Loading...
HomeMy WebLinkAboutZIEGLER - HARVEST PARK PDP - PDP120033 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYTABLE OF CONTENTS I. INTRODUCTION........................................................................................................ 1 II. EXISTING CONDITIONS .......................................................................................... 2 Land Use......................................................................................................................... 2 Roads.............................................................................................................................. 2 Existing Traffic................................................................................................................. 4 Existing Operation........................................................................................................... 4 Pedestrians Facilities ...................................................................................................... 4 Bicycle Facilities..............................................................................................................4 Transit Facilities ..............................................................................................................4 III. PROPOSED DEVELOPMENT................................................................................. 7 Trip Generation ............................................................................................................... 7 Trip Distribution ...............................................................................................................7 Background Traffic Projections ..................................................................................... 10 Trip Assignment ............................................................................................................ 10 Signal Warrants............................................................................................................. 10 Operation Analysis ........................................................................................................ 10 Geometry ...................................................................................................................... 19 Pedestrian Level of Service........................................................................................... 19 Bicycle Level of Service ................................................................................................ 19 Transit Level of Service................................................................................................. 24 IV. CONCLUSIONS/RECOMMENDATIONS .............................................................. 25 DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES LIST OF TABLES 1. Current Peak Hour Operation.................................................................................... 6 2. Trip Generation ......................................................................................................... 7 3. Short Range (2015) Background Peak Hour Operation .......................................... 17 4. Short Range (2017) Background Peak Hour Operation .......................................... 18 5. Phase 1 Short Range (2015) Total Peak Hour Operation ....................................... 20 6. Full Development Short Range (2017) Total Peak Hour Operation ........................ 21 LIST OF FIGURES 1. Site Location ............................................................................................................. 3 2. Recent Peak Hour Traffic .......................................................................................... 5 3. Site Plan.................................................................................................................... 8 4. Trip Distribution ......................................................................................................... 9 5. Short Range (2015) Background Peak Hour Traffic................................................ 11 6. Short Range (2017) Background Peak Hour Traffic................................................ 12 7. Phase 1 Site Generated Peak Hour Traffic ............................................................. 13 8. Full Development Site Generated Peak Hour Traffic............................................... 14 9. Phase 1 Short Range (2015) Total Peak Hour Traffic............................................. 15 10. Full Development Short Range (2017) Total Peak Hour Traffic .............................. 16 11. Phae 1 Short Range (2015) Geometry.................................................................... 22 12. Full Development Short Range (2017) Geometry ................................................... 23 APPENDICES A. Base Assumptions Form/Recent Peak Hour Traffic B. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins LOS Standards C. Short Range (2015) Background Peak Hour Operation D. Short Range (2017) Background Peak Hour Operation E. Phase 1 Short Range (2015) Total Peak Hour Operation F. Full Development Short Range (2017) Total Peak Hour Operation G. Pedestrian/Bicycle Level of Service DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES I. INTRODUCTION This intermediate transportation impact study (ITIS) addresses the capacity, geometric, and control requirements at and near the proposed Harvest Park/Ziegler Mixed-Use development. The proposed Harvest Park/Ziegler Mixed-Use site is located west of Ziegler Road and north of Kechter Drive in Fort Collins, Colorado. During the course of the analysis, numerous contacts were made with the project architect (Architecture West) and the Fort Collins Traffic Engineering staff. This study generally conforms to the format set forth in the Fort Collins transportation impact study guidelines contained in the “Larimer County Urban Area Street Standards” (LCUASS). A Base Assumptions Form and related information are provided in Appendix A. The study involved the following steps: • Collect physical, traffic, and development data; • Perform trip generation, trip distribution, and trip assignment; • Determine peak hour traffic volumes; • Conduct capacity and operational level of service analyses on key intersections; • Analyze signal warrants; • Conduct level of service evaluation of pedestrian, bicycle, and transit modes of transportation. DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES Page 1 II. EXISTING CONDITIONS The location of the Harvest Park/Ziegler Mixed-Use site is shown in Figure 1. It is important that a thorough understanding of the existing conditions be presented. Land Use Land uses in the immediate area are primarily school or residential. There are industrial and commercial land uses to the northeast of the Harvest Park/Ziegler Mixed- Use site (>0.25 miles). Land adjacent to the site is flat (<2% grade) from a traffic operations perspective. The center of Fort Collins lies to the northwest of the proposed Harvest Park/Ziegler Mixed-Use site. Roads The primary streets near the Harvest Park/Ziegler Mixed-Use site are Ziegler Road, Rock Creek Drive, and Saber Cat Drive-County Fair Lane (extended). Ziegler Road is classified as a four-lane arterial street, north of Rock Creek Drive and a two-lane arterial street, south of Rock Creek Drive on the Fort Collins Master Street Plan. Currently, Ziegler Road has a four-lane cross section with auxiliary lanes north of Rock Creek Drive and has a two-lane cross section with auxiliary lanes south of Rock Creek Drive. At the Ziegler/Rock Creek intersection, Ziegler Road has northbound and southbound left-turn lanes, one through lane in each direction, and northbound and southbound right-turn lanes. There are two northbound through lanes on Ziegler Road, north of the Ziegler/Rock Creek intersection. The Ziegler/Rock Creek intersection has signal control. At the Ziegler/Saber Cat intersection, Ziegler Road has a southbound left-turn lane, one southbound through lane, and a combined northbound through/right-turn lane. The existing speed limit in this area is 40 mph. Rock Creek Drive is an east-west street designated as a collector street on the Fort Collins Master Street Plan. Currently, Rock Creek Drive has a two-lane cross section east of Ziegler Road. At the Ziegler/Rock Creek intersection, Rock Creek Drive has a westbound left-turn lane, one westbound through-lane, a combined eastbound left-turn/through lane, and eastbound and westbound right-turn lanes. Saber Cat Drive and County Fair Lane (extended) are classified as a local streets. At the Ziegler/Saber Cat intersection, Saber Cat Drive has a westbound left- turn lane and a westbound right-turn lane. The Ziegler/Saber Cat intersection has stop sign control on Saber Cat Drive. County Fair Lane is built west of the Harvest Park/Ziegler Mixed-Use site. The development of the Harvest Park/Ziegler Mixed-Use site will connect County Fair Lane with Ziegler Road. DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES Page 2 Harmony Rock Creek Ziegler Lady Moon Kechter Timberline Interstate 25 Harvest Park/ Ziegler Mixed-Use Saber Cat Fossil Creek HS Preston MS Bacon ES Zach ES SCALE: 1"=2000' SITE LOCATION Figure 1 DELICH ASSOCIATES Harvest Park/Ziegler Mixed-Use TIS, November 2012 Page 3 Existing Traffic Recent peak hour traffic counts at the Ziegler/Rock Creek and Ziegler/Saber Cat intersections are shown in Figure 2. Raw traffic data is provided in Appendix A. The traffic data at the key intersections was collected in December 2011. The traffic counts were performed when Fossil Ridge High School was in session. Existing Operation The key