Loading...
HomeMy WebLinkAboutMAX FLATS - PDP - PDP120034 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSSOUTH COLLEGE AVENUE W. MULBERRY ST. MASON ST. LAUREL ST. RIVERSIDE AVENUE No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 12/12/12 PROJECT: 860-001 Sheet Of 11 Sheets MAX FLATS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 12/12/12 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� C000 COVER SHEET A. Reese N. Whitcomb N/A DECEMBER, 2012 I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 12/12/12 PROJECT: 860-001 Sheet Of 11 Sheets MAX FLATS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 12/12/12 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R A. GENERAL NOTES 1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. EXISTING BUILDING (209) EXISTING BUILDING (209) EXISTING BUILDING (209) ��� 3 ����� 105 VAULT ELEC ELEC T S R R X X X X X X TRAFFIC VAULT VAULT ELEC W C S E E E E E E E E E E E E E E E E E E E E W W W W W C.O. G X X X X X X OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE S G G G LID S T T E SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS RETAIL OPEN-AIR CONCRETE PARKING AREA COVERED CONCRETE PARKING AREA OPEN-AIR CONCRETE PARKING AREA X X X X X X X X X X X X MULBERRY STREET (100' ROW) MASON STREET (100' ROW) EXISTING (20') ALLEY EXISTING (20') ALLEY EXISTING BUILDING (209) EXISTING BUILDING (209) EXISTING BUILDING (209) EXISTING BUILDING (206) EXISTING BUILDING (202) No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 12/12/12 PROJECT: 860-001 Sheet Of 11 Sheets MAX FLATS T���� �������� ��� VAULT ELEC ELEC T S R R X X X X X X TRAFFIC VAULT VAULT ELEC W C S E E X X X X X X S S T T SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S W W F F F W S S W SSMH A2 SSMH A1 SSMH A 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W W W SANITARY LINE A SEE SHEET 301 MULBERRY STREET (100' ROW) MASON STREET (100' ROW) RETAIL OPEN-AIR CONCRETE PARKING AREA COVERED CONCRETE S W W F F F W S S W VAULT ELEC ELEC T S R R X X X X X X TRAFFIC VAULT VAULT ELEC W C S E E X X X X X X S S T T SS SS SS SS SS SS SS SS SS SS SS SS SS SS 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W SS SS SSMH A1 STA 11+01.81 N: 128672.40 E: 194098.59 SSMH A2 STA 11+76.12 VAULT ELEC ELEC T S R R X X X X X X TRAFFIC VAULT VAULT ELEC E E X X X X X X T T MULBERRY STREET (100' ROW) MASON STREET (100' ROW) FFE= �93.2 FFE= �92.8 FFE= �92.2 FFE=�92.5 FFE= �93.8 RETAIL OPEN-AIR CONCRETE PARKING AREA COVERED CONCRETE PARKING AREA OPEN-AIR CONCRETE PARKING AREA ��� 4 ����� 105 ��������'� �������� ��� 2 ����� 105 ��������'� �������� ��� 1 ����� 105 ��������'� �������� EXISTING ALLEY 7.5' ROW No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 12/12/12 PROJECT: 860-001 Sheet Of 11 Sheets MAX FLATS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 12/12/12 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� C500 DETAILS A. Reese N. Whitcomb N/A NOT TO SCALE 101 C500 TYPICAL WATER SERVICE All residential water service shall be installed in the center of the lot All water and sanitary sewer service shall have a minimum of the curb stop and meter pit, and no trees within 10 feet of curb and meter pit. No landscaping (shrubs, boulders, etc.), retaining walls or fences allowed within 4 feet Use type K copper for the service from the corporation stop to a minimum of 5 feet up to and including the curb stop. The owner is responsible for service from the The City is responsible for maintaining the water main, corporation stop, and service piping Locate curb box and meter pit according to the approved utility drawings. Install 1 1/2 inch and 2 inch services with tapped tee and corporation stop at time of Use direct tap (as shown) for 3/4 inch and 1 inch services unless water main is PVC, unless otherwise approved by the Utility. horizontal separation of ten feet. past the meter pit. No couplings allowed between curb stop and meter setting. curb stop, including the outlet coupling to the building. construction or use a tapping saddle. in which case, use a tapping saddle. GENERAL NOTES No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 12/12/12 PROJECT: 860-001 Sheet Of 11 Sheets MAX FLATS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 12/12/12 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� C501 DETAILS A. Reese N. Whitcomb N/A NOT TO SCALE 200 C501 BEDDING REQUIREMENTS STANDARD MANHOLE ALTERNATE BASE POURED INVERT PRECAST MANHOLE BASE 2 IN. MIN. SLOPE 1 IN. MIN. 8 IN. MIN. 6 IN. 15 IN. OR LESS 48 IN. 18 IN. TO 30 IN. 60 IN. OVER 30 INCHES 72 IN. MIN. MANHOLE MINIMUM INSIDE DIAMETER OF DIAMETER MANHOLE SHALL BE AS FOLLOWS: PIPE SIZE 5 FT. MIN. DEPTH CONCRETE ADJUSTMENT SHIMS No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 12/12/12 PROJECT: 860-001 Sheet Of 11 Sheets MAX FLATS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 12/12/12 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� Date