Loading...
HomeMy WebLinkAboutWEST RANGE FORT COLLINS - PDP - PDP120028 - REPORTS - DRAINAGE REPORTPRELIMINARY DRAINAGE AND EROSION CONTROL REPORT WEST RANGE FORT COLLINS Fort Collins, Colorado December 12, 2012 Prepared for: Epsilon Theta Corporation 200 South Avenue, Suite 10 Fort Collins, Colorado 80524 Prepared by: 200 South College Avenue, Suite 10 Fort Collins, Colorado 80524 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 875-001 3This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. December 12, 2012 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Preliminary Drainage and Erosion Control Report for West Range Fort Collins Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. Comments from the Conceptual Review letter dated 11.16.12 have been addressed. Written responses thereto can be found in the comprehensive response to comments letter on file with Current Planning. This report has been prepared in accordance with the Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed West Range Fort Collins student housing project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Nicholas W. Haws, PE Herman H. Feissner, PE Project Manager Project Engineer West Range Fort Collins Preliminary Drainage and Erosion Control Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ......................................................... 1 II. DRAINAGE BASINS AND SUB-BASINS ............................................................. 5 III. DRAINAGE DESIGN CRITERIA ......................................................................... 7 IV. DRAINAGE FACILITY DESIGN .......................................................................... 9 V. CONCLUSIONS............................................................................................. 12 References ............................................................................................................. 13 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Storm Sewers (reserved for future use) B.2 – Street Flow (reserved for future use) B.3 – Inlets (reserved for future use) B.4 – Detention Facilities APPENDIX C – Water Quality Design Computations APPENDIX D – Operations and Maintenance Guidelines for Rain Gardens (reserved for future use) APPENDIX E – Erosion Control Report LIST OF TABLES AND FIGURES: MAP POCKET: C4.00 – Drainage Exhibit NOTE: TABLE OF CONTENTS WILL BE UPDATED/CORRECTED WITH SUBSEQUENT REPORT ISSUANCES. West Range Fort Collins Preliminary Drainage and Erosion Control Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map Figure 1 – Vicinity Map 2. The West Range Fort Collins project site is located in the Northeast quarter of Section 11, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. West Range Fort Collins is bordered to the north by an existing alleyway and existing multi-family and single family developments; to the south by West Laurel Street and Colorado State University; to the east by Meldrum Street (100' Right-of-Way); and to the west by the Kappa Delta Sorority house. 4. There are no major drainageways within or adjacent to the site. The existing Arthurs Ditch runs parallel to the east property line. As it approaches the north property line, the enclosed concrete irrigation ditch alignment shifts to the northwest. The existing irrigation ditch receives excess developed stormwater from two existing inlets near the project site. The ditch's concrete top slab is at grade, visible and currently used for a sidewalk along the west side of Meldrum Street. West Range Fort Collins Preliminary Drainage and Erosion Control Report 2 B. Description of Property 1. West Range Fort Collins is comprised of ±0.71 acre. 2. The recent existing condition (See Figure 2 - Aerial Photograph) included two (2) fraternity houses which fronted to West Laurel Street, an associated detached garage and a duplex which fronted to Meldrum Street. The asphalt parking lot was constructed in the mid-1990s as a part of the Phase I condition described in the Final Drainage and Erosion Control Report for the Pi Kappa Alpha Fraternity Expansion (Shear Engineering or Phase I, Sheet No. 1 - Phase I Grading, Drainage and Erosion Control Plan is provided for reference in the Map Pocket of the report). The ultimate condition described in the drainage report was never constructed. Figure 2 – Aerial Photograph 3. The subject property was fully developed until the late fall of 2011. At that time, everything was removed from the property except for the asphalt parking lot (northwest corner), concrete curb and gutter and several mature trees. The existing groundcover currently consists of weeds and bare soil. The existing on-site excess runoff drains across flat grades (e.g., <2.00%) into West Laurel Street, Meldrum Street and the alleyway. 