HomeMy WebLinkAboutREGENCY LAKEVIEW - PDP & APU - PDP120013 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYDELICH Regency Lakeview TIS, April 2012 ASSOCIATES TABLE OF CONTENTS I. INTRODUCTION........................................................................................................ 1 II. EXISTING CONDITIONS .......................................................................................... 2 Land Use......................................................................................................................... 2 Streets............................................................................................................................. 2 Existing Traffic................................................................................................................. 6 Existing Operation........................................................................................................... 6 Geometric Evaluation.................................................................................................... 12 Pederstrian Facilities..................................................................................................... 12 Bicycle Facilities............................................................................................................ 12 Transit Facilities ............................................................................................................ 12 III. PROPOSED DEVELOPMENT............................................................................... 13 Trip Generation ............................................................................................................. 13 Trip Distribution ............................................................................................................. 13 Background Traffic Projections ..................................................................................... 16 Trip Assignment ............................................................................................................ 16 Signal Warrants............................................................................................................. 16 Operation Analysis ........................................................................................................ 16 Geometry ...................................................................................................................... 24 Pedestrian Level of Service........................................................................................... 24 Bicycle Level of Service ................................................................................................ 33 Transit Level of Service................................................................................................. 33 IV. CONCLUSIONS .................................................................................................... 34 LIST OF TABLES 1. Current Peak Hour Operation.................................................................................... 9 2. Observed and Calculated Delay.............................................................................. 11 3. Trip Generation ....................................................................................................... 13 4. Short Range (2017) Background Peak Hour Operation .......................................... 22 5. Long Range (2030) Background Peak Hour Operation........................................... 25 6. Short Range (2017) Total Peak Hour Operation ..................................................... 27 7. Long Range (2030) Total Peak Hour Operation...................................................... 29 DELICH Regency Lakeview TIS, April 2012 ASSOCIATES LIST OF FIGURES 1. Site Location ............................................................................................................. 3 2. Existing Geometry..................................................................................................... 4 3. Recent Peak Hour Traffic .......................................................................................... 7 4. Adjusted/Balanced Recent Peak Hour Traffic ........................................................... 