Date Date Date Date Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. VAULT ELEC ELEC T S R R X X X X X X TRAFFIC VAULT VAULT ELEC E E X X X X X X T T / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / MULBERRY STREET (100' ROW) MASON STREET (100' ROW) RETAIL OPEN-AIR CONCRETE PARKING AREA COVERED CONCRETE PARKING AREA OPEN-AIR CONCRETE PARKING AREA 2510 4993 2890 FFE= �93.2 FFE= �92.8 FFE= �92.2 FFE=�92.5 FFE= �93.8 ��� 4 ����� 105 ��������'� �������� ��� 2 ����� 105 ��������'� �������� ������� �� ��� 1 ����� 105 ��������'� �������� EXISTING ALLEY No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 12/12/12 PROJECT: 860-001 Sheet Of 11 Sheets MAX FLATS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 12/12/12 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� C600 FLOODPLAIN EXHIBIT A. Reese A. Reese 1"=20' NORTH ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING STORM SEWER PROPOSED STORM SEWER ST PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER EXISTING CITY FLOODWAY NOTES: PROPOSED STORM INLET PROPOSED CONCRETE CROSS PAN (TYP.) PEDESTRIAN ACCESS RAMPS / / / / / / / / / / / / / / / / / / / / / / / / / / / PROPERTY BOUNDARY FOR STORMWATER REVIEW ONLY NOT FOR CONSTRUCTION 1.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 2.ALL ELEVATIONS DEPICTED IN PLAN VIEW AND BENCHMARKS LISTED HEREON ARE PER THE CITY OF FORT COLLINS VERTICAL CONTROL DATUM (NGVD 29 - UNADJUSTED). 3.THE LOWEST FLOOR (INCLUDING ANY BASEMENT OR CRAWL SPACE) AND ALL HVAC EQUIPMENT AND THE FINISH FLOOR AND LOWEST FLOOR ELEVATION FOR ANY BUILDING IN THE FLOODPLAIN SHALL BE FLOODPROOFED ABOVE THE REGULATORY FLOOD PROTECTION ELEVATION. 4.A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH STRUCTURE AND EACH SITE CONSTRUCTION ELEMENT IN THE FLOODPLAIN. 5.AN ELEVATION CERTIFICATE SHALL BE COMPLETED AND APPROVED BEFORE THE CERTIFICATE OF OCCUPANCY IS ISSUED FOR ANY STRUCTURE IN THE FLOODPLAIN. 6.NO STORAGE OF MATERIALS OR EQUIPMENT SHALL BE ALLOWED IN THE FLOODWAY, WHETHER TEMPORARY (DURING CONSTRUCTION) OR PERMANENT. LANDSCAPING SHALL ALSO MEET THE REQUIREMENTS FOR NO RISE IN THE FLOODWAY. {7.REFER TO THE "DRAINAGE REPORT LETTER FOR MAX FLATS" BY NORTHERN ENGINEERING, DATED DECEMBER 12, 2012 FOR ADDITIONAL INFORMATION. 8.A NO RISE CERTIFICATION IS REQUIRED FOR ANY WORK WITHIN THE FLOODWAY. 9.ALL HVAC EQUIPMENT IS TO BE LOCATED ON THE ROOFTOP OF THE STRUCTURE.} LOWEST FLOOR ELEVATION = C BASE FLOOD ELEVATION (BFE) = A RFPE ELEVATION = B BASE FLOOD ELEVATION (BFE) = A DETAIL NTS FIELD SURVEY BY: BENCHMARKS: Northern Engineering Services, Inc. Project No. 379-019 Date: July 19, 2011 BENCHMARK #1: City of Fort Collins Benchmark 6-00 Elevation= 4990.68 (Unadjusted) BENCHMARK #2: City of Fort Collins Benchmark 29-97 Elevation= 4974.83 (Unadjusted) CROSS-SECTION (CSL) SLAB-ON-GRADE BASE FLOOD ELEVATION (BFE) EXISTING 100-YR CITY FLOODPLAIN BOUNDARY ELEVATION NGVD 29 (UNADJUSTED) 5000 MIXED-USE BUILDING SUMMARY EL. DESIGNATION NGVD 29 (UNADJUSTED) A 4993.60 FT B 4995.10 FT C 4992.5 FT REGULATORY FLOOD PROTECTION ELEVATION (RFPE) 4995.10 FT 20554 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL FIRST FLOOR COMMERCIAL/RETAIL RESIDENTIAL UNITS ABOVE R NOT TO SCALE 300 C502 CURB AND GUTTER 301 CURB AND GUTTER / SIDEWALK STANDARD DRIVEWAY APPROACH (HIGH VOLUME) C502 302 C502 6" 2"R. 2" 6" 6" 12" 1 1/2"R. 2'-6" 6" 4 1/2" 30" 9" R 0.5" 4.5" 18" 3.63" 21.75" R 0.13" 7" 2" 3.75" 12" ROLL-OVER VERTICAL (LOVELAND) G����� ���� ��� �� ������� �� ��������. (T������ ��� ��� C��� & & G����� T����) DATE: 03/01/02 CURB AND GUTTER URBAN AREA STREET STANDARDS LARIMER COUNTY CONSTRUCTION DRAWINGS REVISION NO: 1 701 DRAWING 7 3/8" (L) 1 3/8" 17" 6" 3 3/8" 14" FL R 16" R 16" DRIVE-OVER CURB, GUTTER AND DETACHED SIDEWALK 31" S�� D������ 1601 10 3/4"(L) R 16" DRIVE-OVER CURB, GUTTER AND ATTACHED SIDEWALK 18" 18" 3 3/8" 1 3/8" 6" R 16" FL 14" 6" 17" 1 1/2" 5' (L) 8 5/8" (F.C.) 7 1/4" F.C. 12" (F.C.) S���� �� ���� 1/4"/F�. 1' ���. (F.C.) 48:1 ���. 4:1 ���. E��������� F��� 1' ���. 2' ���. 1/4"/F�. CURB & GUTTER IN A CUT OR FILL DATE: 03/01/02 CURB AND GUTTER/SIDEWALK URBAN AREA STREET STANDARDS LARIMER COUNTY CONSTRUCTION DRAWINGS REVISION NO: 1 702 DRAWING 6" 3'-9" (F.C.) F�� T�������� 2' ���. (L) NOTES: 1. 6' ���� ��� ��� ����������� �������. 2. A�� ������������� �� ���� ������ �����. 3. 6" C��� H�����. 4. 0" C��� H�����. 5. A�� �� ����� ���������� ������������ ���� �� �� ROW �� � ���������� �� ������ ������ ��������. 6. T�������� D��� W������ D��������. 2' Y 1:12 1:48 (���.) D������� G����� S������� P������ S������� ROW F���� O������� E�������� J���� TYPE III DETACHED WALK TYPE IV ATTACHED WALK S�� N��� 4 S�� N��� 3 6' (���.) 1:12 S�� N��� 3 S�� N��� 4 S�� N��� 5 R��� �� ���� ��������� �� ������� ��������. C��� �� ������ L�������� �� N�������� I� C������� D������� D������� C��� 1:48 (���.) 