intersections were evaluated using techniques provided in the 2000 Highway Capacity Manual. Using the recent peak hour traffic shown in Figure 2, the current peak hour operation is shown in Table 1. Calculation forms are provided in Appendix B. A description of level of service for signalized and unsignalized intersections from the 2000 Highway Capacity Manual and a table showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are provided in Appendix B. The key intersections operate acceptably during both the morning and afternoon peak hours. This site is in an area termed “Low Density Mixed-Use Residential.” In “Low Density Mixed-Use Residential” areas, acceptable operation at unsignalized arterial/collector or local intersections is level of service F and at collector/local intersections is level of service C. Acceptable operation at signalized intersections during the peak hours in “Low Density Mixed-Use Residential” areas is defined as level of service D or better, overall. Any leg or movement can operate at level of service D. Pedestrian Facilities There are pedestrian facilities adjacent to developed properties along Ziegler Road, Rock Creek Drive, and Saber Cat Drive. There are no sidewalks adjacent to the Harvest Park/Ziegler Mixed-Use site. As roads are built to arterial/collector standards, sidewalks will be included in the street cross sections. Sidewalks will be incorporated within and adjacent to this development. Bicycle Facilities Bicycle lanes exist on Ziegler Road and Rock Creek Drive. Bike lanes are not required on local or connector streets. Transit Facilities Currently, Transfort serves this area of Fort Collins with Routes 16 and 17. Routes 16 and 17 run along Harmony Road, Ziegler Road, and Rock Creek Drive. Route 16 runs adjacent to the Harvest Park/Ziegler Mixed-Use site. DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES Page 4 AM/PM RECENT PEAK HOUR TRAFFIC Figure 2 DELICH ASSOCIATES Harvest Park/Ziegler Mixed-Use TIS, November 2012 Page 5 102/35 516/294 7/3 14/74 256/476 30/94 66/13 26/17 55/36 107/83 28/10 7/13 Saber Cat Rock Creek Ziegler 274/495 44/30 563/294 31/7 62/38 23/18 TABLE 1 Current Peak Hour Operation Intersection Movement Level of Service AM PM EB LT/T D D EB RT D D EB APPROACH D D WB LT D D WB T D D WB RT D D WB APPROACH D D NB LT A A NB T A A NB RT A A NB APPROACH A A SB LT A A SB T A A SB RT A A SB APPROACH A A Ziegler/Rock Creek (signal) OVERALL B B WB LT C C WB RT B B WB APPROACH C B Ziegler/Saber Cat (stop sign) SB LT A A DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES Page 6 III. PROPOSED DEVELOPMENT Harvest Park/Ziegler Mixed-Use is proposed as four townhome buildings with 22 total dwelling units (south portion) and 15,000 square feet of medical/dental office in two buildings (north portion). Figure 3 shows a site plan of the Harvest Park/Ziegler Mixed- Use site. The site plan shows an access to/from County Fair Lane. County Fair Lane will be extended to Ziegler Road with this development. The development will be built in two phases. The short range analysis (Year 2015) includes development of the south portion of the Harvest Park/Ziegler Mixed-Use site and the short range analysis (Year 2017) includes full development of the Harvest Park/Ziegler Mixed-Use site. Trip Generation Trip generation is important in considering the impact of a development such as this upon the existing and proposed street system. A compilation of trip generation information contained in Trip Generation, 9th Edition, ITE was used to estimate trips that would be generated by the proposed/expected use at this site. Table 2 shows the expected trip generation on a daily and peak hour basis. TABLE 2 Trip Generation Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out Phase 1 230 Townhome 22 DU EQ 172 EQ 3 EQ 12 EQ 11 EQ 6 Phase 2 720 Medical/Dental Office 15.0 KSF EQ 398 1.82 28 0.48 8 EQ 15 EQ 38 Total 570 31 20 26 44 Trip Distribution Directional distribution of the generated trips was determined for the Harvest Park/Ziegler Mixed-Use site. Future year data was obtained from the NFRRTP and other traffic studies. Figure 4 shows the trip distribution used for the Harvest Park/Ziegler Mixed- Use site. DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES Page 7 SCALE: 1"=100' SITE PLAN Figure 3 DELICH ASSOCIATES Harvest Park/Ziegler Mixed-Use TIS, November 2012 Page 8 Ziegler Road 24' 9' WATER LINE 6 PLEX RESIDENCE 21 2 STORY BUILDING A 6005 S,F, FF = 10.60 138.25' 5 SPACES FOSSIL RIDGE HIGH SCHOOL LMN CITY OF FORT COLLINS OPEN SPACE LMN BUFFER ZONE 96' 58.5' 96' 14.5' 34' 68' 30.37' 16.5' LTD. SIGHT SIGN NEW 6' WALK NEW 4.5' WALK TURF TURF TURF TURF TURF WALK WALK WALK WALK CONC. PVMT. 5' 301.83' 50.92' 216'-7.60" 68' PROPERTY LINE PROPERTY LINE LIMIT OF WETLANDS LOT 2 LMN LMN LMN EX. STORM WATER LMN FUTURE WALK FUTURE WALK 10 SPACES 10 SPACES 8 SPACES Ziegler Saber Cat County Fair 60% 25% 50% 30% NOM 5% 15% 15% SCALE: 1"=200' TRIP DISTRIBUTION Figure 4 DELICH ASSOCIATES Harvest Park/Ziegler Mixed-Use TIS, November 2012 Page 9 Med./Den. Office Residential Legend: Background Traffic Projections Figures 5 and 6 show the Phase 1 short range (2015) and Full Development short range (2017) background traffic projections, respectively. Background traffic projections for the short range future horizons were obtained by reviewing the NFRRTP, reviewing traffic studies for other developments, and reviewing historic count data for this area of Fort Collins. Other developments include: various parcels within the Harmony Tech Park. It is important to note that both the short range (2015) and short range (2017) background traffic projections assume that County Fair Lane has already been extended to Ziegler Road. Trip Assignment Trip assignment is how the generated and distributed trips are expected to be loaded on the street system. The assigned trips are the resultant of the trip distribution process. The site generated trip assignment for Phase 1 and Full Development of the Harvest Park/Ziegler Mixed-Use site is shown in Figures 7 and 8, respectively. The site generated traffic was combined with the background traffic to determine the total forecasted traffic at the key intersections. Figures 9 and 10 show the respective Phase 1 short range (2015) and Full Development short range (2017) total traffic at the key intersections. Signal Warrants As a matter of policy, traffic signals are not installed at any location unless warrants are met according to the Manual on Uniform Traffic Control Devices (MUTCD). None of the stop sign controlled intersections are expected to meet peak hour signal warrants. Operation Analysis Operation analyses were performed at the key intersections. The operation analyses were conducted for the Phase 1 short range analysis, reflecting a year 2015 condition and for the Full Development short range analysis, reflecting a year 2017 condition. Using the short range (2015) background peak hour traffic volumes, the key intersections operate as indicated in Table 3. Calculation forms for these analyses are provided in Appendix C. The key intersections operate acceptably during the peak hours. Using the traffic volumes shown in Figure 6, the key intersections operate in the short range (2017) background condition as indicated in Table 4. Calculation forms for these analyses are provided in Appendix D. The key intersections operate acceptably during the peak hours. DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES Page 10 AM/PM SHORT RANGE (2015) BACKGROUND PEAK HOUR TRAFFIC Figure 5 DELICH ASSOCIATES Harvest Park/Ziegler Mixed-Use TIS, November 2012 Page 11 51/17 588/335 34/8 4/23 281/570 48/32 21/4 10/6 28/17 67/41 11/4 25/19 Saber Cat Rock Creek Ziegler 60/21 591/348 25/11 11/57 286/569 93/148 51/10 27/14 32/22 156/152 21/15 15/34 County Fair AM/PM SHORT RANGE (2017) BACKGROUND PEAK HOUR TRAFFIC Figure 6 DELICH ASSOCIATES Harvest Park/Ziegler Mixed-Use TIS, November 2012 Page 12 53/18 610/345 35/8 5/24 292/591 50/34 21/5 10/7 28/18 70/43 11/5 26/20 Saber Cat Rock Creek Ziegler 62/21 614/361 25/11 11/60 298/591 95/152 53/10 28/14 34/23 160/155 22/16 15/35 County Fair AM/PM PHASE 1 SITE GENERATED PEAK HOUR TRAFFIC Figure 7 DELICH ASSOCIATES Harvest Park/Ziegler Mixed-Use TIS, November 2012 Page 13 1/3 2/6 6/3 0/0 4/2 0/0 Saber Cat Rock Creek 6/3 Ziegler 2/6 County Fair Site Access 3/9 0/2 2/1 10/5 AM/PM FULL DEVELOPMENT SITE GENERATED PEAK HOUR TRAFFIC Figure 8 DELICH ASSOCIATES Harvest Park/Ziegler Mixed-Use TIS, November 2012 Page 14 8/7 19/15 11/26 0/0 6/11 0/0 Saber Cat Rock Creek 11/26 Ziegler 19/15 County Fair Site Access 2/1 NOM 10/5 1/6 NOM 7/32 4/2 0/2 24/13 3/9 AM/PM PHASE 1 SHORT RANGE (2015) TOTAL PEAK HOUR TRAFFIC Figure 9 DELICH ASSOCIATES Harvest Park/Ziegler Mixed-Use TIS, November 2012 Page 15 52/20 588/335 34/8 6/29 281/570 48/32 27/7 10/6 32/19 67/41 11/4 25/19 Saber Cat Rock Creek Ziegler 60/21 597/351 25/11 11/57 288/575 93/148 51/10 27/14 32/22 156/152 21/15 15/34 County Fair Site Access 66/44 3/9 59/27 0/2 2/1 10/5 AM/PM FULL DEVELOPMENT SHORT RANGE (2017) TOTAL PEAK HOUR TRAFFIC Figure 10 DELICH ASSOCIATES Harvest Park/Ziegler Mixed-Use TIS, November 2012 Page 16 61/25 610/345 35/8 24/39 292/591 50/34 32/31 10/7 34/29 70/43 11/5 26/20 Saber Cat Rock Creek Ziegler 62/21 625/387 25/11 11/60 317/606 95/152 53/10 28/14 34/23 160/155 22/16 15/35 County Fair 2/1 NOM 10/5 1/6 NOM 7/32 4/2 59/30 0/2 24/13 69/47 3/9 Site Access TABLE 3 Short Range (2015) Background Peak Hour Operation Intersection Movement Level of Service AM PM EB LT/T D D EB RT D D EB APPROACH D D WB LT D D WB T D D WB RT D D WB APPROACH D D NB LT A A NB T A A NB RT A A NB APPROACH A A SB LT A A SB