HomeMy WebLinkAboutBANNER HEALTH MEDICAL CAMPUS - PDP - PDP130003 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTJanuary 23, 2013 PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT BANNER HEALTH MEDICAL CAMPUS Fort Collins, Colorado Prepared for: Banner Health 1801 16th Street Greeley, CO 80631 Prepared by: 200 South College Avenue, Suite 10 Fort Collins, Colorado 80524 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 306-003  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. January 23, 2013 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Preliminary Drainage and Erosion Control Report for BANNER HEALTH MEDICAL CAMPUS Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies the Project Development Plan submittal for the proposed Banner Health Medical Campus development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Aaron Cvar, PE Project Engineer Banner Health Medical Campus Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 2 C. Floodplain.......................................................................................................................................... 4 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4 A. Major Basin Description .................................................................................................................... 4 B. Sub-Basin Description ....................................................................................................................... 4 III. DRAINAGE DESIGN CRITERIA ................................................................................... 5 A. Regulations........................................................................................................................................ 5 B. Four Step Process .............................................................................................................................. 5 C. Development Criteria Reference and Constraints ............................................................................ 5 D. Hydrological Criteria ......................................................................................................................... 6 E. Hydraulic Criteria .............................................................................................................................. 6 F. Floodplain Regulations Compliance .................................................................................................. 6 G. Modifications of Criteria ................................................................................................................... 6 IV. DRAINAGE FACILITY DESIGN .................................................................................... 6 A. General Concept ............................................................................................................................... 6 B. Master Drainage Concepts ................................................................................................................ 8 C. Specific Details .................................................................................................................................. 9 V. CONCLUSIONS ...................................................................................................... 10 A. Compliance with Standards ............................................................................................................ 10 B. Drainage Concept ............................................................................................................................ 10 References ....................................................................................................................... 11 EROSION CONTROL REPORT ............................................................................................ 19 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Storm Sewers (reserved for future use) B.2 – Inlets (reserved for future use) APPENDIX C – Water Quality Design Computations APPENDIX D – SWMM Analysis APPENDIX F –Erosion Control Report Banner Health Medical Campus Preliminary Drainage Report LIST OF TABLES AND FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2– Proposed Site Plan ................................................................................................ 