8 5. Site Plan.................................................................................................................. 14 6. Trip Distribution ....................................................................................................... 15 7. Short Range (2017) Background Peak Hour Traffic................................................ 17 8. Long Range (2030) Background Peak Hour Traffic................................................. 18 9. Site Generated Peak Hour Traffic ........................................................................... 19 10. Short Range (2017) Total Peak Hour Traffic ........................................................... 20 11. Long Range (2030) Total Peak Hour Traffic............................................................ 21 12. Short Range (2017) Geometry ................................................................................ 31 13. Long Range (2030) Geometry................................................................................. 32 APPENDICES A. Base Assumptions Form B. Peak Hour Traffic Counts C. Current Peak Hour Operation/Level of Service Descriptions/Fort Collins Motor Vehicle LOS Standards (Intersections) D. Short Range (2017) Background Peak Hour Operation E. Long Range (2030) Background Peak Hour Operation F. Short Range (2017) Total Peak Hour Operation G. Long Range (2030) Total Peak Hour Operation H. Pedestrian/Bicycle Level of Service Worksheets DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 1 I. INTRODUCTION This transportation impact study (TIS) addresses the capacity, geometric, and control requirements at and near the proposed Regency Lakeview Development. The proposed Regency Lakeview Development is located in the southeast quadrant of the Lemay/Drake intersection, just east of the Christ Center Community Church in Fort Collins, Colorado. During the course of the analysis, numerous contacts were made with the owner (Regency Residential Partners), the project planning consultant (Ripley Design Inc.), the project engineer (Northern Engineering), and the City of Fort Collins Traffic Operations Engineer. The Transportation Impact Study Base Assumptions form and related documents are provided in Appendix A. This study generally conforms to the format set forth in the Fort Collins TIS Guidelines in the “Larimer County Urban Area Street Standards” (LCUASS). Due to the trip generation, this is a full transportation impact study. The study involved the following steps: - Collect physical, traffic, and development data; - Perform trip generation, trip distribution, and trip assignment; - Determine peak hour traffic volumes; - Conduct capacity and operational level of service analyses on key intersections; - Analyze signal warrants; - Conduct level of service evaluation of pedestrian, bicycle, and transit modes of transportation DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 2 II. EXISTING CONDITIONS The location of the Regency Lakeview Development is shown in Figure 1. It is important that a thorough understanding of the existing conditions be presented. Land Use Land uses in the area are primarily residential, commercial, and industrial. The proposed Regency Lakeview Development is on the existing Christ Center Community Church property. There are existing residential land uses to the northwest, east, south, and southwest. There are existing commercial uses (Scotch Pines) to the west, across Lemay Avenue. There is an existing industrial (Woodward Governor) use to the northwest. Streets The primary streets near the Regency Lakeview site are Lemay Avenue and Drake Road. Key intersections near the Regency Lakeview site are Lemay/Drake, Lemay/Scotch Pines-Church Access, Lemay/Strachan-Church Access, Drake/Church Access, Drake/Dorado, Drake/Brookwood (north leg), and Drake/Brookwood (south leg) intersections. A schematic of the existing geometry at the key intersections is shown in Figure 2. The following descriptions are based upon a site visit and review of the Fort Collins Master Street Plan. Lemay Avenue is to the west of the Regency Lakeview site. It is a north-south street classified as a four-lane arterial according to the Fort Collins Master Street Plan. Currently, Lemay Avenue has a four-lane cross section in this area. At the Lemay Drake intersection, Lemay Avenue has northbound and southbound left-turn lanes, two through lanes in each direction, and