T A A SB RT A A SB APPROACH A A Ziegler/Rock Creek (signal) OVERALL B B EB LT/T/RT D C WB LT D D WB T/RT C B WB APPROACH C C NB LT A A Ziegler/Saber Cat-County Fair (stop sign) SB LT A A DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES Page 17 TABLE 4 Short Range (2017) Background Peak Hour Operation Intersection Movement Level of Service AM PM EB LT/T D D EB RT D D EB APPROACH D D WB LT D D WB T D D WB RT D D WB APPROACH D D NB LT A A NB T A A NB RT A A NB APPROACH A A SB LT A A SB T A A SB RT A A SB APPROACH A A Ziegler/Rock Creek (signal) OVERALL B B EB LT/T/RT D C WB LT D D WB T/RT C B WB APPROACH C C NB LT A A Ziegler/Saber Cat-County Fair (stop sign) SB LT A A DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES Page 18 Table 5 shows the Phase 1 short range (2015) peak hour operation at the key intersections with full development of the Harvest Park/Ziegler Mixed-Use site. Calculation forms for these analyses are provided in Appendix E. The key intersections operate acceptably during the peak hours. Table 6 shows the Full Development short range (2017) peak hour operation at the key intersections with full development of the Harvest Park/Ziegler Mixed-Use site. Calculation forms for these analyses are provided in Appendix F. The key intersections operate acceptably during the peak hours. Geometry The Phase 1 short range (2015) geometry is shown in Figure 11 and the Full Development short range (2017) geometry is shown in Figure 12. The geometry at the Ziegler/Rock Creek intersection is the same as the existing geometry. Pedestrian Level of Service Appendix G shows a map of the area that is within 1320 feet and one mile (school walking area) of the Harvest Park/Ziegler Mixed-Use site. The Harvest Park/Ziegler Mixed-Use site is located within an area termed as “other,” which sets the level of service threshold at LOS C for all measured factors. However, since there are residential land uses within the proposed Harvest Park/Ziegler Mixed-Use site, “School Walking Area” was used for Fossil Creek High School and Preston Middle/Traut Core School(s), which sets the level of service threshold at LOS B for all measured factors, except for “Visual Interest & Amenity,” which is LOS C. Residents of the proposed Harvest Park/Ziegler Mixed-Use site will go to Bacon Elementary School, which is more than a mile from the site. There are five destination areas within 1320 feet/one mile of the proposed Harvest Park/Ziegler Mixed-Use site: 1) Fossil Ridge High School; 2) the residential neighborhood to the north and northwest of the site; 3) the residential neighborhood to the south and southwest of the site; 4) the residential neighborhood to the south of the site; and 5) Preston Middle/Traut Core Knowledge School. In most cases, sidewalks exist within the pedestrian influence area, except along undeveloped properties. It is assumed that sidewalks will be completed as properties develop. Sidewalks will be incorporated within and adjacent to this development. Appendix G contains a Pedestrian LOS Worksheet. The pedestrian level of service will be acceptable for all measured categories. Bicycle Level of Service Appendix G shows a map of the area that is within 1320 feet of the Harvest Park/Ziegler Mixed-Use site. Based upon Fort Collins bicycle LOS criteria, 1) Fossil Ridge High School is the only destination area within 1320 feet of the Harvest Park/Ziegler Mixed-Use site. The bicycle level of service is acceptable. Appendix G contains a Bicycle LOS Worksheet. DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES Page 19 TABLE 5 Phase 1 Short Range (2015) Total Peak Hour Operation Intersection Movement Level of Service AM PM EB LT/T D D EB RT D D EB APPROACH D D WB LT D D WB T D D WB RT D D WB APPROACH D D NB LT A A NB T A A NB RT A A NB APPROACH A A SB LT A A SB T A A SB RT A A SB APPROACH A A Ziegler/Rock Creek (signal) OVERALL B B EB LT/T/RT D C WB LT D D WB T/RT C B WB APPROACH C C NB LT A A Ziegler/Saber Cat-County Fair (stop sign) SB LT A A County Fair/Site Access NB LT/RT A A (stop sign) WB LT/T A A DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES Page 20 TABLE 6 Full Development Short Range (2017) Total Peak Hour Operation Intersection Movement Level of Service AM PM EB LT/T D D EB RT D D EB APPROACH D D WB LT D D WB T D D WB RT D D WB APPROACH D D NB LT A A NB T A A NB RT A A NB APPROACH A A SB LT A A SB T A A SB RT A A SB APPROACH A A Ziegler/Rock Creek (signal) OVERALL B B EB LT/T/RT E D WB LT D D WB T/RT C B WB APPROACH C C NB LT A A Ziegler/Saber Cat-County Fair (stop sign) SB LT A A NB LT/T/RT A A SB LT/T/RT A A EB LT/T/RT A A County Fair/Site Access (stop sign) WB LT/T/RT A A DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES Page 21 PHASE 1 SHORT RANGE (2015) GEOMETRY Figure 11 DELICH ASSOCIATES Harvest Park/Ziegler Mixed-Use TIS, November 2012 Page 22 Saber Cat Rock Creek Ziegler County Fair Site Access - Denotes Lane FULL DEVELOPMENT SHORT RANGE (2017) GEOMETRY Figure 12 DELICH ASSOCIATES Harvest Park/Ziegler Mixed-Use TIS, November 2012 Page 23 Saber Cat Rock Creek Ziegler County Fair Site Access - Denotes Lane Transit Level of Service Currently, Transfort serves this area of Fort Collins with Routes 16 and 17. Routes 16 and 17 run along Harmony Road, Ziegler Road, and Rock Creek Drive. Route 16 runs adjacent to the Harvest Park/Ziegler Mixed-Use site. These routes are considered to be within walking distance of the proposed Harvest Park/Ziegler Mixed- Use site. School Traffic Just prior to the morning peak hour (7:30-8:30am), vehicular traffic at the Ziegler/Saber Cat intersection was observed. This time period was prior to the beginning of classes at Fossil Creek High School. Traffic entering Saber Cat Drive, from both the north and south, was significant. There is a southbound left-turn lane on Ziegler Road, that removed the left-turns from the through lane. The northbound right- turns were significant during the observation period (approximately 20 minutes). There is no northbound right-turn lane. As such, the right-turning traffic caused delays to the northbound through traffic. The queue extended to/near Sage Creek Road, which is approximately 600 feet south of Saber Cat Drive. It is recommended that the City of Fort Collins evaluate this situation and consider installing a northbound right-turn lane approaching Saber Cat Drive. Safe Routes To School With the connection of County Fair Lane to Ziegler Road, it is expected that the number of pedestrians crossing Ziegler Road at this location will increase. This is especially true during school times. While the preferred location for pedestrians to cross Ziegler Road is at the signalized Ziegler/Rock Creek intersection to the north, there is little doubt that pedestrians will cross Ziegler Road at the Ziegler/Saber Cat- County Fair intersection. It is recommended that the City of Fort Collins conduct a “Crosswalk Location and Feasibility Analysis” as described in the Fort Collins Pedestrian Plan, February 15, 2011. It is recommended that this segment of Ziegler Road be designated as a reduced speed limit school zone. DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES Page 24 IV. CONCLUSIONS/RECOMMENDATIONS This study assessed the impacts of the proposed Harvest Park/Ziegler Mixed-Use site development on the short range (2015) street system in the vicinity of the proposed development. As a result of this analysis, the following is concluded: • The development of the Harvest Park/Ziegler Mixed-Use site is feasible from a traffic engineering standpoint. Phase 1 of the Harvest Park/Ziegler Mixed-Use site will generate approximately 172 daily trip ends, 15 morning peak hour trip ends, and 17 afternoon peak hour trip ends. At full development, the Harvest Park/Ziegler Mixed-Use site will generate approximately 570 daily trip ends, 51 morning peak hour trip ends, and 70 afternoon peak hour trip ends. • Current operation at the key intersections is acceptable. • In the short range (2015) future, given Phase 1 development of the Harvest Park/Ziegler Mixed-Use site and an increase in background traffic, the key intersections operate acceptably during the peak hours, with existing geometry and intended geometry at the key intersections. • In the short range (2017) future, given full development of the Harvest Park/Ziegler Mixed-Use site and an increase in background traffic, the key intersections operate acceptably during the peak hours, with existing geometry and intended geometry at the key intersections. • Acceptable level of service is achieved for pedestrian, bicycle, and transit modes based upon the measures in the multi-modal transportation guidelines. • It is recommended that the City of Fort Collins conduct an evaluation of the need for a northbound right-turn lane on Ziegler Road approaching Saber Cat Drive and the need for a crosswalk on Ziegler Road with a school zone designation. DELICH Harvest Park/Ziegler Mixed-Use TIS, November 2012 ASSOCIATES Page 25 APPENDIX A APPENDIX B 3: Rock Creek & Ziegler HCM Signalized Intersection Capacity Analysis Recent AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.97 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1798 1583 1770 1863 1583 1770 1863 1583 1770 1863 1583 Flt Permitted 0.77 1.00 0.57 1.00 1.00 0.54 1.00 1.00 0.42 1.00 1.00 Satd. Flow (perm) 1429 1583 1059 1863 1583 997 1863 1583 789 1863 1583 Volume (vph) 66 26 55 7 28 107 102 516 7 30 256 14 Peak-hour factor, PHF 0.85 0.85 0.85 0.85 0.85 0.85 0.94 0.94 0.94 0.85 0.85 0.85 Adj. Flow (vph) 78 31 65 8 33 126 109 549 7 35 301 16 RTOR Reduction (vph) 0 0 56 0 0 109 002005 Lane Group Flow (vph) 0 109 9 8 33 17 109 549 5 35 301 11 Turn