Loading...
HomeMy WebLinkAboutHARMONY TECH PARK 3RD FILING, LOT 1 - FDP - FDP110008 - SUBMITTAL DOCUMENTS - ROUND 1 -BHA Design Incorporated 1603 Oakridge Drive Fort Collins, CO 80525 Page 1 of 9 voice: 970.223.7577 fax: 970.223.1827 landscape architecture | planning | urban design www.bhadesign.com May 18, 2011 Mr. Ted Shepard Current Planning City of Fort Collins 281 North College Avenue Fort Collins, CO 80521 RE: Harmony Technology Park Third Filing, First Replat Dear Ted, We are pleased to submit the Final Plan and Subdivision Plat documents for your review for the Harmony Technology Park Third Filing, First Replat project in Harmony Technology Park. The following are responses to the PDP review comments: Department: Current Planning Contact: Ted Shepard, 970 221 6343, tshepard@fcgov.com Topic: Building Elevations Number: 5 Created: 03/28/2011 03/28/2011: The northwest entry needs to feature a prominent architectural element in order to form the plaza. Such element should break the long horizontal roofline. Response: Northwest corner entry element is prominent do to the height above the majority of the building, change in materials and rotation from the sidewalls. Number: 6 Created: 03/28/2011 03/28/2011: Please indicate how the roofline comprises a distinct top as required by Section 3.5.3(D)(6)(b) such as a cornice, different materials, sloping roof with overhangs and brackets or stepped parapets. Response: Roofline has a distinct top due to the stepped parapet elements and colored banding. Topic: General Number: 8 Created: 03/28/2011 03/28/2011: For the Parking Alternative Compliance request, it would be helpful to know just a bit more about the "growing local employer" in terms of type of business, number of employees, type of layout (cubicles, open shop floor, call center, software engineering, etc.). Will this employer be using any or all of the six overhead doors or will they be occupying the southern half of the building? I may be missing page 2 of the Alternatives and Exceptions Request. Response: Regarding the first item, the building is being designed specifically to house a primary tenant who will occupy over half (25,850 s.f.) of the building. The tenant is primarily an office use with some limited R&D space for their product designs. The tenant floor plans accommodate up to 145 employees (5.6 employees per 1000 sf). In addition, the design includes training rooms and meeting rooms for the tenant and its clients, customers and regular visitors. Based on these specific tenant needs, an Page 2 of 9 voice: 970.223.7577 fax: 970.223.1827 landscape architecture | planning | urban design www.bhadesign.com increased parking allowance is justified. Additional information has been previously submitted and can be found in the Alternatives and Exceptions Request. Topic: Landscape Plans Number: 2 Created: 03/28/2011 03/28/2011: Please add ornamental trees at 15 foot spacing from street lights. Response: Ornamental trees have been added at 15’ from existing street light locations. Number: 3 Created: 03/28/2011 03/28/2011: Please label the aforementioned seat walls, and other amenities associated with the northwest plaza on the Landscape Plan. Response: For clarity, the seat walls and other amenities are labeled on the site plan. Bike racks are labeled on both the site plan and the landscape plan. Due to the intensity of the landscape planting plan at the North West pedestrian plaza area the amenity labels were removed from the Landscape Plan. Topic: Lighting Plan Number: 7 Created: 03/28/2011 03/28/2011: On the Lighting Plan, please indicate the quantity of each fixture described in the Luminaire Schedule. For the point by point illuminance, I don't see where the basis is a light loss factor of 1.00. (Minor comment "distribution" is misspelled.) Response: Type B, quantity of 18. Type C Quantity of 6, Type F quantity of 10, type E quantity of 7, Type D quantity of 7. LLF = 0.7. Spelling has been corrected. Topic: Site Plan Number: 1 Created: 03/28/2011 03/28/2011: On the site plan, please label the seat walls in the northwest plaza. Per Section 3.5.3(B), the plaza must contain pedestrian amenities in order to qualify for the Exception to the Build to Line. Response: Seat walls and “feature walls” are shown and labeled on the Site Plan. Number: 4 Created: 03/28/2011 03/28/2011: The notes indicate 12 bike parking spaces but I don't see 12 spaces indicated on the Site Plan and Landscape Plans. Response: There are 6 bike racks indicated on the plan. Each bike rack will accommodate 2 bikes minimum each. Department: Engineering Development Review Contact: Marc Virata, 970 221 6567, mvirata@fcgov.com