1:12 � 1/4" PER FT. N.T.S. SECTIONS A-A & B-B 1:12 (���.) A A 1:48 SLOPE WALK B B CLASSIFICATION APPROACH TYPE S����� F����� 12' 24' C��������� I, II, III, �� IV M���� F����� 24' 36' 24' 36' MINIMUM WIDTH WIDTH MAXIMUM I��������� 24' 36' I, II, III, �� IV I �� II RESIDENTIAL: * * ** * H��� ������ ��������� (T��� III �� IV) ������� ��� 350 30' ������� ��� 3 ��� �������. N� ������ ������� ����� ������ 36'. W���� ��������� ����� �� ������� �/� ������ ��� ���� ���� 6' ����. �� ������� ���� ����/���. ** * DRIVEWAY WIDTHS LARIMER COUNTY DRAWINGS CONSTRUCTION REVISION NO: 2 707 DRAWING STREET STANDARDS URBAN AREA DATE: 04/01/07 STANDARD DRIVEWAY APPROACH (HIGH VOLUME DRIVE TYPES III & IV) (FC O���)   1:12 M�� M�� S�� N��� 6 S�� N��� 6 1:48 C502 DETAILS A. Reese N. Whitcomb N/A NOT TO SCALE 306 TRENCH DETAIL C502 12" (W���� & S����) I� ���� ������� �� ���� ���� 4' �� �������� �������/��������, �� ���� �� ������� ��� ��������. E��� �� P������� �� L�� �� E������� G����� C�������� L���� �� S������� M�������� P������� T�������� V����� V����� 1" (���.) (S�� N��� 9 ����� ��� S����.) 4" (���.) 6" (���.) T����� W���� V����� 2' (���.) B������ M������� U���������� S��� U������ C������ N�� A������/C������� C���� R��� B��� E������� R��� B��� 6" F��� D���� A������ �� X/Y C�������� S������ NOTES: 1. A�� �������� ����� �� ���������� �� ���������� ���� ��� ����� ������ ������ ��������� ��������� �� ��� L���� E����� E�������. 2. P���� �� ��������� �� �������/��������, �������� ���� ����� �� ��� ��� �� � �����, ��������, ��� �������� ����. 3. W���� ��� ����������� ����� ��� ���-���������, � ����/������ ������ (1 ���� ���) ��� �� ����������� ��� �������� ��������. 4. T����� ����� ����� ��� �� ���� ���� 16" ��� ���� ���� 12" ����� ���� ��� ������� �������� �� ��� ����. 5. U�� � #4 ����� �� ������� ����� ��� ��������� �� �������� ����������� ��������. 6. R���� �� C������ 22, M�������� & C����������� S������������� ��� ���������� ��� ������� ������������. 7. I� ���������� �����, ��� ��������� ����� ����� �� ��������, ������ & �������. 8. I� �������� ��������, � ������� �� ��� ������ �������� ����� ���� �� ��������. 9. B������ �������� ����� ���� ���������� ����� ����� ����� �� �� �� ������ ����, ������ �� ����� �� ���������� ��������; ����, ������� �������� ����� �� ������ �� � ����� 12" ����� ����. LARIMER COUNTY URBAN AREA STREET STANDARDS CONSTRUCTION DRAWINGS REVISION NO: 1 DRAWING 2201 DATE: 08/07/00 TRENCH DETAIL NOT TO SCALE 304 C502 SIDEWALK DETAIL ATTACHED SIDEWALK DETAIL S���� �������� �� ���� 1/4" ��� ����. NOTE: C�������� �������� ���� ������ �� 10' ��������� R 1/8" WEAKENED PLANE JOINT EXPANSION JOINT R1/4" ��� ������� ���� ������� �� ����. INSTALL IN LOCATIONS SPECIFIED IN CHAPTER 22 1/2" 1/4" 1/4 SLAB THICKNESS 1/4" 1/2" E�������� J���� �������� DETACHED SIDEWALK DETAIL V������� L���������� S���� �������� �� ���� 1/4" ��� ����. 2' ���. S����: M������ 1 4"/�� M������ 3"/�� CONSTRUCTION SIDEWALK DETAIL LARIMER COUNTY STREET URBAN STANDARDS AREA DRAWINGS 1602 DRAWING REVISION DATE: 04/NO: 01/07 2 NOT TO SCALE 303 C502 STANDARD SIDEWALK S������� D������� LIP F.L. T.C. DRIVEWAY SIDEWALK SECTION A-A NOTE: 1. S������� ����� ����� ������ ���������� ������ �������� 3. T��� ������ ������� �� R���������� & C��������� ���������. 6" 6" R���������� D������� S������� A������� S������� 1/2" E�������� J���� M������� 1/2" E�������� J���� M������� � � 2. F�� �������� ������ ������������, ��������. ���. 706 & 707. DETACHED ATTACHED 3'-0" 6'-0" A�� S������� T�������� S���� B� 6" �������. M��. STANDARD SIDEWALK STREET STANDARDS LARIMER URBAN COUNTY AREA REVISION NO: 1 CONSTRUCTION DRAWINGS DATE: 04/01/07 1601 DRAWING SIDEWALK 8" C��������� NOT TO SCALE 305 C502 TRUNCATED DOME WARNING FOR ACCESS RAMPS F C��� F���� V����� C��� 2'-0" F���� R��� �������� ����� P����� �������� �� ��� A���� G����� �� C��� ��� G����� F��� ���� 1:20 S���� 1:12 MAX S���� S������ A-A NTS V����� V����� C��� C��� F���� R��� 2'-0" V����� P����� P����� 6" A A CL P��������� ���� A������ ���� R��� W����: 4.5' 5.0' 6.0' 7.0' 8.0' N���: T�������� ���� ������ ��� ��������� �� 2'�2' ������� ��� 2'�2.5' ����������. C������ ��� ������ �� ��� ��� ����. P����� ��� �� ��� �� �� ���� ���� � 2'�1.5' ����. P���� W���� C�����������: 2'+2.5' 2.5'+2.5' 2'+2'+2' 2.5'+2'+2.5' 2'+2'+2'+2' N���: 1. T�������� ���� ������� �����: I������ ������ ����� ���� ��� �������� ���� ��� ��� ����. T�� ����� �������� ����� �� "C��� I� T��� W������ P�����" �� �� ���������� �������� ���� ���� �� ����� �������� �� ��� C��� E������� ����� �� ������������. T�� ����� ����� ����� �� ���, �� ����� ����� �� ��������. S������������� ��� ��� ����� ��� ������������ ������������ ���� �� �������� ���� �������. 