Type Perm Perm Perm Perm pm+pt Perm pm+pt Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 8 2 2 6 6 Actuated Green, G (s) 13.8 13.8 13.8 13.8 13.8 93.5 86.4 86.4 86.9 83.1 83.1 Effective Green, g (s) 15.8 15.8 15.8 15.8 15.8 95.5 88.4 88.4 88.9 85.1 85.1 Actuated g/C Ratio 0.13 0.13 0.13 0.13 0.13 0.80 0.74 0.74 0.74 0.71 0.71 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 188 208 139 245 208 839 1372 1166 616 1321 1123 v/s Ratio Prot 0.02 c0.01 c0.29 0.00 0.16 v/s Ratio Perm c0.08 0.01 0.01 0.01 0.10 0.00 0.04 0.01 v/c Ratio 0.58 0.04 0.06 0.13 0.08 0.13 0.40 0.00 0.06 0.23 0.01 Uniform Delay, d1 49.0 45.5 45.6 46.1 45.7 2.8 5.9 4.2 4.3 6.1 5.1 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 4.3 0.1 0.2 0.3 0.2 0.1 0.9 0.0 0.0 0.4 0.0 Delay (s) 53.3 45.6 45.8 46.3 45.9 2.9 6.8 4.2 4.3 6.5 5.1 Level of Service DDDDDAAAAAA Approach Delay (s) 50.4 46.0 6.1 6.2 Approach LOS D D A A Intersection Summary HCM Average Control Delay 16.7 HCM Level of Service B HCM Volume to Capacity ratio 0.42 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 52.2% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group 3: Rock Creek & Ziegler Timing Report, Sorted By Phase Recent AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Phase Number 124568 Movement SBL NBTL EBTL NBL SBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Recall Mode None C-Min None None C-Min None Maximum Split (s) 21 65 34 23 63 34 Maximum Split (%) 17.5% 54.2% 28.3% 19.2% 52.5% 28.3% Minimum Split (s) 8 22 22 8 22 22 Yellow Time (s) 344344 All-Red Time (s) 122122 Minimum Initial (s) 444444 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 5 5 5 5 Flash Dont Walk (s) 11 11 11 11 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 17 38 103 17 40 103 End Time (s) 38 103 17 40 103 17 Yield/Force Off (s) 34 97 11 36 97 11 Yield/Force Off 170(s) 34 86 0 36 86 0 Local Start Time (s) 97 118 63 97 0 63 Local Yield (s) 114 57 91 116 57 91 Local Yield 170(s) 114 46 80 116 46 80 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 60 Offset: 40 (33%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Splits and Phases: 3: Rock Creek & Ziegler 3: Rock Creek & Ziegler HCM Signalized Intersection Capacity Analysis Recent PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.98 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1824 1583 1770 1863 1583 1770 1863 1583 1770 1863 1583 Flt Permitted 0.86 1.00 0.73 1.00 1.00 0.43 1.00 1.00 0.53 1.00 1.00 Satd. Flow (perm) 1607 1583 1368 1863 1583 792 1863 1583 996 1863 1583 Volume (vph) 13 17 36 13 10 83 35 294 3 74 476 94 Peak-hour factor, PHF 0.85 0.85 0.85 0.85 0.85 0.85 0.87 0.87 0.87 0.85 0.85 0.85 Adj. Flow (vph) 15 20 42 15 12 98 40 338 3 87 560 111 RTOR Reduction (vph) 0 0 39 0 0 90 0010024 Lane Group Flow (vph) 0 35 3 15 12 8 40 338 2 87 560 87 Turn Type Perm Perm Perm Perm pm+pt Perm pm+pt Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 8 2 2 6 6 Actuated Green, G (s) 7.8 7.8 7.8 7.8 7.8 94.6 90.9 90.9 97.8 92.5 92.5 Effective Green, g (s) 9.8 9.8 9.8 9.8 9.8 96.6 92.9 92.9 99.8 94.5 94.5 Actuated g/C Ratio 0.08 0.08 0.08 0.08 0.08 0.80 0.77 0.77 0.83 0.79 0.79 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 131 129 112 152 129 668 1442 1226 863 1467 1247 v/s Ratio Prot 0.01 0.00 0.18 c0.00 c0.30 v/s Ratio Perm c0.02 0.00 0.01 0.01 0.05 0.00 0.08 0.06 v/c Ratio 0.27 0.03 0.13 0.08 0.06 0.06 0.23 0.00 0.10 0.38 0.07 Uniform Delay, d1 51.7 50.7 51.2 50.9 50.9 2.5 3.7 3.1 1.9 3.9 2.9 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 1.1 0.1 0.5 0.2 0.2 0.0 0.4 0.0 0.1 0.8 0.1 Delay (s) 52.8 50.8 51.7 51.2 51.1 2.5 4.1 3.1 1.9 4.6 3.0 Level of Service DDDDDAAAAAA Approach Delay (s) 51.7 51.1 3.9 4.1 Approach LOS D D A A Intersection Summary HCM Average Control Delay 11.2 HCM Level of Service B HCM Volume to Capacity ratio 0.36 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 46.7% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group 3: Rock Creek & Ziegler Timing Report, Sorted By Phase Recent PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Phase Number 124568 Movement SBL NBTL EBTL NBL SBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Recall Mode None C-Min None None C-Min None Maximum Split (s) 22 64 34 21 65 34 Maximum Split (%) 18.3% 53.3% 28.3% 17.5% 54.2% 28.3% Minimum Split (s) 8 22 22 8 22 22 Yellow Time (s) 344344 All-Red Time (s) 122122 Minimum Initial (s) 444444 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 5 5 5 5 Flash Dont Walk (s) 11 11 11 11 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 18 40 104 18 39 104 End Time (s) 40 104 18 39 104 18 Yield/Force Off (s) 36 98 12 35 98 12 Yield/Force Off 170(s) 36 87 1 35 87 1 Local Start Time (s) 98 0 64 98 119 64 Local Yield (s) 116 58 92 115 58 92 Local Yield 170(s) 116 47 81 115 47 81 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 60 Offset: 40 (33%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Splits and Phases: 3: Rock Creek & Ziegler 6: Saber Cat & Ziegler HCM Unsignalized Intersection Capacity Analysis Recent AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 23 62 563 31 44 274 Peak Hour Factor 0.85 0.85 0.92 0.92 0.85 0.85 Hourly flow rate (vph) 27 73 612 34 52 322 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL Median storage veh) 0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1055 629 646 vC1, stage 1 conf vol 629 vC2, stage 2 conf vol 426 vCu, unblocked vol 1055 629 646 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) 5.4 tF (s) 3.5 3.3 2.2 p0 queue free % 90 85 94 cM capacity (veh/h) 274 482 940 Direction, Lane # WB 1 WB 2 NB 1 SB 1 SB 2 Volume Total 27 73 646 52 322 Volume Left 27 0 0 52 0 Volume Right 0 73 34 0 0 cSH 274 482 1700 940 1700 Volume to Capacity 0.10 0.15 0.38 0.06 0.19 Queue Length 95th (ft) 8 13 0 4 0 Control Delay (s) 19.5 13.8 0.0 9.1 0.0 Lane LOS C B A Approach Delay (s) 15.3 0.0 1.3 Approach LOS C Intersection Summary Average Delay 1.8 Intersection Capacity Utilization 46.6% ICU Level of Service A Analysis Period (min) 15 6: Saber Cat & Ziegler HCM Unsignalized Intersection Capacity Analysis Recent PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 18 38 294 7 30 495 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 21 45 346 8 35 582 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type TWLTL Median storage veh) 0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1003 350 354 vC1, stage 1 conf vol 350 vC2, stage 2 conf vol 653 vCu, unblocked vol 1003 350 354 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) 5.4 tF (s) 3.5 3.3 2.2 p0 queue free % 93 94 97 cM capacity (veh/h) 284 693 1205 Direction, Lane # WB 1 WB 2 NB 1 SB 1 SB 2 Volume Total 21 45 354 35 582 Volume Left 21 0 0 35 0 Volume Right 0 45 8 0 0 cSH 284 693 1700 1205 1700 Volume to Capacity 0.07 0.06 0.21 0.03 0.34 Queue Length 95th (ft) 65020 Control Delay (s) 18.7 10.5 0.0 8.1 0.0 Lane LOS C B A Approach Delay (s) 13.2 0.0 0.5 Approach LOS B Intersection Summary Average Delay 1.1 Intersection Capacity Utilization 36.1% ICU Level of Service A Analysis Period (min) 15 UNSIGNALIZED INTERSECTIONS Level-of-Service Average Total Delay sec/veh A < 10 B > 10 and < 15 C > 15 and < 25 D > 25 and < 35 E > 35 and < 50 F > 50 SIGNALIZED INTERSECTIONS Level-of-Service Average Total Delay sec/veh A < 10 B > 10 and < 20 C > 20 and < 35 D > 35 and < 55 E > 55 and < 80 F > 80 Table 4-3 Fort Collins (City Limits) Motor Vehicle LOS Standards (Intersections) Land Use (from structure plan) Other corridors within: Intersection type Commercial corridors Mixed use districts Low density mixed use residential All other areas Signalized intersections (overall) DE*DD Any Leg EEDE Any Movement EEDE Stop sign control (arterial/collector or local— any approach leg) N/A F** F** E Stop sign control (collector/local—any approach leg) N/A C C C * mitigating measures required ** considered normal in an urban environment APPENDIX C 3: Rock Creek & Ziegler HCM Signalized Intersection Capacity Analysis Short Range (2015) Bkgrd AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.97 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1804 1583 1770 1863 1583 1770 1863 1583 1770 1863 1583 Flt Permitted 0.79 1.00 0.61 1.00 1.00 0.55 1.00 1.00 0.35 1.00 1.00 Satd. Flow (perm) 1468 1583 1144 1863 1583 1022 1863 1583 654 1863 1583 Volume (vph) 51 27 32 15 21 156 60 591 25 93 286 11 Peak-hour factor, PHF 0.85 0.85 0.85 0.85 0.85 0.85 0.94 0.94 0.94 0.85 0.85 0.85 Adj. Flow (vph) 60 32 38 18 25 184 64 629 27 109 336 13 RTOR Reduction (vph) 0 0 34 0 0 162 007003 Lane Group Flow (vph) 0 92 4 18 25 22 64 629 20 109 336 10 Turn Type Perm Perm Perm Perm pm+pt Perm pm+pt Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 8 2 2 6 6 Actuated Green, G (s) 12.2 12.2 12.2 12.2 12.2 90.1 84.8 84.8 93.5 86.5 86.5 Effective Green, g (s) 14.2 14.2 14.2 14.2 14.2 92.1 86.8 86.8 95.5 88.5 88.5 Actuated g/C Ratio 0.12 0.12 0.12 0.12 0.12 0.77 0.72 0.72 0.80 0.74 0.74 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 174 187 135 220 187 817 1348 1145 586 1374 1167 v/s Ratio Prot 0.01 0.00 c0.34 c0.01 0.18 v/s Ratio Perm c0.06 0.00 0.02 0.01 0.06 0.01 0.14 0.01 v/c Ratio 0.53 0.02 0.13 0.11 0.12 0.08 0.47 0.02 0.19 0.24 0.01 Uniform Delay, d1 49.8 46.8 47.4 47.3 47.3 3.4 6.9 4.7 3.8 5.0 4.2 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 2.9 0.1 0.5 0.2 0.3 0.0 1.2 0.0 0.2 0.4 0.0 Delay (s) 52.6 46.8 47.8 47.5 47.6 3.4 8.1 4.7 4.0 5.5 4.2 Level of Service DDDDDAAAAAA Approach Delay (s) 50.9 47.6 7.6 5.1 Approach LOS D D A A Intersection Summary HCM Average Control Delay 16.4 HCM Level of Service B HCM Volume to Capacity ratio 0.47 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 Intersection Capacity