northbound and southbound right-turn channelization islands. There is no northbound right-turn lane, along Lemay Avenue, with channelization island in the southeast quadrant of the Lemay/Drake intersection. There is a short (~50 foot) southbound right-turn lane, along Lemay Avenue, associated with the channelization island in the northwest quadrant of the Lemay/Drake intersection. At the Lemay/Scotch Pines-Church Access intersection, Lemay Avenue has a two-way left-turn lane and two through lanes in each direction. At the Lemay/Strachan-Church Access intersection, Lemay Avenue has a two-way left-turn lane and two through lanes in each direction. At this intersection the east/west legs are slightly off-set, but not that there are left-turn conflicts. The Lemay/Drake intersection has signal control. The Lemay/Scotch Pines- Church Access and Lemay/Strachan-Church Access intersections have stop sign control on Scotch Pines-Church Access and Strachan-Church Access, respectively. The posted speed limit in this area of Lemay Avenue is 40 mph. SCALE: 1"=1000' SITE LOCATION Figure 1 DELICH ASSOCIATES Regency Lakeview TIS, April 2012 Page 3 Drake Road Lemay Avenue Strachan Drive Dorado Court Brookwood Drive Timberline Road Brookwood Drive Horsetooth Road Lemay Avenue Drake Road EXISTING GEOMETRY Figure 2 DELICH ASSOCIATES Regency Lakeview TIS, April 2012 Page 4 Lemay Avenue - Denotes Lane Church Access Brookwood Drive Brookwood Drive Dorado Court Scotch Pines- Church Access Strachan- Church Access DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 5 Drake Road is to the north of (adjacent to) the Regency Lakeview site. It is an east-west street classified as a four-lane arterial on the Fort Collins Master Street Plan. Currently, Drake Road has a four-lane cross section. At the Lemay/Drake intersection, Drake Road has eastbound and westbound left-turn lanes, two through lanes in each direction, and a westbound right-turn lane. At the Drake/Dorado, Drake/Brookwood (north leg), and Drake/Brookwood (south leg) intersections, Drake Road has a two-way left-turn lane and two through lanes in each direction. At the Drake/Church Access intersection, Drake Road has a two-way left-turn lane and two through lanes in each direction. At all of the above intersections, there is stop sign control on the minor legs. The posted speed limit in this area of Drake Road is 40 mph. The Scotch Pines and church access are driveway accesses onto Lemay Avenue into Scotch Pines shopping center and the north church access. These accesses are off- set by approximately 20 feet (on-centers). The Scotch Pines and church access are not striped. It was observed that the accesses operated as a left-turn/through lane and a right- turn lane. Strachan Drive is to the south of the Regency Lakeview site. It is an east-west street classified as a local street according to the Fort Collins Master Street Plan. Currently, Strachan Drive has a two-lane cross section in this area. There is a raised median in Strachan Drive. Strachan Drive only has a west leg at the Lemay/Strachan- Church Access intersection, the east leg is the church access and is off-set by approximately 60 feet (on-centers). At the Lemay/Strachan-Church Access intersection, Strachan Drive has an eastbound left-turn lane and an eastbound right-turn lane. The church access is not striped. It was observed that the church access operated as a combined left-turn/through/right-turn lane. The posted speed limit in this area of Strachan Drive is 25 mph. The Drake/Church Access intersection is to the west of the Regency Lakeview site. It is a driveway access onto Drake Road. The church access only has a south leg at the Drake/Church Access intersection. The church access is not striped. It was observed that the church access operated as a combined left-turn/right-turn lane at the Drake/Church Access intersection. Dorado Court is to the east of the Regency Lakeview site. It is a north-south cul- de-sac classified as a local street according to the Fort Collins Master Street Plan. Currently, Dorado Court has a two-lane cross section in this area. Dorado Court only has a south leg at the Drake/Dorado intersection. At the Drake/Dorado intersection, Dorado Court has a combined left-turn/right-turn lane. There is no posted speed on Dorado Court. Brookwood Drive is to the east of the