HomeMy WebLinkAboutLEGACY AUTO - PDP - PDP120001 - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWNovember 21, 2011
Ms. Emma McArdle
City Planner
281 North College Avenue
Fort Collins, CO 80522
RE: Project Development Plan (PDP) Submittal
Legacy Auto
1845 North College Avenue
Fort Collins, CO
Dear Emma,
This is the Response Letter addressing each of the applicable issues raised in the Conceptual Review to Staff's
comments concerning the request referred to as the Legacy Auto - 1845 N College Ave, as required for the
submittal requirements for the Project Development Plan (PDP). This project was presented before the
Conceptual Review Team on November 22, 2010.
If you should have any questions regarding these comments please feel free to contact me at 970-493-2025 or
by email at dons@wgarchitects.com.
Best regards,
Don Shields
Project Manager
WG Architects
P.O. Box 270788. Fort Collins, CO 80527-0788 Ph: 970-493-2025 Fax: 970-493-2026 Email: dons@wgarchitects.com
CONCEPTUAL REVIEW STAFF COMMENTS
Meeting Date: November 22, 2010
Item: Legacy Auto - 1845 N College Ave
Applicant: Don Shields
Fort Collins, CO
dons@wgarchitects.com
Land Use Data:
This is a request to replat 1845 N College and the property to the north into a single lot. The part of
existing building and addition will be used for the sales offices for tractors, ATVs, trailers (27 feet
maximum length), small boats, conversion vans, cars, and light trucks. Also, part of this building will
be used for retail sales and part will be used for minor vehicle repair. The second building pad would
be a 5,000 s.f single-story building located on the western part of the site. The proposed use for this
building will be office/warehouse.
Comments:
ZONING
Contact: Peter Barnes, 970-416-2355, pbarnes@fcgov.com
1. The property is zoned CS. The former "boat sales" permitted use is no longer allowed pursuant to a
code change. The sale of trailers up to 27' in length is questionable (research will have to be done
regarding previous agreements). All of the other uses are allowed subject to a Type 1 review process.
The vehicle sales of cars and light trucks is allowed and is currently approved for the south half of the
lot, along with the existing "urban tractor" sales. Shifting it to the north would be ok as long as the lineal
frontage along College devoted to this use does not increase over the existing lineal frontage on the
south half.
WGA Response:
We agree that the Developer would not display for sale RV’s, boats (excluding jet ski’s similar small
craft), and larger trailers. The Developer would limit the display areas for Urban Tractors, ATV’s,
personal water/snow crafts, and trailers of 25’ length or less to 36 display models on the entire tract
(both the current PUD site and the undeveloped site). 36 display spaces allows for six (6) Urban
Tractors, six (6) ATV’s, six (6) personal water crafts, six (6) trailers six (6) cars, and six (6) light trucks.
We would also shift the existing southern 200 linear foot of frontage used for auto and light truck sales
to the north portion of the development as shown on the site plans submitted.
2. The warehouse/mini-storage building must be at least 200 feet from N. College Avenue.
WGA Response:
The office/warehouse building is located at least 200 feet from N. College Avenue. See site plans.
3. ATV and water sport inventory, etc. will need to be in a screened area. The site plan shows
a screened product storage, and I assume that's where these items would be.
WGA Response:
Urban Tractors, ATVs, personal water craft and trailer inventory, etc. will be in the screened area shown
on the site plan. Phase I shows 66 screened storage spaces, Phase II and III shows 46 storage spaces, and
Phase IV shows 57 storage spaces.
P.O. Box 270788. Fort Collins, CO 80527-0788 Ph: 970-493-2025 Fax: 970-493-2026 Email: dons@wgarchitects.com
1449 Riverside Ave. Fort Collins, CO 80524 970-493-2025 Fax: 970-493-2026 Email:wga@wgarchitects.com
4. The parking and vehicular use areas must be hard surfaced. Recycled asphalt or gravel isn't an
acceptable surface, except in the screened product storage.
WGA Response:
Parking and vehicular use areas are shown paved with asphalt paving. Vehicle display areas are shown
paved with decorative paving. Vehicle storage areas are shown with recycled asphalt or gravel surfaces.
5. It looks like most, if not all, of the car and light truck sales area is shown to be in the landscape area.
The landscape area is for landscaping, and vehicles can't be parked there.
WGA Response:
Vehicle display areas are shown paved with decorative paving. A 15 foot wide landscape area is
maintained along the North College Avenue frontage.
