December 03, 2012
Mike McBride
1603 Oakridge Drive
Fort Collins, CO 80525
RE: Odell Brewery Parking Lot Expansion, PDP120032, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Ted Shepard, at 221‑6343 or
tshepard@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Ted Shepard, 970‑221‑6343, tshepard@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/03/2012
12/03/2012: Please see redlines.
Comment Number: 2 Comment Originated: 12/03/2012
12/03/2012: If the intent is to have low lighting levels, then please address the proposed
lighting under the Alternative Compliance provision that is available under Section 3.2.4(E).
The parking lot has an average of 1.69 foot-candle, as such it is in compliance with the
Land Use Code.
Department: Engineering Development Review
Contact: Andrew Gingerich, 970‑221‑6603, agingerich@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 11/27/2012
11/27/2012: The construction drawings should include an erosion control plan. Please include
in the set and add to the sheet index.
An erosion control plan has been included.
Comment Number: 4 Comment Originated: 11/27/2012
11/27/2012: Sheet C100: The plan shows removing existing concrete from west side of the
existing building. Does this need to be removed per these plans?
The plan has been updated to show the Cellar Charlie improvements correctly.
Comment Number: 5 Comment Originated: 11/27/2012
11/27/2012: Sheet C101: Which asphalt section is being proposed. It appears that there is
conflicting callouts on this sheet and the detail that is referred to shows two different pavement
sections.
The plans have been updated to show the temporary asphalt paving specified in the geotech report.
Comment Number: 6 Comment Originated: 11/27/2012
11/27/2012: Sheet C200: Text over text
Corrected.
Comment Number: 7 Comment Originated: 11/27/2012
11/27/2012: Sheet C300: Please label the elevations on the contours from Colorado Iron and
Metal. Additionally add a note or some way to denote that those contours are from another
project and not a part of these plans.
The contours have been labeled, and the contour style has been added to the legend.
Topic: Easements
Comment Number: 3 Comment Originated: 11/27/2012
11/27/2012: With the preparation of a subdivision plat it may be worthwhile dedicating
easements for the parking lot on the plat than by separate document.
Acknowledged.
Topic: Plat
Comment Number: 2 Comment Originated: 11/27/2012
11/27/2012: This area exists on property that has not yet been subdivided. A subdivision plat
will be required to construct the employee parking lot on this piece of property.
Acknowledged.
Department: PFA
Contact: Jim Lynxwiler, 970‑416‑2869, jlynxwiler@poudre‑fire.org
Topic: General
Comment Number: 01 Comment Originated: 11/27/2012
FIRE LANE SPECIFICATIONS
Maintain the required 20 foot minimum unobstructed width & 14 foot minimum overhead
clearance. For structures three stories or more in height: required fire lanes shall be 30 foot
wide minimum on at least one long side of the building.
Fire Lanes shall be designed as a flat, hard, all‑weather driving surface capable of supporting
40 tons. They shall be designated on the plat as an Emergency Access Easement.
Acknowledged.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970‑416‑2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/30/2012
11/30/2012: Please include a drainage plan in the plan set. The copy attached to the drainage
report is too small to read.
The drainage plan has been included.
Comment Number: 2 Comment Originated: 11/30/2012
11/30/2012: The detention pond calculations for the north pond were not included in the
drainage report.
The calculations have been added to Appendix B.
Department: Technical Services
Contact: Jeff County, 970‑221‑6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 3 Comment Originated: 11/28/2012
11/28/2012: Please correct the Basis Of Bearings statement on sheet C000.
The Basis of Bearing has been corrected
Comment Number: 4 Comment Originated: 11/28/2012
11/28/2012: Please correct the description on benchmark R402 of sheet C001.
Corrected.
Comment Number: 5 Comment Originated: 11/28/2012
11/28/2012: There are line over text issues on sheet C101.
Corrected.
Comment Number: 6 Comment Originated: 11/28/2012
11/28/2012: There is a text over text issues on sheet C200.
Corrected.
Topic: General
Comment Number: 1 Comment Originated: 11/28/2012
11/28/2012: This project is on unplatted property. Does this need to be platted?
A plat has been created.
Topic: Lighting Plan
Comment Number: 2 Comment Originated: 11/28/2012
11/28/2012: The plans need to be 24"x36" in size.
The lighting plan has been reformatted to 24” x 36”.
Department: Zoning
Contact: Noah Beals, 970‑416‑2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/28/2012
11/28/2012: The new parking area is not meeting the minimum 1 foot‑candle requirement.
The parking lot has an average of 1.69 foot-candle, as such it is in compliance with the
Land Use Code.