HomeMy WebLinkAboutREMINGTON ANNEX - PDP - PDP110017 - REPORTS - DRAINAGE REPORT (3)1501 Academy Ct. Ste. 204 Fort Collins, Colorado 80524 (970) 217-7420
Preliminary Drainage & Erosion Control Study
Remington Annex
FortCollins Fort Collins, , CO
Prepared for:
Maxiiimo Development Group LLC
706 S. College Ave #201
Fort Collins, CO 80524
December 19, 2012
Drainage & Erosion Control Report
Remington Annex
Fort Collins, CO
i B11010-DrainageReport-Prelim2.doc
TABLE OF CONTENTS
PAGE
I. GENERAL PROJECT LOCATION AND DESCRIPTION .......................................................... 1
A. Location ................................................................................................................ 1
B. Description of Property ....................................................................................... 1
II. DRAINAGE BASINS AND SUB-BASINS ............................................................................... 1
A. Major Basin Description ...................................................................................... 1
B. Sub-Basin Description .......................................................................................... 2
III. DRAINAGE DESIGN CRITERIA ........................................................................................... 2
A. Regulations .......................................................................................................... 2
B. Hydrological Criteria ............................................................................................ 2
C. Hydraulic Criteria ................................................................................................. 3
D. Variance Request ................................................................................................. 4
IV. DRAINAGE FACILITY DESIGN ............................................................................................ 3
A. General Concept .................................................................................................. 3
B. Specific Details ..................................................................................................... 5
V. CONCLUSIONS .................................................................................................................. 6
A. Compliance with Standards ................................................................................. 6
B. Drainage Concept ................................................................................................ 7
C. Water Quality ....................................................................................................... 7
VI. EROSION AND SEDIMENT CONTROL ............................................................................... 7
VII. REFERENCES .................................................................................................................. 8
APPENDICES
APPENDIX A - Runoff Calculations
APPENDIX B - Detention Pond Analysis
APPENDIX C - Hydraulic Analyses
APPENDIX D - References & Previous Studies
Drainage & Erosion Control Report
Remington Annex
Fort Collins, CO
1 B11010-DrainageReport-Prelim2.doc
I. General Location and Description
A. Location
The Remington Annex site is located in the Northwest Quarter of Section 13,
Township 7 North, Range 69 West of the 6
th
Principal Meridian to the City of
Fort Collins, Larimer County, Colorado.
The site is located immediately west of Remington Street, north of Plum Street,
east of the alley between College Avenue and Remington Street, and south of
Laurel Street.
There are no known drainages within the project site. The alley behind the site is
utilized as a drainage channel for portions of the runoff from both the project
site and the adjacent lots.
B. Description of Property
The Remington Annex site (referred herein as “the site”, “this site) is
approximately 0.46 acres in size that will be developed into multi-family housing
complex.
The following is a summary of the existing conditions:
Ground Cover - The site currently contains three buildings and the utilities to
serve the residences. The existing ground cover consists mostly of grass.
Grades - In general, the majority of the site slopes southeasterly at an
approximately 1% slope.
Soil Type - According to the NRCS Web Soil Survey, the majority of the site
consists of Fort Collins loam, 1 to 3 percent slope (Soil Type B).
Utilities – Other than the service lines to each of the existing houses there
are no known utilities on the site
Detention Ponds and Storm Sewer – There are no detention ponds currently
on the site.
II. Drainage Basins and Sub-Basins
A. Major Basin Description
The site is in the Old Town Basin where any increase over the existing
imperviousness is required to be detained and released at the 2-year historic
rate and to provide water quality for the entire site.
Drainage & Erosion Control Report
Remington Annex
Fort Collins, CO
2 B11010-DrainageReport-Prelim2.doc
B. Sub-Basin Description
Historically, the runoff from this site flows off the site un-detained into the curb
and gutter along Remington Street or the alley between Remington Street and
College Avenue. The proposed site will continue to direct the majority of flows
towards Remington Street and a small portion of the site will continue to drain
towards the alley.
This preliminary drainage study includes the calculations from off-site basins
OS1A and OS2A, which do not flow into the site. These flows were calculated to
assist in determining the alley capacity.
III. Drainage Design Criteria
A. Regulations
The design criteria for this study are directly from the City of Fort Collins Storm
Drainage Design Criteria and Construction Standards Manual and the Urban
Storm Drainage Criteria Manuals Volumes 2, and 3 (referred to herein as
USDCM).
B. Hydrological Criteria
In accordance with the Fort Collins policy, a minor and major storm for the Fort
Collins area is identified as the 2-year and 100-year storms, respectively. A major
storm for the Fort Collins area has a recurrence interval of 100 years has a peak
intensity of 9.95 in/hr.
