Loading...
HomeMy WebLinkAboutCANYON PLACE (331. S. MELDRUM) - PDP - PDP120023 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTPage 1 of 2 D:\Projects\838-002\Drainage\Reports\Drainage Report\838-002_Drainage-Letter_2012-09-18.docx Drainage Letter Report Date: October 31, 2012 Project: Canyon Place Project No. 838-002 Fort Collins, Colorado Attn: Mr. Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Dear Wes: This letter serves to address the stormwater impacts of the above referenced project. The site currently consists of rooftop, concrete walks and patio, asphalt parking areas, some turf, trees, and other vegetation. The majority of the site presently drains to an area inlet located in the center of the main drive aisle. This area inlet releases into the City’s storm sewer system within West Magnolia Street. Historic drainage patterns will generally be preserved. The total impervious area within the limits of construction of the existing site is approximately 23,563 square-feet. The proposed redevelopment will completely remove all existing above-grade structures and adjacent hardscape. The new project will consist of a larger building, as well as a courtyard area and modified parking area. Concrete pedestrian connections will be maintained along South Meldrum Street, West Magnolia Street and Canyon Avenue. The total impervious area within the limits of construction of the proposed redevelopment is roughly 22,775 square-feet. The two existing curb cuts and concrete aprons to West Magnolia will be removed. Two proposed curb cuts are designed within Canyon Avenue to meet current code requirements and minimize the amount of area draining across the pedestrian path. The area within the court yard has been designed with a ridge routing stormwater north and south. The stormwater routed to the south is intercepted by a trench drain which outfalls into the City’s stormwater system. The stormwater routed to the north is intercepted by a trench drain which out falls into Canyon Avenue. The area of pavement sheet flowing across the Canyon sidewalk will be approximately 662 square-feet, which is less than the maximum 750 square-feet allowed by LCUASS. The remaining area within the northern parking lot will be concentrated within a proposed curb chase and routed into Canyon Avenue. The site is located in the Old Town master drainage basin, and therefore, on-site detention is not required so long as the increase in impervious area is less than 5,000 square-feet. The total impervious area proposed with this development will be decreased by approximately 788 square-feet (23,563 – 22,775). A detailed breakdown of the existing and proposed impervious areas is attached to this letter. Page 2 of 2 D:\Projects\838-002\Drainage\Reports\Drainage Report\838-002_Drainage-Letter_2012-09-18.docx Although stormwater quantity detention is not required, stormwater quality mitigation will be addressed by both temporary and permanent Best Management Practices (BMPs). During construction, the Contractor will follow the appropriate and applicable City of Fort Collins standards for erosion and sediment control. A comprehensive Stormwater Management Plan has been prepared for this project, and a copy has been supplied to the Environmental Regulatory Specialist with Fort Collins Utilities. Post construction water quality and erosion control will be achieved by a fully established and stabilized site. All areas disturbed during construction will receive permanent hardscape, landscape, or building structure. This portion of the Old Town basin does receive regional water quality treatment; therefore, on-site water quality mitigation is not required. However, much of the existing landscaped buffers on the north, south and east sides of the building will be preserved as permeable areas to promote infiltration and treat surface runoff prior to entering the adjacent gutters and inlets. The project site is also located in the Old Town Basin floodplain. This is a City of Fort Collins regulatory floodplain. Since a small portion of the development falls within a City of Fort Collins regulatory floodplain, a Floodplain Use Permit (FUP) shall be obtained prior to commencing with any construction within the floodplain. The proposed improvements within the floodplain consist of site work only, no structures are proposed within the 100-year floodplain. As such, this project seeks to obtain a FUP with the initial Development Construction Permit (DCP), which would then cover all work to take place within the floodplain. It is important to note that the floodway currently follows the back of sidewalk along the project’s West Magnolia Street frontage. This means that some of the driveway and streetscape modifications will occur within the floodway. A No-Rise Certification is required for all work within the floodway. Further details and supporting documentation for the No-Rise Certification shall accompany the FUP application. The proposed grading concept closely matches existing elevations and drainage patterns, and only varies in an effort to improve the existing condition. On-site detention is proven to be unnecessary. On-site stormwater quality is not required as runoff will be treated at the Udall Natural Area water treatment facility. The project is designed in accordance to the governing floodplain regulations contained within Chapter 10 of the City Code, and the Floodplain Use Permit and necessary certifications shall ensure that construction remains compliant with Chapter 10. Therefore, it is my professional opinion that the new building and site improvements proposed with Canyon Place satisfy all applicable stormwater criteria. Please do not hesitate to contact me if you have questions or require additional information. Sincerely, Nicholas W. Haws, PE Project Manager Cody N. Snowdon Project Engineer Canyon Place CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Canyon Place Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: C. Snowdon Asphalt ……....……………...……….....…...……………….………………………………….0.. 95 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….0.. 50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Impervious Area (sq ft) Composite % Imperv. Existing 30,781 0.71 0.34 0.12 0.07 0.00 0.17 0.76 0.76 0.95 23,563 74% Proposed 30,781 0.71 0.07 0.19 0.26 0.00 0.18 0.74 0.74 0.93 22,775 68% COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS October 31, 2012 **Soil Classification of site is Sandy Loam** 10-year Cf = 1.00 Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. Page 1 of 1 D:\Projects\838-002\Drainage\Hydrology\838-002 Impervious Calcs.xlsx\C-Values