HomeMy WebLinkAboutODELL BREWERY PARKING LOT EXPANSION - PDP - PDP120032 - SUBMITTAL DOCUMENTS - ROUND 1 - RECOMMENDATION/REPORT (3)GGeoteechniical E
Ode
Engin
ell Brewin
neer
ng Co. Br
800
F
Terra
O
Terr
ring R
rew Hous
0 East Lin
Fort Colli
O
acon Projec
dell Brew
Fort Coll
racon Con
Fort Coll
Repo
se Expans
ncoln Ave
ns, Color
October 9, 2
ct No. 20125
Prepared
wing Comp
ins, Color
Prepared
nsultants,
ins, Color
ort
sion
enue
rado
2012
5035
d for:
pany
rado
d by:
Inc.
rado
TABLE OF CONTENTS
EXECUTIVE SUMMARY ............................................................................................................... i
1.0 INTRODUCTION ............................................................................................................... 1
2.0 PROJECT INFORMATION ............................................................................................... 2
2.1 Project Description ................................................................................................ 2
2.2 Site Location and Description ................................................................................ 3
3.0 SUBSURFACE CONDITIONS .......................................................................................... 3
3.1 Typical Subsurface Profile ..................................................................................... 3
3.2 Laboratory Testing ................................................................................................ 4
3.3 Groundwater ......................................................................................................... 4
4.0 RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION ....................................... 5
4.1 Geotechnical Considerations................................................................................. 5
4.1.1 Existing Fill ................................................................................................. 5
4.1.2 Shallow Groundwater ................................................................................ 5
4.1.3 Detention Pond Considerations ................................................................. 6
4.1.4 Structural Considerations .......................................................................... 6
4.2 Earthwork .............................................................................................................. 7
4.2.1 Site Preparation .......................................................................................... 7
4.2.2 Excavation .................................................................................................. 8
4.2.3 Subgrade Preparation ................................................................................. 9
4.2.4 Fill Materials and Placement ....................................................................... 9
4.2.5 Compaction Requirements ....................................................................... 10
4.2.6 Utility Trench Backfill ................................................................................. 11
4.2.7 Grading and Drainage .............................................................................. 11
4.2.8 Exterior Slab Design and Construction ...................................................... 12
4.2.9 Corrosion Protection ................................................................................. 12
4.3 Foundations ......................................................................................................... 13
4.3.1 Design Recommendations – Spread Footings and Reinforced Mats .... 13
4.3.2 Design Recommendations – Drilled Piers ............................................. 14
4.4 Floor Systems ......................................................................................................... 15
4.5 Seismic Considerations .......................................................................................... 16
4.6 Pavements .............................................................................................................. 17
4.6.1 Compliance ........................................................................................... 18
4.6.2 Pavement Performance ......................................................................... 18
4.6.3 Construction Considerations ................................................................. 19
5.0 GENERAL COMMENTS ................................................................................................. 19
Appendix A – FIELD EXPLORATION
Exhibit A-1 Field Exploration Description
Exhibit A-2 Boring Location Diagram
Exhibits A-3 to A-13 Boring Logs
Appendix B – LABORATORY TESTING
Exhibit B-1 Laboratory Testing Description
Exhibit B-2 Atterberg Limits Test Results
Exhibits B-3 to B-4 Grain-size Distribution Test Results
Exhibit B-5 Swell-consolidation Test Results
Exhibit B-6 Physical Properties of Soil (Bulk Reporting)
Exhibit B-7 R-value Test Results
Exhibits B-8 to B-9 Summary of Laboratory Test Results
Appendix C – SUPPORTING DOCUMENTS
Exhibit C-1 Explanation of Boring Log Information
Exhibit C-2 Unified Soil Classification System
Exhibit C-3 Description of Rock Properties
Exhibit C-4 Laboratory Test Significance and Purpose
Exhibits C-5 and C-6 Report Terminology
Geotechn
Odell Brew
October 9
Respons
EXECU
A geotec
construct
presented
11, were
ground s
fermenta
lanes. D
work. B
others.
Based on
the propo
need to b
E
fo
ex
d
co
b
co
b
F
b
th
T
o
T
b
G
in
st
S
co
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
UTIVE SU
chnical inves
ted at 800
d herein as E
performed t
surface. Th
tion vessels
Detailed reco
orings perfo
n the informa
osed project
be considere
Existing, und
ootprint of th
xisting site g
esired site g
ontents, and
elieve the e
onstruction a
Geotechn
Odell Brew
October 9
Respons
A
co
re
O
u
fil
p
a
A
e
th
T
w
d
p
T
si
C
a
This sum
should b
report m
herein. T
report lim
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
A slab-on-gra
onstructed
ecompacted
On-site soils
se as engin
lls. Importe
roposed ferm
re presented
Assuming pro
stimated to
he total estim
The amount o
wetting of un
iscussed in t
otential mov
The 2009 Inte
ite is C.
Close monito
chieving the
mmary shou
e recognize
ust be read
The section
mitations.
ering Report
w House Exp
racon Project
rceful ■ Relia
Responsive ■ Resourceful ■ Reliable 1
GEOTECHNICAL ENGINEERING REPORT
Odell Brewing Co. Brew House Expansion
800 East Lincoln Avenue
Fort Collins, Colorado
Terracon Project No. 20125035
October 9, 2012
1.0 INTRODUCTION
This report presents the results of our geotechnical engineering services performed for the
proposed Brew House Expansion to be located at 800 East Lincoln Avenue in Fort Collins,
Colorado. The purpose of these services is to provide information and geotechnical engineering
recommendations relative to:
Subsurface soil and bedrock conditions Foundation design and construction
Groundwater conditions Floor slab design and construction
Grading and drainage Pavement construction
Lateral earth pressures Earthwork
Seismic considerations
Our geotechnical engineering scope of work for this project included the initial site visit, the
advancement of eleven (11) test borings to depths ranging from approximately 10.5 to 34.3 feet
below existing site grades, laboratory testing for soil engineering properties and engineering
analyses to provide foundation, floor systems, and pavement design and construction
recommendations.
Logs of the borings along with a Boring Location Diagram (Exhibit A-2) are included in Appendix
A of this report. The results of the laboratory testing performed on soil and bedrock samples
obtained from the site during the field exploration are included in Appendix B of this report.
Previously, Terracon performed a geotechnical study at the project site, as presented in Report
No. 20945015 dated February 9, 1994. The recommendations provided in our previous report
were reviewed and taken into consideration during the development of the recommendations
provided herein.
Geotechn
Odell Brew
October 9
Respons
2.0 P
2.1 P
Site layo
Propose
Building
Finished
Maximu
Grading
Below-g
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
PROJECT
Project Des
Item
out
ed construct
g constructio
d floor elevat
m loads
g in building
grade areas
ering Report
w House Exp
racon Project
rceful ■ Relia
T INFORM
scription
tion
on
tion
area
t
pansion ■ Fort
No. 2012503
able
MATION
Refer to the
We unders
eight ferme
building as
liquid waste
expansion
access driv
new paved
The propos
place conc
concrete de
to the east
two-story b
will be sup
footing foun
We anticipa
near curren
the existing
Geotechn
Odell Brew
October 9
Respons
Estimate
2.2 S
Location
Existing
Current
Existing
3.0 S
3.1 T
Specific
logs inclu
the appro
be gradu
be gener
M
Topsoi
N
Asphal
(Bori
Fill mate
clay with
gravel
(Boring
Clayey
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
Item
ed traffic loa
Site Locatio
Item
n
g improveme
ground cove
g topography
SUBSURF
Typical Sub
conditions e
uded in Appe
oximate loca
ual. Based o
ralized as fo
Material descr
l / vegetative l
os. 1, 2, 8, 9 a
t / Aggregate
ng Nos. 3, 4, 5
erials consistin
h varying amou
, and poorly g
g Nos. 2, 3, 4,
sand, sandy s
and silty cl
ering Report
w House Exp
racon Project
Geotechn
Odell Brew
October 9
Respons
M
Sand
graded w
Silts
in
3.2 L
Laborato
compres
potential
exhibited
indices r
this repo
3.3 G
The bore
groundwa
The grou
summariz
Borin
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
Material descr
and gravel, po
with varying a
and cobb
tone bedrock
nterbedded cla
Laboratory
ory test resu
sion when w
or non-exp
d low to mod
anging from
rt.
Groundwat
eholes were
ater. In add
undwater leve
zed below:
ng Number
1
2
3
4
5
6
7
8
9
10
11
ering Report
w House Exp
racon Project
rceful ■ Relia
Geotechn
Odell Brew
October 9
Respons
These ob
may not
to fluctua
Groundw
and othe
levels du
than the
should be
Fluctuatio
monitorin
measure
4.0 R
4.1 G
Based o
proposed
design a
identified
structure
4.1.1 E
As previo
in the bo
was plac
The reco
existing f
grades in
values, in
to suppo
suitable
condition
engineer
4.1.2 S
As previ
existing s
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
bservations
be indicative
ate with vary
water level fl
er factors no
uring constru
levels indic
e considered
ons in groun
ng plan. Suc
ment of grou
RECOMM
Geotechnic
n subsurfac
d constructio
and constru
d geotechnic
es, pavemen
Existing Fil
Geotechn
Odell Brew
October 9
Respons
and stab
Recomm
4.1.3 D
Boring N
Soils enc
well grad
encounte
exploratio
are outsi
by others
4.1.4 S
The ferm
reduce th
soft com
concrete
the top o
drilled pie
If a sprea
excavatio
area. Th
below the
a depth o
the over
(TensarT
excavatio
course o
should b
bottom o
backfill s
and com
D698.
The brew
soils or o
proposed
provide a
soils, inc
used as f
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
bilization me
mendations fo
Detention P
No. 8 was dr
countered w
ded sand a
ered underly
on of 10½ f
de of our sc
s.
Structural C
mentation ves
he risk for fo
mpressible fo
mat foundat
Geotechn
Odell Brew
October 9
Respons
A slab-on
construct
site soils
The yeas
minimum
Site pav
moisture
report. P
pavemen
pavemen
Design a
and othe
report.
4.2 E
The follo
and plac
observed
include
preparati
exposed
4.2.1 S
Prior to p
of over-e
The base
each foot
Stripped
or used
operation
uniform c
Prior to t
receive fi
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
n-grade floo
ted on a mi
, or on newly
st liquid wast
m of two (2) fe
ements ma
conditioned
Pavements
nt subgrade
nt section co
and construc
er earth rela
Earthwork
wing presen
cement of e
d and evalua
observation
ion, subgrad
during the c
Site Prepara
placing any f
Geotechn
Odell Brew
October 9
Respons
4.2.2 E
It is ant
conventio
and/or sa
levels. P
facilitate
difficult e
The soils
The soil
explorato
proposed
construct
necessar
Although
during th
unexpect
the excav
Any over
beyond a
footing b
accordan
Any exist
the new f
to determ
stress in
engineer
to 1(v) sl
zone of e
the existi
system a
Dependin
groundwa
sumps m
significan
The subg
of the so
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
Excavation
icipated tha
onal earthm
aturated soils
Pier hole exca
rock break-u
xcavation in
s to be pene
classificatio
ory test borin
d area of ex
tion, the actu
ry to maintai
evidence o
he site reco
ted fills or un
Geotechn
Odell Brew
October 9
Respons
flatter tha
be made
maintain
shored in
excavatio
a depth o
designed
As a saf
lateral dis
slope fac
4.2.3 S
Prior to
exposed
95 perce
foundatio
After the
the found
be place
report.
The stab
other fac
drying.
may be
surface s
geotextile
recomme
construct
pumping
4.2.4 F
On-site s
vessels,
engineer
be noted
compact
fermenta
concrete
material
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
an the OSHA
responsible
stability of b
n the interes
on and trenc
of more than
d by a profes
fety measure
stance from
ce should be
Subgrade P
the placeme
ground surf
ent of the ma
on or pavem
Geotechn
Odell Brew
October 9
Respons
Maxi
1. M
o
All fill ma
inches in
be used a
It is not
appropria
based on
4.2.5 C
Engineer
procedur
Scarifica
placeme
Fill lift th
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
Grad
3
No. 4
No. 200
Soil Pro
Liquid
Plastic
mum Expan
Measured on a
optimum water
aterials shou
n size. Pea
as fill or back
ed that if c
ate to specif
n relative de
Compaction
red fill shou
res that will p
Item
ation depth p
ent
hickness
ering Report
w House Exp
racon Project
rceful ■ Relia
dation
3”
Sieve
0 Sieve
operties
d Limit
c Limit
sive Potentia
sample compa
content. The s
Geotechn
Odell Brew
October 9
Respons
Compac
Moisture
4.2.6 U
All trenc
including
All under
couplings
in founda
that utility
trenches
18 inche
surface w
Utility tre
penetrate
through t
effective
The plug
optimum
compacte
It is stron
observati
4.2.7 G
All grade
structure
Infiltratio
Landsca
permitted
construct
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
Item
ction
e content
Utility Trenc
h excavatio
backfill plac
rground pipi
s, so minor d
ation walls s
y trenches b
are backfille
es of cohesiv
water through
enches are a
e beneath th
the trenches
clay “trench
g material sh
water conte
ed in accord
ngly recomm
ion and com
Grading and
es must be a
Geotechn
Odell Brew
October 9
Respons
report. A
relied up
the fill an
Exposed
beyond t
and/or ar
of the str
free of al
of the pr
grading b
Flatwork
practical
addition,
of flatwo
structure
infiltration
Planters
spray he
should d
through t
the roof
other app
4.2.8 E
Exterior s
the site s
Potential
M
C
U
a
P
4.2.9 C
Results o
Type I o
Foundati
provision
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
As a result,
on if positive
nd/or subgra
ground (if a
the perimete
rea drains m
ructures. Ba
ll constructio
roposed stru
be performed
and pavem
should be
allowances
rk, particula
es, care shou
n of surface
Geotechn
Odell Brew
October 9
Respons
4.3 F
The ferm
foundatio
house ad
site soils
spread fo
fill. Desi
elements
4.3.1
Structur
Bearing
Maximu
Lateral e
Sliding c
Moist so
Minimum
Total es
Estimate
1. The
bear
seism
2. The
inclu
Foundati
on the b
constant
Footings
caused b
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
Foundation
mentation ve
on system,
ddition may
or on newly
ooting found
gn recomme
s are presen
Design Re
re
material
m allowable
earth pressu
coefficient
oil unit weigh
m embedmen
stimated sett
ed differentia
design beari
ring pressure
mic conditions
lateral earth
ude any factor
ons should
Geotechn
Odell Brew
October 9
Respons
Exterior
protectio
of 12 inc
foundatio
4.3.1.1
Spread f
foundatio
moisture
should be
Foundati
encounte
recomme
The engi
excavatio
moisture
4.3.2
Minimu
Minimu
Maximu
Skin fric
1.
4.3.2.1
Drilling to
majority o
layers. I
drilling sl
Groundw
should b
be place
bottom-d
concrete
raveling,
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
foundations
n. Interior fo
ches below f
ons and floo
Constru
footing or re
on moveme
conditioned
e maintained
on excavatio
ered differ
endations wi
neered fill sh
on. The so
content and
Design Re
m pier length
m bedrock e
um allowable
ction (for po
Geotechn
Odell Brew
October 9
Respons
The casi
concrete
concrete
through a
We reco
bearing s
bearing
geotechn
All piers
The follo
drilled pie
T
Ang
Un
Stati
Notes:
Piers sho
pier diam
diameter
capacity
Capacity
action an
4.4 Flo
A slab-on
on a min
moveme
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
ng should b
to prevent
. Pier concr
a tremie. Pie
ommend the
strata. This s
surfaces m
nical enginee
should be re
wing table p
er lateral des
Param
Layer Descrip
Material Ty
Total Unit Weig
le of Internal F
drained Shear
c Soil Modulus
Strain, E
1. Materia
2. The de
ould be con
meters. A
rs should be
of individua
y reduction is
Geotechn
Odell Brew
October 9
Respons
Interior f
Floor sla
Sub bas
Modulus
Some dif
of the su
should be
Additiona
P
fo
C
A
re
In
w
F
If
g
O
S
4.5 S
20
1. In ge
2. The
dept
requ
max
cond
deep
Alter
site c
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
Descript
floor system
ab support
se
s of subgrad
fferential mo
ubgrade soil
e prepared a
al floor slab d
Positive sepa
oundations, c
Control joints
ACI Design
ecommende
nterior utility
with the recom
loor slabs sh
f moisture se
iven to the u
Other design
Section 302.1
Geotechn
Odell Brew
October 9
Respons
4.6 Pav
Design o
outlined
Pavemen
soils, or
report, pr
The follo
D
E
R
M
(E
M
We shou
actual tra
Traf
Standard
Standard
Main traf
Main traf
Each alt
economic
at the lo
radius.