2. T��� ������� ����� �������� ����. F�� D���� O��� C��� ��� ������� ��������� �������� ����� �� ������ �� ��� ���� �������� 6" ���� ���� ��� F��� �� C��� �� . C��� 1-D���������� R���� C��� 2-N��-D���������� R���� V����� P����� R��� P����� F���� 2'-0" C��� C��� 3-M��-B���� R���� 6" P����� P����� A���� G����� �� F���� 6" F���� (C����� ���� �� ����) CL -C����� ���� �� ���� BOC BOC BOC FOC L �� FL FOC BOC FL -B��� �� C��� -F��� �� C��� -F��� ���� 2' REVISION NO: DATE: 04/01/07 DRAWING STREET STANDARDS DRAWINGS 1607 URBAN AREA LARIMER COUNTY TRUNCATED DOME WARNING FOR ACCESS RAMPS CONSTRUCTION FORT COLLINS ONLY GROUTED INSIDE ASTM C-478 ECCENTRIC CONE PRE-FORMED PLASTIC GASKET ASTM C-478 MANHOLE SECTIONS GROUT BASE TO BARREL SECTION ON INSIDE PRE-FORMED PLASTIC GASKET CAST-IN-PLACE CONCRETE BASE 16 IN. MAX. FINISHED GRADE 30 IN. MIN. 48 IN. MAX. VARIABLE 28 IN. MAX. 24 IN. SEE TABLE 6 IN. 12 IN. SLOPE 1 IN./FT. 18 IN. MAX. MANHOLE RUNGS 12 IN. O.C. 8 IN. MIN DATE REVISED: SEWER CONSTRUCTION DETAILS APPROVED: DRAWN BY: DETAIL STANDARD MANHOLE WW-3 NBJ 4/11/11 NOT TO SCALE 201 C501 COMPACTED GRANULAR MATERIAL CONFORMING TO CDDH #67 LOWER LIMIT OF TRENCH WALL SLOPING INITIAL LIFT * 12 IN. MIN. PIPE O.D. 4 IN. MIN. TRENCH WIDTH AS SPECIFIED IN SECTION 02221 COMPACTED GRANULAR MATERIAL CONFORMING TO CDDH #67 * DATE REVISED: SEWER CONSTRUCTION DETAILS APPROVED: DRAWN BY: DETAIL BEDDING REQUIRMENTS WW-1 NBJ 4/11/11 PLAN VIEW CROSS VIEW 45 ELBOW SERVICE WYE 8 IN. PVC SEWER PIPE COMPACTED GRANULAR MATERIAL AIR-TIGHT PLUG WITH 4 IN. X 4 IN. MARKER UNYIELDING PIPE BEDDING OF COMPACTED ROCK OR LEAN CONCRETE PVC SEWER PIPE NOTE: WYE CONNECTION NOT ALLOWED ON VCP LEAN CONCRETE o 20 MIN. o 45 MAX. o TRENCH UNYIELDING PIPE BEDDING OF COMPACTED ROCK OR 4 IN. X 4 IN. MARKER AIR-TIGHT PLUG DATE REVISED: SEWER CONSTRUCTION DETAILS APPROVED: DRAWN BY: DETAIL SERVICE WYE DETAIL WW-9 NBJ 4/11/11 NOT TO SCALE 203 PRIVATE SANITARY SEWER CLEANOUT C501 SLOPE TO MATCH SRV. GRADE AS REQ'D TRAFFIC/PAVED AREAS NTS 6" PVC PIPE CUT TO MATE w/ BELL FLOW CONTINUATION OF SEWER LINE COUPLING SRV. PIPE 4"-45 ELBOW 45 6"WYE x6"x4" VARIES COMPACTED GRANULAR 4" PVC SDR 35 PIPE & FITTINGS (TYP.) FROM BOTTOM OF BEDDING ZONE TO TOP OF ELBOW MATERIAL PVC SLIP VALVE BOX AND COVER W/ "SEWER" CAST INTO COVER SCREW-ON WATER TIGHT PLUG 2'x2'x6" DEEP CONCRETE COLLAR ELBOW COMPACTED GRANULAR 45 WYE 4"-45 6"x6"x4" SRV. GRADE AS REQ'D w/ BELL CUT SRV. TO MATE PIPE VARIES PIPE 6" PVC FLOW SLOPE TO MATCH MATERIAL TOP OF ELBOW BEDDING ZONE TO FROM BOTTOM OF & FITTINGS (TYP.) 4" PVC SDR 35 PIPE OVER CLEANOUT PVC COUPLING SLIP OF SEWER LINE CONTINUATION ACCESS COVER HEAVY-DUTY FINISHED GRADE LANDSCAPED AREAS NTS 6" MIN. Date Date Date Date Date Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R STANDARD SEWER SERVICE NOT TO SCALE 202 C501 1'-6" 1 1/2" 6" 1" 6" 6" 4 1/2" 12" NOT TO SCALE 204 C501 PRIVATE INFLOW VERTICAL CURB & GUTTER NOT TO SCALE 205 C501 PRIVATE OUTFALL VERTICAL CURB & GUTTER 1" 6" 4 1/6" 2" 1 1/2" 1'-6" 6" 12" 9. 8. 4. 6. 7. 5. WATER MAIN 3. 2. 1. IN FACE OF CURB CUT 4 INCH CROSS CORPORATION STOP FOR PAVEMENT CURB STOP CURB BOX 66 INCH MAX. 54 INCH MIN. CURB, GUTTER AND SIDEWALK DISTANCE VARIES 1 FT. PROPERTY OR EASEMENT LINE GRADE FINAL LANDSCAPED REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 TYPICAL WATER SERVICE 11 4/12/11 1 1/2 INCH OR GREATER CORPORATION STOP FOR 3/4 AND 1 INCH SERVICES SERVICES 1 INCH SERVICES NOT TO SCALE 100 C500 WATER MAIN BEDDING REQUIREMENTS BOTTOM OF PIPE AND A MINIMUM OF 12 INCHES ABOVE TOP OF PIPE. GRANULAR BEDDING MATERIAL SHALL BE A MINIMUM OF 4 INCHES BELOW INITIAL 12 IN. LIFT MIN. PIPE O.D. 4 IN. MIN. GRANULAR MATERIAL BEDDING ZONE NOTE: * INITIAL LIFT SHALL NOT EXCEED 2 FEET IN DEPTH. TRENCH WALL LOWER LIMIT OF SLOPING TRENCH IN WIDTH SECTION AS 02221 SPECIFIED * REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 WATER MAIN BEDDING REQUIREMENTS (DIP & PVC) 1 4/8/11 {D = RE: STRUCTURAL} {TOP WAT/FIRE = RE: PLAN} {12" MIN.} 5' (TYP.) SEE NOTE 1 NOTES: {SS INV = RE: PLAN} {5.5' MIN.} {FF ELEV = RE: PLAN} 1. SITE CONTRACTOR TO END SEWER AND WATER SERVICES 5' AWAY FROM ALL BUILDINGS (TYP.). BUILDING PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR EXTENDING UTILITIES FROM THIS POINT OF CONNECTION TO RISERS UNDER SLAB. 2.SITE CONTRACTOR TO END FIRE LINE 1' ABOVE FFE INSIDE RISER ROOM AND CAP. 1' (TYP.) NOT TO SCALE 107 C500 TYPICAL COMMERCIAL POINT OF CONNECTION NOT TO SCALE 102 C500 STANDARD EXTERIOR SETTING FOR 3/4" & 1" WATER METERS NOT TO SCALE 103 C500 STANDARD SETTING FOR 11 2" & 2" WATER METERS 6" CONNECTION COMPRESSION 8" LAYER OF 3/4" TO 1 1/2" GRAVEL SUPPORT METER SETTERS BY (2) 18 INCH LENGTHS OF 1 INCH IRON PIPE INSERTED THROUGH IF A PRESSURE REDUCING VALVE IS REQUIRED BY PLUMBING CODE, IT SHALL BE INSTALLED INSIDE THE BUILDING, GRADE ACCEPTANCE AFTER METER PIT INSTALLATION REQUIRES THAT THE OWNER ADJUST METER PIT COVER ALL TEES, COUPLINGS AND CONNECTION FITTINGS TO BE A MINIMUM OF 5 FEET FROM METER PIT WALL ON OUTLET NO LANDSCAPING (TREES, SHRUBS, BOULDERS, ETC.) OR RETAINING WALLS TO BE WITHIN 4 FEET OF METER PIT DO NOT INSTALL IN ANY STREET, ALLEY, PARKING AREA, DRIVEWAY, SIDEWALK, DRAINAGE DITCH OR DETENTION AND NO TREES WITHIN 10 FEET. BRACE PIPE EYELETS AND SET ATOP (4) 8 INCH SQUARE CONCRETE BLOCKS. IMMEDIATELY FOLLOWING THE MAIN SHUT-OFF VALVE. TO 1/2 INCH ABOVE LANDSCAPED FINAL GRADE. MAKE NO PLUMBING CONNECTIONS (TEES, COUPLINGS, ETC.) IN METER PIT. SLOPE GROUND SURROUNDING METER PIT AWAY FROM LID AT 2% GRADE OR GREATER. 