August 25, 2011
Lisa Evans
4949 S. Syracuse, Ste 320
Denver, CO 80237
RE: Regency at Parkwood Lake
Dear Lisa,
Attached, please see a copy of Staff's comments concerning the request referred to as the
Regency at Parkwood Lake, which was presented before the Conceptual Review Team on
August 22, 2011.
The comments offered informally by staff during the Conceptual Review will assist you in
preparing the detailed components of the project application. Modifications and additions to
these comments may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the review
process, please feel free to contact me at 970-221-6343.
Sincerely,
Ted Shepard
Chief Planner
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 -- (970) 221-6750 - FAX (970) 224-6134
CONCEPTUAL REVIEW STAFF COMMENTS
Meeting Date: August 22, 2011
Item: Regency at Parkwood Lake
Applicant: Lisa Evans
4949 S. Syracuse, Ste 320
Denver, CO 80237
lisa@regencyres.com
Land Use Data:
This is a request for an Addition of a Permitted Use and Project Development Plan for a multi-family
project consisting of 238 units divided among nine buildings. The buildings would be three-stories.
The project includes both surface and garage parking for a total of 381 spaces. Amenities include
clubhouse, pool, volleyball court and walking trail. The site is 11 acres and located on the east side
of the Christ Center Community Church at 2700 South Lemay Avenue. The site is currently an
athletic field and zoned R-L, Low Density Residential District.
Response: In response to neighborhood concerns, the Project made several key changes:
Reduced the number of units from 238 to 175 units
Reduced the number of residential buildings from nine to eight buildings
The clubhouse building was moved from the center of the site to frontage on E. Drake
Road.
Reduced the residential building heights from all three story to a mixture of two, two rising
to three and three story buildings.
Reduced the required parking from 381 spaces to 289 parking spaces (the surface and
garage parking provided is 346 (316 + 30) spaces when including 30 tandem spaces
connected to the attached garage parking).
The amenities include clubhouse, pool/spa, bocci court, walking trail, picnic tables,
gazebo and neighborhood two (2) acre pocket park. For noise and maintenance
concerns, the sand volleyball was omitted.
Comments:
Zoning
Contact: Gary Lopez, 970-416-2338, glopez@fcgov.com
1. An Addition of a Permitted Use, combined with a P.D.P., would be a Type Two review
subject to consideration by the Planning and Zoning Board.
Response: Agreed.
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 -- (970) 221-6750 - FAX (970) 224-6134
2. A pre-submittal meeting is recommended with the Building Inspection Division to review the
applicable building and energy codes along with the locally adopted amendments.
Response: This meeting will be scheduled.
3. The required minimum number of parking stalls is based on the number of units on a per
bedroom basis. Please refer to Section 3.2.2(K)(1)(a) of the Land Use Code. Response:
Please see the Site Plan – the required parking follows this section and the calculation is
shown.
4. The minimum number of bicycle parking spaces is 5% of the total number of vehicle spaces
per Section 3.2.2(C)(4). For guest parking standards, please refer Section 3.2.2(D)(3).
Response: The project provides 28 more parking spaces than required by the LUC. While
guest parking is not specifically designated we believe there will be adequate spaces to
accommodate guests. The required minimum number of bicycle parking spaces is 16. The
project is providing 63. Bike racks are shown around the site.
5. Parking lot landscaping is required in the form of islands and there can be no more than 15
spaces in a row without an island. Response: This is done per the Site Plan.
6. Be sure that there is sufficient area within the trash enclosures to provide containers for
recycling. For guidance, please see www.fcgov.com/recycling/enclosures.php. Response:
This is done per the Site Plan – containers will be trash and recycling.
7. Be sure to provide sufficient area for the U.S.P.S. cluster boxes for mail delivery and that
these boxes are adjacent to a sidewalk. Or, for larger projects, the U.S.P.S. may deliver to
central point within a building. Response: Resident mail will be delivered to individual
mailboxes inside the clubhouse and accessible by a sidewalk.
Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
1. Existing water mains and sanitary sewers include a 12-inch water main and a 27-inch
sewer in Drake, a 16-inch water main and a 12-inch sewer in Lemay and an 8-inch water
main in the existing drive extending south from Drake (east of the church).
Response: Acknowledged.
2. For purposes of reliability, it is important to have the water system well looped for a
development of this size. An additional connection to a major line is needed, preferably in
Lemay. Response: An additional water main connection is proposed to Drake Road instead.
See Utility Plans for additional information.
3. The water conservation standards for landscape and irrigation will apply. Information on
these requirements can be found at: http://www.fcgov.com/standards.
Response: Acknowledged.
4. Development fees and water rights will be due at building permit. Response: Acknowledged.
Transportation Planning
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 -- (970) 221-6750 - FAX (970) 224-6134
Contact: Matt Wempe, 970-416-2040, mwempe@fcgov.com
1. The current plans have good internal pedestrian connectivity. The north-south pedestrian
spine cutting through parking areas will need to have ramps or some other method to
achieve at-grade crossings. Response: Acknowledged.
2. Are there are planned uses for the undeveloped area west of the church at Drake and
Lemay?
Response: The Applicant is only purchasing the eastern 11 acres of the Church property.
The Church will retain ownership of the remaining 13 acres. Regency is not aware of any
future plans for development by the Church.
If so, connection to future improvements on the internal pedestrian network should
be considered as part of this development. For example, are the east-west pedestrian
crossings shown in ideal locations for direct pedestrian connectivity?
Response: Yes, the connections from the Project do correspond to sidewalks oriented east
west on the church side.
3. Is there a need to flair the driveway aprons so much to access the internal north-south
access drive? Since this is an access drive internal to the property, you could narrow the
driveway flair and create a direct sidewalk crossing.
Response:The access drives meet City standards for access to a street-like private drive.
Sidewalk crossings have become more direct because of other plan changes since
Conceptual Review.
4. It would likely be safer and easier for vehicles in the parking lot to align the current access
drives and future access drives.
Response: We have not been able to align the proposed driveway with the Church’s existing
drive. We believe the offset driveways will function acceptably given that the Church drive
has minimal traffic during peak hours.
5. How wide is the access drive on the south side of the site? There may be opportunities to
do a more formal bicycle and pedestrian path than the cross-hatch path currently shown.
Response: Pursuant to subsequent meetings with City Planning, the Project will be directing
vehicular traffic to the north. Bicycle and pedestrian traffic will be able to use the north drive
or the southern one. The Project will provide a 6-foot wide striped bicycle and pedestrian
path along the southern Church driveway to facilitate pedestrian/bike traffic to S. Lemay
Avenue. The existing southern driveway is 37 feet wide.
6. Where will bicycle parking be located? The ideal location is on a hard surface, well-lit, near
the main entrances, secure, and protected from the elements. This can include both indoor
and outdoor bike parking. Transportation Planning staff would be happy to discuss
opportunities for enhanced bicycle parking.
Bike racks are shown around the site.
7. There does not appear to be a pedestrian connection to the south as shown on the plans.
This appears to be a concrete drainage way.
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 -- (970) 221-6750 - FAX (970) 224-6134
Response: The public uses the drainage way as a pathway currently. The Project will not
change the City of Fort Collins storm water detention area. The Project desires to make this
connection as it is currently in use.
Stormwater Engineering
Contact: Glen Schlueter, 970-224-6065, gschlueter@fcgov.com
1. It is important to document the existing impervious area since drainage requirements and
fees are based on new impervious area. An exhibit showing the existing and proposed
impervious areas is required. Response: The submitted Drainage Study documents existing
and proposed impervious areas.
2. A drainage and erosion control report and construction plans are required and they must be
prepared by a Professional Engineer registered in Colorado.
Response: The Project will comply with these items.