These storms have been used as a basis for planning and system design. The
peak flow rates for design points have been calculated based on the Rational
Method as described in the USDCM with storm duration set equal to the time of
concentration for each sub-basin. This method was used to analyze the
developed runoff from the 2-year (minor) and the 100-year (major) storm
events. The Rational Method is widely accepted for drainage design involving
small drainage areas (less than 160 acres) and short time of concentrations. The
Rational Method is ideal for storm sewer sizing and small detention pond sizing
(for tributary areas no larger than 90 to 160 acres). Runoff coefficients were
assumed based on impervious area and soil type and are given in Appendices.
C. Hydraulic Criteria
The developed site will convey runoff to the detention ponds in a safe and
effective manner via, swales, concrete pans, and pipes.
Detention Areas
Drainage & Erosion Control Report
Remington Annex
Fort Collins, CO
3 B11010-DrainageReport-Prelim2.doc
The runoff produced by the site will be conveyed to the proposed detention
areas within the development. The detention areas were sized utilizing the
Rational Formula-Based Modified FAA Procedure (assuming the required
pond volume is maximized at 120 minutes or less) and will have no
freeboard.
There are two parking lot detention areas (Detention A and Detention B)
shown on the west side of the proposed buildings. Detention area A will
release through an orifice plate in parking lot curb on the south side of the
lot. Detention area B will release through an orifice plate in the parking lot
curb on the north side of the lot. These small ponds do not have freeboard,
but the spill elevation over the curb is 0.65’ and 0.60’ below the finished
floor of the adjacent buildings.
Refer to Appendix B for preliminary detention pond calculations.
Alley Capacity
The alley will be an inverted crown alley that will convey the runoff northerly
and southerly. For a 0.5% longitudinal slope and a 2.5% cross slope this cross
section has a capacity of approximately 5.5 cfs.
Open Channels
Most sidewalk chases and curb cuts will be designed for the minor storm
with overtopping of the curbs/sidewalks in larger storm events.
D. Variance Request
This site follows City of Fort Collins guidelines and thus no variances are being
requested at this time.
IV. Drainage Facility Design
A. General Concept
The site will ultimately consist of ground covered by pavement, rooftop, and
landscape.
All referenced tables, charts, formulas, etc. are included in the Appendix. The
area, time of concentration, and runoff of each proposed sub-basin is
summarized in Appendix A. The project site was divided into several different
developed sub-basins as explained further below:
Basin A
Basin A consists of rooftop, sidewalk, parking lot, and landscaped area on the
southwestern portion of the site. Runoff is directed to the parking lot
Drainage & Erosion Control Report
Remington Annex
Fort Collins, CO
4 B11010-DrainageReport-Prelim2.doc
detention A, where it will release through an orifice plate on the south side
of the parking lot. These flows will run along the south side of the property
line and be conveyed to Remington Street through a sidewalk chase and
concrete curb channel.
Basin B
Basin B consists of rooftop, sidewalk, parking lot, and landscaped area on the
northwestern portion of the site. Runoff is directed to the parking lot
detention B, where it will release through an orifice plate on the north side
of the parking lot. These flows will run along the north side of the property
line and be conveyed to Remington Street through a sidewalk chase and
concrete curb channel.
Basin C
Basin C consists of rooftop, sidewalk, and landscaped area on the eastern
portion of the site. Runoff is directed to the east, which is then conveyed to
the curb and gutter in Remington Street via concrete curb channels or sheet
flow over the sidewalk.
Basin OS1
Basin OS1 consists of pavement and landscaped area on the southwestern
portion of the site. Runoff is directed un-detained to the public alley to the
west of the site and then flows south towards Plum Street.
Basin OS2
Basin OS2 consists of pavement and landscaped area on the northwestern
portion of the site. Runoff is directed un-detained to the public alley to the
west of the site and then flows north towards Laurel Street.
Basin OS1A
Basin OS1A consists of mostly rooftop from the building directly to the west
of this proposed building. Runoff is directed to the public alley and then
flows south towards Plum Street. This offsite basin was included in order to
calculate the depth of flow in the alley adjacent to the proposed
underground parking garage. These flows combine with Basin OS1 and the
sum of the two flows is shown at Design Point OS1.
Basin OS2A
Basin OS2A consists of mostly rooftop from several buildings directly to the
northwest of this proposed building. Runoff is directed to the public alley
and then flows north towards Laurel Street. This offsite basin was included
in order to calculate the runoff from the 2-year storm event that will pass
Drainage & Erosion Control Report
Remington Annex
Fort Collins, CO
5 B11010-DrainageReport-Prelim2.doc
over the sidewalk along Laurel Street. These flows combine with Basin OS2
and the sum of the two flows is shown at Design Point OS2.