Utilization 57.2% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group 3: Rock Creek & Ziegler Timing Report, Sorted By Phase Short Range (2015) Bkgrd AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Phase Number 124568 Movement SBL NBTL EBTL NBL SBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Recall Mode None C-Min None None C-Min None Maximum Split (s) 22 67 31 18 71 31 Maximum Split (%) 18.3% 55.8% 25.8% 15.0% 59.2% 25.8% Minimum Split (s) 8 22 22 8 22 22 Yellow Time (s) 344344 All-Red Time (s) 122122 Minimum Initial (s) 444444 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 5 5 5 5 Flash Dont Walk (s) 11 11 11 11 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 18 40 107 18 36 107 End Time (s) 40 107 18 36 107 18 Yield/Force Off (s) 36 101 12 32 101 12 Yield/Force Off 170(s) 36 90 1 32 90 1 Local Start Time (s) 98 0 67 98 116 67 Local Yield (s) 116 61 92 112 61 92 Local Yield 170(s) 116 50 81 112 50 81 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 60 Offset: 40 (33%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Splits and Phases: 3: Rock Creek & Ziegler 3: Rock Creek & Ziegler HCM Signalized Intersection Capacity Analysis Short Range (2015) Bkgrd PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.98 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1824 1583 1770 1863 1583 1770 1863 1583 1770 1863 1583 Flt Permitted 0.87 1.00 0.74 1.00 1.00 0.38 1.00 1.00 0.48 1.00 1.00 Satd. Flow (perm) 1626 1583 1377 1863 1583 700 1863 1583 889 1863 1583 Volume (vph) 10 14 22 34 15 152 21 348 11 148 569 57 Peak-hour factor, PHF 0.85 0.85 0.85 0.85 0.85 0.85 0.87 0.87 0.87 0.85 0.85 0.85 Adj. Flow (vph) 12 16 26 40 18 179 24 400 13 174 669 67 RTOR Reduction (vph) 0 0 24 0 0 163 0030015 Lane Group Flow (vph) 0 28 2 40 18 16 24 400 10 174 669 52 Turn Type Perm Perm Perm Perm pm+pt Perm pm+pt Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 8 2 2 6 6 Actuated Green, G (s) 8.9 8.9 8.9 8.9 8.9 91.0 87.4 87.4 99.1 91.5 91.5 Effective Green, g (s) 10.9 10.9 10.9 10.9 10.9 93.0 89.4 89.4 101.1 93.5 93.5 Actuated g/C Ratio 0.09 0.09 0.09 0.09 0.09 0.78 0.75 0.75 0.84 0.78 0.78 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 148 144 125 169 144 575 1388 1179 806 1452 1233 v/s Ratio Prot 0.01 0.00 0.21 c0.01 c0.36 v/s Ratio Perm 0.02 0.00 c0.03 0.01 0.03 0.01 0.17 0.03 v/c Ratio 0.19 0.02 0.32 0.11 0.11 0.04 0.29 0.01 0.22 0.46 0.04 Uniform Delay, d1 50.5 49.7 51.1 50.1 50.1 3.3 5.0 3.9 2.0 4.6 3.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.6 0.0 1.5 0.3 0.3 0.0 0.5 0.0 0.1 1.1 0.1 Delay (s) 51.1 49.7 52.6 50.4 50.5 3.4 5.5 3.9 2.2 5.6 3.1 Level of Service DDDDDAAAAAA Approach Delay (s) 50.4 50.8 5.3 4.8 Approach LOS D D A A Intersection Summary HCM Average Control Delay 13.1 HCM Level of Service B HCM Volume to Capacity ratio 0.44 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 51.8% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group 3: Rock Creek & Ziegler Timing Report, Sorted By Phase Short Range (2015) Bkgrd PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Phase Number 124568 Movement SBL NBTL EBTL NBL SBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Recall Mode None C-Min None None C-Min None Maximum Split (s) 23 66 31 17 72 31 Maximum Split (%) 19.2% 55.0% 25.8% 14.2% 60.0% 25.8% Minimum Split (s) 8 22 22 8 22 22 Yellow Time (s) 344344 All-Red Time (s) 122122 Minimum Initial (s) 444444 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 5 5 5 5 Flash Dont Walk (s) 11 11 11 11 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 17 40 106 17 34 106 End Time (s) 40 106 17 34 106 17 Yield/Force Off (s) 36 100 11 30 100 11 Yield/Force Off 170(s) 36 89 0 30 89 0 Local Start Time (s) 97 0 66 97 114 66 Local Yield (s) 116 60 91 110 60 91 Local Yield 170(s) 116 49 80 110 49 80 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 60 Offset: 40 (33%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Splits and Phases: 3: Rock Creek & Ziegler 6: County Fair & Ziegler HCM Unsignalized Intersection Capacity Analysis Short Range (2015) Bkgrd AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 21 10 28 25 11 67 51 588 34 48 281 4 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.92 0.92 0.92 0.85 0.85 0.85 Hourly flow rate (vph) 25 12 33 29 13 79 55 639 37 56 331 5 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 0 0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1281 1233 333 1251 1217 658 335 676 vC1, stage 1 conf vol 446 446 768 768 vC2, stage 2 conf vol 835 787 482 448 vCu, unblocked vol 1281 1233 333 1251 1217 658 335 676 tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 tC, 2 stage (s) 6.1 5.5 6.1 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 82 94 95 84 94 83 95 94 cM capacity (veh/h) 134 188 709 180 201 464 1224 915 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2 Volume Total 69 29 92 55 676 56 335 Volume Left 25 29 0 55 0 56 0 Volume Right 33 0 79 0 37 0 5 cSH 236 180 392 1224 1700 915 1700 Volume to Capacity 0.29 0.16 0.23 0.05 0.40 0.06 0.20 Queue Length 95th (ft) 30 14 22 4050 Control Delay (s) 26.5 28.9 17.0 8.1 0.0 9.2 0.0 Lane LOS D D C A A Approach Delay (s) 26.5 19.9 0.6 1.3 Approach LOS D C Intersection Summary Average Delay 4.0 Intersection Capacity Utilization 56.4% ICU Level of Service B Analysis Period (min) 15 6: County Fair & Ziegler HCM Unsignalized Intersection Capacity Analysis Short Range (2015) Bkgrd PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 4 6 17 19 4 41 17 335 8 32 570 23 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 5 7 20 22 5 48 20 394 9 38 671 27 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 0 0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1244 1203 684 1208 1212 399 698 404 vC1, stage 1 conf vol 759 759 439 439 vC2, stage 2 conf vol 485 444 769 773 vCu, unblocked vol 1244 1203 684 1208 1212 399 698 404 tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 tC, 2 stage (s) 6.1 5.5 6.1 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 97 97 96 88 98 93 98 97 cM capacity (veh/h) 188 212 449 189 208 651 899 1155 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2 Volume Total 32 22 53 20 404 38 698 Volume Left 5 22 0 20 0 38 0 Volume Right 20 0 48 0 9 0 27 cSH 309 189 547 899 1700 1155 1700 Volume to Capacity 0.10 0.12 0.10 0.02 0.24 0.03 0.41 Queue Length 95th (ft) 9 10 82030 Control Delay (s) 18.0 26.6 12.3 9.1 0.0 8.2 0.0 Lane LOS C D B A A Approach Delay (s) 18.0 16.5 0.4 0.4 Approach LOS C C Intersection Summary Average Delay 1.8 Intersection Capacity Utilization 43.2% ICU Level of Service A Analysis Period (min) 15 APPENDIX D 3: Rock Creek & Ziegler HCM Signalized Intersection Capacity Analysis Short Range (2017) Bkgrd AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.97 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1804 1583 1770 1863 1583 1770 1863 1583 1770 1863 1583 Flt Permitted 0.79 1.00 0.61 1.00 1.00 0.54 1.00 1.00 0.34 1.00 1.00 Satd. Flow (perm) 1466 1583 1129 1863 1583 1003 1863 1583 627 1863 1583 Volume (vph) 53 28 34 15 22 160 62 614 25 95 298 11 Peak-hour factor, PHF 0.85 0.85 0.85 0.85 0.85 0.85 0.94 0.94 0.94 0.85 0.85 0.85 Adj. Flow (vph) 62 33 40 18 26 188 66 653 27 112 351 13 RTOR Reduction (vph) 0 0 35 0 0 165 008003 Lane Group Flow (vph) 0 95 5 18 26 23 66 653 19 112 351 10 Turn Type Perm Perm Perm Perm pm+pt Perm pm+pt Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 8 2 2 6 6 Actuated Green, G (s) 12.6 12.6 12.6 12.6 12.6 89.6 84.3 84.3 93.2 86.1 86.1 Effective Green, g (s) 14.6 14.6 14.6 14.6 14.6 91.6 86.3 86.3 95.2 88.1 88.1 Actuated g/C Ratio 0.12 0.12 0.12 0.12 0.12 0.76 0.72 0.72 0.79 0.73 0.73 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 178 193 137 227 193 799 1340 1138 565 1368 1162 v/s Ratio Prot 0.01 0.00 c0.35 c0.01 0.19 v/s Ratio Perm c0.06 0.00 0.02 0.01 0.06 0.01 0.15 0.01 v/c Ratio 0.53 0.03 0.13 0.11 0.12 0.08 0.49 0.02 0.20 0.26 0.01 Uniform Delay, d1 49.5 46.4 47.0 46.9 47.0 3.5 7.3 4.8 4.1 5.2 4.3 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 3.1 0.1 0.4 0.2 0.3 0.0 1.3 0.0 0.2 0.5 0.0 Delay (s) 52.6 46.5 47.5 47.2 47.2 3.6 8.6 4.8 4.3 5.7 4.3 Level of Service DDDDDAAAAAA Approach Delay (s) 50.8 47.3 8.0 5.3 Approach LOS D D A A Intersection Summary HCM Average Control Delay 16.5 HCM Level of Service B HCM Volume to Capacity ratio 0.49 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 Intersection Capacity Utilization 58.7% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group 3: Rock Creek & Ziegler Timing Report, Sorted By Phase Short Range (2017) Bkgrd AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Phase Number 124568 Movement SBL NBTL EBTL NBL SBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Recall Mode None C-Min None None C-Min None Maximum Split (s) 21 69 30 17 73 30 Maximum Split (%) 17.5% 57.5% 25.0% 14.2% 60.8% 25.0% Minimum Split (s) 8 22 22 8 22 22 Yellow Time (s) 344344 All-Red Time (s) 122122 Minimum Initial (s) 444444 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 5 5 5 5 Flash Dont Walk (s) 11 11 11 11 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 19 40 109 19 36 109 End Time (s) 40 109 19 36 109 19 Yield/Force Off (s) 36 103 13 32 103 13 Yield/Force Off 170(s) 36 92 2 32 92 2 Local Start Time (s) 99 0 69 99 116 69 Local Yield (s) 116 63 93 112 63 93 Local Yield 170(s) 116 52 82 112 52 82 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 60 Offset: 40 (33%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Splits and Phases: 3: Rock Creek & Ziegler 3: Rock Creek & Ziegler HCM Signalized Intersection Capacity Analysis Short Range (2017) Bkgrd PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.98 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1824 1583 1770 1863 1583 1770 1863 1583 1770 1863 1583 Flt Permitted 0.87 1.00 0.74 1.00 1.00 0.36 1.00 1.00 0.47 1.00 1.00 Satd. Flow (perm) 1626 1583 1377 1863 1583 675 1863 1583 872 1863 1583 Volume (vph) 10 14 23 35 16 155 21 361 11 152 591 60 Peak-hour factor, PHF 0.85 0.85 0.85 0.85 0.85 0.85 0.87 0.87 0.87 0.85 0.85 0.85 Adj. Flow (vph) 12 16 27 41 19 182 24 415 13 179 695 71 RTOR Reduction (vph) 0 0 25 0 0 165 0030016 Lane Group Flow (vph) 0 28 2 41 19 17 24 415 10 179 695 55 Turn Type Perm Perm Perm Perm pm+pt Perm pm+pt Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 8 2 2 6 6 Actuated Green, G (s) 8.9 8.9 8.9 8.9 8.9 91.0 87.4 87.4 99.1 91.5 91.5 Effective Green, g (s) 10.9 10.9 10.9 10.9 10.9 93.0 89.4 89.4 101.1 93.5 93.5 Actuated g/C Ratio 0.09 0.09 0.09 0.09 0.09 0.78 0.75 0.75 0.84 0.78 0.78 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 148 144 125 169 144 556 1388 1179 792 1452 1233 v/s Ratio Prot 0.01 0.00 0.22 c0.01 c0.37 v/s Ratio Perm 0.02 0.00 c0.03 0.01 0.03 0.01 0.18 0.03 v/c Ratio 0.19 0.02 0.33 0.11 0.11 0.04 0.30 0.01 0.23 0.48 0.04 Uniform Delay, d1 50.5 49.7 51.1 50.1 50.1 3.4 5.0 3.9 2.1 4.7 3.