9. 8. 7. 6. 5. 1. 3. 2. %GENERAL NOTES: 8" 12" (MIN.) PIPE BRACE 1" DIA. IRON (TYP.) 2' (MAX.) 2% SLOPE GRADE RINGS (IF REQUIRED) PRE-CAST CONCRETE BEFORE BACKFILLING AND GROUT KNOCKOUT ARMOUR-FLEX TUBING MANHOLE PRECAST CONCRETE CURB BOX (TYP. ALL JOINTS) PLASTIC GASKETS PRE-FORMED 1-1/2" METERS FLOW 2" METERS 17 1/4" FOR 13 1/4" FOR SETTER METER 12" O.C. MANHOLE RUNGS 48" ALUMINUM MANHOLE RING AND COVER WITH LOCK NUT 24" 54" (MIN.) 66" (MAX.) INSTALL LID 1/2 IN. ABOVE FINAL LANDSCAPED GRADE MASTIC MORTAR OR 16" (MAX.) 7" (MIN.) FINISHED GRADE AMR POD (FORD YOKE BOX PART #YUC-7 WITH FORD YOKE BOX LID PART #YL-TP WITH 1 27/32" DIA. HOLE AND REMOVABLE PLUG) 3" (MAX.) 1" (MAX.) 1/2" EMT OR PVC VAULT OR PIT TOP INTO YOKEBOX 2' (MAX.) 3/4" ROCK FOR GRADE ADJUSTMENT (IF REQ'D) 12" (MIN.) (MAX.) (TYP.) TOP OF AMR LID TO BE 1/2" ABOVE FINISHED GRADE CONDUIT THROUGH 10. A SEPERATE AMR POD MUST BE INSTALLED FOR EACH METER REGISTER. 4. THE METER PIT AND AMR POD(S) MUST REMAIN OPEN AND ACCESSABLE FOR METER READING AND MAINTENANCE. CURB STOP REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 STANDARD SETTING FOR 1-1/2 IN. AND 2 IN. WATER METERS 16A 4/11/11 SIDE. BASIN. DO NOT INSTALL IN ANY STREET, ALLEY, PARKING AREA, DRIVEWAY, SIDEWALK, DRAINAGE DITCH OR DETENTION NO LANDSCAPING (SHRUBS, BOULDERS, ETC.) OR STRUCTURES TO BE WITHIN 4 FEET OF METER BOX, OR SLOPE GROUND SURROUNDING METER BOX AWAY FROM LID AT 2% MINIMUM GRADE. MAKE NO PLUMBING CONNECTIONS (TEES, COUPLINGS, ETC.) IN METER BOX. ALL TEES AND CONNECTION FITTINGS TO BE A MINIMUM OF 5 FEET FROM METER BOX WALL ON OUTLET SIDE. GRADE ACCEPTANCE AFTER METER BOX INSTALLATION REQUIRES THAT THE OWNER ADJUST METER BOX COVER TO 1/2 INCH ABOVE FINAL GRADE. IF A PRESSURE REDUCING VALVE IS REQUIRED BY PLUMBING CODE, INSTALL VALVE INSIDE THE BUILDING, IMMEDIATELY FOLLOWING THE MAIN SHUT-OFF VALVE. 1. 2. 3. 4. 5. 6. 7. 14 IN. MIN. ALLOWED CAST IRON FROST PROOF METER BOX COVER COMPRESSION TYPE CONNECTION LOCK TYPE INLET VALVE TYPE "K" COPPER PIPING 48 IN. 10 IN. INSTALL LID 1/2 INCH ABOVE FINAL LANDSCAPED GRADE FLOW METER BOX METER GENERAL NOTES 2 FT. MAX. CURB BOX 64 IN. (NO OR EXTENSIONS) ALTERATIONS CAST IRON RECESSED LID WITH WORM LOCK RUBBER OR PLASTIC INNER LID NO TREES WITHIN 10 FEET OF METER BOX. NO FOR FITTINGS MIN. OF 5 FT. 18 IN. MAX. ALLOWED 15 IN. RECOMMENDED C.L. OF METER CONNECTION 6 INCH LAYER OF GRAVEL (3/4 IN.- 1 1/2 IN.) UNDER METER BOX CURB STOP REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 STANDARD EXTERIOR SETTING FOR 3/4 IN. AND 1 IN. WATER METERS 15 4/11/11 BASIN. NOT TO SCALE 104 C500 TAP CONNECTION FOR CATHODICALLY PROTECTED MAIN 105 C500 NOT TO SCALE PLAN VIEW 48" DIA. BEFORE BACKFILLING ARMOUR-FLEX TUBING AND GROUT KNOCKOUT BOX CURB FLOW 2' (MAX.) 1" DIA. IRON (TYP) PIPE BRACE MANHOLE RUNGS BELOW LID) METER (PLACED 12" O.C. 24" DIA. PRECAST CONCRETE MANHOLE 8" x 8" CONCRETE BLOCK (TYP.) AND REMOVABLE PLUG) WITH 1 27/32" DIA. HOLE YOKE BOX LID PART #YL-TP PART #YUC-7 WITH FORD AMR POD (FORD YOKE BOX %GENERAL NOTES: 1. LOCATION AND ALIGNMENT OF AMR POD ON PIT TOP CAN VARY. 2. SEE DETAIL 16-A FOR ADDITIONAL METER PIT INFORMATION. REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 STANDARD SETTING FOR 1 1/2 IN. AND 2 IN. WATER METERS (PLAN VIEW) 16B 4/11/11 �� ���� ������� U S A 1 1/8" 7/16" 3 1/2" 7 5/16" 5/2" 8" A S U I E J W ������� ������� LID PLAN VIEW LID SECTION VIEW VALVE BOX SECTION VIEW 9" 6 1/8" 10" 7 9/16" 2 1/16" CLOSED PICKHOLE (TYPICAL OPPOSITE SIDE) 1/2" RAISED LETTERING (RECESSED FLUSH) REFERENCE SPECIFICATIONS 02622-2 THROUGH 02622-4 FOR LOCATOR FOR CP TEST STATION INFORMATION. REFERENCE SPECIFICATIONS 16640-5 STATION BOX INFORMATION. REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 CP TEST AND LOCATOR STATION BOX 25 4/11/11 W J E I 106 CP TEST AND LOCATOR STATION BOX C500 NOT TO SCALE MECHANICAL COUPLING (TO DISTRIBUTION SYSTEM) 3. EXCAVATION AND BACKFILLING FOR THE TAP CONNECTION PROVIDED BY THE CONTRACTOR/DEVELOPER. STANDARDS SPECIFIED BY THE CITY OF FORT COLLINS. MATERIALS TO BE AS INDICATED IN THE CONSTRUCTION THE CONTRACTOR/DEVELOPER TO PROVIDE ALL MATERIALS. PLAN VIEW 2. 