WATER-WASTEWATER ENGINEERING
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
1. The water and sewer mains in the vicinity of this site include a 4-inch water main in College which
extends from Willox to a point in front of the Lamplighter Motel, an 8-inch water main which was
extended across College from the former Grape Street, a 6-inch water main in Willox Court and a 6-
inch sewer at the southwest corner of the site.
WGA Response:
Shown on civil engineering plans. Civil Engineer: Patricia Kroetch – (970) 686-6939
2. This project will be responsible for extending the water main at the northeast corner of the site with the
objective of connecting to one of the existing mains in noted above. A meeting with the developer's civil
engineer, Poudre Fire Authority and Water Utilities staff is needed to review options for routing this
main to provide service to all buildings in this development and provide adequate fire protection.
WGA Response:
See civil engineering plans. Civil Engineer: Patricia Kroetch – (970) 686-6939
3. The water service to the existing building on the site is a ¾-inch service connecting to the 4-inch water
main in front of the Lamplighter Motel on the west side of college.
WGA Response:
See civil engineering plans. Civil Engineer: Patricia Kroetch – (970) 686-6939
4. Development fees and water rights will be due at building permit.
WGA Response:
Acknowleged.
1449 Riverside Ave. Fort Collins, CO 80524 970-493-2025 Fax: 970-493-2026 Email:wga@wgarchitects.com
STORMWATER ENGINEERING
Contact: Glen Schlueter, 970-224-6065, gschlueter@fcgov.com
1. Drainage requirements and fees are based on new impervious area; therefore, it is important to
document the existing impervious area. To determine these requirements, an exhibit showing the
existing and proposed impervious areas is needed.
WGA Response:
Existing and proposed paved areas are shown on the cover sheet.
2. A drainage and erosion control report and construction plans are required and must be
prepared by a Professional Engineer registered in Colorado.
WGA Response:
See Drainage and Erosion Control Report by Civil Engineer: Patricia Kroetch – (970) 686-6939
3. Since the site is being platted, the existing storm sewer lines need to have easements shown on the
new plat in addition to any new easements needed for detention for the additions and the parking lot.
WGA Response:
See civil engineering plans. Civil Engineer: Patricia Kroetch – (970) 686-6939
4. In the Dry Creek basin, the two year historic release rate is 0.2 cfs/acre. The drainage outfall for the site
may require obtaining easements from this property to Willox Court since that appears to be the
present outfall for the drainage. With detention, some of the site could possibly drain to the existing
storm lines from the North College Mobile Home Park if the pipe under College Avenue is replaced.
The existing pipe under College presently flows from the east to the west. A new pipe would be needed
to reverse the flow. This would require an analysis of the outfall system through the new North College
Market Place to see if there is capacity for this site to flow that direction. The North College Market
Place design included capacity for an eight inch pipe from the mobile home park.
WGA Response:
See civil engineering plans and Drainage and Erosion Control Report by Civil Engineer.
5. The detention pond is now shown at the low end of the site. The design engineer may have sized the
pond but no outlet pipe is shown. The drainage outfall though the buildings to the west is the curb and
gutter of Willox Ct. The design engineer will need to verify that the outfall depth is sufficient to drain the
detention and water quality pond.
WGA Response:
The detention pond has been moved to the south east corner of the site. See civil engineering plans.
6. Water quality treatment is required as described in the Urban Storm Drainage Criteria
Manual, Volume 3 - Best Management Practices (BMPs).
WGA Response:
See civil engineering plans.
1449 Riverside Ave. Fort Collins, CO 80524 970-493-2025 Fax: 970-493-2026 Email:wga@wgarchitects.com
7. The Windsor Reservoir and Canal Company owns and operates the Eaton Ditch (Larimer-Weld Canal)
along the north property line. The ditch company will need to approve the plans if there is any grading
near the ditch. The contact is Bill Johnston, Superintendent; 222-0090 (Cell), 454-3377.
WGA Response:
There will not be any grading near the Eaton Ditch (Larimer-Weld Canal) See civil engineering plans.
8. The design of this site must conform to the drainage basin design of the Dry Creek Master
Drainage Plan as well the City's Design Criteria and Construction standards.
WGA Response:
See civil engineering plans.
9. Stormwater development fees are $6,313/acre ($0.1449/sq.ft.) for new impervious area over 350 sq. ft.
In addition, there is a $1,045/acre review fee. No fee is charged for existing impervious area. These
fees are to be paid at the time each building permit is issued. Information on fees can be found on the
City's web site at http://www.fcgov.com/utilities/builders-fees.php or by contacting Jean Pakech at 221-
6375.