Regency Lakeview site. It is a north-south street classified as a local street according to the Fort Collins Master Street Plan. Currently, Brookwood Drive has a two-lane cross section in this area. Brookwood Drive is off-set by approximately 160 feet (on-centers). Brookwood Drive is not striped. However it was observed, at the Drake/Brookwood (north leg) intersection, Brookwood Drive operates as a southbound left-turn lane and southbound right-turn lane. It was DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 6 observed, at the Drake/Brookwood (south leg) intersection, Brookwood Drive operates as a northbound left-turn lane and a northbound right-turn lane. The posted speed limit in this area of Brookwood Drive is 25 mph Existing Traffic Recent morning and afternoon peak hour traffic volumes are shown in Figure 3. The traffic counts at the Lemay/Drake, Lemay/Scotch Pines-Church Access, Lemay/Strachan-Church Access, Drake/Church Access, Drake/Dorado, Drake/Brookwood (north leg), and Drake/Brookwood (south leg) intersections were obtained in the week of March 5, 2012. This was considered to be a normal week from a traffic perspective. Raw traffic count data are provided in Appendix B. Since the counts were obtained on different days, the counts were adjusted/balanced between the key intersections. The adjusted/balanced recent peak hour traffic is shown in Figure 4. Existing Operation The Lemay/Drake, Lemay/Scotch Pines-Church Access, Lemay/Strachan-Church Access, Drake/Church Access, Drake/Dorado, Drake/Brookwood (north leg), and Drake/Brookwood (south leg) intersections were evaluated using techniques provided in the 2000 Highway Capacity Manual. Using the morning and afternoon peak hour traffic shown in Figure 4, the peak hour operation is shown in Table 1. Calculation forms are provided in Appendix C. The key intersections are currently operating acceptably with existing control and geometry in the morning and afternoon peak hours, except for the eastbound and westbound approaches at the Lemay/Drake intersection in the afternoon peak hour. An adjustment to the City’s current signal timing results in acceptable operation. This operation is shown in parentheses in Table 1. A description of level of service for unsignalized intersections from the 2000 Highway Capacity Manual and a table showing the Fort Collins Motor Vehicle LOS Standards (Intersections) are also provided in Appendix C. The Regency Lakeview site is in an area termed “low density mixed-use residential corridor.” In areas termed “low density mixed-use residential corridors,” acceptable overall operation at signalized intersections is defined as level of service D or better. At signalized intersections, acceptable operation of any leg and any movement is level of service D. At unsignalized intersections, acceptable operation is considered to be at level of service F for any leg for an arterial/local intersection. In “low density mixed-use residential corridors,” delays commensurate with level of service E and F are typical for minor street left-turn and through movements at stop sign controlled intersections along arterial streets during the peak hours. These delays are generally accepted by the traveling public. It was requested that a delay analysis of the Drake/Dorado, Drake/Brookwood (north leg), and Drake/Brookwood (south leg) be included in this study. During counting, the delay of the minor street approaches at the requested intersections was recorded. Table 2 shows of observed delay of Dorado Court, Brookwood Drive (north leg), and Brookwood Drive (south leg). In most cases, the observed delay tends to be shorter Drake Road RECENT PEAK HOUR TRAFFIC Figure 3 DELICH ASSOCIATES Regency Lakeview TIS, April 2012 Page 7 3/16 920/789 0/9 7/19 594/1191 3/1 15/8 0/0 15/15 0/1 0/0 0/6 40/75 851/677 2/0 40/122 558/1141 0/2 29/36 0/0 23/99 2/0 /0 1/0 106/103 633/594 83/99 111/189 425/1060 97/121 172/216 508/689 74/123 101/103 613/654 111/171 Lemay Avenue 708/815 16/31 813/940 6/29 20/21 37/14 44/36 31/17 17/33 816/928 13/47 693/829 675/839 7/24 811/927 4/26 0/10 Drake Road ADJUSTED/BALANCED RECENT PEAK HOUR TRAFFIC Figure 4 DELICH ASSOCIATES Regency Lakeview TIS, April 2012 Page 8 3/16 890/831 0/9 7/19 600/1236 3/1 15/8 0/0 15/15 0/1 0/0 0/6 40/75 821/719 2/0 40/122 564/1186 0/2 29/36 0/0 23/99 2/0 0/0 1/0 110/98 