4. A soils report (Soilogic Project # 08-1051) was completed by Soilogic, Inc on September 29, 2008. The report contains the results of a complete geotechnical subsurface exploration as well as pertinent geotechnical recommendations. According to the summary of findings presented in the aforementioned report, the "subsurface materials encountered in the completed site borings consisted of a thin layer of West Range Fort Collins Preliminary Drainage and Erosion Control Report 3 asphaltic concrete and base course or topsoil and vegetation underlain by brown to reddish brown lean clay with varying amounts of silt and sand. A majority of the site lean clay tested showed low volume change potential with variation in moisture content at in-situ moisture and density conditions. Lean clay with low to moderate swell potential was encountered near surface boring location B-1 completed at the south end of the development. Groundwater was not encountered in any of the completed site borings at the time of drilling." The boring logs show that USCS soil group CL is predominant on-site. These soils are inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays and lean clays. 5. There are no major drainageways within or adjacent to the project site. 6. The proposed West Range Fort Collins project site will include a single backwards L- shaped building with a plan area of approximately 8000 ft2. The completed structure will be two stories. Other proposed improvements include: a new asphalt parking area, an enhanced entryway and landscaping. The north-to-south portion of the proposed building will include an open first level (i.e., breezeway) beneath which approximately one-half of the total on-site parking will be located.. 7. The existing Arthurs Ditch runs parallel to the east property line. As it approaches the northeast corner of the subject site, the concrete box alignment shifts toward the northwest (See Figure 3 – Existing Drainage and Irrigation Infrastructure). Figure 3 – Existing Drainage and Irrigation Infrastructure 8. The proposed land use is residential, multi-family dwellings. This is a permitted use in the Neighborhood Community - Buffer District (NCB). West Range Fort Collins Preliminary Drainage and Erosion Control Report 4 C. Floodplain 1. The subject property is not located in a FEMA regulatory or City of Fort Collins designated floodplain. In particular, the project site is not located within a FEMA designated 100-year floodplain per Map Number 08069C0979H (Effective date: May 2, 2012). Figure 4 – FEMA Firmette (Map Number 08069C0979H) West Range Fort Collins Preliminary Drainage and Erosion Control Report 5 II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. West Range Fort Collins is located within the City of Fort Collins Old Town major drainage basin. This basin is located in north-central Fort Collins and has a drainage area of approximately 2,120 acres, including approximately 400 acres of the Colorado State University campus. The Old Town major drainage basin generally drains from west to east. It receives some runoff from the Canal Importation Basin directly west of Old Town. Most of the runoff from the Old Town major drainage basin drains into the Poudre River. Street flooding is a common occurrence in Old Town. Several capital projects such as the Howes Street, Locust Street and Oak Street Outfall projects have addressed the problem and improved drainage in the area. 2. As previously mentioned, the Arthurs Ditch runs parallel to the east property line. This irrigation conveyance was historically influenced by excess developed runoff from the project site (Shear Engineering: sub-basins 1a and 1c). Excess developed runoff from the subject site will continue to outfall into this irrigation conveyance as described below. B. Sub-Basin Description 1. Shear Engineering, in the Final Drainage and Erosion Control Report for the Pi Kappa Alpha Fraternity Expansion, described and evaluated an existing condition, Phase I condition and Ultimate condition. The existing condition was used to establish the historic release rate. Phase I represented an interim developed condition in which the existing gravel parking lot was paved and used for on-site detention storage. The pond was designed to overdetain (i.e., the total site area was used to size the pond instead of the total area tributary to the pond) and release at the historic 2-year rate (0.50 cfs). The Ultimate condition was never constructed. 2. The subject site can be historically defined by three (3) sub-basins (i.e., Ia. Ib and Ic). From the center of each of the three (3) previously existing structures, runoff drained in three directions. First, runoff from the east portion (sub-basin Ib) of the project site drained into Meldrum Street and travelled north. Second, runoff from the south portion (sub-basin 1c) of the subject site drained into West Laurel Street. From there, runoff traveled east, via curb and gutter, and into an existing combination inlet. Excess runoff from the central and northwest portion of the subject site (sub-basin Ia) currently drains across the existing asphalt parking lot and into an existing outlet structure. This structure outfalls to the storm drain system in the alleyway.The West Range Fort Collins development aims to preserve these existing drainage patterns and will utilize the historic outfall location. 3. Arthurs Ditch receives developed stormwater runoff from the subject site at two locations. First, at an existing combination inlet located on the north side of West Laurel Street (west of Meldrum Street). This inlet is connected to the ditch with a 10” diameter metal pipe. In addition to local developed runoff from West Laurel Street, the combination inlet received developed stormwater runoff from the Phase I developed West Range Fort Collins Preliminary Drainage and Erosion Control Report 6 condition sub-basin Ic. Developed runoff, which is similar in peak rate, will drain to this existing inlet from sub-basin C. The proposed on-site quantity detention pond will outfall at 0.50 cfs (historic 2-year release rate) into the existing public storm sewer system in the alleyway. This system ultimately connects to the Arthurs Ditch. A more detailed description of the project’s drainage patterns follows in Section IV, below. 