Loading...
HomeMy WebLinkAboutLINK-N-GREENS - PDP - PDP130001 - SUBMITTAL DOCUMENTS - ROUND 2 - FIRE AUTHORITY REQUIREMENTSMemo TO: Woodward Project Team DATE: 1/29/2013 SUBJECT: Fire Suppression Scope FROM: Matthew L. Kraft, AIA,DBIA Senior Project Manager CLIENT: Woodward Inc. PROJECT NO.: 127213-001 PROJECT: Woodward – Blue Home Fire Suppression The project will provide wet fire suppression systems for all campus buildings. Fire suppression will be in accordance with current codes, insurance provider requirements and the direction of the Authority Having Jurisdiction. Every fire service entrance into campus buildings will include appropriate fire control valves, alarm devices and fire department connections. Since there will be no fire access or water supply to the south side of the ITS Building, we will include a fire pump with a fossil fuel engine on the north side of the building. This will be designed to insure sufficient water delivery to all parts of the building, including the Cafeteria and the future addition.