Existing Basins
The existing onsite basins were also calculated to quantify the existing flows
that are coming from the site. They were simply broken into flows exiting
the site to the northwest (Basin NW), to the southwest (Basin SW), and to
the east (E).
B. Specific Details
The following is a basin summary table:
Area Q2
Q100
(sf) (cfs) (cfs)
Onsite Basins
A 6337 81% 0.58 0.71 0.240 1.028
B 3337 89% 0.69 0.80 0.151 0.607
C 9319 57% 0.34 0.55 0.209 1.171
OS1 689 44% 0.26 0.51 0.012 0.080
OS2 215 2% 0.03 0.36 0.000 0.018
Onsite
Total
19897 69% 0.44 0.61 0.612 2.904
Post Detention Q100
= 1.779
Existing
Site Totals
19897 44% 0.25 0.50 0.248 1.712
C100
C2
Basin %I
Design
Point
The following is a summary of the alley capacity calculations:
Alley Capacity Calcs
OS1A 13097 91% 0.73 0.83 0.505 1.999
OS1+OS1A OS1 13786 89% 0.69 0.80 0.504 2.027
OS2A 11731 92% 0.74 0.84 0.458 1.806
OS2+OS2A OS2 11946 90% 0.71 0.81 0.450 1.792
The following is a summary of the detention pond volumes:
Pond
Req'd
Storage
Volume
(cfs)
Total
Volume
Provided
(cfs)
Outfall
Elevation
Spill
Elevation
Adjacent
Building
FFE
Freeboard
Pond A 469 637 4990.90 4991.60 4992.25 0.65
Drainage & Erosion Control Report
Remington Annex
Fort Collins, CO
6 B11010-DrainageReport-Prelim2.doc
The spillway for Ponds A & B will be over top back of curb. The spillway for Pond
A will be 0.65’ below the finished floor elevation of the adjacent building. The
spillway for Pond B will be 0.6’ below the finished floor elevation of the adjacent
building.
Water quality for the site is provided by the additional capacity in the parking lot
detention and the disconnected impervious areas before it exits to Remington
Street. There is also the potential to provide rain gardens on the east side of the
building prior to the flows exiting to Remington Street.
V. Conclusions
A. Compliance with Standards
Storm drainage calculations have typically followed the guidelines provided by
the City of Fort Collins Storm Drainage Design Criteria and Construction
Standards Manual and/or the Urban Storm Drainage Criteria Manuals Volumes
2, and 3.
B. Drainage Concept
The drainage system has been designed to convey the runoff to the designated
design points and the detention ponds in an effective manner as safe as
possible.
As proposed, the site has detention pond volumes (2,581 square-feet) in excess
of that required (2,470 square-feet). The required volume includes water quality
for the entire site and detention storage volume for the additional impervious
area of 7,789 square-feet. The post detention 100-year storm runoff is
calculated at 1.848 cfs, which is less than the calculated rate of 2.505 cfs for the
existing site.
C. Water Quality
Water quality has been provided through an expanded detention area and
disconnected impervious areas. Additional water quality could also be provided
with rain gardens on the east side of the building.
VI. Erosion and Sediment Control
In addition to the permanent low-impact design Best Management Practices (BMP’s),
the following temporary and permanent BMP’s will be installed and maintained to
control on-site erosion and prevent sediment from traveling off-site during and/or after
construction:
Drainage & Erosion Control Report
Remington Annex
Fort Collins, CO
7 B11010-DrainageReport-Prelim2.doc
• Silt Fence – a woven synthetic fabric that filters runoff. The silt fence is a
temporary barrier that is placed at the base of a disturbed area.
• Vehicle Tracking Control – a stabilized stone pad located at points of ingress and
egress on a construction site. The stone pad is designed to reduce the amount of
mud transported onto public roads by construction traffic.
• Straw Wattles – wattles act as a sediment filter in swales around inlets and
sidewalk chases. They are a temporary BMP and require proper installation and
maintenance to ensure their performance.
Additional erosion and sediment control measures will be included as part of the final
study.
VII. References
1. Geotechnical Investigation Collegio Two South Remington and East Laurel Streets,
CTL Thompson, Inc., September 23, 2010.
2. Natural Resources Conservation Service Web Soil Survey at
websoilsurvey.nrcs.usda.gov/app
3. Urban Storm Drainage Criteria Manual, Urban Drainage and Flood Control District,
Wright Water Engineers, Inc., Denver, Colorado, June 2001.