4. The project site does not receive any notable runoff from off-site properties. West Range Fort Collins Preliminary Drainage and Erosion Control Report 7 III. DRAINAGE DESIGN CRITERIA A. There are no optional provisions outside of the FCSCM proposed with West Range Fort Collins. B. The overall stormwater management strategy employed with West Range Fort Collins utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices. The first consideration taken in trying to reduce the stormwater impacts of this development is the site selection itself. By choosing an already developed site with public storm sewer currently in place, the burden is significantly less than developing a vacant parcel absent of any infrastructure. West Range Fort Collins aims to reduce runoff peaks, volumes and pollutant loads from frequently occurring storm events (i.e., water quality (80th percentile) and 2-year storm events) by implementing Low Impact Development (LID) strategies. Wherever practical, runoff will be routed across landscaped areas or through a grass-lined swale and bio- retention area. This LID practice reduces the overall amount of impervious area, while Minimizing Directly Connected Impervious Areas (MDCIA) at the same time. The combined LID/MDCIA techniques will be implemented, where practical, throughout the development, thereby slowing runoff and increasing opportunities for infiltration. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release. The efforts taken in Step 1 will help to minimize excess runoff from frequently occurring storm events; however, urban development of this intensity will still have stormwater runoff leaving the site. The primary water quality will occur in a linear bio-retention area along the northwest property line (sub-basin A). The bio-retention area design will be more fully developed at Final Design. Step 3 – Stabilize Drainageways. As stated in Section I.B.4, above, there are no major drainageways in or near the subject site. While this step may not seem applicable to West Range Fort Collins, the proposed project indirectly helps achieve stabilized drainageways nonetheless. Once again, site selection has a positive effect on stream stabilization. By repurposing an already developed, under-utilized site with existing stormwater infrastructure, combined with LID and MDCIA strategies, the likelihood of bed and bank erosion is greatly reduced. Furthermore, this project will pay one-time stormwater development fees, as well as ongoing monthly stormwater utility fees, both of which help achieve Citywide drainageway stability. Step 4 – Implement Site Specific and Other Source Control BMPs. This step typically applies to industrial and commercial developments. C. Development Criteria Reference and Constraints 1. The subject property is not part of any Overall Development Plan drainage study or similar “development/project” drainage master plan. 2. There are no known drainage studies for any adjacent properties that will have any effect on West Range project. The Final Drainage and Erosion Control Report for the Pi Kappa Alpha Fraternity Expansion (Shear Engineering, 1995) was referenced West Range Fort Collins Preliminary Drainage and Erosion Control Report 8 during the preparation of this study. The contents of the report served as the basis for developing our existing drainage conditions, existing pervious/impervious areas/ historic release rate and the existing detention pond volume that was associated with the historic development. 3. The site plan will be constrained on two sides by public streets and by an alleyway on the third. An existing and fully developed site constrains the site plan on the fourth. As previously mentioned, the drainage outfall for Basin A is an existing manhole that ties into an existing 12” RCP storm sewer in the alleyway. The proposed design matches the existing historic release rate (i.e., 0.50 cfs). D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the West Range Fort Collins development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. The Rational Formula-based Federal Aviation Administration (FAA) procedure has utilized for detention storage calculations. 4. Two separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. E. Hydraulic Criteria 1. The drainage facilities proposed with the West Range Fort Collins project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 2. As stated in Section I.C.1, above, the subject property is not located in a FEMA regulatory or a City of Fort Collins designated floodplain. F. Floodplain Regulations Compliance 1. As previously mentioned, this project is not subject to any floodplain regulations. G. Modifications of Criteria 1. No modifications are requested at this time. West Range Fort Collins Preliminary Drainage and Erosion Control Report 9 IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objective of the West Range Fort Collins drainage design is to maintain existing drainage patterns, while not adversely impacting adjacent properties. 