Loading...
HomeMy WebLinkAboutHARMONY TECH PARK 3RD FILING, LOT 1 - FDP - FDP110008 - MAPS/GRAPHICS - LANDSCAPE PLAN (3)HIGH HYDROZONE MODERATE HYDROZONE LOW HYDROZONE PRECISION DRIVE TECHNOLOGY PARKWAY ROCK CREEK DRIVE LEGEND 0 15 30 60 HYDROZONE AREA WATER NEED ANNUAL WATER USE (s.f.) (gallons/s.f.) (gallons) HIGH 15,886 18 285,948 MODERATE 24,663 10 246,630 LOW 12,413 3 37,239 VERY LOW 0 0 0 TOTAL GALLONS 569,817 TOTAL S.F. 52,963 AVERAGE 10.76 GALLONS/S.F./SEASON GENERAL NOTES FOR HYDROZONE COMPLIANCE 1. Apply mulch at a maximum depth of three (3) inches. 2. An irrigation plan is required to be submitted at the same time as the landscape plan in accordance with the requirements in the Land Use Code Section 3.2.1.J(2). 3. When installing trees and shrubs, remove root ball wrapping materials (burlap, fabric, grow bags, twine, ties, wire basket, etc.) from the upper 12 inches or two-thirds of the root ball, whichever is greater after the tree or shrub is set in place. Note: The average needs to be a maximum of 15 gallons/S.F.season. HYDROZONE CHART