APPENDIX A
Runoff Calculations
Remington Annex
Fort Collins, CO Runoff Summary
Area Q2
Q100
(sf) (cfs) (cfs)
Onsite Basins
A 6337 81% 0.58 0.71 0.240 1.028
B 3337 89% 0.69 0.80 0.151 0.607
C 9319 57% 0.34 0.55 0.209 1.171
OS1 689 44% 0.26 0.51 0.012 0.080
OS2 215 2% 0.03 0.36 0.000 0.018
Onsite Total 19897 69% 0.44 0.61 0.612 2.904
Post Detention Q100
= 1.779
Existing Site
Totals
19897 44% 0.25 0.50 0.248 1.712
Alley Capacity Calcs
OS1A 13097 91% 0.73 0.83 0.505 1.999
OS1+OS1A OS1 13786 89% 0.69 0.80 0.504 2.027
OS2A 11731 92% 0.74 0.84 0.458 1.806
OS2+OS2A OS2 11946 90% 0.71 0.81 0.450 1.792
C100
C2
Basin %I
Design
Point
Calculations by: SME
Date: 12/19/2012 C:\Users\Sam\Dropbox\Projects\B11010-RemAnnex\Drainage\Prelim Submittal-2\B11010-Runoff.xlsx
Remington Annex
Fort Collins, CO Summary of Existing and Proposed Site Surfaces
Roof (1) Walks(1) Streets(1) Landscape(1
)
%I = 90% %I = 90% %I =100% %I=2%
acres sf sf sf sf sf C2 C100
Proposed 0.457 19897 6657 1382 6364 5494 69% 0.44 0.61
Existing 0.457 19897 5576 1899 1738 10682 44% 0.30 0.59
Difference 1081 -517 4626 -5188
Basin
Areas
Composite
Imperviousness
(%I)
Composite Runoff
Total Total Coefficients (2)
Calculations by: SME
Date: 12/19/2012 C:\Users\Sam\Dropbox\Projects\B11010-RemAnnex\Drainage\Prelim Submittal-2\B11010-Runoff.xlsx
Remington Annex
Fort Collins, CO Proposed Site - Runoff Coefficients and % Impervious
Roof (1) Walks(1) Streets(1) Landscape(1
)
%I = 90% %I = 90% %I =100% %I=2%
acres sf sf sf sf sf C2 C100
Onsite Basins
A 0.145 6337 910 274 4050 1103 81% 0.58 0.71
B 0.077 3337 887 158 2020 272 89% 0.69 0.80
C 0.214 9319 4860 950 3509 57% 0.34 0.55
A+B+C 0.436 18993
OS1 0.016 689 0 294 395 44% 0.26 0.51
OS2 0.005 215 0 0 215 2% 0.03 0.36
Onsite Total 0.457 19897 6657 1382 6364 5494 69% 0.44 0.61
Alley Capacity Calcs
OS1A 0.301 13097 11199 1892 91% 0.73 0.83
OS1+OS1A OS1 0.316 13786 11199 0 2186 395 89% 0.69 0.80
OS2A 0.269 11731 9433 2296 92% 0.74 0.84
OS2+OS2A OS2 0.274 11946 9433 0 2296 215 90% 0.71 0.81
Notes:
(1) Recommended % Imperviousness Values from USDCM Vol 1 - Ch 5 - Table RO-3. Increased Lawns from 0% to 2% Impervious.
(2) Runoff C is based on %I, UDFCD Eq RO-7 and correction factors in Table RO-4.
(3) Calculated to determine depth of flow in the alley for required height to garage entrance and allowable sheet flow over sidewalk
(See note 3)
Composite Runoff
Basin Coefficients (2)
Areas
Composite
Imperviousness
(%I)
Total Total
Design
Pt.
Calculations by: SME
Date: 12/19/2012 C:\Users\Sam\Dropbox\Projects\B11010-RemAnnex\Drainage\Prelim Submittal-2\B11010-Runoff.xlsx
Remington Annex
Fort Collins, CO Proposed Site - Time of Concentration
Area Length Slope ti
(2)
Length Slope
Velocity
(3) t
t
(4) Check
tc?