Topic: Construction Drawings Number: 1 Created: 03/22/2011 Page 3 of 9 voice: 970.223.7577 fax: 970.223.1827 landscape architecture | planning | urban design www.bhadesign.com 03/22/2011: The driveways appear to be designed like a public street with cross pans both on the horizontal control plan and the details sheets showing LCUASS drawings 708 and 710. Please ensure that driveways are shown in concrete to property line on the horizontal control plan sheets and provide LCUASS drawing 707 (708 and 710 don't appear to be needed). Response: The access driveways have been re-drawn to reflect Portland cement paving to the ROW. Drawing 707 has been added to the set, while details 708 & 710 have been removed. Number: 2 Created: 03/22/2011 03/22/2011: The proposal of crosswalk striping for the drive approach onto Technology Parkway is again similar to the previous comment in that it is more typical of a public street than a driveway. It would technically be proposing putting a crosswalk stripe on top of a sidewalk as the sidewalk continues across the driveway per LCUASS drawing 707. It's preferred that the crosswalk not be added as maintenance of the striping (and by whom?) would be an ongoing issue. Response: Crosswalks have been removed. Number: 3 Created: 03/22/2011 03/22/2011: The curb return radii for the driveway out to Technology Parkway is shown to be 20' while LCUASS Table 8 2 requires this to be 15'. Why isn't the radii matching the 15' shown on the other two driveways? Response: Radii have been corrected/changed to 15’. Number: 4 Created: 03/22/2011 03/22/2011: Final grades should demonstrate (with spot elevations, grade breaks, etc.) that no more than 750 square feet of pavement is graded to sheetflow across a public sidewalk out across the driveways. The initial contour information indicates that the 750 square foot rule might be exceeded. Response: The southeast access drive previously exceeded the 750 sf rule, but has been revised. Now, 747 sf of area will contribute runoff across the sidewalk, which meets the 750 sf requirement. Number: 5 Created: 03/22/2011 03/22/2011: Please ensure that the clear sidewalk width that traverses through the median for the driveway out to Technology Parkway is a minimum of 5' (absent of gutter on both sides of the opening). Response: The sidewalk width for the island is 5’. Please see added dimension on the horizontal control plan. Number: 9 Created: 03/22/2011 03/22/2011: The plans indicate that the project will be constructing a portion of sidewalk along the Custom Blending site that was required with Custom Blending. Was this part of an agreement with Custom Blending? Response: Per the staff review meeting, it is assumed that the contractor/developer will work with Custom Blending and the City to have the sidewalk installed within the Custom Blending property, prior to the construction of the HTP Flex Building project. Page 4 of 9 voice: 970.223.7577 fax: 970.223.1827 landscape architecture | planning | urban design www.bhadesign.com Therefore, the proposed sidewalk improvement has been removed from the HTP Flex project. It is also possible that the sidewalk will be constructed with the HTP Flex project while equipment is on-site to avoid mobilization charges for such a small item. Number: 10 Created: 03/22/2011 03/22/2011: The use of bitmapped graphics on the construction plan set (Colorado 811 and the vicinity map) are likely "scannability" concerns for reproducibility and electronic record keeping and should be revised. Response: Aspen has met with Technical Services (Jeff County) and a higher resolution graphic has been utilized and okayed by Mr. County. Number: 11 Created: 03/22/2011 03/22/2011: The title on the construction plan set for the legal description should reflect that this property is a replat of Lot 1 of Harmony Technology Park 3rd Filing. Response: Aspen met with Mr. County and Edmonds Land Surveying, with the official name of the project now being, “Harmony Technology Park Third Filing, First Replat”. Topic: General Number: 7 Created: 03/22/2011 03/22/2011: The title of all the plans should be consistent. Response: The official name has been distributed to all parties and should now be consistent. Number: 8 Created: 03/22/2011 03/22/2011: The plans show shaded circles at the PCs along the property boundary, are these intended to be design features or just indicting the PCs on paper? Response: The circles are property pins and have been reduced in size for clarity and better presentation. Topic: Plat Number: 6 Created: 03/22/2011 03/22/2011: The plat proposes the establishment of a building envelope. With the surrounding