3. The design of most of this site must conform to the drainage basin design of the Foothills
Drainage Master Drainage Plan, and part of it must conform to the Spring Creek Drainage
Master Plan. The design must also comply with the City's Drainage Design Criteria and
Construction standards. Response: The Project will comply with these items.
4. Normally onsite detention is required with a 2 year historic release rate for water quantity.
In this case the release rate is probably limited by the pipe size out of the Eastborough
pond; so the design engineer will need to analyze the outfall system capacity. Parking lot
detention for water quantity is allowed as long as it is not deeper than one foot. Response:
Detention design criteria and concepts have been discussed between the design engineer
and staff. The submitted Drainage Study and Drainage Exhibit document the results of said
discussions.
5. Water quality treatment is also required as described in the Urban Storm Drainage Criteria
Manual, Volume 3 - Best Management Practices (BMPs).
(http://www.udfcd.org/downloads/down_critmanual_volIII.htm) Extended detention is the
usual method selected for water quality treatment; however the use of any of the BMPs is
encouraged. Response: Water quality design criteria and concepts have been discussed
between the design engineer and staff. The submitted Drainage Study and Drainage Exhibit
document the results of said discussions. Additional dialogue and refinement are expected
during the Final Plan phase.
6. The portion of the site in the Spring Creek basin has four outfalls that all end up draining
into Parkwood Lake. The portion in the Foothills basin appears to surface flow to the
southeast corner of the site and into the Eastborough detention pond. There is one pipe
shown draining into the pond. There is also sub-drain crossing the site that also drains into
the Eastborough detention pond. Due to the amount of increased runoff from this proposal
a storm sewer system from the site to the outfall of the Eastborough pond is needed so that
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 -- (970) 221-6750 - FAX (970) 224-6134
all the runoff does not have to drain through the pond. Response: The outfall concept has
been discussed between the design engineer and staff. The submitted Drainage Study and
Drainage Exhibit document the results of said discussion. A new outfall pipe is proposed
through the City-owned parcel so as not to increase routine nuisance flows through the
existing trickle pans.
7. The city wide Stormwater development fee (PIF) is $6,313.00/acre ($0.1449/sq.ft.) for new
impervious area over 350 sq.-ft., and there is a $1,045.00/acre ($0.024/sq.ft.) review fee.
No fee is charged for existing impervious area. These fees are to be paid at the time each
building permit is issued. Information on fees can be found on the City's web site at
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-developm
ent-fees or contact Jean Pakech at 221- 6375 for questions on fees. There is also an
erosion control escrow required before the Development Construction permit is issued.
The amount of the escrow is determined by the design engineer, and is based on the site
disturbance area or erosion control measures shown on the site construction plans.
Response: The Project will comply with these requirements.
Fire Authority
Contact: Carie Dann, 970-219-5337, CDANN@poudre-fire.org
1. DEVELOPMENT REVIEW FEES
Poudre Fire Authority charges a fee for submitted development review plans. For specific
cost information, contact Hayley Spurrier at hspurrier@poudre-fire.org.
Response: The Project will pay this fee at Submittal of PDP.
2. REQUIRED ACCESS
Fire access roads (fire lanes) shall be provided for every facility, building or portion of a
building hereafter constructed or moved into or within the PFA’s jurisdiction when any
portion of the facility or any portion of an exterior wall of the first story of the building is
located more than 150 feet from fire apparatus access as measured by an approved route
around the exterior of the building or facility. This fire lane shall be visible by painting and
signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for
approval prior to installation. In addition to the design criteria already contained in relevant
standards and policies, any new fire lane must meet the following general requirements:
Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of
supporting fire apparatus weights. Compacted road base shall be used only for temporary
fire lanes or at construction sites.
Have appropriate maintenance agreements that are legally binding and enforceable.
Be designated on the plat as an Emergency Access Easement.
Maintain the required minimum width of 20 feet throughout the length of the fire lane (30
feet on at least one long side of the building when the structures is three or more stories in
height).