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.6 0.0 1.5 0.3 0.4 0.0 0.6 0.0 0.1 1.1 0.1 Delay (s) 51.1 49.7 52.7 50.4 50.5 3.4 5.6 3.9 2.2 5.8 3.1 Level of Service DDDDDAAAAAA Approach Delay (s) 50.4 50.8 5.4 4.9 Approach LOS D D A A Intersection Summary HCM Average Control Delay 13.1 HCM Level of Service B HCM Volume to Capacity ratio 0.46 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 53.0% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group 3: Rock Creek & Ziegler Timing Report, Sorted By Phase Short Range (2017) Bkgrd PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Phase Number 124568 Movement SBL NBTL EBTL NBL SBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Recall Mode None C-Min None None C-Min None Maximum Split (s) 23 67 30 16 74 30 Maximum Split (%) 19.2% 55.8% 25.0% 13.3% 61.7% 25.0% Minimum Split (s) 8 22 22 8 22 22 Yellow Time (s) 344344 All-Red Time (s) 122122 Minimum Initial (s) 444444 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 5 5 5 5 Flash Dont Walk (s) 11 11 11 11 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 17 40 107 17 33 107 End Time (s) 40 107 17 33 107 17 Yield/Force Off (s) 36 101 11 29 101 11 Yield/Force Off 170(s) 36 90 0 29 90 0 Local Start Time (s) 97 0 67 97 113 67 Local Yield (s) 116 61 91 109 61 91 Local Yield 170(s) 116 50 80 109 50 80 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 60 Offset: 40 (33%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Splits and Phases: 3: Rock Creek & Ziegler 6: County Fair & Ziegler HCM Unsignalized Intersection Capacity Analysis Short Range (2017) Bkgrd AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 21 10 28 26 11 70 53 610 35 50 292 5 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.92 0.92 0.92 0.85 0.85 0.85 Hourly flow rate (vph) 25 12 33 31 13 82 58 663 38 59 344 6 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 0 0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1331 1280 346 1297 1264 682 349 701 vC1, stage 1 conf vol 464 464 797 797 vC2, stage 2 conf vol 867 816 500 467 vCu, unblocked vol 1331 1280 346 1297 1264 682 349 701 tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 tC, 2 stage (s) 6.1 5.5 6.1 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 80 93 95 82 93 82 95 93 cM capacity (veh/h) 123 179 697 171 193 450 1209 896 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2 Volume Total 69 31 95 58 701 59 349 Volume Left 25 31 0 58 0 59 0 Volume Right 33 0 82 0 38 0 6 cSH 221 171 381 1209 1700 896 1700 Volume to Capacity 0.31 0.18 0.25 0.05 0.41 0.07 0.21 Queue Length 95th (ft) 32 16 24 4050 Control Delay (s) 28.6 30.5 17.6 8.1 0.0 9.3 0.0 Lane LOS D D C A A Approach Delay (s) 28.6 20.7 0.6 1.3 Approach LOS D C Intersection Summary Average Delay 4.1 Intersection Capacity Utilization 57.6% ICU Level of Service B Analysis Period (min) 15 6: County Fair & Ziegler HCM Unsignalized Intersection Capacity Analysis Short Range (2017) Bkgrd PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 5 7 18 20 5 43 18 345 8 34 591 24 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 6 8 21 24 6 51 21 406 9 40 695 28 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 0 0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1291 1247 709 1254 1256 411 724 415 vC1, stage 1 conf vol 789 789 453 453 vC2, stage 2 conf vol 502 458 801 804 vCu, unblocked vol 1291 1247 709 1254 1256 411 724 415 tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 tC, 2 stage (s) 6.1 5.5 6.1 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 97 96 95 87 97 92 98 97 cM capacity (veh/h) 179 204 434 179 200 641 879 1144 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2 Volume Total 35 24 56 21 415 40 724 Volume Left 6 24 0 21 0 40 0 Volume Right 21 0 51 0 9 0 28 cSH 289 179 521 879 1700 1144 1700 Volume to Capacity 0.12 0.13 0.11 0.02 0.24 0.03 0.43 Queue Length 95th (ft) 10 11 92030 Control Delay (s) 19.2 28.2 12.7 9.2 0.0 8.3 0.0 Lane LOS C D B A A Approach Delay (s) 19.2 17.3 0.4 0.4 Approach LOS C C Intersection Summary Average Delay 2.0 Intersection Capacity Utilization 45.4% ICU Level of Service A Analysis Period (min) 15 APPENDIX E 3: Rock Creek & Ziegler HCM Signalized Intersection Capacity Analysis Short Range (2015) Total AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.97 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1804 1583 1770 1863 1583 1770 1863 1583 1770 1863 1583 Flt Permitted 0.79 1.00 0.61 1.00 1.00 0.55 1.00 1.00 0.35 1.00 1.00 Satd. Flow (perm) 1468 1583 1144 1863 1583 1018 1863 1583 648 1863 1583 Volume (vph) 51 27 32 15 21 156 60 597 25 93 288 11 Peak-hour factor, PHF 0.85 0.85 0.85 0.85 0.85 0.85 0.94 0.94 0.94 0.85 0.85 0.85 Adj. Flow (vph) 60 32 38 18 25 184 64 635 27 109 339 13 RTOR Reduction (vph) 0 0 34 0 0 162 007003 Lane Group Flow (vph) 0 92 4 18 25 22 64 635 20 109 339 10 Turn Type Perm Perm Perm Perm pm+pt Perm pm+pt Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 8 2 2 6 6 Actuated Green, G (s) 12.2 12.2 12.2 12.2 12.2 90.1 84.8 84.8 93.5 86.5 86.5 Effective Green, g (s) 14.2 14.2 14.2 14.2 14.2 92.1 86.8 86.8 95.5 88.5 88.5 Actuated g/C Ratio 0.12 0.12 0.12 0.12 0.12 0.77 0.72 0.72 0.80 0.74 0.74 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 174 187 135 220 187 815 1348 1145 581 1374 1167 v/s Ratio Prot 0.01 0.00 c0.34 c0.01 0.18 v/s Ratio Perm c0.06 0.00 0.02 0.01 0.06 0.01 0.14 0.01 v/c Ratio 0.53 0.02 0.13 0.11 0.12 0.08 0.47 0.02 0.19 0.25 0.01 Uniform Delay, d1 49.8 46.8 47.4 47.3 47.3 3.4 7.0 4.7 3.9 5.1 4.2 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 2.9 0.1 0.5 0.2 0.3 0.0 1.2 0.0 0.2 0.4 0.0 Delay (s) 52.6 46.8 47.8 47.5 47.6 3.4 8.1 4.7 4.0 5.5 4.2 Level of Service DDDDDAAAAAA Approach Delay (s) 50.9 47.6 7.6 5.1 Approach LOS D D A A Intersection Summary HCM Average Control Delay 16.4 HCM Level of Service B HCM Volume to Capacity ratio 0.48 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 Intersection Capacity Utilization 57.5% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group 3: Rock Creek & Ziegler Timing Report, Sorted By Phase Short Range (2015) Total AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Phase Number 124568 Movement SBL NBTL EBTL NBL SBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Recall Mode None C-Min None None C-Min None Maximum Split (s) 22 67 31 18 71 31 Maximum Split (%) 18.3% 55.8% 25.8% 15.0% 59.2% 25.8% Minimum Split (s) 8 22 22 8 22 22 Yellow Time (s) 344344 All-Red Time (s) 122122 Minimum Initial (s) 444444 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 5 5 5 5 Flash Dont Walk (s) 11 11 11 11 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 18 40 107 18 36 107 End Time (s) 40 107 18 36 107 18 Yield/Force Off (s) 36 101 12 32 101 12 Yield/Force Off 170(s) 36 90 1 32 90 1 Local Start Time (s) 98 0 67 98 116 67 Local Yield (s) 116 61 92 112 61 92 Local Yield 170(s) 116 50 81 112 50 81 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 60 Offset: 40 (33%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Splits and Phases: 3: Rock Creek & Ziegler 3: Rock Creek & Ziegler HCM Signalized Intersection Capacity Analysis Short Range (2015) Total PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.98 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1824 1583 1770 1863 1583 1770 1863 1583 1770 1863 1583 Flt Permitted 0.87 1.00 0.74 1.00 1.00 0.37 1.00 1.00 0.48 1.00 1.00 Satd. Flow (perm) 1626 1583 1377 1863 1583 693 1863 1583 886 1863 1583 Volume (vph) 10 14 22 34 15 152 21 351 11 148 575 57 Peak-hour factor, PHF 0.85 0.85 0.85 0.85 0.85 0.85 0.87 0.87 0.87 0.85 0.85 0.85 Adj. Flow (vph) 12 16 26 40 18 179 24 403 13 174 676 67 RTOR Reduction (vph) 0 0 24 0 0 163 0030015 Lane Group Flow (vph) 0 28 2 40 18 16 24 403 10 174 676 52 Turn Type Perm Perm Perm Perm pm+pt Perm pm+pt Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 8 2 2 6 6 Actuated Green, G (s) 8.9 8.9 8.9 8.9 8.9 91.0 87.4 87.4 99.1 91.5 91.5 Effective Green, g (s) 10.9 10.9 10.9 10.9 10.9 93.0 89.4 89.4 101.1 93.5 93.5 Actuated g/C Ratio 0.09 0.09 0.09 0.09 0.09 0.78 0.75 0.75 0.84 0.78 0.78 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 148 144 125 169 144 569 1388 1179 803 1452 1233 v/s Ratio Prot 0.01 0.00 0.22 c0.01 c0.36 v/s Ratio Perm 0.02 0.00 c0.03 0.01 0.03 0.01 0.17 0.03 v/c Ratio 0.19 0.02 0.32 0.11 0.11 0.04 0.29 0.01 0.22 0.47 0.04 Uniform Delay, d1 50.5 49.7 51.1 50.1 50.1 3.3 5.0 3.9 2.0 4.6 3.