1. NOTES: WATER TRANSMISSION MAIN FLANGED TAPPING SLEEVE FLANGE X MJ TAPPING VALVE PVC PIPE 3 FEET EXISTING CATHODICALLY PROTECTED DUCTILE IRON PIPE REVISED DATE: DETAIL TITLE OF DRAWING FIELD OPERATIONS (970) 221-6700 UTILITIES - WATER FORT COLLINS, CO. 80550 CITY OF FORT COLLINS P.O. BOX 580 TAP CONNECTION FOR CATHODICALLY PROTECTED MAIN 18 4/11/11 STANDARD SETTING FOR 11 2" & 2" WATER METERS CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 12/12/12 PROJECT: 860-001 Sheet Of 11 Sheets MAX FLATS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 12/12/12 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL NORTH ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPOSED BARRIER CURB PROPERTY BOUNDARY PROPOSED SPOT ELEVATION 33.43 PROPOSED SLOPES NOTES: 2.0% PEDESTRIAN ACCESS RAMPS EXISTING SPOT ELEVATION (47.45) C400 GRADING PLAN A. Reese N. Whitcomb 1"=20' PROPOSED VERTICAL CURB & GUTTER N: 128746.70 E: 194098.95 SSMH A STA 10+00.00 N: 128671.37 E: 194200.39 MULBERRY STREET (100' ROW) MASON STREET (100' ROW) RETAIL OPEN-AIR CONCRETE PARKING AREA COVERED CONCRETE PARKING AREA OPEN-AIR CONCRETE PARKING AREA ��� 4 ����� 105 ��������'� �������� ��� 2 ����� 105 ��������'� �������� ��� 1 ����� 105 ��������'� �������� MYRTLE STREET (100' ROW) EXISTING (20') ALLEY EXISTING BUILDING (209) EXISTING BUILDING (209) EXISTING BUILDING (209) EXISTING BUILDING (206) EXISTING BUILDING (202) 4970 4975 4980 4985 4990 4995 5000 5005 5010 5015 4970 4975 4980 4985 4990 4995 5000 5005 5010 5015 9+75 10+00 11+00 12+00 CONTRACTOR TO VERIFY LOCATION PRIOR TO CONSTRUCTION. CONTRACTOR TO VERIFY LOCATION PRIOR TO CONSTRUCTION. CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL C301 SANITARY SEWER RE-ALIGNMENT A. Reese N. Whitcomb 1"=20' PROFILE SCALE: VERT. 1"=5' HORIZ. 1"=20' No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 12/12/12 PROJECT: 860-001 Sheet Of 11 Sheets MAX FLATS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 12/12/12 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� SANITARY SEWER LINE A EXISTING WATER MAIN PROPOSED WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS, LATEST EDITION. 3.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 4.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 5.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS, SERVICES AND UNDERDRAINS. 6.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. W EXISTING STORM SEWER ST PROPOSED ELECTRIC TRANSFORMER S W PROPOSED SEWER SERVICE EXISTING SANITARY SEWER SS PROPOSED STORM INLET PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT PROPOSED SANITARY SEWER PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D LOT LINE EASEMENT LINE PROPOSED IRRIGATION CURB STOP & METER PIT IR PROJECT BOUNDARY EXISTING RIGHT OF WAY PROPOSED RESIDENTIAL WATER SERVICE W (SEE UTILITY DETAIL SHEETS) PROPOSED RIGHT-OF-WAY EXISTING RIGHT-OF-WAY NORTH ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 PARKING AREA OPEN-AIR CONCRETE PARKING AREA ��� 4 ����� 105 ��������'� �������� ��� 2 ����� 105 ��������'� �������� ��� 1 ����� 105 ��������'� �������� UTILITY EASEMENT (VARIES) EXISTING (20') ALLEY EXISTING (20') ALLEY EXISTING BUILDING (209) EXISTING BUILDING (209) EXISTING BUILDING (209) EXISTING BUILDING (206) EXISTING BUILDING (202) No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 12/12/12 PROJECT: 860-001 Sheet Of 11 Sheets MAX FLATS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 12/12/12 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� C300 OVERALL UTILITY PLAN A. Reese N. Whitcomb N/A CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL NORTH ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 PROPOSED RIGHT OF WAY EXISTING WATER MAIN PROPOSED STORM SEWER LEGEND: NOTES: 1.THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.ALL WATER AND SEWER CONSTRUCTION SHALL BE PER THE CITY OF FORT COLLINS STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION. 3.ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 4.UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND ARE SUBJECT TO CHANGE IN THE FIELD. 5.MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL SANITARY SEWER MAINS, WATER MAINS & SERVICES. 6.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 7.FIRE LINES SHALL BE STUBBED INSIDE THE RISER ROOM AND CAPPED 1' ABOVE THE FINISHED FLOOR ELEVATION. {8.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. } W G T E EXISTING STORM SEWER ST PROPOSED ELECTRIC EXISTING TELEPHONE EXISTING GAS PROPOSED ELECTRIC TRANSFORMER S PROPOSED PROPOSED SEWER FIRE SERVICE SERVICE W F EXISTING SANITARY SEWER SS PROPOSED DOWNSPOUTS PROPOSED FIRE DEPT. CONN. PROPOSED CURB & GUTTER PROPOSED CURB STOP & METER PIT FDC PROPOSED FIRE HYDRANT EXISTING FIRE HYDRANT H Y D PROPOSED LOTLINE EASEMENT LINE PROPERTY BOUNDARY PROPOSED ASPHALT PATCH ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 12/12/12 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL NORTH ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 LEGEND: PROPERTY BOUNDRY EASEMENTS NOTES: 1.SEE DETAIL SHEETS FOR ADDITIONAL INFORMATION REGARDING CURBS AND PAVEMENT SECTIONS. 2.PAVEMENT MARKINGS SHALL BE PER CITY STANDARDS AND PROJECT SPECIFICATION MANUAL. 3.SEE GEOTECHNICAL REPORT FOR SUBGRADE PREPARATION AND PAVEMENT RECOMMENDATIONS. 