Loading...
HomeMy WebLinkAboutHARMONY TECH PARK 3RD FILING LOT 1 REPLAT - PDP - PDP110001 - MAPS/GRAPHICS - LANDSCAPE PLAN (3)HIGH HYDROZONE MODERATE HYDROZONE LOW HYDROZONE CS MP E E 8'' F 2'' W T VAN 49,900 SF Area 24'' ST 24'' ST 24'' ST 24'' ST 24'' ST 24'' ST 24'' ST 24'' ST SA SA SA SA SA SA 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 24'' W 24'' W 24'' W 24'' W 24'' W LEGEND 0 15 30 60 HYDROZONE AREA WATER NEED ANNUAL WATER USE (s.f.) (gallons/s.f.) (gallons) HIGH 16,062 18 289,116 MODERATE 22,969 10 229,690 LOW 14,636 3 43,908 VERY LOW 0 0 0 TOTAL GALLONS 562,714 TOTAL S.F. 53,667 AVERAGE 10.49 GALLONS/S.F./SEASON GENERAL NOTES FOR HYDROZONE COMPLIANCE 1. Apply mulch at a maximum depth of three (3) inches. 2. An irrigation plan is required to be submitted at the same time as the landscape plan in accordance with the requirements in the Land Use Code Section 3.2.1.J(2). 3. When installing trees and shrubs, remove root ball wrapping materials (burlap, fabric, grow bags, twine, ties, wire basket, etc.) from the upper 12 inches or two-thirds of the root ball, whichever is greater after the tree or shrub is set in place. Note: The average needs to be a maximum of 15 gallons/S.F.season. HYDROZONE CHART