Total
Length
tc
(5)
acres ft % min ft % fps min min
u =
urban
ft min min
Onsite Basins
A 6,337 walk 0.73 24 2 2.6 110 1 20 2.0 0.9 3.5 u 134 11 5
B 3,337 Roof 0.73 24 10 1.5 72 1 20 2.0 0.6 2.1 u 96 11 5
C 9,319 Roof 0.73 18 10 1.3 55 1 20 2.0 0.5 1.8 u 73 10 5
A+B+C 18,993 5
OS1 689 Street 0.90 10 10 0.5 36 0.5 20 1.4 0.4 1.0 u 46 10 5
OS2 215 Street 0.90 10 10 0.5 32 0.5 20 1.4 0.4 0.9 u 42 10 5
Alley Capacity Calcs
OS1A 13,097 Roof 0.73 147 1 8.1 83 0.5 20 1.4 1.0 9.1 u 80 10 9
OS1+OS1A OS1 13,786 9
OS2A 11,731 Roof 0.73 140 1 7.9 93 0.5 20 1.4 1.1 9.0 u 81 10 9
OS2+OS2A OS2 11,946 9
Notes:
(1)
C5
based initial ground type and Table RO-5
(4)
tt
=L/(V*60 sec/min)
(2)
ti
= [1.8(1.1-C5
)L
1/2
]/S
1/3
, S= slope in %, L=length of overland flow (400' max)
(5)
tc
check (for urban or developed areas only) = total length/180 + 10
(3)
V=Cv
S
0.5
, S=watercourse slope in ft/ft, UDFCD Equation RO-4
(6)
min tc
= 5 min
Final
tc
(6)
tc Check for Urbanized
Remington Annex
Fort Collins, CO Proposed Site - Rational Method Peak Runoff
Final
Post
Detention
Discharge
tc
(6) I2 I100 Q2 Q100 Q100
sf min in/hr in/hr cfs cfs cfs cfs
Onsite Basins
A 6,337 5 0.58 0.71 2.85 9.95 0.240 1.028 0.675 0.354
B 3,337 5 0.69 0.80 2.85 9.95 0.151 0.607 0.450 0.157
C 9,319 5 0.34 0.55 2.85 9.95 0.209 1.171 1.171
A+B+C 18,993 0.600 2.806 1.682
OS1 689 5 0.26 0.51 2.85 9.95 0.012 0.080 0.080
OS2 215 5 0.03 0.36 2.85 9.95 0.000 0.018 0.018
Onsite Total 19,897 0.612 2.904 1.779
Alley Capacity Calcs
OS1A 13,097 9 0.73 0.83 2.30 8.03 0.505 1.999
OS1+OS1A OS1 13,786 9 0.69 0.80 2.30 8.03 0.504 2.027
OS2A 11,731 9 0.74 0.84 2.30 8.03 0.458 1.806
OS2+OS2A OS2 11,946 9 0.71 0.81 2.30 8.03 0.450 1.792
Design
Pt.
Reduction
from
Detention
Peak Discharge
Area
Basin Runoff Coefficients Rainfall Intensity
C2 C100
Calculations by: SME
Date: 12/19/2012 C:\Users\Sam\Dropbox\Projects\B11010-RemAnnex\Drainage\Prelim Submittal-2\B11010-Runoff.xlsx
Remington Annex
Fort Collins, CO Existing Site - Runoff Coefficients and % Impervious
Roof (1) Walks(1) Streets(1) Landscape(1)
%I = 90% %I = 90% %I =100% %I=2%
acres sf sf sf sf sf C2 C100
Existing Onsite Basins (See note 3)
NW 0.006 274 197 77 72% 0.48 0.64
SW 0.029 1283 61 1222 7% 0.02 0.39
E 0.421 18340 5576 1901 1480 9383 46% 0.27 0.51
Total 0.457 19897 5576 1901 1738 10682 44% 0.25 0.50
Existing Landscaped (pervious) area = 10682
Proposed Landscaped (pervious) area = 5494 (See "Proposed Runoff Coefficients and Calculations")
Difference in pervious areas = 5188 (This is new impervious area that must be detained)
Historic Calculation for Release Rate (See note 4)
Release Rate 0.119 5188 5188 2% 0.03 0.36
Release Rate 0.119 5188 5188 0 100% 0.89 0.96
Notes:
(1) Recommended % Imperviousness Values from USDCM Vol 1 - Ch 5 - Table RO-3. Increased Lawns from 0% to 2% Impervious.
(2) Runoff C is based on %I, UDFCD Eq RO-7 and correction factors in Table RO-4.
(3) NW = drains to northwest, SW = drains to Southwest, E=drains to the east
(4) Calculated to determine the required release rate for the additional impervious area being proposed
Composite Runoff
Basin Coefficients (2)
Areas
Composite
Imperviousness
(%I)
Total Total
Calculations by: SME
Date: 12/19/2012 C:\Users\Sam\Dropbox\Projects\B11010-RemAnnex\Drainage\Prelim Submittal-2\B11010-Runoff-existing.xlsx
Remington Annex
Fort Collins, CO Existing Site - Time of Concentration
Area Length Slope ti
(2)
Length Slope Velocity
(3)
tt
(4) Check
tc?