Aggregat
specifica
Transpor
base cou
percent o
Asphalt c
and app
designs
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
vements
of privately m
by the Amer
nts may be s
on newly pl
rovided a sta
wing design
Design life =
Equivalent sin
R-value = 21
Maximum he
ESAL)
Maximum sta
uld be conta
affic volumes
ffic area
d duty
d duty
ffic corridors
ffic corridors
Geotechn
Odell Brew
October 9
Respons
recomme
meet par
is recom
verify the
of the the
Where rig
with the f
Modulus
Compre
Entraine
Concret
Longitud
expansio
final pave
should be
prevent e
4.6.1
Recomm
with reco
should be
4.6.2
The perfo
reach th
minimum
S
W
C
p
S
m
P
P
co
P
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
ended mixin
rticular grada
mended for
eir adequacy
eoretical ma
gid pavemen
following min
Prop
s of rupture
essive Streng
ed air conten
te aggregate
inal and tra
on/contractio
ement geom
e a minimum
entry of forei
Complian
Geotechn
Odell Brew
October 9
Respons
Preventa
managem
maintena
the pave
Preventa
patching
the first p
highest r
4.6.3
Site gra
construct
traffic, de
pavemen
evaluated
disturban
and prop
We reco
grading a
disturbed
condition
compacte
the recom
The plac
without a
traffic va
modify th
5.0 G
Terracon
can be m
in the de
testing s
construct
The anal
from the
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
ative mainte
ment progra
ance activitie
ment investm
ative mainte
) and globa
priority when
return on inv
Construc
ading is ge
tion proceed
esiccation, o
nt constructio
d at the time
nce has occu
perly compac
ommend the
and paving.
Geotechn
Odell Brew
October 9
Respons
this repo
site, or d
variations
should b
can be p
The scop
environm
preventio
potential
This repo
project d
engineer
safety, ex
event tha
planned,
valid unle
report in
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
ort. This rep
due to the m
s may not b
be immediate
rovided.
pe of service
mental or bio
on of polluta
for such con
ort has been
discussed an
ring practice
xcavation su
at changes in
the conclus
ess Terracon
writing.
ering Report
w House Exp
racon Project
rceful ■ Relia
port does no
modifying effe
become evid
ely notified
es for this p
logical (e.g.
nts, hazardo
ntamination
n prepared f
nd has been
es. No warr
upport, and
n the nature
sions and re
APPENDIX A
FIELD EXPLORATION
Geotechn
Odell Brew
October 9
Respons
Field Ex
The loca
site plan
site featu
the temp
The bori
During th
Relativel
diameter
Disturbed
were rec
driving th
30 inche
inches fo
is record
indicated
are not c
A CME a
this site.
conventio
the SPT
This high
the pene
method.
and analy
The stan
type mat
since the
addition,
particula
Groundw
completio
backfill a
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
xploration
ations of bor
. The borin
ures. The g
orary bench
ngs were d
he drilling op
y undisturbe
r split-spoon
d bulk samp
corded in a m
he sampler i
es. The num
or standard s
ded as a sta
d on the bor
considered N
automatic SP
A greater
0’ 15’ 30’
APPROXIMATE SCALE
Scale:
1901 Sharp Point Dr., Ste. C Fort Collins, Colorado
PH. (970) 484-0359 FAX. (970) 484-0454
EDB
BCJ
JRM
EDB
Project Manager:
Drawn by:
Checked by:
Approved by:
BORING LOCATION DIAGRAM
Odell Brewing Co. Brew House Expansion
800 East Lincoln Avenue
Fort Collins, Colorado A-2
20125035Exhibit
10/1/2012
1=30’
Project No.
File Name:
Date:
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND
IS NOT INTENDED FOR CONSTRUCTION PURPOSES
LEGEND
Approximate Location of Temporary
Benchmark (Survey Landmark–
Elevation 4943.5’)
2 Approximate Boring Location for
Current Study
Approximate Boring Location for
Previous Terracon Study (Project
No.20945015; report dated February 9,
1994)
1
7 8
9
2
3
5
6
4
6
5
4
3
2
1
1
10
11
1.0
3.5
7.0
16.0
24.2
GRASS and TOPSOIL
CLAYEY SAND
loose, moist, brown
SANDY SILT
medium stiff, moist, brown
WELL-GRADED SAND with GRAVEL AND COBBLES
dense to very dense, wet, brown
SILTSTONE BEDROCK
trace interbedded claystone, very hard, slightly moist, gray
Boring Terminated at 24.2 Feet
4944.5
4942
4938.5
4929.5
4921.5
19
18
6
11
14
2-4-4
N=8
3-5
12-18-21
N=39
23-50/2"
N=73/8"
50/2"
110 NP
See Exhibit A-2
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
LOCATION
GRAPHIC LOG
DEPTH
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TERRACON SMART LOG-NO WELL 20125035.GPJ ODOT TEST.GPJ 10/4/12
800 East Lincoln Avenue
Fort Collins, Colorado
SITE:
While Drilling
9/25/12
WATER LEVEL OBSERVATIONS
PROJECT: O'Dell Brewing Co. Brew
House Expansion
Page 1 of 1
Advancement Method:
4" soild-stem flight augers.
Abandonment Method:
Borings backfilled with soil cuttings upon completion.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20125035
Drill Rig: CME-55
Boring Started: 9/24/2012
BORING LOG NO. 1
2.0
5.5
17.0
34.3
TOPSOIL and GRASS
FILL
lean clay with varying amounts of gravel and silt, stiff to very stiff,
moist, dark brown
POORLY GRADED SAND
trace gravel, loose to dense, wet, brown, red, white
SILTSTONE BEDROCK
trace interbedded claystone, very hard, slightly moist, gray
Boring Terminated at 34.3 Feet
4944.5
4941
4929.5
4912
23
17
15
6
18
17
17
5-8
4-5-19
N=24
6-9
9-18-20
N=38
50/5"
N=50/5"
50/5"
N=50/5"
50/4"
N=50/4"
107
NP
See Exhibit A-2
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
LOCATION
GRAPHIC LOG
DEPTH
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TERRACON SMART LOG-NO WELL 20125035.GPJ ODOT TEST.GPJ 10/4/12
800 East Lincoln Avenue
Fort Collins, Colorado
SITE:
While Drilling
9/25/12
WATER LEVEL OBSERVATIONS
PROJECT: O'Dell Brewing Co. Brew
House Expansion
Page 1 of 1
Advancement Method:
4" soild-stem flight augers.
Abandonment Method:
Borings backfilled with soil cuttings upon completion.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
0.3
0.5
3.0
6.0
14.0
24.4
ASPHALT - 4 inches
AGGREGATE BASE COURSE - 2 inches
FILL
silty clay, very stiff, moist, dark brown
SILTY CLAY
medium stiff, very moist, rusty brown
WELL-GRADED SAND with GRAVEL and COBBLES
dense to very dense, wet, brown, red, white
SILTSTONE BEDROCK
trace interbedded claystone, very hard, slightly moist, gray, buff, olive
Color change to solid gray at 19 feet.
Boring Terminated at 24.4 Feet
4944
4943.5
4941
4938
4930
4920
17
20
10
17
16
8-12
2-3-3
N=6
13-15-22
N=37
8-20-50/5"
N=70/11"
22-50/5"
N=72/11"
50/5"
N=50/5"
106
34-22-12
See Exhibit A-2
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
LOCATION
GRAPHIC LOG
DEPTH
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TERRACON SMART LOG-NO WELL 20125035.GPJ ODOT TEST.GPJ 10/4/12
800 East Lincoln Avenue
Fort Collins, Colorado
SITE:
While Drilling
Backfilled
WATER LEVEL OBSERVATIONS
PROJECT: O'Dell Brewing Co. Brew
House Expansion
Page 1 of 1
Advancement Method:
4" soild-stem flight augers.
Abandonment Method:
0.4
0.7
1.5
5.0
15.0
24.0
ASPHALT - 5 inches
AGGREGATE BASE COURSE - 3 inches
FILL
poorly-graded sand with gravel, moist, brown
SANDY SILTY CLAY
stiff, very moist, brown
WELL-GRADED SAND with GRAVEL
medium dense to dense, moist to wet, brown, red, white
Cobbles from a depth of about 7 to 14 feet.
SILTSTONE BEDROCK
trace interbedded claystone, very hard, slightly moist, gray
Boring Terminated at 24 Feet
4943
4942.5
4941.5
4938
4928
4919
24 0.0
15
11
4-7
4-5-5
N=10
19-13-10
N=23
13-26-15
N=41
24-50/5"
N=74/11"
97
See Exhibit A-2
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
LOCATION
GRAPHIC LOG
DEPTH
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TERRACON SMART LOG-NO WELL 20125035.GPJ ODOT TEST.GPJ 10/4/12
800 East Lincoln Avenue
Fort Collins, Colorado
SITE:
While Drilling
Backfilled
WATER LEVEL OBSERVATIONS
PROJECT: O'Dell Brewing Co. Brew
House Expansion
Page 1 of 1
Advancement Method:
4" soild-stem flight augers.
Abandonment Method:
Borings backfilled with soil cuttings and asphalt patch.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20125035
0.3
0.5
2.0
4.5
6.0
14.5
24.3
ASPHALT - 3 inches
AGGREGATE BASE COURSE - 3 inches
FILL
silty clay with gravel, moist, black
SILTY CLAY
stiff, moist, brown
SILTY SAND
loose, very moist, brown
WELL-GRADED SAND with GRAVEL
medium dense, wet, brown, red, white
Cobbles from a depth of about 7 to 14 feet.
SILTSTONE BEDROCK
trace interbedded claystone, hard to very hard, slightly moist, gray,
buff, olive
Boring Terminated at 24.3 Feet
4943.5
4943.5
4942
4939.5
4938
4929.5
4919.5
22
21
9
16
17
17
4-7
2-4-4
N=8
8-12-7
N=19
17-25-42
N=67
21-50/5"
N=71/11"
50/4"
N=50/4"
33-22-11
See Exhibit A-2
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
LOCATION
GRAPHIC LOG
DEPTH
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TERRACON SMART LOG-NO WELL 20125035.GPJ ODOT TEST.GPJ 10/4/12
800 East Lincoln Avenue
Fort Collins, Colorado
SITE:
While Drilling
Backfilled
WATER LEVEL OBSERVATIONS
PROJECT: O'Dell Brewing Co. Brew
0.3
0.5
2.0
4.0
7.0
17.0
29.4
ASPHALT - 3 inches
AGGREGATE BASE COURSE - 3 inches
FILL
poorly-graded sand with gravel, moist, brown
SILTY CLAY
medium stiff, moist to very moist, brown
SILTY SAND
loose, very moist to wet,rusty brown
WELL-GRADED SAND with GRAVEL
loose to medium dense, wet, brown, red, white
Cobbles from a depth of about 13 to 17 feet.
SILTSTONE BEDROCK
trace interbedded claystone, very hard, slightly moist, gray
Boring Terminated at 29.4 Feet
4943
4942.5
4941
4939
4936
4926
4914
23
21
19
14
14
15
4-4
2-2-3
N=5
1-2-3
N=5
3-4-25
N=29
50/3"
N=50/3"
50/5"
N=50/5"
96
See Exhibit A-2
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
LOCATION
GRAPHIC LOG
DEPTH
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TERRACON SMART LOG-NO WELL 20125035.GPJ ODOT TEST.GPJ 10/4/12
800 East Lincoln Avenue
Fort Collins, Colorado
SITE:
While Drilling
Backfilled
WATER LEVEL OBSERVATIONS
PROJECT: O'Dell Brewing Co. Brew
House Expansion
0.3
0.5
4.0
10.5
ASPHALT - 3 inches
AGGREGATE BASE COURSE - 3 inches
SILTY SAND
loose, moist, brown
WELL-GRADED SAND with GRAVEL
loose to dense, wet, brown, rust
Cobbles from a depth of about 9 to 10.5 feet.
Boring Terminated at 10.5 Feet
4943
4943
4939.5
4933
21
24
8
4-7
3-4-4
N=8
24-21-23
N=44
NP
See Exhibit A-2
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
LOCATION
GRAPHIC LOG
DEPTH
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TERRACON SMART LOG-NO WELL 20125035.GPJ ODOT TEST.GPJ 10/4/12
800 East Lincoln Avenue
Fort Collins, Colorado
SITE:
While Drilling
Backfilled
WATER LEVEL OBSERVATIONS
PROJECT: O'Dell Brewing Co. Brew
House Expansion
Page 1 of 1
Advancement Method:
4" soild-stem flight augers.
Abandonment Method:
Borings backfilled with soil cuttings and asphalt patch.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20125035
Drill Rig: CME-55
Boring Started: 9/24/2012
BORING LOG NO. 7
O'Dell Brewing Company
See Appendix C for explanation of symbols and
abbreviations.
CLIENT:
Fort Collins, Colorado
See Appendix B for description of laboratory
procedures and additional data, (if any).
See Exhibit A-1 for description of field
procedures
0.4
3.0
9.0
10.5
VEGETATIVE LAYER - 5 inches
SILTY CLAY
very stiff, moist to wet, brown, dark gray
WELL-GRADED SAND with GRAVEL
medium dense, wet, brown, buff, gray
Cobbles from a depth of about 5 to 9 feet.
SILTSTONE BEDROCK
medium hard, slightly moist, gray, buff, olive
Boring Terminated at 10.5 Feet
4938.5
4936
4930
4928.5
37
12
19
8-14
8-11-13
N=24
8-14-17
N=31
See Exhibit A-2
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
LOCATION
GRAPHIC LOG
DEPTH
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TERRACON SMART LOG-NO WELL 20125035.GPJ ODOT TEST.GPJ 10/4/12
800 East Lincoln Avenue
Fort Collins, Colorado
SITE:
While Drilling
Backfilled
WATER LEVEL OBSERVATIONS
PROJECT: O'Dell Brewing Co. Brew
House Expansion
Page 1 of 1
Advancement Method:
4" soild-stem flight augers.
Abandonment Method:
Borings backfilled with soil cuttings upon completion.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20125035
Drill Rig: CME-55
Boring Started: 9/24/2012
BORING LOG NO. 8
O'Dell Brewing Company
See Appendix C for explanation of symbols and
abbreviations.
CLIENT:
Fort Collins, Colorado
See Appendix B for description of laboratory
procedures and additional data, (if any).
See Exhibit A-1 for description of field
procedures
0.5
3.0
7.0
10.5
VEGETATIVE LAYER - 6 inches
SILTY CLAY
medium stiff, moist, brown
SILTY SAND
medium dense, wet, rusty brown
POORLY GRADED GRAVEL with SAND
medium dense, wet, brown, gray, pink
Boring Terminated at 10.5 Feet
4941.5
4939
4935
4931.5
21
13
9
3-4
3-5-7
N=12
11-15-6
N=21
107
NP
See Exhibit A-2
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
LOCATION
GRAPHIC LOG
DEPTH
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TERRACON SMART LOG-NO WELL 20125035.GPJ ODOT TEST.GPJ 10/4/12
800 East Lincoln Avenue
Fort Collins, Colorado
SITE:
While Drilling
Backfilled
WATER LEVEL OBSERVATIONS
PROJECT: O'Dell Brewing Co. Brew
House Expansion
Page 1 of 1
Advancement Method:
4" soild-stem flight augers.