WGA Response:
Acknowleged.
PARK PLANNING
Contact: Craig Foreman, 970-221-6618, cforeman@fcgov.com
1. No comments
WGA Response:
Acknowleged.
FIRE AUTHORITY
Contact: Carie Dann, 970-219-5337, CDANN@poudre-fire.org
1. BUILDING AREA
Proposed buildings that exceed 5,000 square feet for Type V construction shall be fire contained or fire
sprinklered. 2006 International Fire Code New Table 903.1 and Section 702
WGA Response:
The building additions to the existing building shown in Phases I and II will be fully sprinkled. The
5,000 s.f. building shown in Phase IV will not be sprinkled.
1449 Riverside Ave. Fort Collins, CO 80524 970-493-2025 Fax: 970-493-2026 Email:wga@wgarchitects.com
2. REQUIRED ACCESS
Fire access roads (fire lanes) shall be provided for every facility, building or portion of a building
hereafter constructed or moved into or within the PFA's jurisdiction when any portion of the facility or
any portion of an exterior wall of the first story of the building is located more than 150 feet from fire
apparatus access as measured by an approved route around the exterior of the building or facility. This
fire lane shall be visible by painting and signage, and maintained unobstructed at all times. A fire lane
plan shall be submitted for approval prior to installation. In addition to the design criteria already
contained in relevant standards and policies, any new fire lane must meet the following general
requirements:
- Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire
apparatus weights. Compacted road base shall be used only for temporary fire lanes or at
construction sites.
- Have appropriate maintenance agreements that are legally binding and enforceable.
- Be designated on the plat as an Emergency Access Easement.
- Maintain the required minimum width of 20 feet throughout the length of the fire lane (30 feet on at
least one long side of the building when the structure is three or more stories in height).
If the building is equipped throughout with an approved automatic fire-sprinkler system, the fire code
official is authorized to increase the dimension of 150 feet.
PLEASE NOTE: An EAE will be required for the site. Please contact me to discuss location that must
be dedicated.
2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D
WGA Response:
Acknowleged. See site plans, civil engineering plans. Emergency access easements are shown on the re-
plat document.
3. WATER SUPPLY
Fire hydrants, where required, must be the type approved by the water district having jurisdiction and
the Fire Department. Hydrant spacing and water flow must meet minimum requirements based on type
of occupancy. Minimum flow and spacing requirements include:
- Commercial and multi-family dwellings 1,500 gpm at 20 psi residual pressure, spaced not further than
300 feet to the building, on 600-foot centers thereafter
- Residential within Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced not further than
400 feet to the building, on 800-foot centers thereafter
- Residential outside Urban Growth Area, 500 gpm at 20 psi residual pressure, spaced not further than
400 feet to the building, on 800-foot centers thereafter.
A hydrant located across an arterial cannot be considered for this requirement unless the building is fire
sprinklered.
These requirements may be modified if buildings are equipped with automatic fire sprinkler systems.
PLEASE NOTE: The closest hydrant is located across College Avenue (an arterial) near
1806 N. College Ave. The closest hydrant on the west side of College is the northwest corner of Willox
Lane and College.
2006 International Fire Code 508.1 and Appendix B
WGA Response:
The eastern building (Phases II and III) shall be fully sprinkled and is within 300’ of both the fire
hydrant at the northeast corner of the site and the fire hydrant on the east side of College (near 1806 N.
College Ave.). The western building (Phase IV) will not be sprinkled, but is within 300’ of the existing
fire hydrant at the northeast corner of the site.
1449 Riverside Ave. Fort Collins, CO 80524 970-493-2025 Fax: 970-493-2026 Email:wga@wgarchitects.com
4. FIRE SPRINKLER REQUIREMENTS
If the building has fire sprinklers, the following requirements must be met:
FIRE LINE
Buildings that are required to be fire sprinklered shall have a minimum 6-inch fire line unless hydraulic
calculations can support a smaller fire line.
KEY BOXES
Poudre Fire Authority requires a key box ("Knox Box") to be mounted in approved location(s) on every
new building equipped with a required fire-sprinkler system or fire-alarm system. Knox Boxes are
required to be installed approximately 60 inches above grade and no higher than 72 inches above
grade.
