HomeMy WebLinkAboutCOLORADO IRON & METAL EXPANSION (REPLAT) - PDP/FDP - FDP120002 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANS (19)4950 4950
4955
4960
4965
4955
4960
4965
50'
SCALE: 1" = 50'
0 50'
4945 4945
4925
4930
4935
4940
4925
4930
4935
4940
14+00 13+00 12+00 11+00 10+00 14+00 13+00 12+00 11+00 10+00
PLAN - STORM LINES A AND B
PROFILE - STORM LINE A
City of Fort Collins, Colorado
UTILITY PLAN Approval
These plans have been reviewed by the City of Fort Collins for concept
only. The review does not imply responsibility by the reviewing
department, the City Engineer, or the City of Fort Collins for accuracy
and corrections of the calculations. Furthermore, the review does not
imply that the quantities of the items on the plans are the final quantities
required. The review shall not be construed in any reason as
acceptance of financial responsibility by the City of Fort Collins for
additional quantities of items shown that may be required during the
construction phase.
NOTES:
NO. DATE BY REVISION
1
2
3
4
5
6
DESIGNED:
DRAWN:
CHECKED:
PROJECT NO.:
DATE:
PRELIMINARY
NOT FOR
CONSTRUCTION
SHEET:
OF
5/30/2012
76-104
FORT COLLINS, COLORADO
COLORADO IRON AND METAL
C14
7
APPROV.
908 Laporte Avenue
Fort Collins, CO 80521
(970) 219-2834
'PIKPGGTKPI
PROFILE - STORM LINE B
STORM DRAIN A AND B - PLAN/PROFILE
C11
BG
BG
DD
C:\Users\Johnny\Desktop\Apex Projects\76-104 - Colorado Iron and Metal - Final - Revision 1\DWG\Production\76-104-STORM A AND B.dwg, 5/31/2012 10:41:31 AM, Johnny