Harmony Technology Park, Third Filing
Custom Blending was founded in 1984 and is a manufacturer of spices, seasonings and
flavoring extracts. The impetus for the expansion is to create space primarily for the
manufacture of extracts in-house. The proposed expansion is anticipated to be 40-50%
production/warehouse and approximately 3,000-5,000 sq. ft. of office space.
The new building will be expanding over the existing 44-space employee parking lot.
Project build-out will provide new access drives on the south and east sides of the building
and new parking area on the east side of the building.
External tank storage for bulk ethanol storage is envisioned to be two 6000 horizontal
storage tanks with setback, monitoring and containment on the southeast side of the
expansion.
The site is in the H-C zoning district. According to the Purpose Statement contained within
Article 4.26 of the Land Use Code, “The Harmony Corridor District is intended to implement
the design concepts and land use vision of the Harmony Corridor Plan -- that of creating an
attractive and complete mixed-use area with a major employment base.”
The area surrounding Custom Blending contains a mix of residential, office, retail and
employment. The site is ideal for this type of use as it provides an expansion to a major
employer in Fort Collins. The proposed project is located within walking and biking distance
to Front Range Village and the surrounding residential subdivisions.
Main access to the expansion site will utilize a new entrance off of Precision Drive. The
drive will be 30’ wide to accommodate Poudre Fire Authority requirements for a fire lane.
45 employee parking spaces will be provided. A truck loading dock and trash enclosure are
provided on the sound end of the buildings.
Page 2
The proposed design of the facility expansion will combine the exterior aesthetic of the
existing building while incorporating the new process functions of Custom Blending's future.
The proposed exterior materials will be identical to the existing facility to create a cohesive
addition that presents as a single facility from the exterior. The building will act a screen
from the public R.O.W. by placing required service uses to the south. The addition allows
for improved site circulation and access from the existing conditions and provides a state of
the art production facility.
(i) Statement of appropriate City Plan Principles and Policies achieved by
the proposed plan:
The Custom Blending building expansion meets the following applicable City
Plan Principles and Policies:
Economic Health
Principle EH 3: The City will support local, unique, and creative
businesses.
Policy EH 3.1 – Support Programs Emphasizing Local Business
Principle EH 4: The City will encourage the redevelopment of strategic
areas within the community as defined in the Community and
Neighborhood Livability and Neighborhood Principles and Policies.
Policy EH 4.1 –Prioritize Targeted Redevelopment Areas
Policy EH 4.2 – Reduce Barriers to Infill Development and
Redevelopment
By expanding their facility, Custom Blending will continue to promote and
sustain their local business thereby further enhancing the economic health of
Fort Collins. This represents job creation and business retention for a
business that is successful and unique to Fort Collins.
Environmental Health
Principle ENV 19: The City will pursue opportunities to protect and
restore the natural function of the community’s urban watersheds and
streams as a key component of minimizing flood risk, reducing urban
runoff pollution, and improving the ecological health of urban streams.
Policy ENV 19.2 – Pursue Low Impact Development
Custom Blending is implementing LID by incorporating soft pan swales and a
wetland pre-sedimentation basin, which will treat runoff from the existing
building, as well as the expansion area.
Page 3
Community and Neighborhood Livability
Principle LIV 38: Employment Districts will be the major employment
centers in the community, and will also include a variety of
complementary uses to meet the needs of employees. By design, they
will be accessible to the City’s multimodal transportation system and
encourage walking, bicycling, car and van pooling, and transit use.
Policy LIV 38.1 – Mix of Uses
Policy LIV 38.3 – Land Use Transitions
Policy LIV 38.5 – Coordinate District Design
Policy LIV 38.7 – Address Parking
Policy LIV 38.8 – Provide Walkways and Bikeways
Custom Blending is a primary use located in an employment park, in a
targeted activity center. The area surrounding the Harmony Technology Park
contains a mix of residential, institutional, employment, office and retail. The
proposed expansion provides a transition in scale to the residential area by
being located mid-block and by providing a softened edge with the use of
landscape and change in building materials. The site is located in the
Harmony Technology Park, which provides a campus-like setting, with platted
lots, streets, sidewalks, and infrastructure already in place. The visual
impacts of the parking lot have been reduced by placing the parking to the
side of the building.
