Loading...
HomeMy WebLinkAboutCOLORADO IRON & METAL EXPANSION (REPLAT) - PDP/FDP - FDP120002 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANS (16)W BUCKINGHAM STREET 4945 4945 4950 4955 4960 4950 4955 4960 50' SCALE: 1" = 50' 0 50' 4940 4940 4945 4950 4955 4960 4940 4945 4950 4955 4960 4940 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 4945 4950 4955 4960 4940 4945 4950 4955 4960 4940 LEFT FLOWLINE CENTERLINE RIGHT FLOWLINE SEE SHEET C8 SEE SHEET C8 NOTE: City of Fort Collins, Colorado UTILITY PLAN Approval These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City Engineer, or the City of Fort Collins for accuracy and corrections of the calculations. Furthermore, the review does not imply that the quantities of the items on the plans are the final quantities required. The review shall not be construed in any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. PLAN BUCKINGHAM STREET - STA 14+00 TO 24+68.53 PROFILE BUCKINGHAM STREET - STA 14+92.95 TO 24+68.53 SEE SHEET C8 SEE SHEET C8 NO. DATE BY REVISION 1 2 3 4 5 6 DESIGNED: DRAWN: CHECKED: PROJECT NO.: DATE: PRELIMINARY NOT FOR CONSTRUCTION SHEET: OF 5/30/2012 76-104 FORT COLLINS, COLORADO COLORADO IRON AND METAL C14 7 APPROV. 908 Laporte Avenue Fort Collins, CO 80521 (970) 219-2834 'PIKPGGTKPI 24+00 25+00 26+00 BUCKINGHAM STREET PLAN AND PROFILE C7 BG BG DD C:\Users\Johnny\Desktop\Apex Projects\76-104 - Colorado Iron and Metal - Final - Revision 1\DWG\Production\76-104-BUCKINGHAM.dwg, 5/31/2012 10:56:40 AM, Johnny