If the building is equipped throughout with an approved automatic fire-sprinkler system, the
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 -- (970) 221-6750 - FAX (970) 224-6134
fire code official is authorized to increase the dimension of 150 feet.
Response: The Project will comply with these requirements.
2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D
3. WATER SUPPLY
Fire hydrants must be the type approved by the City of Fort Collins and the Fire Department.
Hydrant spacing and water flow must meet minimum requirements based on type of
occupancy. Minimum flow and spacing requirements include:
• Multi-family residential structures with three or more units, 1,500 gpm
at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot
centers thereafter. Distance is measured as a hose would lay out from a fire engine, not
necessarily in a direct line.
A hydrant located across an arterial street cannot be “counted” unless the structure is
equipped with an approved, automatic fire-sprinkler system.
These requirements may be modified if buildings are equipped with automatic fire sprinkler
systems. Response: The Project will comply with these requirements.
2006 International Fire Code 508.1 and Appendix B
4. FIRE LINE REQUIREMENT
Buildings that are required to be fire sprinklered shall have a minimum 6-inch fire line
unless hydraulic calculations can support a smaller fire line. NFPA 13 (2007) 23.1.3.
Response: The Project will address this requirement as part of the Fire Department
Construction Building Review.
5. KEY BOXES REQUIRED
Poudre Fire Authority requires at least one key box (“Knox Box”) to be mounted in
approved location(s) on every new building equipped a required fire-sprinkler system or
fire-alarm system. 2006 International Fire Code 506.1; PFA BUREAU POLICY 88-20.
Response: The Project will comply with this request for all buildings.
6. FIRE DEPARTMENT CONNECTION
Fire department connections shall be installed remote from the buildings, and located on
the street or fire lane side of buildings, fully visible and recognizable from the street or
nearest point of fire department vehicle access or as otherwise approved by the fire code
official. Response: The Project will comply with required FDCs.
2006 International Fire Code 912.2 and PFA Fire Prevention Bureau Policy
7. RESIDENTIAL AUTOMATIC FIRE SPRINKLERS
An automatic sprinkler system installed in occupancies in accordance with Section 903.3
shall be provided throughout all buildings with a Group R (Residential) fire area.
(Exceptions: Detached one- and two-family dwellings and multiple single-family dwellings
(townhomes) not more than three stories above grade plane in height with a separate
means of egress). 2006 International Fire Code 903.2.7 and 2006 International Building
Code 101.2. Response: The buildings will have a 13R Automatic Sprinkler System.
8. HAZARDOUS MATERIALS
Toxic, corrosive, or reactive materials, or flammable/combustible liquids (as defined in the
International Fire Code) if used, stored, or handled on site, must have a Hazardous
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 -- (970) 221-6750 - FAX (970) 224-6134
Materials Impact Analysis (HMIA) completed and supplied to the Planning Department and
the Fire Department. (What do you have? How much? How do you prevent it from being a
public threat?)
PLEASE NOTE: This applies to the swimming pool.
Response: The Project will have an onsite OSHA approved, locked metal storage cabinet
for the housing of pool chemicals. Please see attached letter concerning pool chemicals
submitted with the PDP.
FCLUC3.4.5
9. ADDRESS NUMERALS
Address numerals shall be visible from the street fronting the property, and posted with a
minimum six-inch high numerals on a contrasting background. (Bronze numerals on brown
brick are not acceptable). The address numerals shall be mounted on the side of the
building off of which the structure is addressed; if the address numerals are mounted on
other side(s) of the building, the name of the street off of which the building is addressed is
also required to be mounted along with the numerals.
Response: The Project will comply with all requirements for building and unit numbering.
2006 International Fire Code 505.1
10. TURNING RADII
Minimum turning radii for emergency apparatus is 25 feet inside, 50 feet outside.
Response: The Project complies – see Site Plan.
Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
1. With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article
3.2.1 (E)(2)(3), requires that you use native plants and grasses in your landscaping or
re-landscaping and reduce bluegrass lawns as much as possible. Reveille Bluegrass is
one option for having bluegrass lawns and using less water.
Response: The Project will comply with these requirements. Only trees are identified at the
PDP level. More detailed planting plans will be submitted at Final.
Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of
building permit. Please contact Matt Baker at 224-6108 if you have any questions.
Response: Acknowledged.
2. The City's Transportation Development Review Fee (TDRF) is due at the time of submittal.
For additional information on these fees, please see: Response: Acknowledged.
http://www.fcgov.com/engineering/dev-review.php
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 -- (970) 221-6750 - FAX (970) 224-6134
3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets,
sidewalks, curbs and gutters, destroyed, damaged or removed due to construction of this
project, shall be replaced or restored to City of Fort Collins standards at the Developer's
expense prior to the acceptance of completed improvements and/or prior to the issuance
of the first Certificate of Occupancy. Response: Acknowledged.
4. Please contact the City's Traffic Engineer, Joe Olson (224-6062) to schedule a scoping
meeting and determine if a traffic study is needed for this project. In addition, please
contact Transportation Planning for their requirements as well.
Response: The Project held the scoping meeting and the complete TIS is provided with
PDP submittal.
5. Any public improvements must be designed and built in accordance with the Larimer
County Urban Area Street Standards (LCUASS). They are available online at:
http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm
Response: The Project does not anticipate any public street improvements.
6. This project is responsible for dedicating any right-of-way and easements that are
necessary for this project. No right-of-way dedication is anticipated for the proposal,
however easement dedications for utilities, access, and emergency access is likely. These
can be done by replat or by separate document, though note that easement dedication by
separate document requires a TDRF of $250 per easement dedication.
Response: The Project will comply with all easement dedications and recording
requirements. Recorded easements will be shown on the final plat as required.
7. Any potential street cuts to Drake Road or Lemay Avenue for utility installation will require a
street cut permit with street cut penalty fees if the roadways are within 5 years from a
re-pavement. Response: Acknowledged.
8. Construction plans will be required showing grading, utilities and additional construction
design and details. Response: Preliminary Utility Plans have been provided with the PDP
submittal. Additional detail and construction plans will be provided during the Final Plan
phase.
9. A Development Agreement was previously done on the overall property in 1980. A new
development agreement specific to the proposed development and/or an amendment to
the previous development will be required and then recorded at Larimer County once the
project is finalized with fees for the recordation paid by the applicant.
Response: The Project will comply with this request.
10. A Development Construction Permit (DCP) will likely be needed prior to starting any work
on the site. Response: The Project will comply with this request.
Electric Engineering
Contact: Bruce Vogel, 970-224-6157, bvogel@fcgov.com
1. Power is available from existing electric line on the south side of Drake Road.
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 -- (970) 221-6750 - FAX (970) 224-6134
Response: Acknowledged.
2. Development charges for square footage and front footage was paid by the church at time
of construction. The new project will be responsible for primary service charges on site and
modification costs to get power to the site. Response: Acknowledged.
3. Due to the tightness of the site, a utility coordination meeting is recommended. A blanket
easement for the site would be helpful. Response: A Utility Coordination Meeting is currently
being scheduled through Development Review Engineering.
4. Gas and electric meter locations will need to be coordinated. Response: The Preliminary
Utility Plans depict conceptual locations of proposed transformers. It is anticipated that
electric meters will be located on the sides of the buildings closest to the transformers, and
that gas meters will be located on the opposite ends of the buildings. This will be further
discussed at the Utility Coordination Meeting.
5. Transformer locations will need to coordinated and cannot be placed more than 10' from a
paved surface. Response: See response to #4, above.
Current Planning
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
1. As an Addition of a Permitted Use, the request for multi-family at the proposed density
will be reviewed by Section 1.3.4(A) (1 - 5).