4.REFER TO SITE & LANDSCAPE PLANS FOR DECORATIVE PAVING. HEAVY DUTY CONCRETE PAVING PROPOSED CURB & GUTTER C200 PRIVATE STRIPING & PAVING PLAN A. Reese N. Whitcomb 1"=20' LIGHT DUTY CONCRETE PAVING CONCRETE FLATWORK PROPOSED ROW PROPOSED BARRIER CURB & IN-FLOW CURB 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS EXISTING BUILDING EXISTING ASPHALT PARKING LOT EXISTING ASPHALT PARKING LOT ��� 4 ����� 105 ��������'� �������� ��� 2 ����� 105 ��������'� �������� ��� 1 ����� 105 ��������'� �������� / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W 8" W MULBERRY STREET (100' ROW) MASON STREET (100' ROW) EXISTING (20') ALLEY / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EXISTING BUILDING (206) EXISTING BUILDING (202) EXISTING (20') ALLEY No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: 12/12/12 PROJECT: 860-001 Sheet Of 11 Sheets MAX FLATS T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 12/12/12 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL C100 DEMOLITION PLAN EXISTING CONDITIONS & A. Reese N. Whitcomb 1"=20' {1.EXISTING TREES MARKED FOR PROTECTION AND PRESERVATION SHALL NOT BE REMOVED. 2.HEAVY EQUIPMENT SHOULD NOT BE ALLOWED TO COMPACT OVER THE ROOT ZONE OF EXISTING TREES. 3.AVOID CUTTING SURFACE ROOTS WHENEVER POSSIBLE, SIDEWALKS AND PAVING LEVELS SHOULD BE CONTOURED SUFFICIENTLY TO AVOID DAMAGE. 4.ROOT CUTS FROM EXCAVATION SHOULD BE DONE RAPIDLY, SMOOTH FLUSH CUTS SHOULD BE MADE, BACKFILL BEFORE THE ROOTS HAVE A CHANCE TO DRY OUT AND WATER THE TREE IMMEDIATELY. 5.PRIOR TO CONSTRUCTION, ALL PROTECTED TREES SHALL HAVE A ORANGE PROTECTIONS BARRIER FENCING ERECTED, WHICH AS A MINIMUM ARE SUPPORTED BY 1" X 1" OR SIMILAR STURDY STOCK, FOR SHIELDING OF PROTECTED TREES, NO CLOSER THAN SIX (6) FEET FROM THE TRUNK OR ON HALF () OF THE DRIP LINE, WHICH EVER IS GREATER, WITHIN THIS PROTECTION ZONE THERE SHALL BE NO MOVEMENT OF EQUIPMENT OR STORAGE OF EQUIPMENT, MATERIALS, DEBRIS, FILL OR CUT UNLESS APPROVED BY THE CITY FORESTER. 6.ALL EXISTING TREES SHALL BE PRUNED TO THE CITY FORESTER'S "MEDIUM PRUNED STANDARDS." 7.WITHIN THE DRIP LINE OF ANY PROTECTED EXISTING TREE, THERE SHALL BE NO CUT OR FILL OVER A FOUR-INCH DEPTH UNLESS A QUALIFIED ARBORIST OR FORESTER HAS EVALUATED AND APPROVED THE DISTURBANCE. 8.DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE APPLICANT SHALL PREVENT THE CLEANING OF EQUIPMENT OR MATERIAL OR THE STORAGE OR DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OILS, SOLVENTS, ASPHALT, CONCRETE, MOTOR OIL OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF A TREE, WITHIN THE DRIP LINE OF ANY PROTECTED TREE OR GROUP OF TREES. 9.NO DAMAGING ATTACHMENT, WIRES, SIGNS OR PERMITS MAY BE FASTENED TO ANY PROTECTED TREE. 10.LARGE PROPERTY AREAS CONTAINING PROTECTED TREES AND SEPARATION FROM CONSTRUCTION OR LAND CLEARING AREAS, ROAD RIGHTS-OF-WAYS AND UTILITY EASEMENTS MAY BE "RIBBONED OFF," RATHER THAN ERECTING PROTECTIVE FENCING AROUND EACH TREE AS REQUIRED IN NOT (5) ABOVE. THIS MAY BE ACCOMPLISHED BY PLACING METAL T-POSTS STAKES A MAXIMUM OF FIFTY (50) FEET APART AND TYING A RIBBON OR ROPE FROM STAKE-TO-STAKE ALONG THE OUTSIDE PERIMETERS OF SUCH TREE PROTECTION NOTES: NORTH ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 EXISTING ELECTRIC E LEGEND: G T EXISTING STORM SEWER ST EXISTING TELEPHONE EXISTING GAS EXISTING IRRIGATION BOX EXISTING GAS METER EXISTING TELEPHONE PEDESTAL EXISTING TREES FIELD SURVEY BY: SUBSURFACE EXPLORATION BY: Earth Engineering Consultants, Inc. Geotechnical Subsurface Exploration Report Proposed 5-Story Mixed Use Building 203 West Mulberry Street Project No. 1122094 Date: december 3, 2012 NOTES: 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2.CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL, REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL. 3.CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE, ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. {THE CITY OF FORT COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION THAT WILL ACCEPT CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS RECYCLED AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD AND CAN BE REACHED AT (970) 482-1249.} 4.ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE. 5.CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING SITE SURVEY. 6.LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR STANDARDS. 7.REFER TO LANDSCAPE PLANS FOR TREE PROTECTION & MITIGATION. EXISTING SANITARY SEWER SS EXISTING WATER W EXISTING FENCE X EXISTING WATER METER EXISTING FIRE HYDRANT EXISTING ELECTRIC VAULT PROPERTY BOUNDARY EXISTING RIGHT-OF-WAY EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 5015 5013 EXISTING MONITORING WELL MW VAULT ELEC H Y D CONTROL IRR H2O G EXISTING LOT LINE APPROXIMATE LIMITS OF CONCRETE/ ASPHALT REMOVAL Northern Engineering Services, Inc. Project No. 379-019 Date: July 19, 2011 7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction. 