658/561 84/96 111/189 419/1020 98/118 172/216 512/672 73/119 102/104 618/662 112/171 Lemay Avenue 691/814 16/31 784/930 6/29 20/21 37/14 44/36 31/17 17/33 787/918 13/47 676/828 687/862 7/24 832/927 4/26 DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 9 TABLE 1 Current Peak Hour Operation Intersection Movement Level of Service AM PM EB LT D E [D] EB T/RT D F [D] EB APPROACH D F [D] WB LT C D [D] WB T D E [D] WB RT C D [D] WB APPROACH D E [D] NB LT B C [C] NB T/RT C C [C] NB APPROACH C C [C] SB LT B B [B] SB T/RT C C [D] SB APPROACH C C [C] Lemay/Drake (signal) [with timing change] OVERALL C D [D] EB LT C D EB T/RT A B EB APPROACH B B WB LT C A WB T/RT B A WB APPROACH C A NB LT A B Lemay/Scotch Pines-Church Access (stop sign) SB LT A A EB LT C C EB T/RT A A EB APPROACH B B WB LT/T/RT A C NB LT A B Lemay/Strachan-Church Access (stop sign) SB LT B A Continued on next page DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 10 Continued from previous page TABLE 1 Current Peak Hour Operation Intersection Movement Level of Service AM PM Drake/Church Access WB LT A B (stop sign) NB APPROACH B B Drake/Dorado WB LT A A (stop sign) NB APPROACH B B EB LT B B SB LT C C SB RT B B Drake/Brookwood (North Leg) (stop sign) SB APPROACH B B WB LT A B NB LT C C NB RT B B Drake/Brookwood (South Leg) (stop sign) NB APPROACH B C DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 11 TABLE 2 Observed and Calculated Delay Intersection Movement Observed (Calculated) Delay AM PM Drake/Dorado (stop sign) NB LT/RT 11 sec (14.5 sec) 17 sec (13.1 sec) SB LT 42 sec (18.1 sec) 30 sec (19.4 sec) SB RT 12 sec (12.4 sec) 10 sec (14.9 sec) Drake/Brookwood (north leg) (stop sign) SB APPROACH 24 sec (14.8 sec) 16 sec (14.9 sec) NB LT 12 sec (16.2 sec) 24 sec (18.3 sec) NB RT 10 sec (11.6 sec) 6 sec (11.9 sec) Drake/Brookwood (south leg) (stop sign) NB APPROACH 11 sec (13.2 sec) 18 sec (15.7 sec) DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 12 than the calculated delay. This is especially true for the minor street right turns, when they are separated from the left turns. For the minor street left turns, the observed delay was higher than the calculated delay in 3 of the 4 peak hours. At the Drake/Brookwood (north leg) intersection in the morning peak hour, the average observed delay was 42 seconds. For a five minute period (7:37-7:42), it was noted that the lead vehicle for the left turns delayed five other vehicles, due to a reluctance to execute a two-step left turn. This caused the observed delay to be much longer than normal. The longest delay of these five vehicles was 3 minutes and 12 seconds. The longest delay in the morning peak hour not including these five vehicles was 77 seconds. The average observed delay is 22 seconds in the morning peak hour if these five vehicles are excluding for the observed delay. Given the average observed delay on Dorado Court and the north/south legs of Brookwood drive, the average delay for minor street left turns is in the range of 15 to 30 seconds on this segment of Drake Road. This is the typical delay for minor street left turns along arterial streets in Fort Collins and other cities of comparable size. Geometric Evaluation The geometry (lanes) in this area of Fort Collins was built prior to the current LCUASS document being adopted. Therefore, the geometry is “grandfathered” as it currently exists. That fact notwithstanding, evaluation using the current standards was done to point out where deficiencies may exist with the current traffic. This type of evaluation appears to have also been done by the City, since a westbound right-turn lane has recently been installed at the Lemay/Drake intersection. In consideration of the current traffic (2012 counts) right-turn lanes are warranted at the other three approaches of the Lemay/Drake intersection. In addition, a southbound right-turn lane is warranted at the Lemay/Scotch Pines intersection. Pedestrian Facilities There are sidewalks along Lemay Avenue and Drake Road. There are pedestrian crosswalks and ramps at the Lemay/Drake intersection. This site is within 1320 feet of existing residential areas and commercial/retail uses. Bicycle Facilities There are bicycle lanes along Lemay Avenue and Drake Road. Local streets are not required to have designated bicycle lanes. Transit Facilities Currently, this area of Fort