Abandonment Method:
Borings backfilled with soil cuttings upon completion.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20125035
Drill Rig: CME-55
Boring Started: 9/24/2012
BORING LOG NO. 9
O'Dell Brewing Company
See Appendix C for explanation of symbols and
abbreviations.
CLIENT:
Fort Collins, Colorado
See Appendix B for description of laboratory
procedures and additional data, (if any).
See Exhibit A-1 for description of field
2.5
5.0
10.5
FILL
silty clay with varying amounts of gravel, stiff, slightly moist to moist,
brown
SILTY CLAY
very stiff, moist, brown
WELL-GRADED SAND with GRAVEL
dense, slightly moist, brown, rust
Cobbles from a depth of about 6 to 10.5 feet.
Boring Terminated at 10.5 Feet
4944.5
4942
4936.5
11
8
3
5-6
5-8-11
N=19
11-17-21
N=38
109
See Exhibit A-2
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
LOCATION
GRAPHIC LOG
DEPTH
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TERRACON SMART LOG-NO WELL 20125035.GPJ ODOT TEST.GPJ 10/4/12
800 East Lincoln Avenue
Fort Collins, Colorado
SITE:
No free water observed
WATER LEVEL OBSERVATIONS
PROJECT: O'Dell Brewing Co. Brew
House Expansion
Page 1 of 1
Advancement Method:
4" soild-stem flight augers.
Abandonment Method:
Borings backfilled with soil cuttings upon completion.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20125035
Drill Rig: CME-55
Boring Started: 9/24/2012
BORING LOG NO. 10
O'Dell Brewing Company
See Appendix C for explanation of symbols and
abbreviations.
CLIENT:
Fort Collins, Colorado
See Appendix B for description of laboratory
procedures and additional data, (if any).
See Exhibit A-1 for description of field
procedures
Exhibit
Driller: Drilling Engineers, Inc.
0.5
7.0
10.5
VEGETATIVE LAYER - 6 Iinches
CLAYEY SAND
loose, slightly moist, brown
WELL-GRADED SAND with GRAVEL
dense, wet, brown
Cobbles from a depth of about 8 to 10.5 feet.
Boring Terminated at 10.5 Feet
4944.5
4938
4934.5
14
16
10
5-6
3-2-3
N=5
11-21-21
N=42
35-18-17
See Exhibit A-2
Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic
LOCATION
GRAPHIC LOG
DEPTH
THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TERRACON SMART LOG-NO WELL 20125035.GPJ ODOT TEST.GPJ 10/4/12
800 East Lincoln Avenue
Fort Collins, Colorado
SITE:
While Drilling
Backfilled
WATER LEVEL OBSERVATIONS
PROJECT: O'Dell Brewing Co. Brew
House Expansion
Page 1 of 1
Advancement Method:
4" soild-stem flight augers.
Abandonment Method:
Borings backfilled with soil cuttings upon completion.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20125035
Drill Rig: CME-55
Boring Started: 9/24/2012
BORING LOG NO. 11
O'Dell Brewing Company
See Appendix C for explanation of symbols and
abbreviations.
CLIENT:
Fort Collins, Colorado
See Appendix B for description of laboratory
procedures and additional data, (if any).
See Exhibit A-1 for description of field
procedures
Exhibit
Driller: Drilling Engineers, Inc.
A-13
APPENDIX B
LABORATORY TESTING
Geotechn
Odell Brew
October 9
Respons
Laborat
The soil
laborator
descriptio
determin
Laborato
tests are
analyses
tests we
samples
described
descriptio
nical Enginee
wing Co. Brew
9, 2012 ■ Terr
ive ■ Resour
tory Testin
and bedro
ry for obse
ons were re
e engineerin
ory tests wer
presented i
s, and the de
re performe
were class
d in Append
on of rock pr
Wate
Grai
Cons
ering Report
w House Exp
racon Project
rceful ■ Relia
ng Descript
ock samples
rvation by
eviewed and
ng properties
re conducte
in Appendix
evelopment
ed in genera
sified in gen
dix C. Rock
roperties pre
er content
n-size distrib
solidation/sw
t
pansion ■ For
No. 2012503
able
tion
s retrieved
0
10
20
30
40
50
60
0 20 40 60 80 100
CL or OL CH or OH
ML or OL
MH or OH
PL PI
ATTERBERG LIMITS RESULTS
ASTM D4318
4.0
9.0
19.0
14.0
2.0
9.0
4.0
Boring ID Depth Description
SANDY SILT
POORLY GRADED SAND
SANDY LEAN CLAY
SILTY SAND
POORLY GRADED GRAVEL with SAND
CLAYEY SAND
ML
SP
CL
SM
GP
SC
Fines
P
L
A
S
T
I
C
I
T
Y
I
N
D
E
X
LIQUID LIMIT
"U" Line
"A" Line
NP
NP
34
33
NP
NP
35
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
100 10 1 0.1 0.01 0.001
% FINES % CLAY USCS
1
2
5
0.0 2.4 96.6
DEPTH
0.64
1.191
0.82
GRAIN SIZE DISTRIBUTION ASTM D422
ML
SP
CL
4 - 5
9 - 10
14 - 15.5
GRAIN SIZE
SANDY SILT(ML)
POORLY GRADED SAND(SP)
SANDY LEAN CLAY(CL)
16 20
100
90
80
70
60
50
40
30
20
10
0
REMARKS
COBBLES SILT OR CLAY
GRAVEL SAND
medium
52.9
1.0
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
100 10 1 0.1 0.01 0.001
% FINES % CLAY USCS
7
9
11
0.0 50.7 45.8
DEPTH
0.79
11.005
0.25
GRAIN SIZE DISTRIBUTION ASTM D422
SM
GP
SC
2 - 3
9 - 10.5
4 - 5.5
GRAIN SIZE
SILTY SAND(SM)
POORLY GRADED GRAVEL with
SAND(GP)
CLAYEY SAND(SC)
16 20
100
90
80
70
60
50
40
30
20
10
0
REMARKS
COBBLES SILT OR CLAY
GRAVEL SAND
medium
34.3
-10
-8
-6
-4
-2
0
2
4
100 1,000 10,000
AXIAL STRAIN, %
PRESSURE, psf
SWELL CONSOLIDATION TEST
ASTM D4546
NOTES: Water added at 500 psf.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
PROJECT NUMBER: 20125035
EXHIBIT: B-5
PROJECT: O'Dell Brewing Co. Brew House
Expansion
SITE: 800 East Lincoln Avenue
Fort Collins, Colorado
CLIENT: O'Dell Brewing Company
Fort Collins, Colorado
Specimen Identification
2.0 ft
Classification , pcf
4 97 24
WC, %
SANDY SILTY CLAY (CL-ML)
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TC_CONSOL_STRAIN-USCS 20125035.GPJ TERRACON2012.GDT 10/4/12
Physical Properties of Soil
Client Name: O'Dell Brewing Company Project No.:
Address: 800 East Lincoln Avenue Soil Source: Composite Bulk Sample No. 1 from Boring Nos.
Fort Collins, Colorado 80524 7, 9 and 11 from depths of about 0 to 5 feet.
Project Name: Brew House Expansion USCS: SILTY CLAY (CL-ML)
Location: 800 East Lincoln Avenue
Fort Collins, Colorado 80524
Sampled By: Bryce C. Johnson, E.I.T.
Date: 9/24/2012
Sieve Analysis, ASTM C136 ASTM Test Standards
X Passing
Sieve Retained Test Standard
Size Fineness Modulus C125
% Accumulative Dry Rodded Unit Wt, pcf C29
6" Lightweight Pieces, % C123
5" Clay Lumps & Friable, % C142
4" Organic Impurities C40
3" Sulfate Content ppm CPL-2103
2-1/2" LA Abrasion, % Grade C535
2" Soundness-Mg ,%loss C88
1-1/2" Soundness-Na, %loss C88
1" Resistance R-Value of Soils D2844
3/4" R-V @ 300 psi exudation D2844
1/2" Resilient Modulus, psi T294
3/8" Liquid Limit D4318
#4 100 Plasticity Index D4318
#8 Laboratory Compaction Characteristics of Soil
#10 99 Maximum Dry Unit Weight, pcf D698
#16 Optimum Water Content, % D698
#20 99 Maximum Dry Unit Weight, pcf D1557
#30 Optimum Water Content, % D1557
#40 98
#50 Absorption, % C127
#80 97 Specific Bulk (Dry) C127
#100 94 Gravity Bulk (SSD) C127
#200 72 Apparent C127
37
20125035
Specs
Results
23
21
Copy of 20125035 Bulk Property Reporting.xlsx
RESISTANCE R-VALUE & EXPANSION
PRESSURE OF COMPACTED SOIL
CDOT CP-L 3101
CLIENT: O'Dell Brewing Company DATE OF TEST: 25-Sep-12
PROJECT: 20125035
LOCATION: Composite Bulk Sample No.1 from Boring Nos. 7, 9, and 11
TERRACON NO. 20125035 CLASSIFICATION: SILTY CLAY (CL-ML)
SAMPLE DATA TEST RESULTS
TEST SPECIMEN NO. 1 2 3
COMPACTION PRESSURE (PSI) 100 130 160
DENSITY (PCF) 106.0 107.6 108.7
MOISTURE CONTENT (%) 19.7 19.0 18.0
EXPANSION PRESSURE (PSI) 0.22 0.22 0.59
HORIZONTAL PRESSURE @ 160 PSI 135 125 116
SAMPLE HEIGHT (INCHES) 2.57 2.54 2.54
EXUDATION PRESSURE (PSI) 127.3 248.2 329.0
CORRECTED R-VALUE 11.4 17.5 22.3
UNCORRECTED R-VALUE 11.1 17.5 22.3
R-VALUE @ 300 PSI EXUDATION PRESSURE = 21
0
10
20
30
40
50
60
70
80
90
100
0 100 200 300 400 500 600 700 800
R-VALUE
EXUDATION PRESSURE - PSI
1 2 - 3.5 19.4
1 4 - 5 SANDY SILT(ML) NP NP NP 52.9 0.0 0.0 18.3 110.1
1 9 - 10.5 6.4
1 14 - 14.9 11.4
1 24 - 24.2 14.3
2 2 - 3 23.3 107.1
2 4 - 5.5 16.6
2 9 - 10 POORLY GRADED SAND(SP) NP NP NP 1.0 2.4 96.6 14.7
2 14 - 15.5 6.0
2 24 - 24.4 18.0
2 29 - 29.4 16.8
2 34 - 34.3 16.7
3 2 - 3 17.4 105.9
3 4 - 5.5 19.5
3 9 - 10.5 10.0
3 14 - 15.4 16.6
3 19 - 19.9 34 22 12
3 24 - 24.4 16.1
4 2 - 3 SANDY SILTY CLAY (CL-ML) 24.2 97.2
4 4 - 5.5 15.1
4 9 - 10.5 10.7
4 14 - 15.5
4 19 - 19.9
5 2 - 3 21.9
5 4 - 5.5 20.5
5 9 - 10.5 9.3
5 14 - 15.5 SANDY LEAN CLAY(CL) 33 22 11 54.4 0.0 0.0 15.8
5 19 - 19.9 16.9
5 24 - 24.3 16.9
6 2 - 3 23.2 95.7
6 4 - 5.5 21.0
6 9 - 10.5 18.7
6 14 - 15.5 13.9
6 24 - 24.4 14.4
6 29 - 29.4 14.6
7 2 - 3 SILTY SAND(SM) NP NP NP 34.3 0.0 0.0 20.9
7 4 - 5.5 24.2
7 9 - 10.5 7.6
8 2 - 3 36.8
8 4 - 5.5 11.7
8 9 - 10.5 19.1
9 2 - 3 20.9 107.5
Depth USCS Classification
and Soil Description
Compressive
Strength
%
<#200
Sieve
Dry
Density
(pcf)
Water
Content
(%)
BORING
ID
Liquid
Limit
Plastic
9 4 - 5.5 13.3
9 9 - 10.5 POORLY GRADED GRAVEL with
SAND(GP)
NP NP NP 3.5 50.7 45.8 9.3
10 2 - 3 11.1 109.2
10 4 - 5.5 8.4
10 9 - 10.5 2.8
11 2 - 3 14.2
11 4 - 5.5 CLAYEY SAND(SC) 35 18 17 41.4 0.0 0.0 15.7
11 9 - 10.5 9.7
Depth USCS Classification
and Soil Description
Compressive
Strength
%
<#200
Sieve
Dry
Density
(pcf)
Water
Content
(%)
BORING
ID
Liquid
Limit
Plastic
Limit
Plasticity
Index
%
Gravel
%
Sand
%
Silt
%
Clay
Sheet 2 of 2
Summary of Laboratory Results
EXHIBIT: B-9
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
PROJECT NUMBER: 20125035
PROJECT: O'Dell Brewing Co. Brew House
Expansion
SITE: 800 East Lincoln Avenue
Fort Collins, Colorado
CLIENT: O'Dell Brewing Company
Fort Collins, Colorado
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. LAB SUMMARY: USCS-NO ASSIGNMENT 20125035.GPJ TERRACON2012.GDT 10/5/12
APPENDIX C
SUPPORTING DOCUMENTS
Soft
10 - 29 19 - 58
59 - 98 Stiff
less than 500
500 to 1,000
1,000 to 2,000
Macro
Core
2,000 to 4,000
> 99 4,000 to 8,000
LOCATION AND ELEVATION NOTES
SAMPLING
FIELD TESTS
DESCRIPTION OF SYMBOLS AND ABBREVIATIONS
Descriptive Term
(Density)
Non-plastic
Low
Medium
High
Boulders
Cobbles
Gravel
Sand
Silt or Clay
10 - 18
> 50 15 - 30 19 - 42
> 30 > 42
_
CONSISTENCY OF FINE-GRAINED SOILS
Hand Penetrometer
Torvane
Standard Penetration
Test (blows per foot)
N value
Photo-Ionization Detector
Organic Vapor Analyzer
(HP)
(T)
(b/f)
N
(PID)
(OVA)
Trace
With
Modifier
Water Level After
a Specified Period of Time
RELATIVETERMINOLOGY PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE
Trace
With
Modifier
Standard Penetration or
N-Value
Blows/Ft.
Descriptive Term
(Consistency)
Loose
Very Stiff
Exhibit C-1
UNIFIED SOIL CLASSIFICATION SYSTEM
Exhibit C-2
Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A
Soil Classification
Group
Symbol Group Name B
Coarse Grained Soils:
More than 50% retained
on No. 200 sieve
Gravels:
More than 50% of
coarse fraction retained
on No. 4 sieve
Clean Gravels:
Less than 5% fines C
Cu 4 and 1 Cc 3 E GW Well-graded gravel F
Cu 4 and/or 1 Cc 3 E GP Poorly graded gravel F
Gravels with Fines:
More than 12% fines C
Fines classify as ML or MH GM Silty gravel F,G,H
Fines classify as CL or CH GC Clayey gravel F,G,H
Sands:
50% or more of coarse
fraction passes No. 4
sieve
Clean Sands:
Less than 5% fines D
Cu 6 and 1 Cc 3 E SW Well-graded sand I
Cu 6 and/or 1 Cc 3 E SP Poorly graded sand I
Sands with Fines:
More than 12% fines D
Fines classify as ML or MH SM Silty sand G,H,I
Fines classify as CL or CH SC Clayey sand G,H,I
Fine-Grained Soils:
50% or more passes the
No. 200 sieve
Silts and Clays:
Liquid limit less than 50
Inorganic:
PI 7 and plots on or above “A” line J CL Lean clay K,L,M
PI 4 or plots below “A” line J ML Silt K,L,M
Organic:
Liquid limit - oven dried
0.75 OL
Organic clay K,L,M,N
Liquid limit - not dried Organic silt K,L,M,O
Silts and Clays:
Liquid limit 50 or more
Inorganic:
PI plots on or above “A” line CH Fat clay K,L,M
PI plots below “A” line MH Elastic Silt K,L,M
Organic:
Liquid limit - oven dried
0.75 OH
Organic clay K,L,M,P
Liquid limit - not dried Organic silt K,L,M,Q
Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat
A Based on the material passing the 3-inch (75-mm) sieve
B If field sample contained cobbles or boulders, or both, add “with cobbles
or boulders, or both” to group name.