2. No notable off-site runoff flows directly through the project site. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. The project site has been divided into three (3) drainage sub-basins, designated as sub-basins A, B, and C. The drainage patterns anticipated for each basin are further described below. Sub-Basin A Basin A encompasses a little over of one-half of the total project site area. It is comprised of roof area, concrete walks and asphalt parking. A large part of the parking area in this basin will comprise the on-site detention pond (Pond 1). D.P. A is situated at the proposed outfall. A short section of pipe will connect to an existing manhole in the alleyway. This basin releases at a 2-year historic rate of 0.50 cfs. Sub-Basin B Basin B encompasses the eastern third of the project site. It is comprised of roof area, a concrete patio and landscaping. The downspouts will direct developed runoff from the roof into the landscaping. The excess developed runoff will primarily drain into Meldrum Street as sheet flow (i.e., non-concentrated). The developed flows in this basin are similar to the existing (i.e., Phase I) condition. During the 2-year and 100- year storm events, the proposed condition decreases runoff into Meldrum Street by ±0.08cfs and ±0.36cfs, respectively. Sub-Basin C Basin C is very similar in composition to Basin B. It is situated along the south portion of the subject site. The excess developed runoff will primarily drain into West Laurel Street as sheet flow. In West Laurel Street, the runoff drains into an existing combination inlet which is connected to the Arthurs Ditch. During the 2-year and 100-year storm events, the proposed condition increases runoff into Meldrum Street by ±0.08cfs and ±0.35cfs, respectively. A full-size copy of the Drainage Exhibit (sheet C4.00) can be found in the Map Pocket at the end of this report. B. Specific Details 1. The FAA method was used to size the on-site pond for quantity detention. The Phase I quantity detention volume (computed by Shear Engineering - 1995) is 2756 ft3. This quantity storage volume calculation was based on the total site area (i.e., 0.71 acre) and a historic release rate of 0.50 cfs. The pond was originally designed as though the entire 0.71 acre site was tributary to it. Our West Range Fort Collins Preliminary Drainage and Erosion Control Report 10 design approach and FAA method calculation included only sub-basin A. The required 100-year quantity detention volume is 2957 cf. ft. To this, we added the available Water Quality Capture Volume of 261 cu. ft. and arrived at a total pond volume of 3218 cu. The corresponding 100-year Water Surface Elevation (WSE) is 5001.40. The total ponding depth, at the lowest curb cut is 1.07 feet. The approximate area for which the depth will exceed one foot is 17 sq. ft. The impact associated a ponding depth 0.07 foot greater than one foot is negligible. 2. During Final Design, computations will be more fully developed for the proposed bio- retention area in sub-basin A by utilizing the UDFCD’s UD-BMP Version 3.01 “Rain Garden (RG)” Design Procedure Form. Preliminary calculations for this area, based on the characteristics of sub-basin A, indicate a required volume of 461 cu. ft. The maximum volume available is approximately 261 cu. ft. Site constraints, which include a shallow storm drain outfall (4999.41) and a low adjacent parking lot finished grade (5000.33), allow for a total ponding depth at the outlet of 11 inches. A fully developed bio-retention section generally requires at least eighteen inches for just the bio-retention soil media. The proposed water quality area is designed to maximize available volume without ponding water, during water quality events, in the parking area and releasing this volume over 12-hours. The aforementioned constraints also eliminate the possibility for installing an underdrain. The area will infiltrate nuisance flows and allow sediment to settle during water quality rain events. The Fort Collins Soil Mix will be used in the base of the water quality area. Tree plantings within this area as well as those in close proximity are less of an issue because an underdrain is not being proposed. 3. The detention storage information for Pond 1 is contained in Appendix B.4. The drainage features associated with West Range Fort Collins project are private facilities and located on private property. 4. As previously mentioned, the outfall for the West Range Fort Collins project is the public storm sewer in the neighboring alleyway. This storm sewer flows northwest to an existing area inlet before heading north towards Myrtle Street. As shown above in Figure 3, this storm drain outfalls into the Arthurs Ditch due south of Myrtle Street. There are no additional facilities or upgrades needed off-site in order to accommodate the developed runoff from West Range Fort Collins. 