Transportation
Principle T 9: Enhanced Travel Corridors will contain amenities and
designs that specifically promote walking, the use of mass transit, and
bicycling.
Policy T 9.1 – Locating Enhanced Travel Corridors
Principle T10: Using transit will be a safe, affordable, easy, and
convenient mobility option for all ages and abilities.
Policy T 10.1 – Transit Stops
Policy T 10.6 – High Frequency Transit Service
Principle T11: Bicycling will be a safe, easy, and convenient mobility
option for all ages and abilities
The location of this project at the south end of an employment campus, near
residential subdivisions, Fossil Ridge High School and its proximity to
Harmony Road will promote and support the idea of a predominance of the
daily trips of the employees of this project utilizing alternative modes of
transportation (walking/biking) or public transportation. The on-street bike
lanes will help to encourage safe cycling. Harmony Road is designated as an
enhanced travel corridor
(ii) Description of proposed open space, wetlands, natural habitats and
features, landscaping, circulation, transition areas, and associated
buffering on site and in the general vicinity of the project.
Page 4
There are no wetlands or significant natural habitats within the boundaries of
the site. There are several existing mature trees on the site that will have to
be removed and possibly mitigated. The team will meet with the City
Forester to assess the existing trees and landscaping.
(iii) Statement of proposed ownership and maintenance of public and
private open space areas; applicant's intentions with regard to future
ownership of all or portions of the project development plan.
The existing building and proposed expansion will be owned by CBI Real
Estate Holdings, LLC.
(iv) Estimate of number of employees for business, commercial, and
industrial uses.
The number of employees is approximately 60.
(v) Description of rationale behind the assumptions and choices made by
the applicant.
At this time the Custom Blending project is not proposing any variance from
any City of Fort Collins criteria. However, the developer would like to discuss
the possibility of eliminating the pervious pavement requirement, as the
proposed development will involve frequent truck use for the majority of the
proposed new pavement areas, rather than the majority of the pavement
areas being required for small cars and other vehicles for parking needs. The
developer has concerns as to the costs of not only installing pervious
pavement for areas that will see heavy truck use, but also the on-going
maintenance that will be required for the pervious pavement.
(vi) The applicant shall submit as evidence of successful completion of the
applicable criteria, the completed documents pursuant to these
regulations for each proposed use. The planning Director may require,
or the applicant may choose to submit, evidence that is beyond what is
required in that section. Any variance from the criteria shall be
described.
At this time the project is not proposing any variance from any City of Fort
Collins criteria, however, the developer would like to discuss the possibility of
eliminating the pervious pavement requirement, as the proposed
development will involve frequent truck use for the majority of the proposed
new pavement areas, rather than the majority of the pavement areas being
required for small cars and other vehicles for parking needs. The developer
has concerns as to the costs of not only installing pervious pavement for
areas that will see heavy truck use, but also the on-going maintenance that
will be required for the pervious pavement.
(vii) Narrative description of how conflicts between land uses or
disturbances to wetlands, natural habitats and features and or wildlife
are being avoided to the maximum extent feasible or are mitigated.
There are not existing wetlands, natural habitats or features currently located
on site. There are existing trees within the site which would be preserved
and/or mitigated with this proposed PDP/Final Plan. There are some trees
within the interior of the site which would be removed with the expansion of
Page 5
the building. We will meet with Tim Buchanan, City Forester to have an
assessment of the existing trees completed.
(viii) Written narrative addressing each concern/issue raised at the
neighborhood meeting(s), if a meeting has been held.
There was no neighborhood meeting.
(ix) Name of the project as well as any previous name the project may have
had during Conceptual Review.
The project is called Harmony Technology Park Third Filing Second Replat,
Custom Blending. The project was referred to as 3461 Precision Drive –
Custom Blending at Conceptual Review.