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.6 0.0 1.5 0.3 0.3 0.0 0.5 0.0 0.1 1.1 0.1 Delay (s) 51.1 49.7 52.6 50.4 50.5 3.4 5.5 3.9 2.2 5.7 3.1 Level of Service DDDDDAAAAAA Approach Delay (s) 50.4 50.8 5.3 4.8 Approach LOS D D A A Intersection Summary HCM Average Control Delay 13.1 HCM Level of Service B HCM Volume to Capacity ratio 0.45 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 52.1% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group 3: Rock Creek & Ziegler Timing Report, Sorted By Phase Short Range (2015) Total PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Phase Number 124568 Movement SBL NBTL EBTL NBL SBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Recall Mode None C-Min None None C-Min None Maximum Split (s) 23 66 31 17 72 31 Maximum Split (%) 19.2% 55.0% 25.8% 14.2% 60.0% 25.8% Minimum Split (s) 8 22 22 8 22 22 Yellow Time (s) 344344 All-Red Time (s) 122122 Minimum Initial (s) 444444 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 5 5 5 5 Flash Dont Walk (s) 11 11 11 11 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 17 40 106 17 34 106 End Time (s) 40 106 17 34 106 17 Yield/Force Off (s) 36 100 11 30 100 11 Yield/Force Off 170(s) 36 89 0 30 89 0 Local Start Time (s) 97 0 66 97 114 66 Local Yield (s) 116 60 91 110 60 91 Local Yield 170(s) 116 49 80 110 49 80 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 60 Offset: 40 (33%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Splits and Phases: 3: Rock Creek & Ziegler 6: County Fair & Ziegler HCM Unsignalized Intersection Capacity Analysis Short Range (2015) Total AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 27 10 32 25 11 67 52 588 34 48 281 6 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.92 0.92 0.92 0.85 0.85 0.85 Hourly flow rate (vph) 32 12 38 29 13 79 57 639 37 56 331 7 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 0 0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1285 1236 334 1258 1221 658 338 676 vC1, stage 1 conf vol 447 447 771 771 vC2, stage 2 conf vol 837 789 487 451 vCu, unblocked vol 1285 1236 334 1258 1221 658 338 676 tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 tC, 2 stage (s) 6.1 5.5 6.1 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 76 94 95 83 94 83 95 94 cM capacity (veh/h) 133 187 708 178 200 464 1222 915 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2 Volume Total 81 29 92 57 676 56 338 Volume Left 32 29 0 57 0 56 0 Volume Right 38 0 79 0 37 0 7 cSH 229 178 392 1222 1700 915 1700 Volume to Capacity 0.35 0.17 0.23 0.05 0.40 0.06 0.20 Queue Length 95th (ft) 38 14 22 4050 Control Delay (s) 29.1 29.2 17.0 8.1 0.0 9.2 0.0 Lane LOS D D C A A Approach Delay (s) 29.1 20.0 0.6 1.3 Approach LOS D C Intersection Summary Average Delay 4.3 Intersection Capacity Utilization 57.0% ICU Level of Service B Analysis Period (min) 15 6: County Fair & Ziegler HCM Unsignalized Intersection Capacity Analysis Short Range (2015) Total PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 7 6 19 19 4 41 20 335 8 32 570 29 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 8 7 22 22 5 48 24 394 9 38 671 34 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 0 0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1255 1214 688 1218 1226 399 705 404 vC1, stage 1 conf vol 763 763 446 446 vC2, stage 2 conf vol 492 451 772 780 vCu, unblocked vol 1255 1214 688 1218 1226 399 705 404 tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 tC, 2 stage (s) 6.1 5.5 6.1 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 96 97 95 88 98 93 97 97 cM capacity (veh/h) 186 210 446 185 205 651 893 1155 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2 Volume Total 38 22 53 24 404 38 705 Volume Left 8 22 0 24 0 38 0 Volume Right 22 0 48 0 9 0 34 cSH 294 185 545 893 1700 1155 1700 Volume to Capacity 0.13 0.12 0.10 0.03 0.24 0.03 0.41 Queue Length 95th (ft) 11 10 82030 Control Delay (s) 19.0 27.1 12.3 9.1 0.0 8.2 0.0 Lane LOS C D B A A Approach Delay (s) 19.0 16.7 0.5 0.4 Approach LOS C C Intersection Summary Average Delay 1.9 Intersection Capacity Utilization 46.5% ICU Level of Service A Analysis Period (min) 15 9: County Fair & Site Access HCM Unsignalized Intersection Capacity Analysis Short Range (2015) Total AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 59 0 3 66 2 10 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 69 0 4 78 2 12 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 69 154 69 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 69 154 69 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 100 100 99 cM capacity (veh/h) 1531 835 993 Direction, Lane # EB 1 WB 1 NB 1 Volume Total 69 81 14 Volume Left 0 4 2 Volume Right 0 0 12 cSH 1700 1531 963 Volume to Capacity 0.04 0.00 0.01 Queue Length 95th (ft) 0 0 1 Control Delay (s) 0.0 0.3 8.8 Lane LOS A A Approach Delay (s) 0.0 0.3 8.8 Approach LOS A Intersection Summary Average Delay 0.9 Intersection Capacity Utilization 15.9% ICU Level of Service A Analysis Period (min) 15 9: County Fair & Site Access HCM Unsignalized Intersection Capacity Analysis Short Range (2015) Total PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 27 2 9 44 1 5 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 32 2 11 52 1 6 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 34 106 33 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 34 106 33 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 99 100 99 cM capacity (veh/h) 1577 886 1041 Direction, Lane # EB 1 WB 1 NB 1 Volume Total 34 62 7 Volume Left 0 11 1 Volume Right 2 0 6 cSH 1700 1577 1011 Volume to Capacity 0.02 0.01 0.01 Queue Length 95th (ft) 0 1 1 Control Delay (s) 0.0 1.3 8.6 Lane LOS A A Approach Delay (s) 0.0 1.3 8.6 Approach LOS A Intersection Summary Average Delay 1.4 Intersection Capacity Utilization 19.5% ICU Level of Service A Analysis Period (min) 15 APPENDIX F 3: Rock Creek & Ziegler HCM Signalized Intersection Capacity Analysis Short Range (2017) Total AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.97 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1804 1583 1770 1863 1583 1770 1863 1583 1770 1863 1583 Flt Permitted 0.79 1.00 0.61 1.00 1.00 0.52 1.00 1.00 0.33 1.00 1.00 Satd. Flow (perm) 1466 1583 1129 1863 1583 976 1863 1583 615 1863 1583 Volume (vph) 53 28 34 15 22 160 62 625 25 95 317 11 Peak-hour factor, PHF 0.85 0.85 0.85 0.85 0.85 0.85 0.94 0.94 0.94 0.85 0.85 0.85 Adj. Flow (vph) 62 33 40 18 26 188 66 665 27 112 373 13 RTOR Reduction (vph) 0 0 35 0 0 165 008003 Lane Group Flow (vph) 0 95 5 18 26 23 66 665 19 112 373 10 Turn Type Perm Perm Perm Perm pm+pt Perm pm+pt Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 8 2 2 6 6 Actuated Green, G (s) 12.6 12.6 12.6 12.6 12.6 89.6 84.3 84.3 93.2 86.1 86.1 Effective Green, g (s) 14.6 14.6 14.6 14.6 14.6 91.6 86.3 86.3 95.2 88.1 88.1 Actuated g/C Ratio 0.12 0.12 0.12 0.12 0.12 0.76 0.72 0.72 0.79 0.73 0.73 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 178 193 137 227 193 780 1340 1138 556 1368 1162 v/s Ratio Prot 0.01 0.00 c0.36 c0.01 0.20 v/s Ratio Perm c0.06 0.00 0.02 0.01 0.06 0.01 0.15 0.01 v/c Ratio 0.53 0.03 0.13 0.11 0.12 0.08 0.50 0.02 0.20 0.27 0.01 Uniform Delay, d1 49.5 46.4 47.0 46.9 47.0 3.5 7.4 4.8 4.2 5.3 4.3 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 3.1 0.1 0.4 0.2 0.3 0.0 1.3 0.0 0.2 0.5 0.0 Delay (s) 52.6 46.5 47.5 47.2 47.2 3.6 8.7 4.8 4.4 5.8 4.3 Level of Service DDDDDAAAAAA Approach Delay (s) 50.8 47.3 8.1 5.4 Approach LOS D D A A Intersection Summary HCM Average Control Delay 16.4 HCM Level of Service B HCM Volume to Capacity ratio 0.50 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 16.0 Intersection Capacity Utilization 59.2% ICU Level of Service B Analysis Period (min) 15 c Critical Lane Group 3: Rock Creek & Ziegler Timing Report, Sorted By Phase Short Range (2017) Total AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Phase Number 124568 Movement SBL NBTL EBTL NBL SBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Recall Mode None C-Min None None C-Min None Maximum Split (s) 21 69 30 17 73 30 Maximum Split (%) 17.5% 57.5% 25.0% 14.2% 60.8% 25.0% Minimum Split (s) 8 22 22 8 22 22 Yellow Time (s) 344344 All-Red Time (s) 122122 Minimum Initial (s) 444444 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 5 5 5 5 Flash Dont Walk (s) 11 11 11 11 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 19 40 109 19 36 109 End Time (s) 40 109 19 36 109 19 Yield/Force Off (s) 36 103 13 32 103 13 Yield/Force Off 170(s) 36 92 2 32 92 2 Local Start Time (s) 99 0 69 99 116 69 Local Yield (s) 116 63 93 112 63 93 Local Yield 170(s) 116 52 82 112 52 82 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 60 Offset: 40 (33%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Splits and Phases: 3: Rock Creek & Ziegler 3: Rock Creek & Ziegler HCM Signalized Intersection Capacity Analysis Short Range (2017) Total PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 1.00 1.00 0.85 Flt Protected 0.98 1.00 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 1.00 Satd. Flow (prot) 1824 1583 1770 1863 1583 1770 1863 1583 1770 1863 1583 Flt Permitted 0.87 1.00 0.74 1.00 1.00 0.35 1.00 1.00 0.45 1.00 1.00 Satd. Flow (perm) 1626 1583 1377 1863 1583 658 1863 1583 840 1863 1583 Volume (vph) 10 14 23 35 16 155 21 387 11 152 606 60 Peak-hour factor, PHF 0.85 0.85 0.85 0.85 0.85 0.85 0.87 0.87 0.87 0.85 0.85 0.85 Adj. Flow (vph) 12 16 27 41 19 182 24 445 13 179 713 71 RTOR Reduction (vph) 0 0 25 0 0 165 0030016 Lane Group Flow (vph) 0 28 2 41 19 17 24 445 10 179 713 55 Turn Type Perm Perm Perm Perm pm+pt Perm pm+pt Perm Protected Phases 4 8 5 2 1 6 Permitted Phases 4 4 8 8 2 2 6 6 Actuated Green, G (s) 8.9 8.9 8.9 8.9 8.9 91.0 87.4 87.4 99.1 91.5 91.5 Effective Green, g (s) 10.9 10.9 10.9 10.9 10.9 93.0 89.4 89.4 101.1 93.5 93.5 Actuated g/C Ratio 0.09 0.09 0.09 0.09 0.09 0.78 0.75 0.75 0.84 0.78 0.78 Clearance Time (s) 6.0 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 6.