Total
Length
tc
(5)
sf ft % min ft % fps min min
u =
urban
ft min min
Existing Onsite Basins
NW 274 Street 0.90 13 1 1.3 0.0 1.3 u 13 10 5
SW 1,283 Lawn 0.09 20 1 8.1 0.0 8.1 u 20 10 8
E 18,340 Lawn 0.09 132 1 20.9 0.0 20.9 u 132 11 11
Total 19,897 Lawn 0.09 132 1 20.9 2.0 22.9 u 132 11 11
Historic Calculation for Release Rate
Release
Rate
5,188 Lawn 0.09 60 1 14.1 0.0 14.1 u 60 10 10
Release
Rate
5,188 Street 0.90 60 1 2.8 1.0 3.8 u 60 10 5
Notes:
(1)
C5
based initial ground type and Table RO-5
(4)
tt
=L/(V*60 sec/min)
(2)
ti
= [1.8(1.1-C5
)L
1/2
]/S
1/3
, S= slope in %, L=length of overland flow (400' max)
(5)
tc
check (for urban or developed areas only) = total length/180 + 10
(3)
V=Cv
S
0.5
, S=watercourse slope in ft/ft, UDFCD Equation RO-4
(6)
min tc
= 5 min
Final
tc
(6)
tc Check for Urbanized
Basin
Remington Annex
Fort Collins, CO Existing Site - Rational Method Peak Runoff
Final
tc
(6) I2 I100 Q2 Q100
sf min in/hr in/hr cfs cfs
Existing Onsite Basins
NW 274 5 0.48 0.64 2.85 9.95 0.009 0.040
SW 1,283 8 0.02 0.39 2.40 8.38 0.001 0.096
E 18,340 11 0.27 0.51 2.13 7.42 0.240 1.597
Total 19,897 11 0.25 0.50 2.13 7.42 0.248 1.712
Historic Calculation for Release Rate
Release Rate 5,188 10 0.03 0.36 2.21 7.72 0.008 0.333
Release Rate 5,188 5 0.89 0.96 2.85 9.95 0.301 1.132
Difference between existing 2 yr and proposed 100 yr for new impervious area (Amount to be detained) = 1.124
Proportion to be detained in Detention Pond A = 0.675
Proportion to be detained in Detention Pond B = 0.450
Peak Discharge
Area
Basin
Runoff Coefficients Rainfall Intensity
C2 C100
Calculations by: SME
Date: 12/19/2012 C:\Users\Sam\Dropbox\Projects\B11010-RemAnnex\Drainage\Prelim Submittal-2\B11010-Runoff-existing.xlsx
APPENDIX B
Detention Pond Analysis
Remington Annex
Fort Collins, CO Pond Summary
Pond Summary
Pond
Req'd
Storage
Volume
(cfs)
Total
Volume
Provided
(cfs)
Outfall
Elevation
Spill
Elevation
Adjacent
Building FFE
Freeboard
Pond A 469 637 4990.90 4991.60 4992.25 0.65
Pond B 335 528 4991.20 4991.90 4992.50 0.60
Totals 805 1165
Calculations by: SME
Date: 12/19/2012 C:\Users\Sam\Dropbox\Projects\B11010-RemAnnex\Drainage\Prelim Submittal-2\B11010-Runoff.xlsx
Remington Annex
Fort Collins, CO
Detention Pond A
100 year storm into detention facility A
Area (sf) Area (acres) Q100 C100*Area %I
6337 0.145 1.028 0.10 81%
Release rate out of detention system based on
Qout (cfs) cfs/acre Tc (min)
0.354 2.43 5
Rainfall
Intensity
Inflow
Volume
Adjustment
Factor
Average
Outflow Rate
Outflow
Volume
Required
Storage
Volume
I Vi=(Qin*T*60)
m= 0.5(1 +
Tc/T)
Qav = m*Qout Vo=Qav*T *60 Vs=Vi-Vo
min in/hr cfs ft 3 cfs ft 3 ft 3
5 9.95 1.03 309 1.00 0.35 106 202
10 7.72 0.80 479 0.75 0.27 159 320
15 6.52 0.67 607 0.67 0.24 212 394
20 5.60 0.58 695 0.63 0.22 265 429
25 4.98 0.51 772 0.60 0.21 318 454
30 4.52 0.47 841 0.58 0.21 371 469
35 4.08 0.42 886 0.57 0.20 425 461
40 3.74 0.39 928 0.56 0.20 478 450
45 3.46 0.36 966 0.56 0.20 531 435
50 3.23 0.33 1,002 0.55 0.19 584 418
55 3.03 0.31 1,034 0.55 0.19 637 397