Response: See the Request for Addition of Permitted Use submitted with the PDP and the
Planning Objectives.
2. The P.D.P. will be reviewed by the compatibility standards in Section 3.5.1. Please
note that Section 3.5.1(H) addresses transitional issues between differing uses.
Response: See the Planning Objectives provided.
3. The location of Building Three and its proximity to the east property line may need to be
reconsidered or significant buffering would need to be installed. Perhaps it can be pulled
away from the property line and replaced with parking instead. Or, perhaps additional land
area west of the stormwater detention, in the existing church parking lot, could be utilized for
a building envelope. Or, consider lowering the height of Building Three to two stories.
Response: In response to concerns raised at neighborhood meetings, the Project omitted
the original Building Three and reduced the total number of residential buildings from nine to
eight. Additionally, the Project reduced the total number of residential units from 238 to 175.
Now, the Project’s eight buildings are no longer all three stories in height. Several buildings
are either two story or have a split roof height – a two story roof for 2/3rds of the building
rising to a center three story roof section. The change in building roof heights creates more
visual interest in the Project. This Project has 5 building types – a clubhouse building and
four residential buildings. Given the total Project has 9 buildings (clubhouse and 8 residential
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 -- (970) 221-6750 - FAX (970) 224-6134
buildings), the proportionately high number of building types provides for greater variation.
4. Section 3.5.2(C) requires buildings to have a relationship to the public street. Or,
buildings must be within 200 feet of a public sidewalk or 350 from a major walkway spine
(as specifically defined in Article Five). Please be aware that the Planning and Zoning
Board recommended to City Council that a "Street-Like Private Drive" may be used to
satisfy connectivity standards. A hand-out describing this change is provided.
Response: The Project will use the “Street-Like Private Drive”. Buildings 1 and 2 face E.
Drake Road. Buildings 3, 4, 6 and 8 are adjacent to the “Street-Like Private Drive” and
Buildings 5, 7 and 9 are connected by internal walkways.
5. If the existing north-south parking lot drive aisle is to be converted to a Street-Like
Private Drive, then it needs to feature a minimum six foot wide parkway, street trees and a
detached sidewalk at least 4.5 feet wide. Preferably, the parking along this drive would be
parallel or diagonal. The head-in parking as shown diminishes the effectiveness of the
Street Like Private Drive.
Response: The Project is providing the parkway, street trees and detached sidewalk. The
Project has omitted the head-in parking previously shown.
6. The Planning and Zoning also recommended approval to City Council several design
improvements for multi-family buildings in the M-M-N zone. Since you are seeking the
Addition of a Permitted Use, Staff recommends that you review these standards consider
their implementation. A hand-out will be provided. Generally, these standards call for three
distinctly different building designs, three color schemes, roof variety, architectural
articulation on all four sides, and a variety of exterior building materials.
Response: The Planning Objectives address these standards.
7. Since the proposed use is multi-family, please note that in the M-M-N zone, there is a
requirement that the common amenity area contain a minimum of 10,000 square feet.
Response: The project provides substantially more than 10,000 SF of useable open space.
See Planning Objectives letter.
8. Section 3.2.4 will require a Lighting Plan. Please note that there can be no more than
one-tenth (0.1) foot candle as measured 20 feet off the property line.
Response: The Project has provided a photometric study. Due to the neighboring single
family residences, the Project is taking care in the Lighting Plan to ensure it meets
requirements and is compatible with the neighboring single family residences.
9. Section 3.2.5 requires trash enclosures to be constructed of the predominant exterior
building and should not be located along the east or south property lines.
Response: The Project will comply with Section 3.2.5.
10. Since the original construction of the stormwater detention pond, there are new
standards for landscaping. Response: See responses to Stormwater comments #4 and #5,
above. The proposed pond is expected to be one of the first to pursue the multi-use
detention and sports field option since these new guidelines were adopted.