DESCRIPTION OF ROCK PROPERTIES
Exhibit C-3
WEATHERING
Fresh Rock fresh, crystals bright, few joints may show slight staining. Rock rings under hammer if crystalline.
Very slight Rock generally fresh, joints stained, some joints may show thin clay coatings, crystals in broken face show
bright. Rock rings under hammer if crystalline.
Slight Rock generally fresh, joints stained, and discoloration extends into rock up to 1 in. Joints may contain clay. In
granitoid rocks some occasional feldspar crystals are dull and discolored. Crystalline rocks ring under hammer.
Moderate Significant portions of rock show discoloration and weathering effects. In granitoid rocks, most feldspars are dull
and discolored; some show clayey. Rock has dull sound under hammer and shows significant loss of strength
as compared with fresh rock.
Moderately severe All rock except quartz discolored or stained. In granitoid rocks, all feldspars dull and discolored and majority
show kaolinization. Rock shows severe loss of strength and can be excavated with geologist’s pick.
Severe All rock except quartz discolored or stained. Rock “fabric” clear and evident, but reduced in strength to strong
soil. In granitoid rocks, all feldspars kaolinized to some extent. Some fragments of strong rock usually left.
Very severe All rock except quartz discolored or stained. Rock “fabric” discernible, but mass effectively reduced to “soil” with
only fragments of strong rock remaining.
Complete Rock reduced to ”soil”. Rock “fabric” not discernible or discernible only in small, scattered locations. Quartz may
be present as dikes or stringers.
HARDNESS (for engineering description of rock – not to be confused with Moh’s scale for minerals)
Very hard Cannot be scratched with knife or sharp pick. Breaking of hand specimens requires several hard blows of
geologist’s pick.
Hard Can be scratched with knife or pick only with difficulty. Hard blow of hammer required to detach hand specimen.
Moderately hard Can be scratched with knife or pick. Gouges or grooves to ¼ in. deep can be excavated by hard blow of point of
a geologist’s pick. Hand specimens can be detached by moderate blow.
Medium Can be grooved or gouged 1/16 in. deep by firm pressure on knife or pick point. Can be excavated in small
chips to pieces about 1-in. maximum size by hard blows of the point of a geologist’s pick.
Soft Can be gouged or grooved readily with knife or pick point. Can be excavated in chips to pieces several inches in
size by moderate blows of a pick point. Small thin pieces can be broken by finger pressure.
Very soft Can be carved with knife. Can be excavated readily with point of pick. Pieces 1-in. or more in thickness can be
broken with finger pressure. Can be scratched readily by fingernail.
Joint, Bedding, and Foliation Spacing in Rock
a
Spacing Joints Bedding/Foliation
Less than 2 in. Very close Very thin
2 in. – 1 ft. Close Thin
1 ft. – 3 ft. Moderately close Medium
3 ft. – 10 ft. Wide Thick
More than 10 ft. Very wide Very thick
a. Spacing refers to the distance normal to the planes, of the described feature, which are parallel to each other or nearly so.
Rock Quality Designator (RQD) a Joint Openness Descriptors
RQD, as a percentage Diagnostic description Openness Descriptor
Exceeding 90 Excellent No Visible Separation Tight
90 – 75 Good Less than 1/32 in. Slightly Open
75 – 50 Fair 1/32 to 1/8 in. Moderately Open
50 – 25 Poor 1/8 to 3/8 in. Open
Less than 25 Very poor 3/8 in. to 0.1 ft. Moderately Wide
a. RQD (given as a percentage) = length of core in pieces Greater than 0.1 ft. Wide
4 in. and longer/length of run.
References: American Society of Civil Engineers. Manuals and Reports on Engineering Practice - No. 56. Subsurface Investigation for
Design and Construction of Foundations of Buildings. New York: American Society of Civil Engineers, 1976. U.S.
Department of the Interior, Bureau of Reclamation, Engineering Geology Field Manual.
Exhibit C-4
LABORATORY TEST
SIGNIFICANCE AND PURPOSE
Test Significance Purpose
California Bearing
Ratio
Used to evaluate the potential strength of subgrade soil,
subbase, and base course material, including recycled
materials for use in road and airfield pavements.
Pavement Thickness
Design
Consolidation
Used to develop an estimate of both the rate and amount of
both differential and total settlement of a structure. Foundation Design
Direct Shear
Used to determine the consolidated drained shear strength
of soil or rock.
Bearing Capacity,
Foundation Design,
and Slope Stability
Dry Density
Used to determine the in-place density of natural, inorganic,
fine-grained soils.
Index Property Soil
Behavior
Expansion
Used to measure the expansive potential of fine-grained
soil and to provide a basis for swell potential classification.
Foundation and Slab
Design
Gradation
Used for the quantitative determination of the distribution of
particle sizes in soil. Soil Classification
Liquid & Plastic Limit,
Plasticity Index
Used as an integral part of engineering classification
systems to characterize the fine-grained fraction of soils,
and to specify the fine-grained fraction of construction
materials.
Soil Classification
Permeability
Used to determine the capacity of soil or rock to conduct a
liquid or gas.
Groundwater Flow
Analysis
pH
Used to determine the degree of acidity or alkalinity of a
soil. Corrosion Potential
Resistivity
Used to indicate the relative ability of a soil medium to carry
electrical currents. Corrosion Potential
R-Value
Used to evaluate the potential strength of subgrade soil,
subbase, and base course material, including recycled
materials for use in road and airfield pavements.
Pavement Thickness
Design
Soluble Sulfate
Used to determine the quantitative amount of soluble
sulfates within a soil mass. Corrosion Potential
Exhibit C-5
REPORT TERMINOLOGY
(Based on ASTM D653)
Allowable Soil
Bearing Capacity
The recommended maximum contact stress developed at the interface of the foundation
element and the supporting material.
Alluvium
Soil, the constituents of which have been transported in suspension by flowing water and
subsequently deposited by sedimentation.
Aggregate Base
Course
A layer of specified material placed on a subgrade or subbase usually beneath slabs or
pavements.
Backfill A specified material placed and compacted in a confined area.
Bedrock
A natural aggregate of mineral grains connected by strong and permanent cohesive forces.
Usually requires drilling, wedging, blasting or other methods of extraordinary force for
excavation.
Bench A horizontal surface in a sloped deposit.
Caisson (Drilled
Pier or Shaft)
A concrete foundation element cast in a circular excavation which may have an enlarged
base. Sometimes referred to as a cast-in-place pier or drilled shaft.
Coefficient of
Friction
A constant proportionality factor relating normal stress and the corresponding shear stress
at which sliding starts between the two surfaces.
Colluvium
Soil, the constituents of which have been deposited chiefly by gravity such as at the foot of a
slope or cliff.
Compaction The densification of a soil by means of mechanical manipulation
Concrete Slab-on-
Grade
A concrete surface layer cast directly upon a base, subbase or subgrade, and typically used
as a floor system.
Differential
Movement Unequal settlement or heave between, or within foundation elements of structure.
Earth Pressure The pressure exerted by soil on any boundary such as a foundation wall.
ESAL
Equivalent Single Axle Load, a criteria used to convert traffic to a uniform standard, (18,000
pound axle loads).
Engineered Fill
Specified material placed and compacted to specified density and/or moisture conditions
under observations of a representative of a geotechnical engineer.
Equivalent Fluid
A hypothetical fluid having a unit weight such that it will produce a pressure against a lateral
support presumed to be equivalent to that produced by the actual soil. This simplified
approach is valid only when deformation conditions are such that the pressure increases
linearly with depth and the wall friction is neglected.
Existing Fill (or
Man-Made Fill) Materials deposited throughout the action of man prior to exploration of the site.
Existing Grade The ground surface at the time of field exploration.
Exhibit C-6
REPORT TERMINOLOGY
(Based on ASTM D653)
Expansive Potential The potential of a soil to expand (increase in volume) due to absorption of moisture.
Finished Grade The final grade created as a part of the project.
Footing A portion of the foundation of a structure that transmits loads directly to the soil.
Foundation The lower part of a structure that transmits the loads to the soil or bedrock.
Frost Depth The depth at which the ground becomes frozen during the winter season.
Grade Beam
A foundation element or wall, typically constructed of reinforced concrete, used to span
between other foundation elements such as drilled piers.
Groundwater Subsurface water found in the zone of saturation of soils or within fractures in bedrock.
Heave Upward movement.
Lithologic
The characteristics which describe the composition and texture of soil and rock by
observation.
Native Grade The naturally occurring ground surface.
Native Soil Naturally occurring on-site soil, sometimes referred to as natural soil.
Optimum Moisture
Content
The water content at which a soil can be compacted to a maximum dry unit weight by a given
compactive effort.
Perched Water
Groundwater, usually of limited area maintained above a normal water elevation by the
presence of an intervening relatively impervious continuous stratum.
Scarify To mechanically loosen soil or break down existing soil structure.
Settlement Downward movement.
Skin Friction (Side
Shear)
The frictional resistance developed between soil and an element of the structure such as a
drilled pier.
Soil (Earth)
Sediments or other unconsolidated accumulations of solid particles produced by the physical
and chemical disintegration of rocks, and which may or may not contain organic matter.
Strain The change in length per unit of length in a given direction.
Stress The force per unit area acting within a soil mass.
Strip To remove from present location.
Subbase A layer of specified material in a pavement system between the subgrade and base course.
Subgrade The soil prepared and compacted to support a structure, slab or pavement system.
Unconfined
Compression
To obtain the approximate compressive strength of soils
that possess sufficient cohesion to permit testing in the
unconfined state.
Bearing Capacity
Analysis for
Foundations
Water Content
Used to determine the quantitative amount of water in a soil
mass.
Index Property Soil
Behavior
C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded
gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly
graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded
sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded
sand with silt, SP-SC poorly graded sand with clay
E Cu = D60/D10 Cc =
10 60
2
30
D x D
(D )
F If soil contains 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
H If fines are organic, add “with organic fines” to group name.
I If soil contains 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,”
whichever is predominant.
L If soil contains 30% plus No. 200 predominantly sand, add “sandy” to
group name.
M If soil contains 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
N PI 4 and plots on or above “A” line.
O PI 4 or plots below “A” line.
P PI plots on or above “A” line.
Q PI plots below “A” line.
Standard Penetration or
N-Value
Blows/Ft.
Ring Sampler
Blows/Ft.
Ring Sampler
Blows/Ft.
Medium Dense
Dense
Very Dense
0 - 1 < 3
4 - 9 2 - 4 3 - 4
Medium-Stiff 5 - 9
30 - 50
WATER LEVEL
Auger Shelby Tube Split Spoon
Rock
Core
8 - 15
PLASTICITY DESCRIPTION
Term
< 15
15 - 29
> 30
Descriptive Term(s)
of other constituents
Water Initially
Encountered
Water Level After a
Specified Period of Time
Major Component
of Sample
Percent of
Dry Weight
(More than 50% retained on No. 200 sieve.)
Density determined by Standard Penetration Resistance
Includes gravels, sands and silts.
Hard
Very Loose 0 - 3 0 - 6 Very Soft
7 - 18
(50% or more passing the No. 200 sieve.)
Consistency determined by laboratory shear strength testing, field
visual-manual procedures or standard penetration resistance
DESCRIPTIVE SOIL CLASSIFICATION
> 8,000
Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device. The accuracy
of such devices is variable. Surface elevation data annotated with +/- indicates that no actual topographical survey was
conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic
maps of the area.
Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry
weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have
less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and
silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be
added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined
on the basis of their in-place relative density and fine-grained soils on the basis of their consistency.
Plasticity Index
0
1 - 10
11 - 30
> 30
RELATIVE PROPORTIONS OF FINES
Descriptive Term(s)
of other constituents
Percent of
Dry Weight
< 5
5 - 12
> 12
RELATIVE DENSITY OF COARSE-GRAINED SOILS
Particle Size
Over 12 in. (300 mm)
12 in. to 3 in. (300mm to 75mm)
3 in. to #4 sieve (75mm to 4.75 mm)
#4 to #200 sieve (4.75mm to 0.075mm
Passing #200 sieve (0.075mm)
STRENGTH TERMS
Unconfined Compressive
Strength, Qu, psf
4 - 8
GENERAL NOTES
Grab
Sample
No
Recovery
Water levels indicated on the soil boring
logs are the levels measured in the
borehole at the times indicated.
Groundwater level variations will occur
over time. In low permeability soils,
accurate determination of groundwater
levels is not possible with short term water
level observations.
Modified
California
Ring Sampler
Modified
Dames & Moore
Ring Sampler
Limit
Plasticity
Index
%
Gravel
%
Sand
%
Silt
%
Clay
Sheet 1 of 2
Summary of Laboratory Results
EXHIBIT: B-8
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
PROJECT NUMBER: 20125035
PROJECT: O'Dell Brewing Co. Brew House
Expansion
SITE: 800 East Lincoln Avenue
Fort Collins, Colorado
CLIENT: O'Dell Brewing Company
Fort Collins, Colorado
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. LAB SUMMARY: USCS-NO ASSIGNMENT 20125035.GPJ TERRACON2012.GDT 10/5/12
3.5
41.4
0.224
GRAIN SIZE IN MILLIMETERS
PERCENT FINER
3/4 1/2
3/8
SIEVE
(size)
D60
30 40
3 60
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER
4 4 6 100
3 2
fine coarse
SOIL DESCRIPTION
CU 49.11
BORING ID
10 14
6 50
1.5 8 200
1 140
coarse fine
COEFFICIENTS
% COBBLES % GRAVEL % SAND
D30
D10
CC
PERCENT FINER BY WEIGHT
PERCENT COARSER BY WEIGHT
% SILT
1 1/2"
1"
3/4"
1/2"
3/8"
#4
#10
#20
#40
#60
#100
#200 34.27
100.0
75.07
61.53
58.24
49.33
41.83
31.63
16.17
6.13
3.51 41.43
EXHIBIT: B-4
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
PROJECT NUMBER: 20125035
PROJECT: O'Dell Brewing Co. Brew House
Expansion
SITE: 800 East Lincoln Avenue
Fort Collins, Colorado
CLIENT: O'Dell Brewing Company
Fort Collins, Colorado
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GRAIN SIZE: USCS 1 20125035.GPJ TERRACON2012.GDT 10/4/12
54.4
0.421
GRAIN SIZE IN MILLIMETERS
PERCENT FINER
3/4 1/2
3/8
SIEVE
(size)
D60
30 40
3 60
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER
4 4 6 100
3 2
fine coarse
SOIL DESCRIPTION
CU 2.83
BORING ID
10 14
6 50
1.5 8 200
1 140
coarse fine
COEFFICIENTS
% COBBLES % GRAVEL % SAND
D30
D10
CC
PERCENT FINER BY WEIGHT
PERCENT COARSER BY WEIGHT
% SILT
1 1/2"
1"
3/4"
1/2"
3/8"
#4
#10
#20
#40
#60
#100
#200 52.92
100.0
99.64
97.61
84.79
43.86
10.07
2.07
1.03 54.4
EXHIBIT: B-3
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
PROJECT NUMBER: 20125035
PROJECT: O'Dell Brewing Co. Brew House
Expansion
SITE: 800 East Lincoln Avenue
Fort Collins, Colorado
CLIENT: O'Dell Brewing Company
Fort Collins, Colorado
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GRAIN SIZE: USCS 1 20125035.GPJ TERRACON2012.GDT 10/4/12
NP
NP
22
22
NP
NP
18
NP
NP
12
11
NP
NP
17
53
1
54
34
4
41
LL USCS
1
2
3
5
7
9
11
EXHIBIT: B-2
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
PROJECT NUMBER: 20125035
PROJECT: O'Dell Brewing Co. Brew House
Expansion
SITE: 800 East Lincoln Avenue
Fort Collins, Colorado
CLIENT: O'Dell Brewing Company
Fort Collins, Colorado
LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. ATTERBERG LIMITS 20125035.GPJ TERRACON2012.GDT 10/4/12
CL-ML
the project
d an applica
s of the subs
d on selecte
B. The test
of foundatio
al accordanc
neral accord
samples we
sented in Ap
bution
well
rt Collins, Col
35
during the
t geotechnic
able laborat
surface mate
ed soil and
t results wer
on and earth
ce with appl
dance with
ere visually c
ppendix C.
lorado
field explor
cal enginee
tory testing
erials.
bedrock sam
re used for t
hwork recom
icable local
the Unified
classified in
Plasti
Dry d
R-val
ration were
er. At that
program wa
mples. The
the geotech
mmendations
ly accepted
d Soil Class
general acc
icity index
density
ue
Exhib
returned to
t time, the
as formulate
e results of t
nical engine
s. The labor
standards.
sification Sy
cordance wit
bit B-1
o the
field
ed to
these
eering
ratory
Soil
ystem
th the
Boring Completed: 9/24/2012
ELEVATION (Ft.)