Collins is served by Transfort Route 5. There are bus stops at the Lemay/Drake intersection. DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 13 III. PROPOSED DEVELOPMENT Regency Lakeview is a proposed 175 dwelling unit apartment development, located in the southeast quadrant of the Lemay/Drake intersection in Fort Collins. Figure 5 shows a site plan of Regency Lakeview. The short range analysis (Year 2017) includes development of Regency Lakeview and an appropriate increase in background traffic due to normal growth and other potential developments in the area. The long range analysis year is considered to be 2030. The site plan shows that Regency Lakeview will have primary access to Drake Road via the Drake/Church Access intersection and Lemay Road via the Lemay/Scotch Pine-Church Access intersection. Regency Lakeview will have secondary access to Lemay Road via the Lemay/Strachan- Church Access intersection. Trip Generation Trip generation is important in considering the impact of a development such as this upon the existing and proposed street system. Trip generation for Apartment (Code 220) in Trip Generation, 8th Edition, ITE was used to estimate the trips that would be generated by the proposed Regency Lakeview Development. A trip is defined as a one-way vehicle movement from origin to destination. Table 3 shows the expected trip generation on a daily and peak hour basis. At full development the trip generation of Regency Lakeview resulted in 1184 daily trip ends, 89 morning peak hour trip ends, and 114 afternoon peak hour trip ends. TABLE 3 Trip Generation Code Use Size AWDTE AM Peak Hour PM Peak Hour Rate Trips Rate In Rate Out Rate In Rate Out 220 Apartments 175 D.U. EQ. 1184 EQ. 18 EQ. 71 EQ. 74 EQ. 40 Trip Distribution Trip distribution for Regency Lakeview was based on existing/future travel patterns, land uses in the area, consideration of trip attractions/productions in the area, and engineering judgment. Figure 6 shows the trip distribution for the short range (2017) and long range (2030) analysis futures. The trip distribution was agreed to by City of Fort Collins staff in the scoping meeting. Drake Road TRIP DISTRIBUTION Figure 6 DELICH ASSOCIATES Regency Lakeview TIS, April 2012 Page 15 Lemay Avenue Church Access Brookwood Drive Brookwood Drive Dorado Court Scotch Pines- Church Access Strachan- Church Access 30% 30% 20% 20% SITE DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 16 Background Traffic Projections Figures 7 and 8 show the respective short range (2017) and long range (2030) background traffic projections. Background traffic projections for the short range and long range future horizons were obtained by reviewing the North Front Range Regional Transportation Plan and traffic studies prepared for this area of Fort Collins. The other traffic studies in this area are Spring Creek Farms and Liberty Commons School. Trip Assignment Trip assignment is how the generated and distributed trips are expected to be loaded on the street system. The assigned trips are the resultant of the trip distribution process. Figure 9 shows the site generated peak hour traffic assignment of the Regency Lakeview site. Figures 10 and 11 show the respective short range (2017) and long range (2030) total (site plus background) peak hour traffic assignment. Signal Warrants As a matter of policy, traffic signals are not installed at any location unless warrants are met according to the Manual on Uniform Traffic Control Devices. The Lemay/Drake intersection is signalized. All the key stop sign control intersections do not meet the signal spacing criteria and will not be signalized. Operation Analysis Capacity analyses were performed at the Lemay/Drake, Lemay/Scotch Pines- Church Access, Lemay/Strachan-Church Access, Drake/Church Access, Drake/Dorado, Drake/Brookwood (north leg), and Drake/Brookwood (south leg) intersections. The operations analyses were conducted for the short range and long range futures, reflecting year 2017 and 2030 conditions, respectively. The long range future analysis is for informational purposes only. Using the traffic volumes shown in Figure 7, the Lemay/Drake, Lemay/Scotch Pines-Church Access, Lemay/Strachan-Church Access, Drake/Church Access, Drake/Dorado, Drake/Brookwood (north leg), and Drake/Brookwood (south leg) intersections operate in the