FIRE DEPARTMENT CONNECTION
Fire department connections shall be installed remote from the buildings, and located on the street or
fire lane side of buildings, fully visible and recognizable from the street or nearest point of fire
department vehicle access or as otherwise approved by the fire code official. 2006 International Fire
Code 912.2 and PFA Fire Prevention Bureau Policy, 2006
International Fire Code 506.1; and NFPA 13 (2007) 23.1.3
WGA Response:
Fire line:
The eastern building (Phases II and III) shall be fully sprinkled and have a 6” fire line as
shown on the civil engineering drawings. The western building (Phase IV) will not be
sprinkled, but is within 300’ of the existing fire hydrant at the northeast corner of the site.
Key boxes:
Each building will have a Knox Box as required by the Poudre Fire Authority. The type
and location of key box will be specified and located on the building permit drawings
when submitted for building permit review.
Fire Department connection:
See civil engineer’s Utility Site Plans for fire department connection locations.
5. TURNING RADII
The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50
feet outside 2006 International Fire Code 503.2.4 and Appendix D103.3
WGA Response:
Turning radii along the 20’ wide fire apparatus access road complies with the 25 feet inside and 50 feet
outside turning radii. See the truck paths on the site plans and the fire access easements on re-plat
drawings.
6. ADDRESS NUMERALS
Address numerals shall be visible from the street fronting the property, and posted with a minimum six-
inch high numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable).
If the numerals are mounted on a side of the building other than the side off of which it is addressed,
the street name is required to be posted along with the numerals.
PLEASE NOTE: In order for its address to be visible from College Avenue, the second building may
need to have a business sign/address located at College Avenue.
2006 International Fire Code 505.1
WGA Response:
Acknowleged.
1449 Riverside Ave. Fort Collins, CO 80524 970-493-2025 Fax: 970-493-2026 Email:wga@wgarchitects.com
ENGINEERING DEVELOPMENT REVIEW
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
1. The Access Control Plan for North College specifies that two access points would serve the site in
the long term, a commercial local road between the property and the Lamplighter as well as an
additional access point to the north along the property. The proposed site plan proposes two access
points, however a private drive instead of a commercial local road is shown. As was previously
indicated on the 3/15/2010 conceptual review the City is potentially willing to change the commercial
local road designation specified in the Access Control Plan to a private drive. The applicant and the
City should have further discussion on specifics should this proposal proceed. Further internal City
discussion would be needed and amending the Access Control Plan (and receiving buy-in from
CDOT) would be needed.
2. WGA Response:
The current PDP submittal shows the dedication of a 36 foot wide half-right-of-way for a future local
commercial street along the south property line. The proposed name for this street is “Farkas Place.”
This street will be constructed when the building on the property to the south is demolished as part of a
redevelopment of that property.
3. The following two comments would likely not be applicable if the result of an agreement to move
forward with amending the Access Control Plan to remove the commercial local street and instead
provide a private drive takes place:
4. 36' half right-of-way for the future commercial local street would need to be dedicated at this time.
WGA Response:
The current PDP submittal shows the dedication of a 36 foot wide half-right-of-way for a future local
commercial street along the south property line. The proposed name for this street is “Farkas Place.”
See site plans and re-plat drawings.
5. The project is obligated for the half street design and construction of the commercial local street
along the southern boundary. Whether it would be beneficial to have this half constructed at this time
or financially obligated in a development agreement would likely be at the applicant's preference.
WGA Response:
The current PDP submittal shows the dedication of a 36 foot wide half-right-of-way for a future local
commercial street along the south property line. The proposed name for this street is “Farkas Place.”
This street will be constructed when the building on the property to the south is demolished as part of a
redevelopment of that property. The design of this street is shown on the civil engineering drawings.
Civil Engineer: Patricia Kroetch – (970) 686-6939. This project would be financially obligated for half
the construction of the local commercial street at the time the street is constructed as stipulated in a
development agreement.
6. Repays for the local street portion of College Avenue frontage improvements and right-of-way would
be required of the property prior to the issuance of a building permit in conjunction with the
development proposal.
WGA Response:
Acknowledged: Repays for the local street portion of College Avenue frontage improvements and
right-of-way would be required of the property prior to the issuance of a building
permit in conjunction with this development proposal.
1449 Riverside Ave. Fort Collins, CO 80524 970-493-2025 Fax: 970-493-2026 Email:wga@wgarchitects.com
7. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit.
Please contact Matt Baker at 224-6108 if you have any questions.
WGA Response:
Acknowledged: Larimer County Road Impact Fees and Street Oversizing Fees are due at the time
of building permit.
8. Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional
information on these fees, please see
http://www.fcgov.com/engineering/dev-review.php
WGA Response:
Acknowledged: Transportation Development Review Fee (TDRF) is due at the time of submittal.
9. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks,
curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be
replaced or restored to City of Fort Collins standards at the Developer’s expense prior to the
acceptance of completed improvements and/or prior to the issuance of the first Certificate of
Occupancy.
WGA Response:
Acknowledged:
10. Please contact Joe Olson and Transportation Planning to schedule a scoping meeting and determine
if a traffic study is needed for this project.
WGA Response:
A Traffic Memo has been written and will be submitted with this PDP.
11. Any public improvements must be designed and built in accordance with the Larimer County Urban
Area Street Standards (LCUASS).
WGA Response:
See civil engineering plans. Civil Engineer: Patricia Kroetch – (970) 686-6939
12. A 15' utility easement behind the right-of-way established with the North College improvement project
will be required.
WGA Response:
See civil engineering plans. Civil Engineer: Patricia Kroetch – (970) 686-6939
See re-plat drawings by King Surveying.
13. This site is adjacent to CDOT roadway and all access to the site is governed by an access control
plan. The access control plan will need to be followed and implemented with any project. Plans will
be routed to CDOT for review and approval and the applicant may need to obtain access permits
from CDOT.
WGA Response:
The CDOT roadway adjacent to the site and all access points to the site conform to the current access
control plan. No changes to the existing accesses are requested. See civil engineering plans. Civil
Engineer: Patricia Kroetch – (970) 686-6939
1449 Riverside Ave. Fort Collins, CO 80524 970-493-2025 Fax: 970-493-2026 Email:wga@wgarchitects.com
14. Construction improvement plans will be needed for this project.
WGA Response:
See civil engineering plans. Civil Engineer: Patricia Kroetch – (970) 686-6939
See re-plat drawings by King Surveying.
15. A development agreement will be done with this project.
WGA Response:
Acknowledged: A development agreement will be done with this project.
16. A Development Construction Permit (DCP) will need to be obtained prior to starting any work on the
site.
WGA Response:
Acknowledged: A Development Construction Permit (DCP) will need to be obtained prior to
starting any work on the site.
17. Matt Wempe is in transportation planning and his contact information is 416-2040,
mwempe@fcgov.com regarding the private drive issue.
WGA Response:
The current PDP submittal shows the dedication of a 36 foot wide half-right-of-way for a future local
commercial street along the south property line. The proposed name for this street is “Farkas Place.”
18. With the discussion at conceptual on public street vs. private drive and sub-phasing, we'll need
additional discussion on how full or partial portions are built and what may need to be tied to the first
phase in order to prevent a disjointed development plan.
WGA Response:
The current PDP submittal shows the dedication of a 36 foot wide half-right-of-way for a future local
commercial street along the south property line. The proposed name for this street is “Farkas Place.”
This street will be constructed when the building on the property to the south is demolished as part of a
redevelopment of that property. The design of this street is shown on the civil engineering drawings.
Civil Engineer: Patricia Kroetch – (970) 686-6939. This project would be financially obligated for half
the construction of the local commercial street at the time the street is constructed as stipulated in a
development agreement.
ELECTRIC ENGINEERING
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
1. The existing building is fed from a 1-phase 50KVA transformer on the West side of the building. This
transformer is fed from a switch cabinet along College Ave. at the Northeast corner of the existing lot.
The 4,400 s.f. addition to the existing building looks like it will impact this primary electric line.
WGA Response:
See civil engineering Utility Plan. Civil Engineer: Patricia Kroetch – (970) 686-6939
1449 Riverside Ave. Fort Collins, CO 80524 970-493-2025 Fax: 970-493-2026 Email:wga@wgarchitects.com
2. Any relocation or modification to the existing electric facilities will be at the owner’s expense. This will
need to be coordinated with Light & Power Engineering.
WGA Response:
Acknowledged: Any relocation or modification to the existing electric facilities will be at the
owner’s expense and will need to be coordinated with Light & Power Engineering.
3. Owner will need to submit a C-1 form and One-line diagram with their electrical needs to Light & Power
Engineering. A transformer location within 10' of a paved surface will need to be coordinated. Owner
may want to consider sizing the transformer for all the additions and new buildings on the property.
Contact Light & Power Engineering @ 221-6700.
WGA Response:
A C-1 form and one-line diagram will be submitted to Light and Power Engineering for review and
approval when the development construction plans are submitted for permit.