SWELL (%)
WATER
CONTENT (%)
FIELD TEST
RESULTS
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
Surface Elev.: 4945.1 (Ft.)
DEPTH (Ft.)
5
10
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
A-12
Boring Completed: 9/24/2012
ELEVATION (Ft.)
SWELL (%)
WATER
CONTENT (%)
FIELD TEST
RESULTS
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
Surface Elev.: 4946.8 (Ft.)
DEPTH (Ft.)
5
10
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
procedures
Exhibit
Driller: Drilling Engineers, Inc.
A-11
Boring Completed: 9/24/2012
ELEVATION (Ft.)
SWELL (%)
WATER
CONTENT (%)
FIELD TEST
RESULTS
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
Surface Elev.: 4941.8 (Ft.)
DEPTH (Ft.)
5
10
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Exhibit
Driller: Drilling Engineers, Inc.
A-10
Boring Completed: 9/24/2012
ELEVATION (Ft.)
SWELL (%)
WATER
CONTENT (%)
FIELD TEST
RESULTS
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
Surface Elev.: 4939.0 (Ft.)
DEPTH (Ft.)
5
10
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Exhibit
Driller: Drilling Engineers, Inc.
A-9
Boring Completed: 9/24/2012
ELEVATION (Ft.)
SWELL (%)
WATER
CONTENT (%)
FIELD TEST
RESULTS
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
Surface Elev.: 4943.3 (Ft.)
DEPTH (Ft.)
5
10
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Page 1 of 1
Advancement Method:
4" soild-stem flight augers.
Abandonment Method:
Borings backfilled with soil cuttings and asphalt patch.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20125035
Drill Rig: CME-55
Boring Started: 9/24/2012
BORING LOG NO. 6
O'Dell Brewing Company
See Appendix C for explanation of symbols and
abbreviations.
CLIENT:
Fort Collins, Colorado
See Appendix B for description of laboratory
procedures and additional data, (if any).
See Exhibit A-1 for description of field
procedures
Exhibit
Driller: Drilling Engineers, Inc.
A-8
Boring Completed: 9/24/2012
ELEVATION (Ft.)
SWELL (%)
WATER
CONTENT (%)
FIELD TEST
RESULTS
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
Surface Elev.: 4943.2 (Ft.)
DEPTH (Ft.)
5
10
15
20
25
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
House Expansion
Page 1 of 1
Advancement Method:
4" soild-stem flight augers.
Abandonment Method:
Borings backfilled with soil cuttings and asphalt patch.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20125035
Drill Rig: CME-55
Boring Started: 9/25/2012
BORING LOG NO. 5
O'Dell Brewing Company
See Appendix C for explanation of symbols and
abbreviations.
CLIENT:
Fort Collins, Colorado
See Appendix B for description of laboratory
procedures and additional data, (if any).
See Exhibit A-1 for description of field
procedures
Exhibit
Driller: Drilling Engineers, Inc.
A-7
Boring Completed: 9/25/2012
ELEVATION (Ft.)
SWELL (%)
WATER
CONTENT (%)
FIELD TEST
RESULTS
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
Surface Elev.: 4943.8 (Ft.)
DEPTH (Ft.)
5
10
15
20
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Drill Rig: CME-55
Boring Started: 9/25/2012
BORING LOG NO. 4
O'Dell Brewing Company
See Appendix C for explanation of symbols and
abbreviations.
CLIENT:
Fort Collins, Colorado
See Appendix B for description of laboratory
procedures and additional data, (if any).
See Exhibit A-1 for description of field
procedures
Exhibit
Driller: Drilling Engineers, Inc.
A-6
Boring Completed: 9/25/2012
ELEVATION (Ft.)
SWELL (%)
WATER
CONTENT (%)
FIELD TEST
RESULTS
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
Surface Elev.: 4943.2 (Ft.)
DEPTH (Ft.)
5
10
15
20
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Borings backfilled with soil cuttings and asphalt patch.
1901 Sharp Point Drive, Suite C
Fort Collins, Colorado
Notes:
Project No.: 20125035
Drill Rig: CME-55
Boring Started: 9/25/2012
BORING LOG NO. 3
O'Dell Brewing Company
See Appendix C for explanation of symbols and
abbreviations.
CLIENT:
Fort Collins, Colorado
See Appendix B for description of laboratory
procedures and additional data, (if any).
See Exhibit A-1 for description of field
procedures
Exhibit
Driller: Drilling Engineers, Inc.
A-5
Boring Completed: 9/25/2012
ELEVATION (Ft.)
SWELL (%)
WATER
CONTENT (%)
FIELD TEST
RESULTS
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
Surface Elev.: 4944.2 (Ft.)
DEPTH (Ft.)
5
10
15
20
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
Project No.: 20125035
Drill Rig: CME-55
Boring Started: 9/24/2012
BORING LOG NO. 2
O'Dell Brewing Company
See Appendix C for explanation of symbols and
abbreviations.
CLIENT:
Fort Collins, Colorado
See Appendix B for description of laboratory
procedures and additional data, (if any).
See Exhibit A-1 for description of field
procedures
Exhibit
Driller: Drilling Engineers, Inc.
A-4
Boring Completed: 9/24/2012
ELEVATION (Ft.)
SWELL (%)
WATER
CONTENT (%)
FIELD TEST
RESULTS
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
Surface Elev.: 4946.4 (Ft.)
DEPTH (Ft.)
5
10
15
20
25
30
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
O'Dell Brewing Company
See Appendix C for explanation of symbols and
abbreviations.
CLIENT:
Fort Collins, Colorado
See Appendix B for description of laboratory
procedures and additional data, (if any).
See Exhibit A-1 for description of field
procedures
Exhibit
Driller: Drilling Engineers, Inc.
A-3
Boring Completed: 9/24/2012
ELEVATION (Ft.)
SWELL (%)
WATER
CONTENT (%)
FIELD TEST
RESULTS
SAMPLE TYPE
WATER LEVEL
OBSERVATIONS
Surface Elev.: 4945.6 (Ft.)
DEPTH (Ft.)
5
10
15
20
DRY UNIT
WEIGHT (pcf)
ATTERBERG
LIMITS
LL-PL-PI
onal safety h
values and
her efficiency
etration per
The effect o
ysis of the su
ndard penetr
terials, but o
e blow coun
considerab
rly where the
water measu
on of drilling
nd/or patch
ering Report
w House Exp
racon Project
rceful ■ Relia
Descriptio
rings were b
ngs were loc
ground surfa
hmark shown
drilled with C
perations, a
ed samples
n sampler (S
ples (BS) we
manner simi
nto the grou
mber of blow
split-spoon s
andard pene
ring logs at
N-values.
PT hammer
efficiency is
hammer ope
soil properti
y affects the
hammer blo
of the automa
ubsurface inf
ration test pr
only provide
nt in these s
ble care sho
e size of the
rements we
g, the boring
may occur a
t
pansion ■ For
No. 2012503
able
on
based upon
cated in the
ace elevation
n on Exhibit
CME-55 tru
lithologic log
were obtai
SS) and a
ere obtained
ilar to the st
und with a 1
ws required
samplers, fin
etration resis
the respecti
was used to
typically ac
erated with a
es are base
standard pe
ow over wh
atic hammer
formation for
rovides a re
es an indica
soils may b
ould be exer
e gravel parti
ere obtained
gs were bac
and should b
rt Collins, Col
35
the propose
field by mea
n was surve
A-2 using an
ck-mounted
g of the borin
ned at sele
3-inch outs
d from auger
tandard pen
40-pound ha
to advance
nal 12 inche
stance value
ve sample d
o advance th
hieved with
a cathead an
ed on the low
enetration re
at would be
r's efficiency
r this report.
asonable in
ation of the
e affected b
rcised in inte
icle exceeds
in the borin
ckfilled with a
be repaired a
lorado
ed developm
asuring from
eyed at each
n engineer’s
rotary drill
ngs were re
ected interva
side diamete
r cuttings. P
etration test
ammer free-
e the ring-b
s are record
e (N-value).
depths. Ring
he samplers
the automa
nd rope. Pu
wer efficienc
esistance blo
e obtained u
has been co
dication of t
relative stif
by the mois
erpreting th
s the inside d
ngs at the tim
auger cuttin
as soon as p
ment shown
m property li
h boring loc
s level.
rig with so
corded by th
als utilizing
er ring-barre
Penetration r
t (SPT). This
-falling throu
arrel sample
ded) or the i
The blow c
g-barrel sam
s in the borin
atic hammer
ublished corr
cy cathead a
ow count va
using the ca
onsidered in
the in-place
ffness of co
sture conten
e N-values
diameter of t
me of site e
ngs. Some s
possible.
Exhib
on the prov
ines and ex
ation refere
olid-stem au
he field engi
a 2-inch ou
el sampler
resistance va
s test consis
ugh a distan
er 12 inches
nterval indic
count value
mple blow co
ngs performe
compared t
relations betw
and rope me
lue by incre
athead and
the interpret
density of s
ohesive mate
nt of the soi
in gravelly
the sampler
exploration.
settlement o
bit A-1
vided
xisting
ncing
ugers.
ineer.
utside
(RS).
alues
sts of
nce of
s (18
cated,
s are
ounts
ed on
to the
tween
ethod.
asing
rope
tation
sandy
erials
il. In
soils,
.
After
of the
n reviews th
t
pansion ■ Fort
No. 2012503
able
ot reflect var
ects of cons
dent until du
so that furth
project does
, mold, fung
ous material
or pollution,
for the exclu
n prepared i
ranties, eithe
dewatering
e, design, or
commendat
he changes a
t Collins, Colo
35
riations that
struction or w
uring or afte
her evaluatio
not include
i, bacteria) a
s or conditio
, other studie
usive use of
n accordanc
er express o
requirement
location of t
tions contain
and either ve
orado
may occur
weather. Th
er constructio
on and sup
e either spec
assessment
ons. If the o
es should be
f our client f
ce with gene
or implied, a
ts are the re
the project a
ned in this re
erifies or mo
between bo
he nature an
on. If variat
plemental re
cifically or by
of the site o
owner is con
e undertaken
for specific a
erally accep
are intended
esponsibility
as described
eport shall n
odifies the co
orings, acros
nd extent of
tions appea
ecommenda
y implication
or identificati
cerned abou
n.
application t
pted geotech
d or made.
of others. I
in this repo
not be consid
onclusions o
20
ss the
such
ar, we
ations
n any
ion or
ut the
to the
hnical
Site
In the
rt are
dered
of this
d earlier and
ns are locate
ed fills. All p
mmendation
cement of a
a detailed pa
aries from th
he pavement
GENERAL
n should be
made regard
esign and sp
services dur
tion phases
lysis and rec
borings per
ering Report
w House Exp
racon Project
rceful ■ Relia
enance sho
am in orde
es are inten
ment.
enance cons
l maintenan
n implementi
estment for
tion Consi
enerally acc
ds, the subg
or rainfall.
on and corre
e of paveme
urred, pavem
cted to the re
pavement
Particular a
d to areas w
ed should be
pavement ar
s in this rep
partial pavem
avement ana
he assumptio
t thickness r
L COMME
retained to
ing interpret
pecifications
ring grading
of the projec
commendati
rformed at t
t
pansion ■ Fort
No. 2012503
able
ould be pla
er to enhan
ded to slow
sists of bot
ce (e.g. sur
ing a planne
pavements.
iderations
complished
grade may b
As a result
ective action
ent construc
ment subgra
ecommenda
areas be ro
attention sho
where backf
e repaired by
reas should
ort immedia
ment thickne
alysis incorp
ons outlined
recommenda
ENTS
review the
tation and im
s. Terracon a
, excavation
ct.
ions present
he indicated
t Collins, Colo
35
anned and
nce future
the rate of
th localized
rface sealing
ed pavement
early in t
be disturbed
, the pavem
n will be requ
ction for sign
ade areas sh
ations in this
ough graded
ould be paid
illed trenche
y removing a
be moisture
tely prior to
ess for use d
porating con
d above, we
ations outlin
final design
mplementatio
also should
n, foundatio
ted in this re
d locations a
orado
provided
pavement
pavement d
maintenan
g). Preventa
t maintenanc
he constru
d due to util
ment subgra
uired. The s
ns of disturb
hould be rew
report imme
d and then
to high traff
es are locate
and replacin
e conditioned
paving.
during cons
nstruction tra
e should be
ed above.
n plans and
on of our geo
be retained
on construct
eport are ba
and from ot
for an ong
performanc
deterioration
ce (e.g. cra
ative mainte
ce program
ction phase
ity excavatio
ade may no
subgrade sh
ance or exc
worked, mois
ediately prio
thoroughly
fic areas tha
ed. Areas w
ng the mater
d and prope
truction is n
affic. In addi
contacted t
specificatio
otechnical re
d to provide
tion and oth
ased upon th
her informat
going pave
ce. Prevent
n and to pres
ack sealing
enance is us
and provide
e. However
ons, constru
ot be suitabl
hould be car
cessive ruttin
sture conditio
or to paving.
proof rolled
t were rutted
where unsu
rials with pro
erly compact
ot recomme
tion, if the a
to confirm a
ns so comm
ecommenda
observation
her earth-re
he data obta
tion discuss
19
ement
tative
serve
g and
sually
es the
r, as
uction
le for
refully
ng. If
oned,
final
d and
itable
operly
ted to
ended
actual
and/or
ments
ations
n and
elated
ained
sed in
mendations f
ommended
e performed
Pavemen
ormance of
he subgrade
m:
Site grading a
Water should
Compaction
avement su
Sealing all l
moisture mig
Placing comp
Placing curb,
ourse mater
Placing shou
ering Report
w House Exp
racon Project
rceful ■ Relia
ng and plac
ations. Mate
asphalt con
y. Asphalt m
ximum dens
nts are used
nimum prop
erties
@ 28 days
gth
nt (%)
ansverse join
on and isolat
metry. Sawed
m of 25 perc
ign material
nce
or pavemen
material sp
d under the o
t Performa
all pavemen
e materials.
at a minimum
d not be allow
of any utilit
bgrade;
andscaped
ration to sub
pacted backf
, gutter and/
rials; and
lder or edge
t
pansion ■ Fort
No. 2012503
able
ing tempera
erial meeting
ncrete. Mix d
material shou
sity (ASTM D
d, the concre
erties:
nts should b
tion. The loc
d joints shou
ent of slab t
and dowele
nt design an
pecifications
observation o
ance
nts can be e
. The follow
m 2 percent
wed to pond
ty trenches
areas in o
bgrade soils;
fill against th
/or sidewalk
e drains in pa
t Collins, Colo
35
atures. Aggr
CDOT Grad
designs sho
uld be compa
D 2041).
ete should b
AST
be provided
cation and ex
uld be cut wi
hickness plu
ed where nec
nd constructi
. To asses
of the geote
enhanced by
wing recom
grade onto
behind curb
for landsca
or adjacent
;
he exterior s
k directly on
avement are
orado
regate used
ding S or SX
uld be subm
acted within
e obtained f
V
60
4,0
6
TM C33 and
d as needed
xtent of joint
thin 24 hour
us 1/4 inch.
cessary for l
ion presente
s complianc
echnical engi
y minimizing
mmendations
or away from
bs;
aped areas
to paveme
ide of curb a
subgrade s
eas adjacent
d in asphalt
X specificatio
mitted prior t
n a range of
from an app
Value
00 psi
000 psi
to 8
CDOT Sectio
d in concret
ts should be
rs of concret
All joints sho
oad transfer
ed depend u
ce, observa
ineer.
g excess mo
s should be
m the pavem
to the sam
nts to mini
and gutter;
soils without
t to water so
concrete sh
ons or equiv
to constructi
92 to 96 pe
roved mix de
on 703
te pavement
e based upo
te placemen
ould be seal
r.
upon compl
ation and te
oisture which
e considere
ments;
e criteria as
mize or pre
t the use of
ources.