short range (2017) background condition as indicated in Table 4. Calculation forms for these analyses are provided in Appendix D. All the key intersections will operate acceptably, with timing adjustments in the afternoon peak hour at the Lemay/Drake intersection. Using the traffic volumes shown in Figure 8, the Lemay/Drake, Lemay/Scotch Pines-Church Access, Lemay/Strachan-Church Access, Drake/Church Access, Drake/Dorado, Drake/Brookwood (north leg), and Drake/Brookwood (south leg) Drake Road SHORT RANGE (2017) BACKGROUND PEAK HOUR TRAFFIC Figure 7 DELICH ASSOCIATES Regency Lakeview TIS, April 2012 Page 17 3/16 957/893 0/9 7/19 651/1340 3/1 15/8 0/0 15/15 0/1 0/0 0/6 40/75 888/781 2/0 40/122 615/1290 0/2 29/36 0/0 23/99 2/0 0/0 1/0 119/106 709/604 91/107 120/204 451/1099 107/131 185/233 559/750 79/128 114/114 689/725 125/187 Lemay Avenue 751/916 16/31 880/1019 6/29 20/21 37/14 44/36 31/17 17/33 883/1007 13/47 739/930 750/964 7/24 928/1016 4/26 Drake Road LONG RANGE (2030) BACKGROUND PEAK HOUR TRAFFIC Figure 8 DELICH ASSOCIATES Regency Lakeview TIS, April 2012 Page 18 5/15 1105/1025 0/10 5/20 765/1565 5/5 15/10 0/0 15/15 0/5 0/0 0/5 40/75 1035/915 5/0 40/120 730/1515 0/5 30/35 0/0 25/100 5/0 0/0 5/0 140/125 825/700 105/125 140/235 525/1275 125/150 215/270 645/865 100/150 130/130 795/840 145/215 Lemay Avenue 875/1070 15/30 1025/1180 5/30 20/20 35/15 45/35 30/15 15/35 1030/1165 15/45 860/1085 870/1115 5/25 1070/1175 5/25 Drake Road SITE GENERATED PEAK HOUR TRAFFIC Figure 9 DELICH ASSOCIATES Regency Lakeview TIS, April 2012 Page 19 3/12 1/3 11/6 3/2 3/12 6/28 30/16 11/6 15/8 15/8 3/15 2/7 2/9 3/13 6/4 7/4 Lemay Avenue 14/8 4/15 4/15 14/8 4/16 4/15 13/8 14/8 14/8 4/15 Church Access Brookwood Drive Brookwood Drive Dorado Court Scotch Pines- Church Access Strachan- Church Access AM/PM Drake Road SHORT RANGE (2017) TOTAL PEAK HOUR TRAFFIC Figure 10 DELICH ASSOCIATES Regency Lakeview TIS, April 2012 Page 20 3/16 960/905 1/12 7/19 662/1346 3/1 15/8 0/0 15/15 0/1 0/0 3/8 40/75 888/781 5/12 40/122 615/1290 6/30 29/36 0/0 23/99 32/16 0/0 12/6 134/114 724/612 91/107 120/204 454/1114 109/138 185/233 561/759 82/141 120/118 696/729 125/187 Lemay Avenue 765/924 16/31 884/1034 6/29 20/21 37/14 44/36 31/17 17/33 887/1022 13/47 753/938 750/964 11/40 928/1016 8/41 Drake Road LONG RANGE (2030) TOTAL PEAK HOUR TRAFFIC Figure 11 DELICH ASSOCIATES Regency Lakeview TIS, April 2012 Page 21 5/15 1110/1035 5/15 5/20 775/1570 5/5 15/10 0/0 15/15 0/5 0/0 5/10 40/75 1035/915 10/10 40/120 735/1520 5/30 30/35 0/0 25/100 35/15 0/0 15/5 155/135 840/710 105/125 140/235 530/1290 125/155 215/270 650/875 105/165 135/135 805/845 145/215 Lemay Avenue 890/1080 15/30 1030/1195 5/30 20/20 35/15 45/35 30/15 15/35 1035/1180 15/45 875/1095 870/1115 10/40 1070/1175 10/40 DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 22 TABLE 4 Short Range (2017) Background Peak Hour Operation Intersection Movement Level of Service AM PM EB LT D E [D] EB T/RT D F [D] EB APPROACH D F [D] WB LT C E [D] WB T D F [D] WB RT C D [C] WB APPROACH D E [D] NB LT B C [D] NB T/RT C C [C] NB APPROACH C C [C] SB LT B B [B] SB T/RT C C [D] SB APPROACH C C [D] Lemay/Drake (signal) [with timing change] OVERALL C E [D] EB LT C D EB T/RT A B EB APPROACH B C WB LT C A WB T/RT B A WB APPROACH C A NB LT A B Lemay/Scotch Pines-Church Access (stop sign) SB LT A A EB LT C C EB T/RT A B EB APPROACH B B WB LT/T/RT A C NB LT A B Lemay/Strachan-Church Access (stop sign) SB LT B A Continued on next page DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 23 Continued from previous page TABLE 4 Short Range (2017) Background Peak Hour Operation Intersection Movement Level of Service AM PM Drake/Church Access WB LT A B (stop sign) NB APPROACH B C Drake/Dorado WB LT A B (stop sign) NB APPROACH C B EB LT B B SB LT C C SB RT B B Drake/Brookwood (North Leg) (stop sign) SB APPROACH C C WB LT A B NB LT C C NB RT B B Drake/Brookwood (South Leg) (stop sign) NB APPROACH B C DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 24 intersections operate in the long range (2030) background traffic future as indicated in Table 5. Calculation forms for these analyses are provided in Appendix E. All of the stop sign controlled intersections will operate acceptably. At the Lemay/Drake intersection, selected movements will operate at level of service E in the afternoon peak hour. This