HomeMy WebLinkAboutMAX FLATS - PDP - PDP120034 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPage 1 of 2
D:\Projects\860-001\Drainage\860-001_Drainage-Letter_2012-12-12.docx
Drainage Letter Report
Date: December 12, 2012
Project: MAX Flats Project No. 860-001
Fort Collins, Colorado
Attn: Mr. Wes Lamarque
City of Fort Collins Stormwater Utility
700 Wood Street
Fort Collins, Colorado 80521
Dear Wes:
This letter serves to address the stormwater impacts of the MAX Flats mixed-use redevelopment located at
203 West Mulberry Street. The existing site includes a two-level concrete block building with a footprint of
approximately 3050 square-feet. It is located along the western edge of the property and roughly centered
north-to-south. The remainder of the site is almost entirely paved as a parking lot. Existing landscaping is
minimal and generally limited to narrow strips of shrubs along the north and east edges of the property.
The site currently surface drains from southwest to northeast along flat grades of less than one percent.
Two existing off-site curb inlets are located at the southwest west corner of Mulberry and Mason Streets
along the south and west flowlines of each, respectively. These inlets collect existing developed site runoff
and discharge it to the public storm sewer system. The proposed condition will generally preserve historic
drainage patterns. The total impervious area of the existing site is approximately 28,588 square-feet.
The proposed redevelopment will completely remove all existing above-grade structures and adjacent
hardscape. The project will consist of four stories of residential units over a ground level containing a
commercial flex space and parking. The total impervious area of the proposed redevelopment is
approximately 27,403 square-feet.
The site is located in the Old Town master drainage basin, and therefore, on-site detention is not required
so long as the increase in impervious area is less than 5,000 square-feet. The total impervious area will
decrease with this development by approximately 1,185 square-feet (28,588 - 27,403). A detailed
breakdown of the existing and proposed impervious areas is attached to this letter.
Page 2 of 2
D:\Projects\860-001\Drainage\860-001_Drainage-Letter_2012-12-12.docx
Although stormwater quantity detention is not required, stormwater quality mitigation will be addressed by
both temporary and permanent Best Management Practices (BMPs). During construction, the contractor
will follow appropriate and applicable City of Fort Collins (City) standards for erosion and sediment control.
Post construction erosion control will be achieved by a fully established and stabilized site. The areas
disturbed during construction will be permanently stabilized with hardscape (i.e., concrete), landscape or
building structure.
This portion of the Old Town Basin does receive regional water quality treatment in the Udall Natural Area;
therefore, permanent on-site water quality mitigation is not required.
This project is located in the Old Town Basin floodplain. This is a City regulatory floodplain. Since a small
portion of the development falls within a City regulatory floodplain, a Floodplain Use Permit (FUP) shall be
obtained prior to commencing with any construction within the floodplain. The improvements within the
flood fringe of the City basin floodplain consist of mixed-use redevelopment with the residential use on a
floor completely above the regulatory flood protection elevation. The mixed-use redevelopment shall
comply with requirements for floodproofing in lieu of elevating the structure.
It is important to note that the floodway of the City basin floodplain currently follows the midpoint of the
existing sidewalk along the project's north Mulberry Street frontage. The proposed improvements within
the floodway of the City basin floodplain consist of nonstructural development (i.e., driveway and
streetscape modifications). A No-Rise Certification is required for all work within the floodway. Further
details and supporting documentation for the No-Rise Certification shall accompany the FUP application.
The proposed grading concept closely matches existing elevations and drainage patterns, and only varies in
an effort to improve the existing condition. On-site detention is proven to be unnecessary. On-site
stormwater quality is not required as runoff is treated in the Udall Natural Area water treatment facility.
The project is designed in accordance to the governing floodplain regulations contained within Chapter 10
of the City Code, and the Floodplain Use Permit and necessary certifications shall ensure that construction
remains compliant with Chapter 10. Therefore, it is my professional opinion that the MAX Flats mixed-use
redevelopment satisfies all applicable stormwater criteria.
Please do not hesitate to contact me if you have questions or require additional information.
Sincerely,
Herman H. Feissner, PE
enc.