18
hould
valent
on to
ercent
esign
ts for
on the
nt and
led to
iance
esting
h can
ed at
s the
event
base
ternative sh
c conditions
ocation of du
te base co
tions for qu
rtation (CDO
urse should b
of the maxim
concrete sho
proved bitum
stating the
ering Report
w House Exp
racon Project
rceful ■ Relia
maintained
rican Associ
supported o
laced engine
able subgrad
parameters
20 years
ngle axle loa
avy duty loa
andard duty
acted to co
s differ from
Aggregat
course (in
6
4
8
4
hould be in
s. A minimum
umpsters wh
urse should
uality and g
OT) Class 6
be placed in
mum dry unit
ould be com
minous mate
Superpave
t
pansion ■ Fort
No. 2012503
able
pavements
ation of Stat
on 8-inches o
eered fill in
de can be at
s for paveme
ading = 18,0
ad (main traf
load (autom
nfirm and/o
the assume
te base
nches)
nvestigated
m 6-inch thic
here trash t
d consist of
gradation. U
6 specificati
n lifts not exc
t weight as d
posed of a m
erial. The a
e properties
t Collins, Colo
35
for the proje
te Highway a
of scarified,
accordance
ttained.
ent thickness
000 pounds
ffic corridors
obile parking
r modify the
ed values sh
Hot-mix asph
(HMA) (inche
4
-
4
-
with respec
ckness of rig
trucks park
f a blend o
Use of mate
ons is reco
ceeding 6 inc
determined b
mixture of ag
asphalt conc
, optimum
orado
ect has bee
and Transpo
moisture co
e with the 4.
s design we
s) = 30,000
g) = 11,000
e recommen
own above.
halt
es)
Co
(in
ct to curre
gid concrete
and load, a
of sand and
erials meetin
ommended f
ches and co
by ASTM D6
ggregate, fil
crete should
asphalt con
en based on
ortation Offic
onditioned, a
.2 Earthwor
re assumed
Equivalent S
ESAL
ndations co
oncrete
nches)
-
5
-
6
ent material
e pavement
and in areas
d gravel wh
ng Colorado
for base co
ompacted to
698.
ler and addi
d conform t
ntent, job m
n the proced
cials (AASHT
and recompa
rk section o
for this proj
Single Axle
ntained her
Total (inch
10
9
12
10
availability
is recomme
s of tight tu
hich meets
o Departme
ourse. Aggre
a minimum
tives (if requ
to approved
mix formula
17
dures
TO).
acted
of this
ect:
Load
rein if
es)
and
ended
urning
strict
ent of
egate
of 95
uired)
d mix
a and
Seismic Co
C
09 Internation
eneral accord
2009 Interna
th of 100 feet
uired 100 foot
imum depth o
ditions exist b
per depths co
rnatively, a ge
class. Howev
ering Report
w House Exp
racon Project
rceful ■ Relia
tion
de reaction
ovement of a
ls is increas
as described
design and c
arations and
columns, or
s should be
Manual, S
ed) to control
trench back
mmended sp
hould not be
ensitive floor
use of barrie
and constr
1R are recom
onsideratio
ode used
nal Building Co
dance with the
ational Buildin
t for seismic s
t soil profile d
of about 35½
below the max
ould be perfor
eophysical exp
ver, we believe
t
pansion ■ Fort
No. 2012503
able
Concret
Minimum
compac
4-inches
100 pou
on exist
imported
a slab-on-gr
sed. To red
d in section 4
construction
d/or isolation
utility lines t
provided in
Section 30
l the location
kfill placed b
pecifications
e constructed
r coverings a
rs to minimiz
ruction cons
mmended.
ons
ode (IBC) 1
e 2009 Interna
ng Code (IBC
site classifica
determination
½ feet and thi
ximum depth
rmed to confir
ploration coul
e a higher sei
t Collins, Colo
35
te slab-on-gra
m of 8-inches
cted on-site so
s of granular m
unds per cubic
ting soils, and
d granular fill.
rade floor sy
duce potenti
4.2 Earthwo
n recommend
n joints shou
to allow inde
slabs after c
2.1R-37 8.
n and extent
beneath slab
s given in the
d on frozen s
are used on
ze potential
siderations, a
ational Buildin
C) requires a
tion. The cur
n. The boring
s seismic site
of the subsu
rm the conditi
d be utilized i
ismic site clas
orado
Valu
ade
of scarified, m
oils or newly p
material is acc
c inch (pci) ma
200 pci may
ystem is pos
ial slab mov
ork of this re
dations are
uld be provi
ependent mo
concrete pla
3.12 (toole
t of cracking
bs should be
e 4.2 Earthw
subgrade.
n interior slab
vapor rise th
as outlined
Site
ng Code, Tab
site soil prof
rrent scope re
gs completed
e class defini
urface explora
ions below th
in order to atte
ss for this site
ue
moisture cond
placed enginee
ceptable.
ay be used for
be used for flo
ssible if the
vements, the
eport.
as follows:
ided betwee
ovement.
acement in a
ed control
.
e compacted
work section
bs, consider
hrough the s
in the ACI
classificatio
C 2
ble 1613.5.2.
file determina
equested doe
d for this proje
ition consider
ation. Additio
he current dep
empt to justify
is unlikely.
itioned, and
ered fill.
r floors suppo
oors supporte
moisture co
e subgrade
en slabs and
accordance
joints are
d in accorda
n of this repo
ration should
slab.
Design Man
on
ation extendi
es not include
ect extended
rs that similar
onal exploratio
pth of explora
y a higher sei
16
orted
ed on
ontent
soils
d all
with
not
ance
ort.
d be
nual,
ng a
e the
to a
r soil
on to
ation.
smic
nalyses are n
oor System
n-grade floo
nimum of 1
nt of slab-on
ering Report
w House Exp
racon Project
rceful ■ Relia
be withdrawn
t infiltration
rete should h
er concrete
e sides of e
should be a
must be clea
er should ob
einforced ful
presents the
sign.
meter
ption (per log)
pe (Note 1)
ht (pcf) (Note 2
riction, Ф (Deg
Strength, cu (p
s Parameter, k
50 (in/in)
al Types for L-P
esign water tabl
sidered to w
minimum p
e maintained
al piers mu
s a function
necessary, c
ms
r system ma
2 inches of
n-grade floor
t
pansion ■ Fort
No. 2012503
able
n in a slow
of water
have a relat
with slump i
each pier s
ccomplished
aned prior
bserve the be
l depth for th
recommend
2)
gree)
psf)
(pci)
Pile: 3=Stiff Cla
le should be co
work in grou
practical ho
d, and adjac
st be reduc
of pier spac
capacity redu
ay be utilized
f scarified,
rs should be
t Collins, Colo
35
continuous
or caving s
ively high flu
n the range
hould be m
d by a rough
to concrete
earing surfa
he applied a
ded L-Pile p
0 - 6
Fill
Ignore
120
Ignore
Ignore
Ignore
Ignore
ay without Free
onsidered at de
up action if t
orizontal spa
cent piers sh
ced when c
ing and the
uction factor
d for interior
moisture co
e expected
orado
manner ma
soils or the
uidity when p
of 5 to 7 inc
mechanically
hening tooth
e placemen
ce and shaft
axial and late
arameter va
Dept
6 t
Sands a
1
N
e Water, 4 = Sa
epth of 8 feet.
the horizonta
acing betwe
hould bear
considering
number of p
rs can be pro
r floor system
onditioned, a
intaining a s
e creation
placed in ca
ches is recom
roughened
h placed on
nt. A repre
ft configurati
eral stresses
alues that ca
th (feet)
to 14
and Gravels
4
125
36
0
60
N/A
and
al spacing is
een piers o
at the same
the effects
piers within a
ovided for th
ms provided
and compac
sufficient he
of voids in
ased pier hol
mmended.
d in the silts
the auger.
esentative o
on.
s imposed.
an be used i
14 to Max De
Siltstone Bed
3
125
N/A
2,000
2,000
0.004
s less than
of at least
e elevation.
of group a
a group. If g
he analyses.
d it is constru
cted soil. S
15
ad of
pier
les or
stone
Shaft
of the
in the
epth
drock
three
three
The
ction.
group
.
ucted
Some
Drilled piers s
loads and pie
penetration.
Constru
o design de
of the site; h
n addition,
urry will be r
water should
e placed im
ed in dry co
dump hoppe
segregatio
foundation
ering Report
w House Exp
racon Project
rceful ■ Relia
should be
oundations w
finished gra
r subgrade l
uction Con
einforced m
ent can be
d and compa
d until found
ons should b
significant
ill be require
hould extend
oils should
d compacted
ecommend
D
h
embedment 1
e end-bearing
rtion of pier
should be em
er diameters m
uction Con
pth should b
owever, spe
caving soils
required to p
be removed
mmediately a
onditions, a
er, or an ele
n will be m
concrete qu
t
pansion ■ Fort
No. 2012503
able
placed a m
within heate
ade. Finishe
evel for inte
nsideration
at foundatio
tolerated.
acted. The m
dation constr
be observed
tly from t
ed.
d laterally an
be replaced
.
dations – D
Description
g pressure
in bedrock)
mbedded into f
may dictate e
nsideration
be possible
ecialized drill
s and groun
properly drill
d from each
after complet
tremie shou
ephant's trun
minimized, i
antities may
t Collins, Colo
35
inimum of 3
d areas of th
ed grade is t
rior footings
ns – Spread
on construct
Subgrade
moisture co
ruction.
d by the geo
hose pres
n additional d
d as engine
Drilled Pier
firm or harder
embedment de
ns – Drilled
with conven
ing equipme
dwater indic
the piers pr
pier hole pri
tion of drillin
uld be used
nk discharg
s recomme
y exceed cal
orado
36 inches be
he building c
the lowest a
s.
d Footings
tion should
soils bene
ntent and c
otechnical en
ented in
distance of 8
eered fill, co
rs
r bedrock ma
eeper than th
d Piers
ntional single
ent may be re
cate that tem
rior to concre
ior to concre
ng and clean
for concret
ing near the
ended. Due
culated geo
elow finishe
can be supp
adjacent gra
s and Reinf
only be con
eath founda
ompaction o
ngineer. If th
this report
8 inches for e
onditioned t
aterials. Actua
he recommen
e-flight powe
equired for v
mporary ste
ete placeme
ete placeme
ning. If pier
te placemen
e bottom of
to potentia
metric volum
ed grade for
ported a mini
ade for perim
forced Mat
nsidered if s
tions shoul
of subgrade
he soil cond
t, supplem
each foot of
to near opti
Value
20 feet
5 feet
25,000 psf
2,000 psf
al structural
ded minimum
er augers o
very hard bed
eel casing a
ent.
nt. Pier con
r concrete ca
nt. The use
f the hole w
al sloughing
mes.
14
r frost
imum
meter
ts
some
d be
soils
itions
mental
over-
imum
m
n the
drock
and/or
ncrete
annot
of a
where
g and
basis of equ
dead-load p
and founda
by differentia
ering Report
w House Exp
racon Project
rceful ■ Relia
s
essel can b
or on a dri
be supporte
y placed eng
dation system
endations fo
ted in the fo
ecommend
Description
bearing pres
ure coefficien
ht
nt depth belo
lement
al settlement
ng pressure
may be incre
s.
pressure an
r of safety. Th
be proportio
ual total se
pressure wil
ations should
al foundation
t
pansion ■ Fort
No. 2012503
able
be supported
lled pier fou
ed on a spr
gineered fill.
m bearing o
or foundation
ollowing para
dations – S
n
ssure1
nts2
ow finished g
t
applies to de
eased by one
nd sliding coe
he foundation
oned to redu
ettlement is
ll also reduc
d be reinforc
n movement.
t Collins, Colo
35
d by a sha
undation sys
read footing
The yeast l
on a minimu
ns for the pr
agraphs.
Spread Foo
F
a
F
E
e
p
B
O
Y
M
grade
ead loads plu
e-third when c
efficients give
n designer sh
uce different
recommend
ce differentia
ced as neces
.
orado
allow, sprea
stem bottom
foundation
liquid waste
um of 2 feet
roposed stru
otings and
Fermentation
and yeast liqu
Fermentation
Engineered fil
extending to 7
proposed slab
Brew house a
On-site soils o
Yeast liquid w
Minimum of 2
A
P
A
½ t
us design live
considering to
en above are
ould include a
tial foundatio
ded; howev
al movemen
ssary to red
d footing o
ming in bed
system bea
tank may b
of newly pl
uctures and
d Reinforce
Value
vessel, brew
uid waste tank
n vessel:
l and two laye
7 feet below th
b elevation
addition:
or newly place
waste tank:
feet of engin
3,000 psf
Active, Ka = 0
Passive, Kp =
At-Rest, Ko =
0.5
γ = 115 pc
36 inches
Up to 1 inc
to ¾ of total s
e load conditi
otal loads tha
e ultimate va
appropriate fa
on movemen
ver, proportio
t between a
duce the pote
r reinforced
rock. The
aring existing
e supported
aced engine
related struc
ed Mats
house additio
k
ers of geogrid
he top of
ed engineered
eered fill
f
0.33
= 3.0
= 0.5
cf
s
ch
settlement
ons. The de
at include win
alues and do
actors of safe
nt. Proportio
oning to re
adjacent foot
ential for dis
13
d mat
brew
g on-
d on a
eered
ctural
on,
d
d fill
esign
nd or
o not
ety.
oning
lative
tings.
stress
located adja
ads should
ischarge on
the use of s
drains disch
propriate out
Exterior Sla
slabs on-gra
soils will like
movement
Minimizing m
Controlling m
Using design
nd adjoining
Placing contr
Corrosion P
of water-solu
r II, Portland
on concrete
ns of the ACI
ering Report
w House Exp
racon Project
rceful ■ Relia
any estimat
e drainage i
de.
any) should
er of the pro
may be requi
ackfill agains
on debris to
uctures and
d to docume
ments will b
used for pa
in final grad
rly if such m
uld be taken
water.
acent to stru
be located a
pavements
splash block
harge to sto
tfall.
ab Design a
ade, exterior
ely experien
could be red
oisture incre
moisture-dens
ns which allo
g structural e
rol joints on r
Protection
uble sulfate
d cement sh
e should be
I Design Ma
t
pansion ■ Fort
No. 2012503
able
tions of pote
s not obtain
be sloped a
oposed struc
red to facilita
st footings an
reduce the
prior to proj
ent positive d
be subject to
ving and fla
des should t
movement wo
n that joints
ctures shou
a minimum o
or be exten
ks or downs
orm sewers
and Constr
r architectur
ce some mo
duced by:
eases in the
sity during p
ow vertical m
elements; an
relatively clo
testing com
hould be spe
e designed
nual, Sectio
t Collins, Colo
35
ential movem
ed and main
at a minimum
ctures, wher
ate drainage
nd exterior w
possibility o
ject comple
drainage, as
o post-cons
atwork to pre
take into co
ould be critic
are properl
ld preferably
of 5 feet awa
nded away fr
pout extens
by solid pip
ruction
al features,
ovement due
backfill;
placement of
movement b
nd
ose centers.
pleted durin
ecified for a
for low su
on 318, Chap
orado
ment descri
ntained, and
m of 10 perc
re possible.
e in unpaved
walls should
of moisture in
tion, we rec
s described a
struction mo
event areas
onsideration
cal. Where
ly sealed an
y be self-con
ay from the
rom the stru
sions. A pre
pe or daylig
and utilities
e to the vol
f the backfill;
between the
g our previo
all project co
lfate exposu
pter 4.
bed in this
d water is al
cent grade fo
The use o
d areas arou
d be properly
nfiltration. A
commend ve
above, has b
ovement. M
s where wat
post-constru
paving or fl
nd maintaine
ntained. Spr
building line
uctures a mi
eferred alter
hted to a d
s founded on
ume change
;
e exterior fea
ous study ind
oncrete on a
ure in acco
report cann
lowed to infi
or at least 10
f swales, ch
und the perim
y compacted
After constru
erification of
been achiev
Maximum gr
ter can pond
uction move
latwork abut
ed to preven
rinkler mains
e(s). Roof d
nimum of 10
rnative is to
etention pon
n, or in back
e of the mat
atures;
dicate that A
and below g
ordance with
12
ot be
iltrate
0 feet
hases
meter
d and
uction
f final
ved.
rades
d. In
ement
ts the
nt the
s and
drains
0 feet
have
nd or
kfill or
terial.