60 2.86 0.30 1,064 0.54 0.19 690 374
70 2.59 0.27 1,124 0.54 0.19 796 328
80 2.39 0.25 1,186 0.53 0.19 902 284
90 2.23 0.23 1,245 0.53 0.19 1,008 236
100 2.08 0.21 1,290 0.53 0.19 1,114 175
110 1.96 0.20 1,337 0.52 0.18 1,221 116
120 1.83 0.19 1,362 0.52 0.18 1,327 35
Max Volume, ft 3 = 469
Delta Volume = (d/3)(A1+A2+(A1*A2)0.5)
Elevation d
Elevation
Area
Delta Volume
Cumulative
Volume
ft ft ft 2 ft 3 ft 3
4990.90 0 0 0
4991.00 0.10 114 4 4
4991.20 0.20 593 64 68
4991.40 0.20 1,423 196 264
4991.60 0.20 2,346 373 637
Required Detention Volume
Remington Annex
Fort Collins, CO
Detention Pond A
Elev81 - Elev80 (VolRequired-Vol80)+Elev80
Vol81 - Vo80
W.S. Elevation, ft = 4991.60
100-year Depth D, ft = 0.70
Top-of-Berm, ft = 4992.25
Freeboard , ft = 0.65
Orifice Flow Rate, Q (cfs) = CoAo(2gHo)0.5 Area of orifice Ao, ft2 = Q
Co = 0.6 Co(2gHo)0.5
Q = Qout of pond, cfs = 0.35
gravitational acceleration g, ft/sec 2 = 32.2
diam, ft = 0.374
Effective head on orifice Ho = D-1/2diam, ft = 0.51
Area of orifice Ao, ft 2 = 0.10
Area of orifice Ao, in 2 = 14.77
diam, in = 4.34 4 3
8
W.S. Elevation, ft =
inch diameter
opening
Orifice Opening
Calculations by: SME
Date: 12/19/2012 C:\Users\Sam\Dropbox\Projects\B11010-RemAnnex\Drainage\Prelim Submittal-2\B11010-Runoff.xlsx
Remington Annex
Fort Collins, CO
Detention Pond B
100 year storm into detention facility B
Area (sf) Area (acres) Q100 C100*Area %I
3337 0.077 0.607 0.06 89%
Release rate out of detention system based on
Qout (cfs) cfs/acre Tc (min)
0.157 2.05 5
Rainfall
Intensity
Inflow
Volume
Adjustment
Factor
Average
Outflow Rate
Outflow
Volume
Required
Storage
Volume
I Vi=(Qin*T*60)
m= 0.5(1 +
Tc/T)
Qav = m*Qout Vo=Qav*T *60 Vs=Vi-Vo
min in/hr cfs ft 3 cfs ft 3 ft 3
5 9.95 0.61 182 1.00 0.16 47 135
10 7.72 0.47 282 0.75 0.12 71 212
15 6.52 0.40 358 0.67 0.10 94 264
20 5.60 0.34 410 0.63 0.10 118 292
25 4.98 0.30 455 0.60 0.09 141 314
30 4.52 0.28 496 0.58 0.09 165 331
35 4.08 0.25 522 0.57 0.09 188 334
40 3.74 0.23 547 0.56 0.09 212 335
45 3.46 0.21 570 0.56 0.09 235 334
50 3.23 0.20 591 0.55 0.09 259 332
55 3.03 0.18 610 0.55 0.09 282 327
60 2.86 0.17 628 0.54 0.08 306 322
70 2.59 0.16 663 0.54 0.08 353 310
80 2.39 0.15 699 0.53 0.08 400 299
90 2.23 0.14 734 0.53 0.08 447 287
100 2.08 0.13 761 0.53 0.08 494 267
110 1.96 0.12 789 0.52 0.08 541 248
120 1.83 0.11 803 0.52 0.08 588 215
Max Volume, ft 3 = 335
Delta Volume = (d/3)(A1+A2+(A1*A2)0.5)
Elevation d
Elevation
Area
Delta Volume
Cumulative
Volume
ft ft ft 2 ft 3 ft 3
4991.20 0 0 0
4991.30 0.10 50 2 2
4991.50 0.20 499 47 49
4991.70 0.20 1,213 166 215
4991.90 0.20 1,948 313 528
Required Detention Volume
Remington Annex
Fort Collins, CO
Detention Pond B
Elev81 - Elev80 (VolRequired-Vol80)+Elev80
Vol81 - Vo80
W.S. Elevation, ft = 4991.90
100-year Depth D, ft = 0.70
Top-of-Berm, ft = 4991.75
Freeboard , ft = -0.15
Orifice Flow Rate, Q (cfs) = CoAo(2gHo)0.5 Area of orifice Ao, ft2 = Q
Co = 0.6 Co(2gHo)0.5
Q = Qout of pond, cfs = 0.16
gravitational acceleration g, ft/sec 2 = 32.2