3 Figure 3 – Existing Floodplains ............................................................................................. 4 Table 1 - SWMM Pond Modeling Summary; Interim Conditions………………………………………8 Table 2 - SWMM Pond Modeling Summary; Full Build-Out Conditions.……………………….…..…9 Table 3 - Water Quality Pond Summary…………………………………………………………………9 MAP POCKET: Drainage Exhibits Banner Health Medical Campus Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. The project site is located in the northwest quarter of Section 4, Township 6 South, Range 68 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is located just southeast of the intersection of East Harmony Road and Lady Moon Drive. 4. The project site lies within the East Harmony portion of the McClellands Creek Master Drainage Basin. Per the “East Harmony Portion of the McClellands Creek Master Drainage Plan Update”, by Icon Engineering, August 1999 (Ref. 6), onsite detention is required with a release rate of 0.5 cfs per acre in the 100-year storm event. 5. Areas directly adjacent to the project site on the west, south and east are currently undeveloped. The existing Hewlett Packard campus is located just north of the project site on the north side of Harmony Road. Banner Health Medical Campus Preliminary Drainage Report 2 B. Description of Property 1. The subject property is approximately 33 net acres. Figure 1 – Aerial Photograph 2. The subject property currently consists of vacant ground. The ground cover generally consists of open pasture and some native seeding. Existing ground slopes are generally mild (i.e., 1 to 5±%) through the interior of the property. General topography slopes from west to east towards the Fossil Creek Reservoir Inlet Ditch. 3. According to the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey, the site consists of Paoli fine sandy loam, which falls into Hydrologic Soil Group B. 4. The proposed project will develop the majority of the existing site, constructing a medical campus. Parking areas and associated utilities will be constructed. Detention/water quality ponds will be constructed at the northeast and southeast corners of the site. Banner Health Medical Campus Preliminary Drainage Report 3 Figure 2– Proposed Site Plan 5. The Fossil Creek Reservoir Inlet Ditch is located roughly 1400 feet east of the project site, and runs parallel to the site from north to south. There are no other major irrigation ditches or related facilities in the vicinity of the project site. 6. The proposed land use is comprised entirely of a medical campus. Banner Health Medical Campus Preliminary Drainage Report 4 C. Floodplain 1. The Cache La Poudre River 100-year floodplain lies approximately 2000 feet offsite to the east. No portion of the subject property is encroached by any City or FEMA jurisdictional floodplain. Figure 3 – Existing Floodplains 2. It is noted that the vertical datum utilized for site survey work is the City of Fort Collins Benchmark #7-01 (Elevation=4911.33, Ft. Collins NGVD 29). II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The project site is located within the East Harmony portion of the McClellands Creek Master Drainage Basin. B. Sub-Basin Description 2. The subject property historically drains overland towards the Fossil Creek Reservior Inlet Ditch, located roughly 1400 feet east of the project site. A more detailed description of the project drainage patterns follows in Section IV.A.4., below. 3. Areas to the east of the site drain into an existing storm line within Lady Moon Drive and are conveyed south in the existing storm system. Drainage from East Harmony Road to the north of the site is conveyed east via the roadside ditch running along the south side of East Harmony Road. There is an existing storm line that begins just west of Cinquefoil Lane and runs roughly 500 feet east which conveys drainage from the roadside ditch. PROJECT SITE Banner Health Medical Campus Preliminary Drainage Report 5 III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the proposed project. B. Four Step Process The overall stormwater management strategy employed with the proposed project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed by implementing multiple Low Impact Development (LID) strategies including: Conserving existing amenities in the site including the existing vegetated areas. Providing vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through vegetated swales to increase time of concentration, promote infiltration and provide initial water quality. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, urban development of this intensity will still generate stormwater runoff that will require additional BMPs and water quality treatment. All stormwater runoff from the site will ultimately be routed to onsite water quality ponds, where it will be treated prior to exiting the site and entering the storm collection system. Step 3 – Stabilize Drainageways There are no major drainageways within the subject property. While this step may not seem applicable to proposed development, the project indirectly helps achieve stabilized drainageways nonetheless. By providing water quality where none previously existed, sediment with erosion potential is removed from the downstream drainageway systems and receiving Fossil Creek Reservoir Inlet Ditch. Furthermore, this project will pay one- time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve City-wide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will require the need for site specific source controls including: Localized trash enclosures throughout the site for the disposal of waste products. C. Development Criteria Reference and Constraints The subject property is bounded on several sides by currently developed properties and existing public streets. As such, several constraints have been identified during the course of this analysis that will impact the proposed drainage system including: Banner Health Medical Campus Preliminary Drainage Report 6 Existing elevations along property lines will generally be maintained. Overall drainage patterns of the existing site will be maintained. Elevations of existing downstream facilities that the subject property will release to will be maintained. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the proposed development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. Three separate design storms have been utilized to address distinct drainage scenarios. A fourth design storm has also been computed for comparison purposes. The first design storm considered is the 80th percentile rain event, which has been employed to design the project’s water quality features. The second event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The third event considered is the “Major Storm,” which has a 100-year recurrence interval. The fourth storm computed, for comparison purposes only, is the 10-year event. 4. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property maintains historic drainage patterns. 2. All drainage facilities proposed with the project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated above the subject property is not located in a FEMA regulatory floodplain. 4. The proposed project does not propose to modify any natural drainageways. F. Floodplain Regulations Compliance 1. As previously mentioned, all structures are located outside of any FEMA100-year floodplain, and thus the structures are not subject to any floodplain regulations. G. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the project drainage design are to maintain existing drainage patterns, ensure no adverse impacts to any adjacent properties, and to maintain the detention concepts as outlined in the “Harmony Portion of the McClellands Creek Master Drainage Plan Update”, by Icon Engineering, August 1999 (Ref. 6). 2. Areas to the west of the site are intercepted by a storm line system within Lady Moon Banner Health Medical Campus Preliminary Drainage Report 7 Drive and do not flow through the site. East Harmony Road and areas to the north of the site drain into a roadside swale along the south side of East Harmony Road and do not drain through the site. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. The drainage patterns anticipated for proposed drainage basins are described below. Basin 1 Basin 1 consists of landscaped and paved parking areas, and drains into the proposed Pond 1. Basin 2 Basin 2 consists of landscaped, paved parking areas and drives, and drains into the proposed Pond 1. Basin 3 Basin 2 consists of landscaped, paved parking areas and drives, and a proposed helipad. This basin drains into the proposed Pond 1. Basin 4 Basin 4 consists of landscaped areas, paved drives, and public street. This basin drains offsite into the roadside ditch running along the south side of East Harmony Road. Due to grading constraints this 0.50 acres of area (0.24 acres of public R.O.W. - Cinquefoil Lane, 0.26 acres of the project site) must drain north into East Harmony Road R.O.W. Basin 5 Basin 5 consists of rooftop area, and drains into the proposed Pond 1. Basin 6 Basin 6 consists of rooftop area, and drains into the proposed Pond 2. Basin 7 Basin 7 consists of landscaped, paved parking areas and drives, and drains into the proposed Pond 2. Basin 8 Basin 8 consists of landscaped area, and drains into the proposed Pond 2. Basin 9 Basin 9 consists of landscaped areas, paved drives, and public street. This basin drains offsite into Regional Pond 3. Due to grading constraints, this area must drain into Cinquefoil Lane. Drainage will be collected in a storm collection system with Cinquefoil Lane, and directed east into Regional Pond 3. Basin 10 Basin 10 consists of the proposed Pond 2. Banner Health Medical Campus Preliminary Drainage Report 8 Basin 11 Basin 11 consists of 0.21 acres of LeFever Drive R.O.W. and drains into the existing storm collection system within Lady Moon Drive. Basin 12 Basin 12 consists of 0.76 acres of LeFever Drive R.O.W. Drainage will be collected in a storm collection system with Cinquefoil Lane, and directed east into Regional Pond 3. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Master Drainage Concepts 1. The intent of the master drainage plan done with this PDP submittal was to demonstrate overall drainage concepts for the sites adjacent to the current project site. The currently proposed detention ponds must work in conjunction with future ponds to the south (Ponds 4 and 5), and both the currently proposed Interim Regional Pond 3 as well as the future (full build-out) Pond 3. The computer model EPA SWMM 5 has been utilized to model the overall drainage system.Tables 1 and 2, below summarize master drainage SWMM modeling results. SWMM output is provided in the Appendix of this report. A full-size copy of the Master Drainage Exhibit can be found in the Map Pocket at the end of this report. Table 1 – SWMM Pond Modeling Summary; Interim Conditions Pond ID Detention Water Quality Total Volume Peak Volume Capture Volume Release Rate (AC-FT) (AC-FT) (AC-FT) (CFS) 1 2.92 0.43 3.35 5.80 2 0.91 0.40 1.31 52.80 3 (Interim) 3.56 0.11 3.67 14.00 Banner Health Medical Campus Preliminary Drainage Report 9 Table 2 – SWMM Pond Modeling Summary; Full Build-Out Conditions Pond ID Detention Water Quality Total Volume Peak Volume Capture Volume Release Rate (AC-FT) (AC-FT) (AC-FT) (CFS) 1 2.92 0.43 3.35 5.80 2 0.91 0.40 1.31 52.80 3 7.70 0.80 8.50 29.30 4 1.26 0.15 1.41 1.20 5 1.47 0.20 1.67 1.40 C. Specific Details 1. Water quality treatment is being provided for the proposed development in the form of extended detention as previously described. Further documentation of treatment volumes and removal rates of stormwater BMPs will be documented with the Final Drainage Report prepared during the City FCP process. Final design details, construction documentation, and Standard Operating Procedures (SOP) Manual shall be provided to the City of Fort Collins for review prior to Final Development Plan approval. A final copy of the approved SOP manual shall be provided to City and must be maintained on-site by the entity responsible for the facility maintenance. Annual reports must also be prepared and submitted to the City discussing the results of the maintenance program (i.e. inspection dates, inspection frequency, volume loss due to sedimentation, corrective actions taken, etc.). 2. Table 1, below, summarizes the water quality information for the proposed water quality ponds. Table 3 – Water Quality Pond Summary Pond ID Water Quality Water Quality Pond Spillway Top of Pond Capture Volume WSEL Elevation Elevation (AC-FT) (FT) (FT) (FT) 1 0.43 4900.20 4905.10 4905.60 2 0.40 4902.60 4905.00 4905.80 3 (Interim) 0.11 4887.20 4893.00 4894.00 3. Proper maintenance of the drainage facilities designed with the proposed development is a critical component of their ongoing performance and effectiveness. The water quality pond may be easily accessed by maintenance staff via the gentle slope provided at the southwest corners of Ponds 1 and 2 to the bottom of the pond. Banner Health Medical Campus Preliminary Drainage Report 10 Current grading shown for Regional Pond 3 represents an interim grading plan. At full-build out for the pond, a gentle slope should be designed for ease of access. 