ASTM
rade.
h the
es during co
n of water
ped irrigatio
d to pond
tion) can re
ering Report
w House Exp
racon Project
rceful ■ Relia
ch Backfill
ns should b
cement and c
ng within or
deviations in
hould be ov
e backfilled
ed with relati
ve fill in non
h the trench
a common s
he buildings
s that could
h plug” that e
hould consis
ent. The clay
ance with re
mended that
paction testi
d Drainage
adjusted to
onstruction
r into found
on adjacent
near or adj
esult in sign
t
pansion ■ Fort
No. 2012503
able
Found
98% o
Lands
95% o
On-sit
2 perc
On-sit
3 perc
Impor
Cond
be made w
compaction.
r near the p
alignment d
versized to a
with relative
ively clean g
n-pavement
backfill.
source of wa
should be e
migrate be
extends at le
st of clay co
fill should be
ecommendat
t a represen
ing of trench
e
provide pos
and mainta
dation exca
to foundat
jacent to th
nificantly hig
t Collins, Colo
35
dation, slab, a
of maximum d
scaped and c
of maximum d
te clay soils a
cent below to
te sands:
cent below to
rted granular
itioned suffici
with sufficien
roposed stru
do not result
accommodate
ly clean mat
granular mate
areas to re
ater infiltratio
effectively se
low the buil
east 5 feet o
ompacted a
e placed to c
tions in this r
ntative of the
backfill with
itive drainag
ained throug
avations mu
tions should
he perimete
gher soil mo
orado
Descript
and pavemen
dry density (A
common fill ar
dry density (A
approved by t
o 2 percent ab
o 1 percent ab
fill:
ently to achie
t working s
uctures shou
in breakage
e differentia
terials and is
erial, they sh
educe the in
on and migr
ealed to res
dings. We
out from the
t a water co
completely s
report.
e geotechnic
hin building a
ge away from
ghout the lif
ust be prev
d be minim
er of structu
ovements th
tion
nt subgrades:
ASTM D698)
reas:
ASTM D698)
the geotechni
bove optimum
bove optimum
eve compactio
space to pe
uld be desig
or distress.
l movements
s properly ba
hould be cap
nfiltration an
ration. All uti
strict water in
recommend
face of the
ontent at or
surround the
cal engineer
and pavemen
m the existin
fe of the p
vented duri
mized or elim
ures (either
han those d
ical engineer:
m
m
on
ermit constru
gned with fle
Utility knoc
s. It is impe
ackfilled. If
pped with at
d conveyan
ility trenches
ntrusion and
d constructin
building ext
r above the
utility line an
r provide ful
nt areas.
ng and prop
proposed pro
ng construc
minated. W
during or
discussed in
11
:
uction
exible
kouts
rative
utility
least
ce of
s that
d flow
ng an
terior.
soils
nd be
l-time
posed
oject.
ction.
Water
post-
n this
uld be inorga
gravel or oth
kfill without t
crushed gra
fy compactio
nsity should
n Requirem
uld be plac
produce reco
prior to fill
t
pansion ■ Fort
No. 2012503
able
al (%)
acted to appro
sample is conf
anic soils fre
her similar n
the prior app
avel or cert
on criteria ba
be evaluate
ments
ced and co
ommended
Found
Follow
excav
inche
engin
Floor
Scarif
subgr
Pavem
Scarif
pavem
Lands
Scarif
place
Found
8 inch
Lands
12 inc
t Collins, Colo
35
Perce
ximately 95 pe
ined under a 1
ee of vegetat
non-cementit
proval of the g
ain other g
ased on a re
ed based on
mpacted in
moisture co
dations:
wing the remo
vation, scarify
s of native su
eered fill
Slab:
fy, moisture c
rade prior to t
ments:
fy, moisture c
ment section
scaped and c
fy, condition,
ment of engin
dation, slab, s
hes (loose)
scaped and c
ches (loose)
orado
ent finer by w
70
50
1
V
30
15
Non-ex
ercent of the AS
00 psf surchar
tion, debris,
tious, poorly
geotechnica
granular ma
elative dens
a project sp
horizontal
ntents and d
Descript
oval of the rec
y, moisture co
ubgrade prior
condition, and
the placemen
condition, and
construction
common fill ar
and compact
neered fill
sidewalk, and
common fill ar
weight (ASTM
0-100
0-100
5-50
Value
(max)
(max)
xpansive1
STM D698 max
rge and subme
and fragme
y-graded mat
al engineer.
terials are
sity test. Co
pecific basis
lifts, using
densities thro
tion
commended d
ondition, and c
to the placem
d compact 12
t of engineere
d compact 12
reas:
t 8 inches prio
d pavement s
reas:
M C136)
ximum dry den
rged.
ents larger th
terials shoul
used it ma
ompaction cr
.
equipment
oughout the
depth of over
compact 12
ment of
inches of nat
ed fill
inches prior t
or to the
ubgrades:
10
nsity at
han 4
ld not
ay be
riteria
t and
e lift.
r-
tive
to
bottom of t
dation subgr
ed in accord
bility of the s
ctors. If uns
Alternatively
used, or cr
soil until a st
es could als
ended to de
tion. Light
.
Fill Material
soils, includin
are consid
red fill benea
d that on-sit
ion criteria.
ation vessels
base cours
property req
ering Report
w House Exp
racon Project
rceful ■ Relia
A maximum
e for designin
both the exc
st of safety f
h safety stan
n 20 feet, it w
ssional engin
e, it is recom
the crest of
protected ag
Preparation
ent of fills o
face should
aximum dry
ent is constr
the excavatio
rade and pa
dance with t
subgrade ma
stable cond
y, over-exca
rushed grave
table workin
so be cons
etermine th
tweight exc
s and Plac
ng those rem
dered suitab
ath the brew
te soils will
Imported s
s should co
e. Imported
quirements:
t
pansion ■ Fort
No. 2012503
able
values may
ng and cons
cavation side
following loc
ndards. If an
will be neces
neer.
mmended th
f the slope e
gainst the el
n
or the const
be scarified
unit weight a
ructed.
on has been
avement sub
the recomm
ay be affect
itions develo
avation of w
el and/or ro
ng surface is
idered as a
e effect of
avation equ
cement
moved durin
ble for bac
w house add
require rew
soils for use
onsist of CD
d soils for ge
t Collins, Colo
35
have to be u
structing stab
es and botto
cal, and fede
ny excavatio
ssary to hav
hat all vehicl
equal to no le
ements.
truction of f
d, moisture c
as determine
n compacted
bgrade to th
endations p
ted by preci
op, workabi
wet zones a
ock can be
s attained. U
a stabilizatio
chemical s
uipment ma
ng over-exca
ckfill agains
ition, pavem
working to a
e as over-e
DOT Class
eneral site us
orado
used. The in
ble, tempora
om. All exca
eral regulatio
n, including
ve the side s
les and soil
ess than the
foundations
conditioned,
ed by ASTM
d, engineere
e desired g
presented in
ipitation, rep
lity may be
nd replacem
tracked or
Use of lime,
on technique
stabilization
ay also be
avation below
st foundatio
ments, and fo
adjust the m
excavation b
6 aggregat
se (if require
ndividual con
ry excavatio
avations sho
ons, includin
a utility trenc
slopes and/o
piles be ke
e slope heig
the upper
and recomp
M D698 befo
ed fill can be
rade. Engin
n subsequen
petitive cons
improved b
ment with gr
“crowded” i
fly ash, kiln
e. Laborato
on subgrad
used to r
w the propo
ons and wa
or general s
moisture con
backfill belo
te base cou
ed) should m
ntractor(s) s
ons as requir
ould be slop
ng current O
ch, is extend
or shoring sy
ept to a mini
ht. The exp
12 inches o
pacted to at
ore any new
e placed to
neered fill sh
nt section o
struction traf
by scarifying
ranular mate
nto the uns
n dust, ceme
ory evaluati
de soils pri
educe subg
osed ferment
alls, for us
ite fills. It sh
tent to mee
ow the prop
urse or rec
meet the follo
9
hould
red to
ed or
OSHA
ded to
ystem
imum
posed
of the
least
fill or
bring
hould
of this
ffic or
g and
erials
stable
ent or
on is
or to
grade
tation
e as
hould
et the
posed
cycled
owing
vation thorou
r-excavation
all edges of
ase elevatio
nce with the r
ting building
foundation e
mine the nee
nfluence zon
. The stress
lope from th
existing foun
ng foundatio
are beyond th
ng upon dep
ater may be
may be utiliz
nt groundwat
grade soil co
oils determin
ering Report
w House Exp
racon Project
rceful ■ Relia
at excavatio
oving equip
s with possib
avations (if s
up and remo
the contract
etrated by th
ons are ba
ngs. The co
xcavation. If
ual condition
n safe condi
of undergrou
onnaissance,
nderground f
ughly cleane
that extends
the footings
on. The ove
recommenda
foundations
excavations s
ed for any s
ne of the ex
s influence z
he bottom ed
ndations can
ons. While t
he scope of t
pth of excav
e encountere
zed to contr
ter flow, or w
onditions sho
ned at that t
t
pansion ■ Fort
No. 2012503
able
ns for the
pment. Exc
ble caving co
selected) ma
oval. Consid
t documents
he proposed
ased solely
ontractor sho
f different su
s should be
tions.
und facilities
, such featu
facilities are
ed prior to ba
s below the b
s at least 8
r-excavation
ations prese
s that are ex
should be ex
horing or un
xisting found
zone is defin
dge of the e
result in los
he evaluatio
this study, w
vation and s
ed in excava
rol water wit
where excava
ould be evalu
time by the
t Collins, Colo
35
proposed c
avations int
onditions, pa
ay require the
deration sho
for the proje
d excavation
on the ma
ould verify th
ubsurface co
evaluated to
s vaults, bas
ures could b
encountere
ackfill placem
bottom of fou
inches per
n should be b
ented in this r
xposed durin
xamined and
nderpinning.
dations with
ed as the ar
existing found
ss of suppor
on of existing
we can perfor
seasonal con
tions on the
thin excavat
ations penet
uated during
contractors’
orado
construction
to the on-sit
articularly wh
e rock bits to
ould be given
ect.
ns may vary
aterials enc
hat similar co
onditions are
o determine
sements, an
be encounte
ed, such feat
ment and/or c
undation ele
foot of over
backfilled to
report.
ng the excav
d evaluated
Excavation
hout prior e
rea below a
dation. Exc
rt, and can c
g foundations
rm these tas
nditions, sur
e site. It is a
tions. Well
rate groundw
g the excava
’ Competent
can be ac
te soils will
hen approac
o advance th
n to obtainin
significantly
countered in
onditions exi
e encountere
any excavat
nd utilities w
ered during
tures should
construction.
evation shoul
r-excavation
the footing
vation of the
by the geote
ns should no
evaluation by
line projecte
cavations wit
create settle
s and the de
sks as a sepa
rface water
anticipated th
points may
water to a sig
ation process
t Person. S
ccomplished
encounter
hing groundw
he excavation
ng a unit pric
y across the
n widely sp
st throughou
ed at the tim
tion modifica
was not obse
construction
be removed
.
ld extend lat
depth below
base elevat
existing fill
echnical eng
ot extend int
y a geotech
ed down at a
thin the influ
ment or failu
esign of a sh
arate study.
infiltration a
hat pumping
y be require
gnificant dep
s and the sta
Slope inclina
8
with
weak
water
n and
ce for
e site.
paced
ut the
me of
ations
erved
n. If
d and
terally
w the
ion in
or for
gineer
to the
hnical
a 1(h)
uence
ure of
horing
and/or
from
ed for
pth.
ability
ations
excavation, a
e of any over
t of excavatio
materials co
to re-vege
ns. All expos
compaction.
the placeme
ll, and to pro
ering Report
w House Exp
racon Project
rceful ■ Relia
or system is
nimum of 12
y placed eng
te storage ta
eet of engine
y be suppo
d, and recom
may also b
should be
onstruction.
ction recom
ated phases
nts recomme
engineered
ated by Ter
of over-ex
de stabilizati
construction
ation
ill, strip and
and any oth
r-excavation
on below the
onsisting of v
etate landsc
sed surfaces
ent of fills, th
ovide for a re
t
pansion ■ Fort
No. 2012503
able
considered
2 inches of
gineered fill.
ank may be s
eered fill.
orted on site
mpacted in
e supported
thoroughly
mendations
s of the pro
endations fo
fills on the
racon on a
xcavation o
ion, foundat
of the proje
remove exis
her deleterio
should also
e bottom of t
vegetation a
caped areas
s should be f
he site shou
elatively unifo
t Collins, Colo
35
suitable for
scarified, m
supported on
e soils prov
accordance
d on newly p
proof-rolled
for foundat
oject are pre
r site prepar
e project. A
full-time bas
operations,
tion bearing
ct.
sting vegetat
us materials
extend later
he foundatio
and organic m
s or expose
free of moun
uld be grade
orm thicknes
orado
the propose
oisture cond
n spread foo
vided the up
e with the 4.
placed engi
with a fully
tion systems
esented in
ration, excav
All earthwork
sis. The eva
testing of
soils and o
ion, paveme
s from the p
rally an addi
ons.
materials sh
ed slopes a
nds and dep
ed to create
ss of fill bene
ed brew hou
ditioned, and
oting foundat
pper 12 inc
.2 Earthwor
neered fill.
y loaded wa
s, floor syst
subsequent
vation, subg
k on the pr
aluation of e
engineered
other geotec
ents, the reco
proposed co
tional distan
hould be was
after compl
ressions wh
e a relatively
eath propose
use provided
d compacte
ions bearing
ches is scar
rk section o
Additionally
ater truck pr
tems, pavem
sections o
grade prepar
roject shoul
earthwork sh
d fills, subg
chnical cond
ommended d
onstruction a
nce of 8 inche
sted from the
etion of gra
ich could pre
y level surfa
ed structures
7
d it is
d on-
g on a
rified,
of this
y, the
ior to
ments
f this
ration
ld be
hould
grade
itions
depth
areas.
es for
e site
ading
event
ace to
s.
f the propos
er foundation
ad footing or
on should be
he over-exca
e bottom of
of at least 1
r-excavation
M TriAx® TX
on. We reco
or recycled
be placed wi
of the propo
hould be pla
pacted to at
w house add
on newly pla
d brew hous
a relatively u
cluding those
fill for develo
ering Report
w House Exp
racon Project
rceful ■ Relia
thods may b
or dewaterin
Pond Cons
rilled in the a
within this tes
nd gravel e
ying the wel
eet. Furthe
cope of servi
Considerat
ssels may be
oundation se
oundation so
tions on eng
ed slab. As
n system bott
r reinforced m
e performed
avation shou
the propose
2 inches, m
is properly
X140 or eng
ommend bac
concrete ba
ithin the com
osed founda
aced in 6 to
t least 98 pe
dition may b
ced enginee
se will be a
uniform dept
e removed d
opment of th
t
pansion ■ Fort
No. 2012503
able
be required
ng and stabil
siderations
area of the
st boring con
extending to
l graded san
r recommen
ces and the
tions
e supported
ettlements ca
oils, we reco
ineered fill th
s an alternativ
toming in be
mat foundat
in a mass o
uld extend 8
ed pads. Th
oisture cond
y prepared,
gineered app
ckfilling the o
ase course t
mpacted ba
tions. The
8 inch lifts, m
ercent of the
be supported
ered fill. As
net import.