diam, ft = 0.246
Effective head on orifice Ho = D-1/2diam, ft = 0.58
Area of orifice Ao, ft 2 = 0.04
Area of orifice Ao, in 2 = 6.17
diam, in = 2.80 2 6
8
inch diameter
opening
W.S. Elevation, ft =
Orifice Opening
Calculations by: SME
Date: 12/19/2012 C:\Users\Sam\Dropbox\Projects\B11010-RemAnnex\Drainage\Prelim Submittal-2\B11010-Runoff.xlsx
APPENDIX C
Hydraulic Analyses
Channel Report
Hydraflow Express Extension for AutoCAD® Civil 3D® 2012 by Autodesk, Inc. Tuesday, Dec 6 2011
<Name>
Triangular
Side Slopes (z:1) = 40.00, 40.00
Total Depth (ft) = 0.25
Invert Elev (ft) = 100.00
Slope (%) = 0.50
N-Value = 0.012
Calculations
Compute by: Known Depth
Known Depth (ft) = 0.25
Highlighted
Depth (ft) = 0.25
Q (cfs) = 5.468
Area (sqft) = 2.50
Velocity (ft/s) = 2.19
Wetted Perim (ft) = 20.01
Crit Depth, Yc (ft) = 0.25
Top Width (ft) = 20.00
EGL (ft) = 0.32
0 2 4 6 8 10 12 14 16 18 20 22 24
Elev (ft) Depth (ft)
Section
99.75 -0.25
100.00 0.00
100.25 0.25
100.50 0.50
100.75 0.75
101.00 1.00
Reach (ft)
COLLEGE AVENUE
LAUREL STREET
PLUM STREET
REMINGTON STREET
PROJECT SITE
COLORADO
STATE
UNIVERSITY
MATTHEWS STREET
PETERSON STREET
WHEDBEE STREET
MYRTLE STREET
PREPARED FOR: DATE SUBMITTED:
The engineer preparing these plans will not be responsible for, or
liable for, unauthorized changes to or uses of these plans. All
changes to the plans must be in writing and must be approved by
the preparer of these plans.
CAUTION
MAXIIIMO DEVELOPMENT GROUP LLC 12/19/2012
REMINGTON ANNEX
7
B11010
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
Civil Engineering & Consulting
1501 Academy Court, Suite 204
Fort Collins, CO 80524
(970) 217-7420
www.bluesky-engineer.com
BLUE SKY
E n g i n e e r i n g
LEGEND
DRAINAGE PLAN
DR01
4
EXISTING ITEMS
PROPOSED ITEMS
SCALE: 1"=400'
VICINITY MAP
NOTES
RUNOFF SUMMARY TABLE
POND SUMMARY TABLE
Rainfall
Duration (T)
Qin=
∑C100*Area*I
Comments
Based only on additional impervious area.
Comments
Based on 2 yr historic release rate of new impervious
Detention Volume and Depth
Calculations by: SME
Date: 12/19/2012 C:\Users\Sam\Dropbox\Projects\B11010-RemAnnex\Drainage\Prelim Submittal-2\B11010-Runoff.xlsx
Rainfall
Duration (T)
Qin=
∑C100*Area*I
Detention Volume and Depth
Comments
Based only on additional impervious area.
Based on 2 yr historic release rate of new impervious
Comments
Calculations by: SME
Date: 12/19/2012 C:\Users\Sam\Dropbox\Projects\B11010-RemAnnex\Drainage\Prelim Submittal-2\B11010-Runoff.xlsx
Initial Overland Flow Time (ti) Travel/Channelized Time of Flow (tt)
Initial
Ground
Type
C5
(1)
Cv
ti+tt
Calculations by: SME
Date: 12/19/2012 C:\Users\Sam\Dropbox\Projects\B11010-RemAnnex\Drainage\Prelim Submittal-2\B11010-Runoff-existing.xlsx
Basin
Initial Overland Flow Time (ti) Travel/Channelized Time of Flow (tt)
Design
Pt.
Initial
Ground
Type
C5
(1)
Cv
ti+tt
Calculations by: SME
Date: 12/19/2012 C:\Users\Sam\Dropbox\Projects\B11010-RemAnnex\Drainage\Prelim Submittal-2\B11010-Runoff.xlsx
Pond B 335 528 4991.20 4991.90 4992.50 0.60
Totals 805 1165