5. The net effect of West Range on existing runoff rates is zero during the 2-, 10- and 100-year storm events (see below). Note that the Phase I flows used for comparison were re-calculated using the current City of Fort Collins Intensity-Duration-Frequency curve. West Range Fort Collins Preliminary Drainage and Erosion Control Report 11 Design Point Runoff Comparison (Proposed Condition vs. Phase I) Q2 Q10 Q100 A | Ia 0.00 0.00 0.00 B | Ib -0.08 -0.14 -0.36 C | Ic 0.08 0.14 0.35 Net Change: 0.00 0.00 -0.01 Existing and Proposed Runoff Rate Comparison In particular, there is no change in sub-basin A because the quantity detention release rate will remain the same. The developed runoff in sub-basin B, which drains into Meldrum Street, decreased. The runoff draining to Laurel Street will increase during each of the storm events; however, the magnitude of the increase is negligible relative to the size of each storm event. West Range Fort Collins Preliminary Drainage and Erosion Control Report 12 V. CONCLUSIONS A. Compliance with Standards 1. The design elements comply without variation. 2. The drainage design proposed with West Range Fort Collins complies with the City of Fort Collins Master Drainage Plan for the Old Town Basin. 3. There are no regulatory floodplains associated with the West Range Fort Collins development. 4. The drainage plan and stormwater management measures proposed with the West Range Fort Collins student housing project are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit potential damage associated with its stormwater runoff. West Range Fort Collins will detain for the pervious area converted to impervious areas to release at the 2-year historic rate during the 100-year storm. 2. The proposed West Range Fort Collins development will not impact the Master Drainage Plan recommendations for the Old Town Basin. West Range Fort Collins Preliminary Drainage and Erosion Control Report 13 References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Final Drainage and Erosion Control Report for Pi Kappa Alpha Fraternity Expansion, October 1995, Shear Engineering Corporation (Project No. 1060-02-95). 3. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 4. Geotechnical Exploration Report, Pike Redevelopment, 406 West Laurel Street, Fort Collins, Colorado, September 29, 2008, Soilogic, Inc. (Soilogic # 08-1051). 5. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 6. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS West Range Fort Collins CHARACTER OF SURFACE1: Runoff Coefficient Percentage Impervious Project: West Range Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: H. Feissner Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 100% . Date: Concrete …….......……………….….……….………………..….…………………………………………………….0.95 90% . Gravel ……….…………………….….…………………………..……………………………………………………… 0.50 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Pavers…………………………...………………..……………………………………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 0% . Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 0% . Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Basin ID Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Gravel (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. Ia 0.34 0.00 0.00 0.16 0.05 Clayey | Flat <2% 0.13 0.45 0.45 0.56 32% Ib 0.24 0.00 0.02 0.00 0.05 Clayey | Flat <2% 0.17 0.42 0.42 0.52 26% Ic 0.13 0.00 0.01 0.00 0.03 Clayey | Flat <2% 0.09 0.43 0.43 0.54 28% Irowb 0.34 0.26 0.02 0.00 0.00 Clayey | Flat <2% 0.06 0.82 0.82 1.00 82% Irowc 0.13 0.08 0.02 0.00 0.00 Clayey | Flat <2% 0.03 0.78 0.78 0.97 75% West Range Fort Collins Overland Flow, Time of Concentration: Project: West Range Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = T i + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V West Range Fort Collins Rational Method Equation: Project: West Range Calculations By: Date: Rainfall Intensity: Ia Ia 0.34 5 5 5 0.45 0.45 0.56 3.29 5.64 9.30 0.51 0.87 1.78 To on-site detention pond Ib Ib 0.24 5 5 5 0.42 0.42 0.52 3.29 5.64 9.30 0.33 0.57 1.17 To Meldrum Street Ic Ic 0.13 5 5 5 0.43 0.43 0.54 3.29 5.64 9.30 0.18 0.32 0.65 To West Laurel Street Irowb Irowb 0.34 5 5 5 0.82 0.82 1.00 3.29 5.64 9.30 0.91 1.57 3.16 Meldrum Street Irowc Irowc 0.13 5 5 5 0.78 0.78 0.97 3.29 5.64 9.30 0.33 0.57 1.17 West Laurel Street C100 Notes Intensity, i2 (in/hr) Intensity, i10 (in/hr) Intensity, i100 (in/hr) EXISTING CONDITIONS RUNOFF COMPUTATIONS H. Feissner October 24, 2012 Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 Design Point Basin(s) Area, A (acres) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Flow, Q2 (cfs) Flow, Q10 (cfs) Flow, Q100 (cfs) C2 C10 Q C f C i A 10/24/201212:25 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Historic_Rational_Calcs\Runoff_Exist_OLD idf West Range Fort Collins CHARACTER OF SURFACE1: Runoff Coefficient Percentage Impervious Project: West Range Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: H. Feissner Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 100% . Date: Concrete …….......……………….….……….………………..….…………………………………………………….0.95 90% . Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 40% . Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Pavers…………………………...………………..……………………………………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 0% . Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 0% . Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Basin ID Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Gravel (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. Ia 0.340 0.16 0.00 0.00 0.050 Clayey | Flat <2% 0.13 0.66 0.66 0.83 60% Ib 0.240 0.00 0.02 0.00 0.050 Clayey | Flat <2% 0.17 0.42 0.42 0.52 26% Ic 0.130 0.00 0.01 0.00 0.030 Clayey | Flat <2% 0.09 0.43 0.43 0.54 28% Irowb 0.340 0.26 0.02 0.00 0.000 Clayey | Flat <2% 0.06 0.82 0.82 1.00 82% Irowc 0.130 0.08 0.02 0.00 0.000 Clayey | Flat <2% 0.03 0.78 0.78 0.97 75% West Range Fort Collins Overland Flow, Time of Concentration: Project: West Range Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr West Range Fort Collins Rational Method Equation: Project: West Range Calculations By: Date: Rainfall Intensity: Ia Ia 0.34 5 5 5 0.66 0.66 0.83 3.29 5.64 9.30 0.74 1.27 2.62 Modified w/Phase I Ib Ib 0.24 5 5 5 0.42 0.42 0.52 3.29 5.64 9.30 0.33 0.57 1.17 No change w/Phase I Ic Ic 0.13 5 5 5 0.43 0.43 0.54 3.29 5.64 9.30 0.18 0.32 0.65 No change w/Phase I Irowb Irowb 0.34 5 5 5 0.82 0.82 1.00 3.29 5.64 9.30 0.91 1.57 3.16 No change w/Phase I Irowc Irowc 0.13 5 5 5 0.78 0.78 0.97 3.29 5.64 9.30 0.33 0.57 1.17 No change w/Phase I * Pond Release Rates for each basin include the 100-year flow rate from the historic impervious area plus the 2-year release rate from the historic pervious area. Notes PHASE I RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) H. Feissner October 24, 2012 Intensity, i10 (in/hr) Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) Q C f C i A 10/24/201212:25 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Historic_Rational_Calcs\Runoff_Phase I_OLD idf West Range Fort Collins CHARACTER OF SURFACE 1 : Runoff Coefficient Percentage Impervious Project: West Range Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: H. Feissner Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 100% . Date: December 12, 2012 Concrete …….......……………….….……….………………..….…………………………………………………….0.95 90% . Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 40% . Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Pavers…………………………...………………..……………………………………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 0% . Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 0% . Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year C f = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Basin ID Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Gravel (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. Basin A 0.46 0.12 0.08 0.00 0.20 Clayey | Average 2% to 7% 0.05 0.87 0.87 1.00 83% West Range Fort Collins Overland Flow, Time of Concentration: Project: West Range Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr West Range Fort Collins Rational Method Equation: Project: West Range Calculations By: Date: Rainfall Intensity: A Basin A 0.46 5 5 5 0.87 0.87 1.00 2.85 4.87 9.95 1.14 1.94 4.54 B Basin B 0.13 5 5 5 0.56 0.56 0.71 2.85 4.87 9.95 0.20 0.35 0.89 C Basin C 0.12 5 5 5 0.68 0.68 0.85 2.85 4.87 9.95 0.24 0.41 1.05 PROPOSED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) H. Feissner Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 December 12, 2012 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) Intensity, i10 (in/hr) Q C f C i A 12/12/201211:30 AM D:\Projects\875-001\Drainage\Hydrology\875-001_Proposed_Rational_Calcs\Runoff West Range Fort Collins Project: West Range Fort Collins Project Site Area 30927.6 Calculations By: Ia 14810.40 Date: Ib 10454.40 Ic 5662.80 A 19886.42 B 5516.79 C 5394.34 Basin Area, sq. ft. Surface Description % Impervious Area, sq. ft. Notes Ia 6969.6 Asphalt 100% 6970 Ia 2178.0 Roofs 90% 1960 Impervious Area 8930 % Impervious 60% Ib 871.2 Concrete (e.g., walks & parking) 90% 784 Ib 2178.0 Concrete (e.g., walks & parking) 90% 1960 Impervious Area 2744 % Impervious 26% Ic 435.6 Concrete (e.g., walks & parking) 90% 392 Ic 1306.8 Pavers (e.g., wood deck) 22% 287 Impervious Area 680 %Impervious 12% Total Impervious Area 12354 % Impervious 40% Basin Area, sq. ft. Surface Description % Impervious Area, sq. ft. Notes A 5272.39 Asphalt 100% 5272 SUMMARY OF EXISTING AND PROPOSED IMPERVIOUS AREA Areas, sq. ft. H. Feissner December 12, 2012 EXISTING CONDITION PROPOSED CONDITION 12/12/2012 12:09 PM A 5272.39 Asphalt 100% 5272 A 3665.45 Concrete 90% 3299 A 8801.00 Roofs 90% 7921 Impervious Area 16492 % Impervious 83% B 189.76 Asphalt 100% 190 B 723.44 Concrete 90% 651 B 1568.02 Roofs 90% 1411 Impervious Area 2252 % Impervious 42% C 0 Asphalt 100% 0 C 954.97 Concrete 90% 859 C 2354.16 Roofs 90% 2119 Impervious Area 2978 % Impervious 55% Impervious Area 21722 % Impervious 70% Area, sq. ft. Area, acre Total Impervious Area Increase 9369 0.215 SUMMARY 12/12/2012 12:09 PM APPENDIX B HYDRAULIC COMPUTATIONS B.1 – Storm Sewers (reserved for future use) B.2 – Street Flow (reserved for future use) B.3 – Inlets (reserved for future use) B.4 – Detention Facilities APPENDIX B.1 STORM SEWERS (reserved for future use) APPENDIX B.2 STREET FLOW (reserved for future use) APPENDIX B.3 INLETS (reserved for future use) APPENDIX B.4 DETENTION FACILITIES West Range Fort Collins Detention Pond Calculation | FAA Method Project Number: West Range Fort Collins Calculations By: H. Feissner Date: 12/12/2012 Project Number: West Range Fort Collins Project Location: Fort Collins, Colorado H. Feissner Date: 12/12/2012 Pond No.: Pond A Calculations By: A Input Variables Results Design Point A 100-yr Design Point Design Storm Required Detention