h of importe
during over-
he brew hous
t Collins, Colo
35
as excavati
ization meth
s
proposed de
nsisted of ap
o a depth of
nd stratum a
ndations reg
e information
on spread f
aused by co
ommend co
hat extends t
ve, the ferm
drock.
ion system i
over-excavat
inches outs
e base of th
ditioned and
we recomm
proved equiv
over-excava
to the desir
se course m
aggregate b
moisture con
e maximum
d on spread
previously n
According
ed fill soils be
-excavation
se addition.
orado
ions approa
hods are pre
etention pon
pproximately
f about 9 fe
and extende
garding the d
n gathered d
footing or re
omparatively
onstructing s
to a depth of
entation ves
is selected b
tion below th
side of the p
he over-exca
d compacted
mend placin
valent) over
ation with CD
red grades.
materials at
base course
nditioned ne
dry unit wei
footing fou
noted, we un
gly, we reco
eneath the p
below the fe
ach the level
esented in th
nd improvem
y 3 feet of si
eet. Siltsto
ed to the ma
design of the
uring our stu
einforced ma
y heavy foun
shallow foot
f at least sev
ssels can be
by the projec
he entire fou
pad envelope
avation shou
d in-place. O
ng a single
r the entire b
DOT Class 6
A second
a depth of
e placed as
ear optimum
ight as dete
ndations be
nderstand tha
ommend gra
proposed str
fermentation
l of groundw
his report.
ments at the
ilty clay ove
one bedrock
aximum dep
e detention
udy is to be
at foundation
ndation loads
ing or reinfo
ven (7) feet b
constructed
ct team, the
undation and
e for every 1
uld be scarifi
Once the ba
layer of ge
base of the
6 aggregate
layer of ge
1-foot below
s over-excav
moisture co
rmined by A
earing on ex
at the area o
ading the ar
ructures. On
vessels, ca
6
water.
e site.
rlying
k was
pth of
pond
used
ns. To
s and
orced
below
d on a
over-
d slab
1-foot
ied to
ase of
eogrid
over-
base
eogrid
w the
vation
ontent
ASTM
xisting
of the
ea to
n-site
an be
ously noted,
orings drilled
ced under the
ommended o
fill in that ar
n the area o
n-situ dry de
ort the impo
for the supp
ned, and re
red fills in ac
Shallow Gro
ously stated
site grades
ering Report
w House Exp
racon Project
rceful ■ Relia
represent g
e of other tim
ying seasona
uctuations o
ot evident at
uction or at
cated on the
d when deve
ndwater leve
ch a plan wo
undwater lev
ENDATIO
cal Conside
ce conditions
on from a
ction recom
cal condition
ts, and othe
l
existing un
d at the site.
e observatio
over-excavat
rea. We un
of the brew
ensities, and
orted fill and
port of site p
compacted
ccordance w
oundwater
d, groundwa
in the area o
t
pansion ■ Fort
No. 2012503
able
groundwater
mes or at ot
al and weath
occur due to
the time the
other times
e boring log
eloping the d
els can best
ould include
vels over a su
ONS FOR
erations
s encounter
geotechnica
mmendations
ns that coul
r site improv
documented
. We do not
on of a geote
tion of the fe
nderstand th
house add
moisture co
d/or lightly lo
pavements
prior to the
ith the recom
r
ater was m
of the propo
t Collins, Colo
35
conditions
ther location
her condition
seasonal v
e borings w
in the life o
g. The poss
design and c
be determin
installation o
ufficient perio
R DESIGN
ed in the bo
al point of v
s described
d impact de
vements.
d fill was enc
t possess an
echnical eng
ermentation
at a net imp
ition. Base
ontents, it is
oaded found
provided the
e constructi
mmendation
measured at
osed fermen
orado
at the time
ns. Groundw
ns, and other
variations in
were perform
of the structu
sibility of gr
construction
ned by imple
of groundwat
od of time.
N AND CO
orings, the s
view provid
in this rep
esign and c
countered to
ny informati
gineer.
vessel foun
port will be
ed upon the
our opinion
dations. Ad
e upper 12-
on of pave
s presented
depths as
tation vesse
of the field
water levels
r factors.
the amount
med. Therefo
ures may be
roundwater
plans for th
ementation o
ter piezomet
ONSTRUC
site appears
ded certain
port are foll
construction
o depths up
on regarding
dation soils
required to
field penet
the existing
dditionally, t
-inches is sc
ements or th
d herein.
shallow as
els. Constru
exploration
can be expe
of rainfall, r
ore, groundw
e higher or
level fluctua
e project.
of a groundw
ters, and pe
CTION
s suitable fo
precautions
owed. We
of the prop
to about 5½
g whether th
will eliminat
achieve pla
tration resist
g fill may be
he existing
carified, moi
he placeme
s 8½ feet b
uction dewat
5
, and
ected
runoff
water
lower
ations
water
riodic
or the
s and
have
posed
½ feet
he fill
te the
anned
tance
used
fill is
isture
ent of
below
tering
ription
oorly to well
amounts of silt
le
with trace
aystone
Testing
ults indicate
wetted. Th
pansive. Sa
derate plastic
m non-plastic
ter
observed w
dition, delaye
els observed
Depth t
while
Not e
t
pansion ■ Fort
No. 2012503
able
Approxim
of
t
Maximum
that the ov
e siltstone b
amples of s
city with liqu
c to 17. Lab
while drilling
ed groundwa
d in the bore
o groundwat
e drilling, ft.
7
9
7
7
7
6
7
2
5
encountered
6
t Collins, Colo
35
mate depth to
stratum (feet
14 to 17 feet
m depth explor
feet)
verburden sa
bedrock is a
ite soils and
id limits rang
boratory test
and after c
ater levels w
eholes are no
ter Depth
1 day
orado
o bottom
t) Co
red (34.3
and, silt, an
also conside
d bedrock s
ging from no
t results are
completion fo
were also ob
oted on the a
to groundwa
after drilling
8.5
8.6
-
-
-
-
-
-
-
-
-
onsistency/d
Loose to
Medium har
nd clay soils
ered to hav
selected for
on-plastic to
e presented
or the prese
btained in tw
attached bor
ater
g, ft. gro
af
density/hardn
very dense
rd to very hard
s exhibited
ve low expa
plasticity te
o 35 and plas
in Appendix
ence and lev
wo of the bo
ring logs, an
Elevation of
undwater 1 d
fter drilling, f
4937.1
4937.8
-
-
-
-
-
-
-
-
-
4
ness
d
slight
nsive
esting
sticity
x B of
vel of
rings.
nd are
f
day
ft.
rceful ■ Relia
ading
on and Des
ents
er
y
FACE CO
bsurface P
encountered
endix A of th
ation of chan
on the resul
llows:
ription
layer (Boring
and 11)
base course
5 ,6 and 7)
ng primarily of
unts of silt and
graded sand
5, 6, and 10)
silt, silty sand,
lay
t
pansion ■ Fort
No. 2012503
able
Estimated d
On-site
On-site
scription
The propos
located at 8
The existin
property wi
to the west
located in th
The ground
currently c
landscaping
Grading pla
from the e
towards the
ONDITION
rofile
d at each bo
his report. S
nges in soil
lts of the bo
Approxim
of
5 i
6
f
d 1
t Collins, Colo
35
design equiva
e standard du
e heavy duty
sed expansio
800 East Linc
ng Odell Bre
th paved acc
t of the existi
he southeast
d surface in
covered with
g, and natura
ans provided
existing build
e southeast co
NS
oring locatio
Stratification
types; in-sit
orings, subsu
mate depth to
stratum (feet
nches to 2 fee
6 to 8 inches
1½ to 5½ feet
3 to 7 feet
orado
Descripti
alent single-ax
uty pavements
pavements (d
Descripti
n to the Ode
coln Avenue in
ewing Co. bu
cess drive lan
ing building.
portion of the
the area of
h asphalt p
l grasses and
indicate the
ding with ov
orner of the p
n are indica
boundaries
tu, the trans
urface cond
o bottom
t) Co
et
M
ion
xle loads (ES
s (parking):
drive lanes):
on
ell Brewing Co
n Fort Collins
uilding curren
nes and parki
An existing
e property.
f the propos
avement, co
d weeds.
site slopes g
verall site d
property.
ated on the
on the borin
sition betwee
itions on the
onsistency/d
Medium st
Medium stiff to
to mediu
SAL’s):
11,0
30,0
ompany facili
, Colorado.
ntly occupies
ing areas loc
detention are
sed expansio
oncrete flatw
gently down a
drainage dire
individual b
ng logs repre
en materials
e project site
density/hardn
-
-
tiff to very stiff
o very stiff / lo
um dense
3
000
000
ity is
s the
cated
ea is
on is
work,
away
ected
boring
esent
s may
e can
ness
f
ose
Brew house
Colum
Walls –
Slabs –
Fermentatio
Interio
Exterio
Yeast liquid
Total d
We anticipa
excavation
and cuts on
proposed n
feet are exp
No below-g
proposed e
t Collins, Colo
35
e Boring Loca
stand the pro
entation vess
well as a bre
e tank to the
project will
ve on the so
parking area
sed fermenta
crete column
eck. The pro
side of the ex
uilding with n
pported on 4
ndations.
ate the propo
nt site grades
g building.
e addition:
mns – 50 kips
– 2 klf
– 125 psf (as
on vessels:
r columns – 2
or columns –
d waste tank:
dead load – 1
ate cuts of up
of the ferm
n the order o
orthern parki
pected in the
grade basem
expansion pro
orado
Descripti
ation Diagram
oposed expa
sels on the w
w house and
e east side o
also include
utheast portio
s north of the
ation vessels
ns and pilas
oposed brew
xisting buildin
no basement
steel legs su
osed building
s and will mat
ssumed)
200 kips
150 kips
50 kips
p to 7 feet ma
mentation ves
of 5 feet may
ng. Addition
area of the p
ment areas
oject.
ion
m (Exhibit A-2
nsion will inc
western portio
tap room add
of the existin
e construction
on of the pro
e existing build
will be supp
sters support
house and ta
ng will be a si
. The yeast
upported on
g additions w
tch finished f
ay be required
ssels foundat
be required
nally, fills on t
roposed brew
are planned
in Appendix A
clude a grou
on of the exis
dition and a y
ng building.
n of new pa
operty along
ding.
ported on cas
ting an elev
ap room addit
ingle-story, pa
liquid waste
individual sp
ill be constru
floor elevation
d during the o
tion construc
in the area o
the order of 3
w house addit
as part of
2
A)
up of
sting
yeast
The
aved
with
st-in-
vated
tions
artial
tank
pread
ucted
ns of
over-
ction,
f the
3 to 4
tion.
f the
ade floor sys
on a mini
on-site soils
are conside
eered fill be
ed granular
mentation ve
d in this repo
oper site pre
be on the o
mated movem
of movemen
nderlying sup
the 4.2.7 Gr
ement.
ernational Bu
oring of the
design subg
ld be used
d that detai
d in its entire
titled GENE
t
pansion ■ Fort
No. 2012503
able
stem may b
mum of 12
, or on newly
ered suitable
neath the br
fills needed
essel founda
ort.
eparation an
rder of abou
ment.
t of foundatio
pporting soil
rading and D
uilding Code,
e constructio
grade suppo
in conjunct
ls were not
ety for a co
ERAL COMM
t Collins, Colo
35
be used for
2-inches of
y placed eng
e for backfil
rew house a
d to balance
ations. Reco
d any neces
ut 1 inch and
ons, floor sla
ls. Therefore
Drainage se
, Table 1613
on operation
ort.
tion with the
included or
omprehensiv
MENTS sho
orado
the brew ho
f scarified,
gineered fill.
l against fou
addition, pav
e the site s
ommendatio
ssary subgra
d differentia
abs, paveme
e, it is impe
ection of this
3.5.2 IBC sei
ns discusse
e entire rep
r fully develo
ve understan
ould be read
ouse additio
moisture c
undations an
vements, an
should be u
ons for granu
ade repair, to
l movement
ents, etc. will
erative the r
s report be fo
smic site cla
ed herein w
port for desi
oped in this
nding of the
d for an und
ons provided
conditioned,
nd walls, an
d for genera
sed beneath
ular importe
otal moveme
t about ½ to
l be related t
recommenda
ollowed to re
assification fo
will be critic
ign purpose
section, an
items conta
erstanding o
i
d it is
and
nd for
al site
h the
ed fills
ent is
¾ of
to the
ations
educe
or this
cal in
es. It
d the
ained
of the
eneath propo
ermentation
earing on en
he proposed
The brew hou
n existing on
The yeast liq
earing on a m
Groundwater
n the area
tabilization m
Site pavemen
onditioned, a
ering Report
w House Exp
racon Project
rceful ■ Relia
UMMARY
tigation has
East Linco
Exhibits A-3
to depths of
his report s
, brew house
ommendation
ormed in the
ation obtaine
. However,
d:
ocumented
he proposed
grades. We
grades. Bas
d in-situ dry
xisting fill is
areas should
osed structu
vessels ma
ngineered fill
slab, or on a
use addition
n-site soils or
quid waste s
minimum of t
was encoun
of the ferm
may be requi
nts may be
and recompa
t
pansion ■ Fort
No. 2012503
able
been perfor
oln Avenue
through A-1
approximate
specifically a
e addition, y
ns for the sto
ese areas ar
ed from our s
the following
fill was enc
d additions t
understand
sed upon the
densities m
acceptable
d be graded
res.
ay be suppor
that extends
a drilled pier
may be sup
r on newly pl
storage tank
two (2) feet o
ntered at dep
mentation ve
red to compl
constructed
acted on-site
t Collins, Colo
35
rmed for the
in Fort Co
3 and design
ely 10.5 to 34
addresses t
yeast liquid w
orm water re
re for inform
subsurface e
g geotechnic
countered in
to depths ra
that the pro
e field penet
easured on
for support
to create a
rted on spre
s to a depth
foundations
ported on sh
aced engine
k may be s
of engineere
pths as shall
essels. Ac
lete the over
d on a minim
soils, or on
orado
proposed B
ollins, Colora
nated as Bo
4.3 feet belo
the recomm
waste tank, n
etention feat
mational purp
exploration, t
cal considera
n our test b
anging from
oject will req
tration resist
samples co
of the impo
relatively un
ead footing o
of at least s
system botto
hallow sprea
eered fill.
supported on
ed fill.
low as 8½ fe
ccordingly, c
r-excavation.
mum of 12-
newly placed
Brew House
ado. Eleve
ring No. 1 th
ow the existin
mendations f
new parking
ture are outs
poses and w
the site can
ations were
borings perfo
about 1½ t
quire a net i
tance values
ollected from
orted fill mat
niform depth
or reinforced
even (7) fee
oming in bed
ad footing fou
n spread foo
eet below ex
construction
.
-inches of sc
d engineered
Expansion
en (11) bor
hrough Borin
ng pavemen
for the prop
areas, and
side our sco
will be utilize
be develope
identified an
ormed within
to 5½ feet b
mport to ac
s, in-situ mo
m our borings
erials. Prop
of imported
d mat founda
et below the t
drock.
undations be
oting founda
xisting site gr
dewatering
carified, mo
d fill.
i
to be
rings,
g No.
nt and
posed
drive
ope of
ed by
ed for
nd will
n the
below
chieve
isture
s, we
posed
soils
ations
top of
earing
ations
rades
g and
isture