4. The drainage features associated with the proposed project are all private facilities, located on private property, with the exception of the pond outfalls. Pond outfalls for Ponds 1 and 2 will be within Cinquefoil Land R.O.W. The outfall for Regional Pond 3 will be within the R.O.W. of Fossil Creek Reservoir Inlet Ditch. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the proposed project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with this project complies with the “East Harmony Portion of the McClellands Creek Master Drainage Plan Update”, by Icon Engineering, August 1999 (Ref. 6) 3. There are no regulatory floodplains within the proposed development. 4. The drainage plan and stormwater management measures proposed with the proposed development are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit any potential damage associated with its stormwater runoff by providing an extended detention water quality pond. 2. The drainage concept for the proposed development is consistent with the “East Harmony Portion of the McClellands Creek Master Drainage Plan Update”, by Icon Engineering, August 1999 (Ref. 6) Banner Health Medical Campus Preliminary Drainage Report 11 References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. 6. East Harmony Portion of the McClellands Creek Master Drainage Plan Update, Icon Engineering, August 1999. 7. Final Drainage and Erosion Control Report for Presidio Apartments, Northern Engineering, December 2009. APPENDIX A HYDROLOGIC COMPUTATIONS CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: 306-003 Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: ATC Asphalt ……....……………...……….....…...……………….…………………………………..0.95 100% Date: Concrete …….......……………….….……….………………..….………………………………0….95 90% Gravel ……….…………………….….…………………………..………………………………..0.50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year C f = 1.00 100-year C f = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. 1 145337 3.34 Note: Assumed 90% imperviousness for all basins 0.000 0.88 0.88 1.00 90% 2 261080 5.99 for preliminary calculations. 0.254 0.88 0.88 1.00 90% 3 91205 2.09 0.254 0.88 0.88 1.00 90% 4 21710 0.50 0.254 0.88 0.88 1.00 90% 5 66666 1.53 0.254 0.88 0.88 1.00 90% 6 126012 2.89 0.254 0.88 0.88 1.00 90% 7 328111 7.53 0.254 0.88 0.88 1.00 90% Overland Flow, Time of Concentration: Project: 306-003 Calculations By: Date: Gutter/Swale Flow, Time of Concentration: T t = L / 60V T c = T i + T t (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*C f (2-yr C f =1.00) C*C f (10-yr C f =1.00) C*C f (100-yr C f =1.25) Length, L (ft) Slope, S (%) T i 2-yr (min) T i 10-yr (min) T i 100-yr (min) Length, L Rational Method Equation: Project: 306-003 Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: 1 1 3.34 5 5 5 0.88 0.88 1.00 2.85 4.87 9.95 8.4 14.4 33.2 2 2 5.99 8 8 7 0.88 0.88 1.00 2.40 4.10 8.80 12.7 21.7 52.7 3 3 2.09 5 5 5 0.88 0.88 1.00 2.85 4.87 9.95 5.3 9.0 20.8 4 4 0.50 6 6 5 0.88 0.88 1.00 2.67 4.56 9.95 1.2 2.0 5.0 5 5 1.53 5 5 5 0.88 0.88 1.00 2.85 4.87 9.95 3.9 6.6 15.2 6 6 2.89 5 5 5 0.88 0.88 1.00 2.85 4.87 9.95 7.3 12.5 28.8 7 7 7.53 10 10 9 0.88 0.88 1.00 2.21 3.78 8.03 14.7 25.2 60.5 8 8 1.23 17 17 16 0.88 0.88 1.00 1.78 3.04 6.41 1.9 3.3 7.9 9 9 2.60 8 8 7 0.88 0.88 1.00 2.46 4.21 8.80 5.7 9.7 22.9 DEVELOPED RUNOFF COMPUTATIONS C 100 Design Point Flow, Q 100 (cfs) Flow, Q 2 (cfs) 10-yr T c (min) 2-yr T c (min) C 2 Flow, Q 10 (cfs) Intensity, i 100 (in/hr) Basin(s) ATC January 21, 2013 Intensity, i 10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C 10 Area, A (acres) Intensity, i 2 APPENDIX B HYDRAULIC COMPUTATIONS B.1 – Storm Sewers (reserved for future use) B.2 – Inlets (reserved for future use) APPENDIX B.1 STORM SEWERS (reserved for future use) APPENDIX B.2 INLETS (reserved for future use) APPENDIX C WATER QUALITY DESIGN COMPUTATIONS WATER QUALITY POND DESIGN CALCULATIONS POND 1 Project: 306-003 By: ATC Date: 1.21.13 REQUIRED STORAGE & OUTLET WORKS: BASIN AREA = 12.950 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 90.