10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19. All recommendations of the (Drainage Letter Report for MAX FLATS dated December 12, 2012)by Northern Engineering shall be followed and implemented. 20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The the City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by thE construction activities. 32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by Larimer County. 35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: City of Fort Collins Benchmark6-00 On a catch basin at the Northwest corner of Mulberry St. and College Ave. ELEV. = 4990.68 City of Fort Collins Benchmark29-97 Northeast corner of Mulberry St. and Whedbee St., on a concrete traffic signal base. ELEV. = 4974.83 41. All stationing is based on centerline of roadways unless otherwise noted. 42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48. Approved Variances are listed as follows: a. Pending Variance Request for Off-Street Parking Setback. CONSTRUCTION NOTES A. Grading and Erosion Control Notes 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed priorto any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. 17. For additional information see separate Stormwater Management Plan / Erosion Control Report for MAX FLATS. B. Street Improvement Notes 1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. Traffic Signing and Pavement Marking Construction Notes 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. Storm Drainage Notes 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the (Drainage Letter Report for MAX FLATS dated December 12, 2012)by Northern Engineering shall be followed and implemented. 3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. Utility Notes 1. All waterline and sanitary sewer construction shall conform to the City of Fort Collins Utility standards and specifications current to date of construction. 2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water utility. 3. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire. 4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal box and tracer wire test lid per City Water Detail 25. City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL C001 CONSTRUCTION NOTES GENERAL & A. Reese N. Whitcomb N/A DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: PROJECT LOCATION VICINITY MAP NORTH 1"=1500' BENCHMARK #1: City of Fort Collins Benchmark 6-00 Elevation= 4990.68 BENCHMARK #2: City of Fort Collins Benchmark 29-97 Elevation= 4974.83 Basis of Bearings Northeast corner Block 105 Harrison's Addition Northern Engineering Services, Inc. Project No. 379-019 Date: July 19, 2011 ORIGINAL FIELD SURVEY BY: PROJECT BENCHMARKS: CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R LOT 3, A PORTION OF LOT 1 AND A PORTION OF A 20' ALLEY, BLOCK 105, HARRISON'S ADDITION TO THE CITY OF FORT COLLINS, LOCATED IN THE NORTHEAST QUARTER OF SECTION 14, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO MAX FLATS OWNER/APPLICANT CONTACT INFORMATION PROJECT TEAM: SITE ENGINEER N��� H���, PE, LEED AP N������� E���������� S�������, I��. 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 (970) 221-4158 SURVEYOR G��� G��������, PLS N������� E���������� S�������, I��. 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 (970) 221-4158 LANDSCAPE ARCHITECT CONTACT INFORMATION PROJECT TEAM: J�� B������� TB G���� 444 M������� A����� B�������, C������� 80513 (970) 532-5891 D���� S. D�����, J�., LEED AP B������� D����������, LLC 3003 E��� H������ R���, S���� 300 F��� C������, C������� 80528 (970) 672-1011 COVER SHEET SHEET INDEX C000 C001 GENERAL & CONSTRUCTION NOTES C100 EXISTING CONDITIONS & DEMOLITION PLAN C500-C502 DETAILS C200 PRIVATE STRIPING & PAVING PLAN C400 GRADING PLAN E N G I N E E R I N G � � � � � � �� E N G I N E E R I N G � � � � � � �� UTILITY PLANS FOR E��� L. B�����, PE, PTOE ELB E����������, LLC 5401 Taylor Lane Fort Collins, Colorado 80528 (970) 988-7551 TRAFFIC ENGINEER City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. PHONE NUMBER GAS----------------- Xcel Energy----------------------------- Terry Stencel (970) 225-7857 ELECTRIC-------- City of Fort Collins Light & Power-- Doug Martine (970) 224-6152 CABLE------------- Comcast---------------------------------- Don Kapperman (970) 567-0425 TELECOM.--------CenturyLink------------------------------- William Johnson (970) 377-6401 WATER------------ City of Fort Collins Utilities----------- Roger Buffington (970) 221-6700 WASTEWATER--City of Fort Collins Utilities----------- Roger Buffington (970) 221-6700 STORMWATER- City of Fort Collins Utilities----------- Glen Schlueter (970) 221-6700 ARCHITECT E������ I������, AIA OZ A����������� 1805 29�� S�����, S���� 2054 B������, C������� 80301 (303) 449-8900 D��� R����� E���� E���������� C��������� 4396 Greenfield Drive Windsor, Colorado 80550 (970) 545-3908 GEOTECH C300 OVERALL UTILITY PLAN C301 SANITARY SEWER RE-ALIGNMENT C600 FLOODPLAIN EXHIBIT