HomeMy WebLinkAboutLINK-N-GREENS - PDP - PDP130001 - SUBMITTAL DOCUMENTS - ROUND 1 - ELEVATIONS (12)FORT COLLINS, COLORADO
LINK-N-GREENS SITE
REVISIONS: DATE:
SHEET OF X
JANUARY 10, 2012
THE MULHERN GROUP, LTD.
1730 BLAKE STREET, SUITE 435
DENVER, CO 80202
P: 303-297-3334
ARCHITECTURE PLANNING INTERIORS
CONCEPTUAL ARCHITECTURAL COMMERCIAL ELEVATION
PROJECT DEVELOPMENT PLAN SUBMITTAL
4
NORTH ELEVATION
INTERIOR TO SITE
MATERIAL LEGEND
1 STOREFRONT DOORS - KYNAR BRONZE / ANODIZED SILVER
2 STOREFRONT WINDOWS - KYNAR BRONZE / ANODIZED SILVER
3 CURTAIN WALL SYSTEM - KYNAR ANODIZED SILVER
4 COMPOSITE PANEL - ALUMINUM COMPOSITE - PLUM
5 CORRUGATED METAL PANEL SYSTEM - LIGHT GREY / BLUE / DARK GREY
6 STONE VENEER - BEIGE AND ROSE
7 STUCCO - IVORY OR SIMILAR
8 METAL RAILING - DARK GREY
9 FABRIC AWNING - PLUM / DARK GREY / EMERALD GREEN
10 METAL CANOPY - GUNMETAL BLUE
11 PAINTED METAL - GUNMETAL BLUE / DARK GREY
12 METAL REVEAL - STANDARD ANODIZED ALUMINUM
13 SPANDREL GLASS -
14 METAL ROOF ELEMENT - GUNMETAL BLUE / DARK GREY
15 METAL LOUVER - LIGHT GREY / DARK GREY
PROTOTYPICAL MIXED USE OFFICE/ RETAIL
3
WEST ELEVATION
FACING RIVER
2
SOUTH ELEVATION
INTERIOR TO SITE 1
EAST ELEVATION
INTERIOR TO SITE
KEY PLAN NORTH