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 148 144 125 169 144 543 1388 1179 767 1452 1233 v/s Ratio Prot 0.01 0.00 0.24 c0.01 c0.38 v/s Ratio Perm 0.02 0.00 c0.03 0.01 0.03 0.01 0.18 0.03 v/c Ratio 0.19 0.02 0.33 0.11 0.11 0.04 0.32 0.01 0.23 0.49 0.04 Uniform Delay, d1 50.5 49.7 51.1 50.1 50.1 3.5 5.1 3.9 2.2 4.7 3.0 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.6 0.0 1.5 0.3 0.4 0.0 0.6 0.0 0.2 1.2 0.1 Delay (s) 51.1 49.7 52.7 50.4 50.5 3.5 5.7 3.9 2.3 5.9 3.1 Level of Service DDDDDAAAAAA Approach Delay (s) 50.4 50.8 5.6 5.1 Approach LOS D D A A Intersection Summary HCM Average Control Delay 13.0 HCM Level of Service B HCM Volume to Capacity ratio 0.47 Actuated Cycle Length (s) 120.0 Sum of lost time (s) 12.0 Intersection Capacity Utilization 53.8% ICU Level of Service A Analysis Period (min) 15 c Critical Lane Group 3: Rock Creek & Ziegler Timing Report, Sorted By Phase Short Range (2017) Total PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Phase Number 124568 Movement SBL NBTL EBTL NBL SBTL WBTL Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize Yes Yes Yes Yes Recall Mode None C-Min None None C-Min None Maximum Split (s) 23 67 30 16 74 30 Maximum Split (%) 19.2% 55.8% 25.0% 13.3% 61.7% 25.0% Minimum Split (s) 8 22 22 8 22 22 Yellow Time (s) 344344 All-Red Time (s) 122122 Minimum Initial (s) 444444 Vehicle Extension (s) 333333 Minimum Gap (s) 333333 Time Before Reduce (s) 000000 Time To Reduce (s) 000000 Walk Time (s) 5 5 5 5 Flash Dont Walk (s) 11 11 11 11 Dual Entry No Yes Yes No Yes Yes Inhibit Max Yes Yes Yes Yes Yes Yes Start Time (s) 17 40 107 17 33 107 End Time (s) 40 107 17 33 107 17 Yield/Force Off (s) 36 101 11 29 101 11 Yield/Force Off 170(s) 36 90 0 29 90 0 Local Start Time (s) 97 0 67 97 113 67 Local Yield (s) 116 61 91 109 61 91 Local Yield 170(s) 116 50 80 109 50 80 Intersection Summary Cycle Length 120 Control Type Actuated-Coordinated Natural Cycle 60 Offset: 40 (33%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Splits and Phases: 3: Rock Creek & Ziegler 6: County Fair & Ziegler HCM Unsignalized Intersection Capacity Analysis Short Range (2017) Total AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 32 10 34 26 11 70 61 610 35 50 292 24 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.92 0.92 0.92 0.85 0.85 0.85 Hourly flow rate (vph) 38 12 40 31 13 82 66 663 38 59 344 28 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 0 0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1360 1309 358 1322 1304 682 372 701 vC1, stage 1 conf vol 475 475 815 815 vC2, stage 2 conf vol 884 834 507 489 vCu, unblocked vol 1360 1309 358 1322 1304 682 372 701 tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 tC, 2 stage (s) 6.1 5.5 6.1 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 68 93 94 81 93 82 94 93 cM capacity (veh/h) 118 173 687 164 185 450 1187 896 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2 Volume Total 89 31 95 66 701 59 372 Volume Left 38 31 0 66 0 59 0 Volume Right 40 0 82 0 38 0 28 cSH 201 164 377 1187 1700 896 1700 Volume to Capacity 0.44 0.19 0.25 0.06 0.41 0.07 0.22 Queue Length 95th (ft) 52 16 25 4050 Control Delay (s) 36.5 31.8 17.8 8.2 0.0 9.3 0.0 Lane LOS E D C A A Approach Delay (s) 36.5 21.2 0.7 1.3 Approach LOS E C Intersection Summary Average Delay 5.0 Intersection Capacity Utilization 58.6% ICU Level of Service B Analysis Period (min) 15 6: County Fair & Ziegler HCM Unsignalized Intersection Capacity Analysis Short Range (2017) Total PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 31 7 29 20 5 43 25 345 8 34 591 39 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 36 8 34 24 6 51 29 406 9 40 695 46 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Raised Raised Median storage veh) 0 0 Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1316 1272 718 1283 1291 411 741 415 vC1, stage 1 conf vol 798 798 469 469 vC2, stage 2 conf vol 518 474 814 821 vCu, unblocked vol 1316 1272 718 1283 1291 411 741 415 tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1 tC, 2 stage (s) 6.1 5.5 6.1 5.5 tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 79 96 92 86 97 92 97 97 cM capacity (veh/h) 174 199 429 166 191 641 866 1144 Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2 SB 1 SB 2 Volume Total 79 24 56 29 415 40 741 Volume Left 36 24 0 29 0 40 0 Volume Right 34 0 51 0 9 0 46 cSH 238 166 515 866 1700 1144 1700 Volume to Capacity 0.33 0.14 0.11 0.03 0.24 0.03 0.44 Queue Length 95th (ft) 35 12 93030 Control Delay (s) 27.4 30.2 12.8 9.3 0.0 8.3 0.0 Lane LOS D D B A A Approach Delay (s) 27.4 18.0 0.6 0.4 Approach LOS D C Intersection Summary Average Delay 3.0 Intersection Capacity Utilization 50.7% ICU Level of Service A Analysis Period (min) 15 9: County Fair & HCM Unsignalized Intersection Capacity Analysis Short Range (2017) Total AM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Volume (veh/h) 4 59 0 3 69 24 2 0 10 7 0 1 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 5 69 0 4 81 28 2 0 12 8 0 1 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 109 69 182 195 69 193 181 95 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 109 69 182 195 69 193 181 95 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 100 100 100 99 99 100 100 cM capacity (veh/h) 1481 1531 775 696 993 754 709 961 Direction, Lane # EB 1 WB 1 NB 1 SB 1 Volume Total 74 113 14 9 Volume Left 5428 Volume Right 0 28 12 1 cSH 1481 1531 949 775 Volume to Capacity 0.00 0.00 0.01 0.01 Queue Length 95th (ft) 0011 Control Delay (s) 0.5 0.2 8.9 9.7 Lane LOS AAAA Approach Delay (s) 0.5 0.2 8.9 9.7 Approach LOS A A Intersection Summary Average Delay 1.3 Intersection Capacity Utilization 16.0% ICU Level of Service A Analysis Period (min) 15 9: County Fair & HCM Unsignalized Intersection Capacity Analysis Short Range (2017) Total PM 11/27/2012 Michael Delich Synchro 6 Matthew J. Delich , P. E. 11/27/2012 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Free Free Stop Stop Grade 0% 0% 0% 0% Volume (veh/h) 2 30 2 9 47 13 1 0 5 32 0 6 Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Hourly flow rate (vph) 2 35 2 11 55 15 1 0 6 38 0 7 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 71 38 132 133 36 131 126 63 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 71 38 132 133 36 131 126 63 tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2 tC, 2 stage (s) tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3 p0 queue free % 100 99 100 100 99 95 100 99 cM capacity (veh/h) 1530 1573 828 752 1036 831 758 1002 Direction, Lane # EB 1 WB 1 NB 1 SB 1 Volume Total 40 81 7 45 Volume Left 2 11 1 38 Volume Right 2 15 6 7 cSH 1530 1573 994 854 Volume to Capacity 0.00 0.01 0.01 0.05 Queue Length 95th (ft) 0114 Control Delay (s) 0.4 1.0 8.6 9.4 Lane LOS AAAA Approach Delay (s) 0.4 1.0 8.6 9.4 Approach LOS A A Intersection Summary Average Delay 3.4 Intersection Capacity Utilization 20.9% ICU Level of Service A Analysis Period (min) 15 APPENDIX G Harmony Rock Creek Ziegler Lady Moon Kechter Timberline 2 3 1 4 Fossil Creek HS Bacon ES Saber Cat Preston MS 5 Traut Core 5 SCALE: 1"=2000' PEDESTRIAN INFLUENCE AREA DELICH ASSOCIATES Harvest Park/Ziegler Mixed-Use TIS, November 2012 Pedestrian LOS Worksheet Project Location Classification: Other Level of Service (minimum based on project location classification) Description of Applicable Destination Area Within 1320’ Destination Area Classification Directness Continuity Street Crossings Visual Interest & Amenities Security Minimum B B B C B 1 Actual A D B B A Fossil Creek High School School Proposed A B B B A Minimum C C C C C 2 Actual A D B B A Residential neighborhood to the north and northwest Residential Proposed A B B B A Minimum C C C C C 3 Actual A D B B A Residential neighborhood to the south and southwest Residential Proposed A B B B A Minimum C C C C C 4 Actual A D B B A Residential neighborhood to the south Residential Proposed A B B B A Minimum B B B C B 5 Actual A D B B A Preston Middle School/Traut Core School School Proposed A B B B A Minimum 6 Actual Proposed Minimum 7 Actual Proposed Minimum 8 Actual Proposed Minimum 9 Actual Proposed Harmony Rock Creek Lady Moon Kechter Fossil Creek HS Saber Cat SCALE: 1"=1000' BICYCLE INFLUENCE AREA DELICH ASSOCIATES Harvest Park/Ziegler Mixed-Use TIS, November 2012 Bicycle LOS Worksheet Level of Service – Connectivity Minimum Actual Proposed Base Connectivity: C B B Specific connections to priority sites: Description of Applicable Destination Area Within 1320’ Destination Area Classification 1 Fossil Creek High School School A A A 2 3 4 Minimum 10 Actual Proposed 9 SPACES SEWER WATER / FIRE STONE SITTING WALL TRELLIS STONE SITTING WALL TRELLIS 6005 S.F. FF = 12.18 PROPERTY LINE PROPERTY LINE GARAGE TURF STORM WATER STORM WATER STORM WATER STORM WATER WATER / FIRE WATER / FIRE WATER / FIRE SEWER SEWER GARAGE GARAGE 30' SETBACK 15' UTILITY EASEMENT WALK WALK SANITARY SANITARY CONC. PVMT. 9' UTILITY EASEMENT 9' STOR MWATER STORM WATER STORMWATER WALK WALK TURF TURF TURF WALK CONC. PVMT. STORM WATER STORM WATER TURF FUTURE STORM WATER FUTURE STORM WATER SEWER SEWER WATER LINE PROPERTY LINE WATER LIN E HCP SEWER WALK WALK 5 PLEX RESIDENCE 21 2 STORY BUILDING C 6 PLEX RESIDENCE 21 2 STORY BUILDING B 5000 S,F, FF = 10.60 SEWER SEWER SEWER 100' BUFFER FROM WETLANDS 100' BUFFER FROM WETLANDS 100 YEAR FLOODPLAIN EASEMENT EASEMENT EASEMENT EASEMENT HIGH WATER MARK 5' UTILITY EASEMENT TURF 17' TYP. 20' ESMT. BR ALLEY 5 8 SPACES GARAGE 5 PLEX RESIDENCE 21 2 STORY BUILDING C 5000 S,F, FF = 10.60 County Fair Lane Saber Cat Drive