11. Section 3.5.2(F) contains architectural standards for the rear elevation of the detached
garages.
Response: The Project will comply with this request. Please refer to the Architectural
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 -- (970) 221-6750 - FAX (970) 224-6134
elevations.
12. Please note Section 3.2.2(K)(1)(h) allows for places of worship to share parking with
adjacent uses. For multi-family, the minimum parking requirements are in Section 3.2.2(K)
(1)(a).
Response: The Project exceeds the minimum parking requirements and is not relying on
shared parking with the Church.
13. The proposed addition of permitted use is subject to Section 1.3.4 Addition of Permitted
Uses, of the LUC. The proposed use is subject to a Type 2 (Planning and Zoning Board)
review and public hearing. The applicant for this development request will be required to
hold a neighborhood information meeting prior to formal submittal of the project. Type 2
development proposals are subject to the neighborhood meeting requirement, per Section
2.2.2 of the LUC. Please contact me at 221-6750, to assist you in setting a date, time, and
location for a meeting. A planner and possibly other City staff, would be present to facilitate
the meeting. Response: The City and Project completed the three neighborhood meetings.
They occurred on Tuesday August 23, 2011 and Wednesday August 31, 2011. A third follow
up meeting was held on Thursday February 9, 2012.
14. Please see the Development Review Guide at www.fcgov.com/drg. This online guide
features a color coded flowchart with comprehensive, easy to read information on each
step in the process. This guide includes links to just about every resource you need during
development review. Response: Acknowledged.
15. This development proposal will be subject to all applicable standards of the Fort Collins
Land Use Code (LUC), including Article 3 General Development Standards. The entire
LUC is available for your review on the web at
http://www.colocode.com/ftcollins/landuse/begin.htm.
Response: Acknowledged.
16. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a
Modification of Standard Request will need to be submitted with your formal development
proposal. Please see Section 2.8.2 of the LUC for more information on criteria to apply for
a Modification of Standard.
Response: The Project is not requesting any Modifications of Standards.
17. Please see the Submittal Requirements and Checklist at:
http://www.fcgov.com/developmentreview/applications.php. Response: Acknowledged.
18. The request will be subject to the Development Review Fee Schedule that is available in the
Community Development and Neighborhood Services office. The fees are due at the time
of submittal of the required documents for the appropriate development review process by
City staff and affected outside reviewing agencies. Also, the required Transportation
Development Review Fee must be paid at time of submittal. Response: Acknowledged.
19. When you are ready to submit your formal plans, please make an appointment with
Community Development and Neighborhood Services at (970)221-6750.
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522 - 0580 -- (970) 221-6750 - FAX (970) 224-6134
Response: Acknowledged.
Pre-Submittal Meetings for Building Permits
Pre-Submittal meetings are offered to assist the designer/builder by assuring, early on in the
design, that the new commercial or multi-family projects are on track to complying with all of the
adopted City codes and Standards listed below. The proposed project should be in the early to
mid-design stage for this meeting to be effective and is typically scheduled after the Current
Planning conceptual review meeting.
Applicants of new commercial or multi-family projects are advised to call 416-2341 to schedule
a pre-submittal meeting. Applicants should be prepared to present site plans, floor plans, and
elevations and be able to discuss code issues of occupancy, square footage and type of
construction being proposed.
Construction shall comply with the following adopted codes as amended:
2009 International Building Code (IBC)
2009 International Residential Code (IRC)
2009 International Energy Conservation Code (IECC)
2009 International Mechanical Code (IMC)
2009 International Fuel Gas Code (IFGC)
2009 International Plumbing Code (IPC) as amended by the State of Colorado
2008 National Electrical Code (NEC) as amended by the State of Colorado
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2003.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2009 IRC Chapter 11 or 2009 IECC Chapter 4
2. Multi-family and Condominiums 3 stories max: 2009 IECC Chapter 4.
3. Commercial and Multi-family 4 stories and taller: 2009 IECC Chapter 5.