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.9000 <-- CALCULATED WQCV (watershed inches) = 0.401 <-- CALCULATED from Figure EDB-2 WQCV (ac-ft) = 0.433 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WQ Depth (ft) = ** <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = ** <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = ** <-- INPUT from Figure 5 n = ** <-- INPUT from Figure 5 t (in) = ** <-- INPUT from Figure 5 number of rows = ** <-- CALCULATED from WQ Depth and row spacing **To be completed at final design WATER QUALITY POND DESIGN CALCULATIONS POND 2 Project: 306-003 By: ATC Date: 1.21.13 REQUIRED STORAGE & OUTLET WORKS: BASIN AREA = 12.790 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 90.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.9000 <-- CALCULATED WQCV (watershed inches) = 0.401 <-- CALCULATED from Figure EDB-2 WQCV (ac-ft) = 0.428 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WQ Depth (ft) = ** <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = ** <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = ** <-- INPUT from Figure 5 n = ** <-- INPUT from Figure 5 t (in) = ** <-- INPUT from Figure 5 number of rows = ** <-- CALCULATED from WQ Depth and row spacing **To be completed at final design WATER QUALITY POND DESIGN CALCULATIONS POND 3 Project: 306-003 By: ATC Date: 1.21.13 REQUIRED STORAGE & OUTLET WORKS: BASIN AREA = 3.360 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 90.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.9000 <-- CALCULATED WQCV (watershed inches) = 0.401 <-- CALCULATED from Figure EDB-2 WQCV (ac-ft) = 0.112 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 WQ Depth (ft) = ** <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = ** <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = ** <-- INPUT from Figure 5 n = ** <-- INPUT from Figure 5 t (in) = ** <-- INPUT from Figure 5 number of rows = ** <-- CALCULATED from WQ Depth and row spacing **To be completed at final design APPENDIX D SWMM ANALYSIS 1 2 3 5 6 out1 out2 out3 mh2 mh3 FCRID pond1 pond2 pond3 FtCollins-100-yr 11/21/2012 00:15:00 SWMM 5 Page 1 EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.022) -------------------------------------------------------------- ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ NOV-21-2012 00:00:00 Ending Date .............. NOV-21-2012 06:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:15:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 30.00 sec ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 8.898 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 0.331 0.136 Surface Runoff ........... 8.414 3.470 Final Surface Storage .... 0.221 0.091 Continuity Error (%) ..... -0.769 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 8.414 2.742 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 5.565 1.813 Internal Outflow ......... 0.000 0.000 Storage Losses ........... 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 2.845 0.927 Continuity Error (%) ..... 0.051 ******************************** Highest Flow Instability Indexes ******************************** Link out2 (37) Link 6 (28) ************************* Routing Time Step Summary ************************* Minimum Time Step : 30.00 sec SWMM 5 Page 1 Average Time Step : 30.00 sec Maximum Time Step : 30.00 sec Percent in Steady State : 0.00 Average Iterations per Step : 1.00 *************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------------------------- Total Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Coeff Subcatchment in in in in in 10^6 gal CFS -------------------------------------------------------------------------------------------------------- 1 3.67 0.00 0.00 0.14 3.47 1.22 121.50 0.946 2 3.67 0.00 0.00 0.14 3.47 1.21 120.63 0.946 3 3.67 0.00 0.00 0.13 3.47 0.32 33.16 0.946 ****************** Node Depth Summary ****************** --------------------------------------------------------------------- Average Maximum Maximum Time of Max Depth Depth HGL Occurrence Node Type Feet Feet Feet days hr:min --------------------------------------------------------------------- mh2 JUNCTION 0.29 0.32 101.32 0 02:08 mh3 JUNCTION 0.41 0.98 99.98 0 00:47 FCRID OUTFALL 0.00 0.00 96.00 0 00:00 pond1 STORAGE 1.91 2.38 107.38 0 02:08 pond2 STORAGE 0.34 2.54 107.54 0 00:47 pond3 STORAGE 1.93 2.50 99.50 0 02:09 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Lateral Total Time of Max Inflow Inflow Inflow