4. Owner will be responsible for Electric Capacity Fees, Building Site charges and system modification
charges where applicable.
WGA Response:
Acknowledged: The Owner will be responsible for Electric Capacity Fees, Building Site charges
and system modification charges where applicable.
CURRENT PLANNING
Contact: Emma McArdle, 970-221-6206, emcardle@fcgov.com
1. Please submit the memo from our meeting in May regarding the use of this site with your formal
submittal.
WGA Response:
See the enclosed referenced memo.
2. Buffer will need to be examined closer by the environmental planner. 50' buffer is required from top of
bank, from the plan I cannot tell where that is, formal plan will need to show this.
WGA Response:
The 50’ wildlife buffer starting at the southern “top of bank” of the Larimer-Weld Canal (Eaton Ditch)
is shown on the site plans. The southern “top of bank” of the Larimer-Weld Canal (Eaton Ditch) was
established by an improvement/topo survey by King Surveying.
3. Landscaping shall meet all standards of Article 3.
WGA Response:
The Landscape Plans C3.1A, C3.1B, C3.2, and C3.2 comply with the Article 3 standards of the Land
Use Code.
1449 Riverside Ave. Fort Collins, CO 80524 970-493-2025 Fax: 970-493-2026 Email:wga@wgarchitects.com
4. Elevations shall comply with Section 3.5.3, this includes having a recognizable base and top. Please
submit a color rendering with your formal submittal, with colors labeled.
WGA Response:
Building materials and colors are noted on the building exterior elevations submitted for PDP review.
A colored rendering of the buildings’ exterior elevations will be submitted before submittal of the final
development plans.
5. Modifications may be needed for Orientation to Connecting Walkway and Orientation to build-to lines
for street front buildings.
WGA Response:
A pedestrian connection from the existing sidewalk along North College Avenue to the existing
eastern building is achieved by a sidewalk/raised sidewalk under the existing canopy.
6. Please clearly illustrate different phasing on all plans (site, landscaping).
WGA Response:
Phasing lines are shown on the site and landscaping plans submitted for PDP review.
7. The proposed development project is subject to a Type 1 review and public hearing, the decision
maker for Type 1 hearings is an Administrative Hearing Officer. The applicant for this development
request is not required to hold a neighborhood meeting for a Type 1 hearing, but if you would like to
have one to notify your neighbors of the proposal, please let me know and I will can help you in
setting a date, time and location for a meeting. Neighborhood Meetings are a great way to get public
feedback and avoid potential hick-up that may occur later in the review process.
WGA Response:
We are not requesting a neighborhood meeting.
8. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color
coded flowchart with comprehensive, easy to read information on each step in the process. This
guide includes links to just about every resource you need during development review.
WGA Response:
Thank you. The Development Review Guide is very helpful.
9. This development proposal will be subject to all applicable standards of the Fort Collins
Land Use Code (LUC), including Article 3 General Development Standards. The entire
LUC is available for your review on the web at
http://www.colocode.com/ftcollins/landuse/begin.htm.
WGA Response:
Thank you. This link is very helpful.
10. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a
Modification of Standard Request will need to be submitted with your formal development proposal.
Please see Section 2.8.2 of the LUC for more information on criteria to apply for a Modification of
Standard.
WGA Response:
To the best of my knowledge this submittal meets all LUC development standards.
1449 Riverside Ave. Fort Collins, CO 80524 970-493-2025 Fax: 970-493-2026 Email:wga@wgarchitects.com
11. Please see the Submittal Requirements and Checklist at:
http://www.fcgov.com/currentplanning/submittals.php.
WGA Response:
Thank you. This link is very helpful.
12. The request will be subject to the Development Review Fee Schedule that is available in the
Community Development and Neighborhood Services office. The fees are due at the time of
submittal of the required documents for the appropriate development review process by
City staff and affected outside reviewing agencies. Also, the required Transportation
Development Review Fee must be paid at time of submittal.
WGA Response:
A check for the Development Review Fee: $5,879.00 + $50.00 sign fee (plus .75 for each APO label) for a
Project Development Plan (PDP) With a Subdivision Plat will be included with the submittal.
$5,879.00 + $50.00 + ($0.75 x 411 APO labels) = $6,237.25
A check for the Transportation development Review Fee submittal is included. $2,000 + ($0.25 per
square foot of building x 12,211 s.f.) + ($250 per acre of total site x 2.92 total acres) = $5,782.75.
13. When you are ready to submit your formal plans, please make an appointment with Community
Development and Neighborhood Services at (970)221-6750.