easements already being defined, it is suggested that the building envelope not be defined on the plat. We've found that creating a building envelope establishes a "hard line" as to where the building(s) can be situated. Any change to the building that would exceed the prescribed building envelope would require a replat the change the building envelope as there is no other tool to modify a prescribed building envelope on a plat. Response: Term building envelope has been removed from the plat. Department: Environmental Planning Contact: Lindsay Ex, 970 224 6143, lex@fcgov.com Topic: General Number: 1 Created: 03/22/2011 Page 5 of 9 voice: 970.223.7577 fax: 970.223.1827 landscape architecture | planning | urban design www.bhadesign.com 03/22/2011: No comments. Department: Forestry Contact: Tim Buchanan, 970 221 6361, tbuchanan@fcgov.com Topic: Landscape Plans Number: 1 Created: 04/11/2011 Street trees should be selected from the City Street Tree list. Quantities of species selected should follow minimum species diversity 3.2.1. D 3 Northern Red Oak does not do well in Fort Collins soils so another species should be considered for use in its place. Response: The Northern Red Oak was replaced with Swamp White Oak. The Landscape Plan includes two Emerald Queen Norway Maple trees which will be changed to American Linden in the construction drawings. Department: Light And Power Contact: Doug Martine, 970 224 6152, dmartine@fcgov.com Topic: General Number: 1 Created: 03/09/2011 03/09/2011: No comments from Light & Power. Department: PFA Contact: Carie Dann, 970 219 5337, CDANN@poudre fire.org Topic: General Number: 1 Created: 03/21/2011 03/21/2011: KNOX BOX LOCATIONS: Is the second (north) Knox Box located near the exterior door that provides access to the sprinkler riser room? Typically, the first Knox Box is located near the main entrance and the second Knox Box is near the riser room entry. Response: Both Knox Boxes are located near the exterior doors. However, the riser room is located approximately 110’ south of the north exterior door. Please refer to the utility plan for location of the riser room and knox boxes. Number: Created: 03/21/2011 03/21/2011: HYDRATN LOCATION: Please relocate the existing hydrant that is SE of the building, to an area near the FDC on the south side of the building (on the side of the drive aisle closer to the building). While the existing hydrant meets the distance requirement from the building, it is essentially unusable to supply the FDC, due to the tight turning radius (180 degree turn) coming from the street into the parking lot, then south to the FDC). Response: The FDC has been relocated to the north side of the building and has been positioned such that PFA can utilize one hose-length (200’) to provide connection from the existing fire hydrant (at SE corner of Precision/Tech.Parkway) to the proposed FDC riser location. Page 6 of 9 voice: 970.223.7577 fax: 970.223.1827 landscape architecture | planning | urban design www.bhadesign.com Number: Created: 03/21/2011 03/21/2011: NO PARKING FIRE LANE SIGNS: Please get together with me to discuss location of FIRE LANE NO PARKING signs. Response: Aspen has met w/ Ms. Dann and signs have been added accordingly. Department: Stormwater Engineering Contact: Wes Lamarque, 970 416 2418, wlamarque@fcgov.com Topic: General Number: 1 Created: 03/22/2011 03/22/2011: Stormwater is ready for a hearing. Number: 2 Created: 03/22/2011 03/22/2011: At final, the eastern swale needs to be designed carefully to make sure if will function as intended. Response: The eastern swale has been sized appropriately and all hydrologic and hydraulic calculations can be seen in the final drainage report. Department: Technical Services Contact: Jeff County, 970 221 6588, jcounty@fcgov.com Topic: Construction Drawings Number: 12 Created: 03/25/2011 03/25/2011: The sheet numbering on the index don't match the actual numbering on each sheet of the plans. Response: The sheet numbering has been revised to provide matching between the index and all sheets. Number: 13 Created: 03/25/2011 03/25/2011: The vicinity map on the cover sheet needs to be changed. Response: Aspen met with Mr. County and the City’s Street Map is now being utilized for the Vicinity Map. Department: Technical Services Contact: Jeff County, 970 221 6588, jcounty@fcgov.com Topic: Construction Drawings Number: 14 Created: 03/25/2011 03/25/2011: Please try to clean up the "811" image. Response: Aspen has met with Technical Services (Jeff County) and a higher resolution graphic has been utilized and okayed by Mr. County. Number: 15 Created: 03/25/2011 03/25/2011: There is an error in