Inflow Occurrence Volume Volume Node Type CFS CFS days hr:min 10^6 gal 10^6 gal ------------------------------------------------------------------------------------- mh2 JUNCTION 0.00 5.77 0 02:08 0.000 0.761 mh3 JUNCTION 0.00 57.95 0 00:47 0.000 1.965 FCRID OUTFALL 0.00 13.99 0 02:09 0.000 1.813 pond1 STORAGE 121.50 121.50 0 00:40 1.220 1.220 pond2 STORAGE 120.63 120.63 0 00:40 1.205 1.205 pond3 STORAGE 33.16 83.61 0 00:40 0.317 2.281 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- pond1 STORAGE 6.01 2.384 7.616 pond2 STORAGE 6.01 2.535 7.465 ********************* Node Flooding Summary SWMM 5 Page 2 ********************* No nodes were flooded. ********************** Storage Volume Summary ********************** -------------------------------------------------------------------------------------------- Average Avg E&I Maximum Max Time of Max Maximum Volume Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------------- pond1 89.442 4 0 127.940 6 0 02:08 5.77 pond2 3.254 1 0 40.205 6 0 00:46 53.03 pond3 102.171 4 0 156.012 6 0 02:08 13.99 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg. Max. Total Freq. Flow Flow Volume Outfall Node Pcnt. CFS CFS 10^6 gal ----------------------------------------------------------- FCRID 97.23 11.53 13.99 1.813 ----------------------------------------------------------- System 97.23 11.53 13.99 1.813 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- 5 CONDUIT 5.77 0 02:08 7.48 0.00 0.03 6 CONDUIT 57.95 0 00:47 14.96 0.02 0.10 out1 DUMMY 5.77 0 02:08 out2 DUMMY 53.03 0 00:47 out3 DUMMY 13.99 0 02:09 ************************* Conduit Surcharge Summary ************************* No conduits were surcharged. Analysis begun on: Mon Jan 21 13:01:14 2013 Analysis ended on: Mon Jan 21 13:01:14 2013 Total elapsed time: < 1 sec SWMM 5 Page 3 1 2 3 4 5 5 6 out1 out2 out3 out4 out5 mh2 mh3 FCRID pond1 pond2 pond3 pond4 pond5 FtCollins-100yr 11/21/2012 00:15:00 SWMM 5 Page 1 EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.022) -------------------------------------------------------------- ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ NOV-21-2012 00:00:00 Ending Date .............. NOV-21-2012 06:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:15:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 30.00 sec ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 18.508 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 0.758 0.150 Surface Runoff ........... 17.435 3.457 Final Surface Storage .... 0.457 0.091 Continuity Error (%) ..... -0.772 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 17.435 5.681 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 11.247 3.665 Internal Outflow ......... 0.000 0.000 Storage Losses ........... 0.000 0.000 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 6.183 2.015 Continuity Error (%) ..... 0.026 ******************************** Highest Flow Instability Indexes ******************************** Link out2 (37) Link 6 (26) ************************* Routing Time Step Summary ************************* Minimum Time Step : 30.00 sec Average Time Step : 30.00 sec Total Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Coeff Subcatchment in in in in in 10^6 gal CFS -------------------------------------------------------------------------------------------------------- 1 3.67 0.00 0.00 0.14 3.47 1.22 121.50 0.946 2 3.67 0.00 0.00 0.14 3.47 1.21 120.63 0.946 3 3.67 0.00 0.00 0.14 3.47 2.24 216.06 0.945 4 3.67 0.00 0.00 0.21 3.40 0.47 47.21 0.928 5 3.67 0.00 0.00 0.21 3.40 0.55 54.75 0.928 ****************** Node Depth Summary ****************** --------------------------------------------------------------------- Average Maximum Maximum Time of Max Depth Depth HGL Occurrence Node Type Feet Feet Feet days hr:min --------------------------------------------------------------------- mh2 JUNCTION 0.29 0.32 101.32 0 02:08 mh3 JUNCTION 0.46 1.00 100.00 0 00:47 FCRID OUTFALL 0.00 0.00 96.00 0 00:00 pond1 STORAGE 1.91 2.38 107.38 0 02:08 pond2 STORAGE 0.34 2.54 107.54 0 00:47 pond3 STORAGE 1.62 2.12 99.12 0 02:07 pond4 STORAGE 2.50 2.96 107.96 0 02:12 pond5 STORAGE 2.93 3.43 108.43 0 02:12 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Lateral Total Time of Max Inflow Inflow Inflow Inflow Occurrence Volume Volume Node Type CFS CFS days hr:min 10^6 gal 10^6 gal ------------------------------------------------------------------------------------- mh2 JUNCTION 0.00 5.77 0 02:08 0.000 0.761 mh3 JUNCTION 0.00 60.24 0 00:47 0.000 2.334 FCRID OUTFALL 0.00 29.31 0 02:07 0.000 3.665 pond1 STORAGE 121.50 121.50 0 00:40 1.220 1.220 pond2 STORAGE 120.63 120.63 0 00:40 1.205 1.205 pond3 STORAGE 216.06 268.29 0 00:40 2.240 4.573 pond4 STORAGE 47.21 47.21 0 00:40 0.471 0.471 pond5 STORAGE 54.75 54.75 0 00:40 0.545 0.545 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- pond1 STORAGE 6.01 2.384 7.616 pond2 STORAGE 6.01 2.535 7.465 pond4 STORAGE 6.01 2.965 7.035 pond5 STORAGE 6.01 3.430 6.570 ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** pond1 89.442 4 0 127.940 6 0 02:08 5.77 pond2 3.254 1 0 40.205 6 0 00:46 53.03 pond3 217.800 3 0 336.791 4 0 02:06 29.31 pond4 42.519 7 0 54.939 9 0 02:11 1.24 pond5 49.801 8 0 63.953 10 0 02:12 1.36 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg. Max. Total Freq. Flow Flow Volume Outfall Node Pcnt. CFS CFS 10^6 gal ----------------------------------------------------------- FCRID 97.23 23.31 29.31 3.665 ----------------------------------------------------------- System 97.23 23.31 29.31 3.665 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- 5 CONDUIT 5.77 0 02:08 7.48 0.00 0.03 6 CONDUIT 60.24 0 00:48 15.10 0.02 0.10 out1 DUMMY 5.77 0 02:08 out2 DUMMY 53.03 0 00:47 out3 DUMMY 29.31 0 02:07 out4 DUMMY 1.24 0 02:12 out5 DUMMY 1.36 0 02:12 ************************* Conduit Surcharge Summary ************************* No conduits were surcharged. Analysis begun on: Mon Jan 21 12:54:22 2013 Analysis ended on: Mon Jan 21 12:54:22 2013 Total elapsed time: < 1 sec SWMM 5 Page 3 APPENDIX E EROSION CONTROL REPORT River District Block One Mixed Use Preliminary Erosion Control Report EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on the Utility Plans. The Final Plans will contain a full-size Erosion Control sheet as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in the Development Agreement for the development. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, prior to any earth disturbance activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. River District Block One Mixed Use Preliminary Erosion Control Report MAP POCKET DRAINAGE EXHIBITS Storage Volume Summary ********************** -------------------------------------------------------------------------------------------- Average Avg E&I Maximum Max Time of Max Maximum Volume Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------------- SWMM 5 Page 2 Maximum Time Step : 30.00 sec Percent in Steady State : 0.00 Average Iterations per Step : 1.00 *************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------------------------- SWMM 5 Page 1 (in/hr) 100-yr T c (min) Q  C f  C  i  A  (ft) Slope, S (%) Velocity, V (ft/s) T t (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) T t (min) 2-yr T c (min) 10-yr T c (min) 100-yr T c (min) 1 1 No 0.95 0.95 1.00 50 2.00% 1.6 1.6 1.0 0 0.50% N/A N/A 287 1.50% 1.84 2.6 5 5 5 2 2 No 0.95 0.95 1.00 130 2.00% 2.5 2.5 1.7 469 0.50% 1.41 5.5 0 N/A N/A N/A 8 8 7 3 3 No 0.95 0.95 1.00 122 2.00% 2.5 2.5 1.6 177 0.50% 1.41 2.1 0 N/A N/A N/A 5 5 5 4 4 No 0.95 0.95 1.00 53 2.00% 1.6 1.6 1.1 372 0.50% 1.41 4.4 0 N/A N/A N/A 6 6 5 5 5 No 0.95 0.95 1.00 197 1.00% 3.9 3.9 2.6 0 0.50% N/A N/A 0 N/A N/A N/A 5 5 5 6 6 No 0.95 0.95 1.00 156 1.00% 3.5 3.5 2.3 0 0.50% N/A N/A 0 N/A N/A N/A 5 5 5 7 7 No 0.95 0.95 1.00 193 2.00% 3.1 3.1 2.1 605 0.50% 1.41 7.1 0 N/A N/A N/A 10 10 9 8 8 No 0.25 0.25 0.31 141 2.00% 15.0 15.0 13.9 135 0.50% 1.41 1.6 0 N/A N/A N/A 17 17 16 9 9 No 0.95 0.95 1.00 91 5.00% 1.6 1.6 1.0 514 0.50% 1.41 6.1 0 N/A N/A N/A 8 8 7 10 10 No 0.95 0.95 1.00 154 2.00% 2.8 2.8 1.8 0 0.50% N/A N/A 175 1.00% 1.50 1.9 5 5 5 11 11 No 0.95 0.95 1.00 20 2.00% 1.0 1.0 0.7 148 0.50% 1.41 1.7 0 N/A N/A N/A 5 5 5 12 12 No 0.95 0.95 1.00 20 2.00% 1.0 1.0 0.7 781 0.50% 1.41 9.2 0 N/A N/A N/A 10 10 10 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow ATC January 21, 2013 Time of Concentration (Equation RO-4)   3 1 1 . 87 1 . 1 * S C Cf L Ti   8 53517 1.23 0.254 0.88 0.88 1.00 90% 9 113315 2.60 0.254 0.88 0.88 1.00 90% 10 49256 1.13 0.254 0.88 0.88 1.00 90% 11 9177 0.21 0.254 0.88 0.88 1.00 90% 12 33063 0.76 0.254 0.88 0.88 1.00 90% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year C f = 1.00 January 21, 2013