Volume 1.00 WQCV 0 ft2 Area (A)= 0.46 acres 2957 ft3 Developed "C" = Area (A)= 0.46 acres 2957 ft Max Release Rate = 0.50 cfs 0.0679 ac-ft Ft.Collins Q Inflow Outflow Storage Time Time 100-yr Intensity Q100 (Runoff) Volume Outflow (Release) Volume Detention Intensity Volume Volume (mins) (secs) (in/hr) (cfs) (ft 3 ) (ft 3 ) (ft 3 ) 5 300 9.95 4.6 1373 150 1223 10 600 7.72 3.6 2131 300 1831 15 900 6.52 3.0 2699 450 2249 20 1200 5.60 2.6 3091 600 2491 25 1500 4.98 2.3 3436 750 2686 30 1800 4.52 2.1 3743 900 2843 35 2100 4.08 1.9 3941 1050 2891 40 2400 3.74 1.7 4129 1200 2929 45 2700 3.46 1.6 4297 1350 2947 50 3000 3.23 1.5 4457 1500 2957 55 3300 3.03 1.4 4600 1650 2950 60 3600 2.86 1.3 4736 1800 2936 65 3900 2.72 1.3 4880 1950 2930 12/12/2012 11:37 AM D:\Projects\875-001\Drainage\Detention\875-001__Detention Pond.xlsm\FAA_Current idf West Range Fort Collins 875-001 Stage - Storage Calculation Project Number: 875-001 Fort Collins, Colorado H. Feissner Date: 12/12/2012 Project Number: Project Location: Calculations By: H. Feissner Date: 12/12/2012 Pond No.: Pond A Calculations By: Design Point A Required Volume Water Surface Elevation (WSE) A WQCV 261 ft3 5000.33 ft. Design Point Design Storm Require Volume= 261 ft3 5000.33 ft. Design Storm 100-yr ft3 5001.40 ft. Require Volume= Required Volume= 3218 ft3 5001.40 ft. Contour Elevation (Y- Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) Area Avg. End Avg. End Conic values) ft3 ft ft. ft3 ft ft3 ft ft3 ft ft3 ft 4,999.60 93 0.00 0 0 0 0 4,999.80 254 0.20 35 35 33 33 5,000.00 400 0.20 65 100 65 98 5,000.20 486 0.20 89 189 88 187 5,000.40 560 0.20 105 293 104 291 5,000.60 1063 0.20 162 456 160 451 5,000.80 1996 0.20 306 761 301 752 5,001.00 3355 0.20 535 1297 529 1281 5,001.20 4924 0.20 828 2124 823 2104 5,001.40 6504 0.20 1143 3267 1139 3243 5,001.60 8071 0.20 1457 4725 1455 4698 5,002.00 5,001.50 5,001.00 Contour Elevation 5,000.50 Contour Elevation 5,000.50 Contour Elevation 5,000.00 APPENDIX C WATER QUALITY DESIGN COMPUTATIONS West Range Fort Collins Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 83.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.830 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.28 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 19,886 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 461 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 0.0 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 11 in Design Procedure Form: Rain Garden (RG) H. Feissner Northern Engineering December 12, 2012 West Range Fort Collins Fort Collins, Colorado A) WQCV Depth (12-inch maximum) DWQCV = 11 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 0.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 308 sq ft D) Actual Flat Surface Area AActual = 90 sq ft ACTUAL FLAT AREA < MINIMUM FLAT AREA E) Area at Design Depth (Top Surface Area) ATop = 520 sq ft F) Rain Garden Total Volume VT= 280 cu ft TOTAL VOLUME < DESIGN VOLUME (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media Fort Collins Soil Mix 60% Sand (ASTM C-33), 25% Topsoil and 15% Shredded Mulch 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = N/A ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = N/A cu ft iii) Orifice Diameter, 3/8" Minimum DO = N/A in Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 875-001_UD-BMP_v3_01, RG 12/12/2012, 12:26 PM West Range Fort Collins Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: December 12, 2012 West Range Fort Collins Fort Collins, Colorado Design Procedure Form: Rain Garden (RG) H. Feissner Northern Engineering Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO Notes: 875-001_UD-BMP_v3_01, RG 12/12/2012, 12:26 PM APPENDIX D OPERATIONS AND MAINTENANCE GUIDELINES FOR RAIN GARDENS(reserved for future use) APPENDIX E EROSION CONTROL REPORT West Range Fort Collins Preliminary Erosion Control Report EROSION CONTROL REPORT A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the Best Management Practices (BMPs) depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet C.?? of the Utility Plans. The Final Plans will contain a full-size Erosion Controlsheet as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in the Development Agreement for West Range Fort Collins. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, prior to any earth disturbance activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections and maintenance of construction BMPs. West Range Fort Collins Preliminary Erosion Control Report MAP POCKET C4.00 – DRAINAGE EXHIBIT X D D VAULT ELEC acres A 0.87 0.46 1.00 acres B 0.56 0.13 0.71 acres C 0.68 0.12 0.85 B C ROOF ROOF ROOF ROOF ROOF ROOF ROOF ROOF ROOF ROOF ROOF W. LAUREL STREET S. MELDRUM STREET PROPOSED MULTIFAMILY BUILDING LOT 1 BLOCK 1 A POND A No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 12.12.12 PROJECT: 875-001 Sheet Of 6 Sheets WEST RANGE FORT COLLINS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 10.24.12 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� C4.00 DRAINAGE EXHIBIT NORTH ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 GRAPHIC SCALE: K��� ����'� �����. C��� ������ ��� ���. R BENCHMARK/BASIS OF BEARING BENCHMARK #1: City of Fort Collins Benchmark 6-00 Located on a catch basin at the northwest corner of Mulberry Street and College Avenue. Elevation = 4990.68 (NGVD 29 - Unadjusted) BENCHMARK #2: City of Fort Collins Benchmark CSU 2 Standard brass Larimer County Geodetic Control Disk set in 2002, located in the campus of Colorado State University approximately 240.8 feet south from the center line of North Drive, 46.6 feet northeast from the edge of the CSU Lagoon, 33 feet southwest from the center of the delivery road to the University Club and 1.1 feet southwest from the edge of the sidewalk. Elevation = 5003.12 (NGVD 29 - Unadjusted) Basis of Bearings Considering the East line of Lot 8, Block 87, City of Fort Collins and its southerly extension as bearing South 00�21'57' West (assumed bearing). LEGEND: 4953 PROPOSED CONTOUR 93 PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER PROPERTY BOUNDARY PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL BASIN DESIGNATION BASIN AREA (AC) DRAINAGE BASIN BOUNDARY PROPOSED SWALE SECTION 1 1 B2 1.45 ac PROPOSED 100-YEAR WATER SURFACE ELEVATION NOTES: 1.REFER TO THE "PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR WEST RANGE FORT COLLINS" BY NORTHERN ENGINEERING, DATED {OCTOBER 24, 2012} FOR ADDITIONAL INFORMATION.{ } PROPOSED BIO-RETENTION Contour Elevation 5,000.00 4,999.50 0 500 1000 1500 2000 2500 3000 3500 4000 4500 Cummulative Volume, cu. ft. 12/12/201211:36 AM D:\Projects\875-001\Drainage\Detention\875-001__Detention Pond.xlsm\Stage_Storage_2nd PDP Tc (min) 10-yr Tc (min) 100-yr Tc (min) A Basin A No 0.87 0.87 1.00 1 2.00% 0.3 0.3 0.1 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5 B Basin B No 0.56 0.56 0.71 1 2.00% 0.8 0.8 0.6 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5 C Basin C No 0.68 0.68 0.85 1 2.00% 0.6 0.6 0.4 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5 * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. PROPOSED TIME OF CONCENTRATION COMPUTATIONS H. Feissner December 12, 2012 Design Point Basin Overland Flow Gutter Flow Swale Flow Time of Concentration (Equation RO-4) 3 1 1 . 87 1 . 1 * S Ti C Cf L  12/12/201211:29 AM D:\Projects\875-001\Drainage\Hydrology\875-001_Proposed_Rational_Calcs\Tc Basin B 0.13 0.00 0.02 0.00 0.04 Clayey | Average 2% to 7% 0.07 0.56 0.56 0.71 41% Basin C 0.12 0.00 0.02 0.00 0.05 Clayey | Average 2% to 7% 0.05 0.68 0.68 0.85 55% TOTAL (Site ONLY ) 0.71 0.13 0.12 0.00 0.29 Clayey | Average 2% to 7% 0.17 0.78 0.78 0.98 71% 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis PROPOSED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Composite Runoff Coefficient with Adjustment 12/12/201211:29 AM D:\Projects\875-001\Drainage\Hydrology\875-001_Proposed_Rational_Calcs\Composite Runoff Coeff Tc (min) 10-yr Tc (min) 100-yr Tc (min) Ia Ia No 0.66 0.66 0.83 1 2.00% 0.6 0.6 0.4 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5 Ib Ib No 0.42 0.42 0.52 1 2.00% 1.0 1.0 0.9 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5 Ic Ic No 0.43 0.43 0.54 1 2.00% 1.0 1.0 0.8 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5 Irowb Irowb No 0.82 0.82 1.00 1 2.00% 0.4 0.4 0.1 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5 Irowc Irowc No 0.78 0.78 0.97 1 2.00% 0.5 0.5 0.2 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5 * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. PHASE I TIME OF CONCENTRATION COMPUTATIONS H. Feissner October 24, 2012 Design Point Basin Overland Flow Gutter Flow Swale Flow Time of Concentration (Equation RO-4) 3 1 1 . 87 1 . 1 * S Ti C Cf L  * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. 10/24/201212:25 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Historic_Rational_Calcs\Tc_Phase 1 TOTAL (Site ONLY ) 0.710 0.16 0.03 0.00 0.130 Clayey | Flat <2% 0.39 0.54 0.54 0.67 43% 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis PHASE I COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS October 24, 2012 Composite Runoff Coefficient with Adjustment 10/24/201212:25 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Historic_Rational_Calcs\Composite Runoff Coeff_Phase I (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Ia Ia No 0.45 0.45 0.56 1 2.00% 1.0 1.0 0.8 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5 Ib Ib No 0.42 0.42 0.52 1 2.00% 1.0 1.0 0.9 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5 Ic Ic No 0.43 0.43 0.54 1 2.00% 1.0 1.0 0.8 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5 Irowb Irowb No 0.82 0.82 1.00 1 2.00% 0.4 0.4 0.1 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5 Irowc Irowc No 0.78 0.78 0.97 1 2.00% 0.5 0.5 0.2 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5 * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. EXISTING CONDITIONS TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow H. Feissner October 24, 2012 Time of Concentration (Equation RO-4) 3 1 1 . 87 1 . 1 * S Ti C Cf L  * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. 10/24/201212:25 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Historic_Rational_Calcs\Tc_Exist TOTAL (Site ONLY ) 0.71 0.00 0.03 0.16 0.13 Clayey | Flat <2% 0.39 0.44 0.44 0.55 29% 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis EXISTING CONDITIONS COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS October 24, 2012 Composite Runoff Coefficient with Adjustment 10/24/201212:25 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Historic_Rational_Calcs\Composite Runoff Coeff_Exist