the description for benchmark 17 01 on sheet 2. Response: Aspen has corrected the benchmark description. Page 7 of 9 voice: 970.223.7577 fax: 970.223.1827 landscape architecture | planning | urban design www.bhadesign.com Number: 16 Created: 03/25/2011 03/25/2011: There are line over text issues on sheets 6 & 8. Response: These have been corrected. Number: 17 Created: 03/25/2011 03/25/2011: The Subdivision name on the Utility Plans should match the rest of the plans. Response: The official name has been distributed to all parties and should now be consistent. Topic: Landscape Plans Number: 9 Created: 03/23/2011 03/23/2011: There are scanning issues on the Planting Plan. Response: Text over lines has been avoided where possible. PDF files have been provided. Number: 10 Created: 03/23/2011 03/23/2011: The subdivision name in the title on the Planting Plan will need to change to match the Subdivision Plat. Response: Subdivision Title has been revised to Harmony Technology Park Third Filing, First Replat Number: 11 Created: 03/23/2011 03/23/2011: The subdivision name in the title on the Hydrozone Plan will need to change to match the Subdivision Plat. Response: Subdivision Title has been revised to Harmony Technology Park Third Filing, First Replat Topic: Plat Number: 1 Created: 03/23/2011 03/23/2011: The Subdivision Plat boundary closes. Response: Boundary closes, no changes to boundary. Number: 2 Created: 03/23/2011 03/23/2011: Please change "Directory" on sheet 1 of the Subdivision Plat to "Director" in the Planning Approval signature block. Response: “Director” corrected in Planning Approval signature block. Number: 3 Created: 03/23/2011 03/23/2011: Please correct the bearings on the drainage easement at the south end of the property. Response: Drainage easement bearings corrected to be parallel with south property line. Number: 4 Created: 03/23/2011 Page 8 of 9 voice: 970.223.7577 fax: 970.223.1827 landscape architecture | planning | urban design www.bhadesign.com 03/23/2011: Please add the missing bearing & distance on the emergency access easement on sheet 2 of the Subdivision Plat. Response: Missing bearing and distance has been added. Number: 5 Created: 03/23/2011 03/23/2011: Please add the standard City sight distance easement restriction statement to the Subdivision Plat. Response: Sight distance easement note added (taken verbatim from Harmony Technology Park 3rd Filing Plat, as this plat does not dedicate any new sight distance easements) Number: 6 Created: 03/23/2011 03/23/2011: Please change the Subdivision Plat title. The title can not begin with "Replat of". Response: Subdivision Title has been revised to Harmony Technology Park Third Filing, First Replat Department: Technical Services Contact: Jeff County, 970 221 6588, jcounty@fcgov.com Topic: Site Plan Number: 7 Created: 03/23/2011 03/23/2011: There are scanning issues on the Site Plan. Response: Text over lines has been avoided where possible. PDF files have been provided. Number: 8 Created: 03/23/2011 03/23/2011: The legal description & subdivision name in the title on the Site Plan will need to change to match the Subdivision Plat. Response: The legal description & subdivision name has been revised to be consistent with the Subdivision Plat. Department: Transportation Planning Contact: Matt Wempe, 970 416 2040, mwempe@fcgov.com Topic: Site Plan Number: 1 Created: 03/15/2011 03/15/2011: The bicycle parking locations are excellent, though I would encourage additional bike racks. Many other employers in this area have a high number of bicycle commuters and lunch time riders. Response: The requirement of 10 bike parking spaces is being met and exceeded. 12 spaces are provided with adequate space for additional racks as needed. Department: Water Wastewater Engineering Contact: Roger Buffington, 970 221 6854, rbuffington@fcgov.com Topic: Construction Drawings Page 9 of 9 voice: 970.223.7577 fax: 970.223.1827 landscape architecture | planning | urban design www.bhadesign.com Number: 1 Created: 03/21/2011 03/21/2011: Curb stop and meter pit must be in a landscaped area. It appears that the space between the sidewalk and the parking area may not be adequate to avoid the hardscaped areas. Response: The dimensions of the curb stop and meter pit have been verified and do fit within the area shown on the plans. Department: Zoning Contact: Gary Lopez, 970 416 2338, glopez@fcgov.com Topic: General Number: 1 Created: 03/11/2011 03/11/2011: No Comments on 1st round after conceptual. We look forward to your comments. Please let me know if you have any questions or need additional information. Sincerely, BHA Design, Inc. Angela K. Milewski