is expected to occur in the long range future. Using the traffic volumes shown in Figure 10, the Lemay/Drake, Lemay/Scotch Pines-Church Access, Lemay/Strachan-Church Access, Drake/Church Access, Drake/Dorado, Drake/Brookwood (north leg), and Drake/Brookwood (south leg) intersections operate in the short range (2017) total traffic future as indicated in Table 6. Calculation forms for these analyses are provided in Appendix F. All the key intersections will operate acceptably, with timing adjustments in the afternoon peak hour at the Lemay/Drake intersection. Using the traffic volumes shown in Figure 11, the Lemay/Drake, Lemay/Scotch Pines-Church Access, Lemay/Strachan-Church Access, Drake/Church Access, Drake/Dorado, Drake/Brookwood (north leg), and Drake/Brookwood (south leg) intersections operate in the long range (2030) total traffic future as indicated in Table 7. Calculation forms for these analyses are provided in Appendix G. All the key stop sign controlled intersections will operate acceptably. At the Lemay/Drake intersection, selected movements will operate at level of service E in the afternoon peak hour. This is expected to occur in the long range future. Geometry Figure 12 shows the short range (2017) geometry. This is the existing geometry. As stated earlier, the existing traffic volumes at the Lemay/Drake intersection indicate that the warrant for a right-turn lane is met for the all legs. Figure 13 shows the long range (2030) geometry. It is assumed that the Lemay/Drake intersection will have right-turn lanes on all legs. The decision to install the right-turn lanes will rest with the City. Pedestrian Level of Service Appendix H shows a map of the area that is within 1320 feet of the Regency Lakeview development. There are five pedestrian destinations within 1320 feet of the Regency Lakeview development. These are: 1) Woodward Governor to the northwest of the site, 2) the residential neighborhoods to the east of the site, 3) the residential neighborhoods to the south of the site, 4) the residential neighborhoods to the southwest of the site, and 5) the commercial (Scotch Pines) to the west of the site. This site is in an area type termed “Activity Center,” which sets the level of service threshold at LOS B for all measured categories. Acceptable pedestrian level of service cannot be achieved for the directness, continuity, and street crossing factors. This area of Fort Collins was built prior to the current LCUASS Document being adopted. All of the sidewalks in the area are adjacent to the streets. This is not likely to change, since this is a constrained corridor. The Pedestrian LOS Worksheet is provided in Appendix H. DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 25 TABLE 5 Long Range (2030) Background Peak Hour Operation Intersection Movement Level of Service AM PM EB LT D E EB T C D EB RT C C EB APPROACH D D WB LT C E WB T D E WB RT C C WB APPROACH D E NB LT B D NB T D C NB RT C C NB APPROACH C C SB LT C B SB T C D SB RT C C SB APPROACH C D Lemay/Drake (signal) OVERALL D D EB LT C E EB T/RT A B EB APPROACH C C WB LT D A WB T/RT B A WB APPROACH C A NB LT A C Lemay/Scotch Pines-Church Access (stop sign) SB LT A B EB LT C D EB T/RT A B EB APPROACH B C WB LT/T/RT A C NB LT A B Lemay/Strachan-Church Access (stop sign) SB LT B B Continued on next page DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 26 Continued from previous page TABLE 5 Long Range (2030) Background Peak Hour Operation Intersection Movement Level of Service AM PM Drake/Church Access WB LT B B (stop sign) NB APPROACH B C Drake/Dorado WB LT B B (stop sign) NB APPROACH C C EB LT B B SB LT C D SB RT B B Drake/Brookwood (North Leg) (stop sign) SB APPROACH C C WB LT B B NB LT C C NB RT B B Drake/Brookwood (South Leg) (stop sign) NB APPROACH C C DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 27 TABLE 6 Short Range (2017) Total Peak Hour Operation Intersection Movement Level of Service AM PM EB LT D E [D] EB T/RT D F [D] EB APPROACH D F [D] WB LT C E [D] WB T D F [D] WB RT C D [C] WB APPROACH D F [D] NB LT B D [D] NB T/RT C C [C] NB APPROACH C C [C] SB LT C B [B] SB T/RT C C [D] SB APPROACH C C [D] Lemay/Drake (signal) [with timing change] OVERALL C E [D] EB LT C D EB T/RT A B EB APPROACH B C WB LT C C WB T/RT B B WB APPROACH C B NB LT A B Lemay/Scotch Pines-Church Access (stop sign) SB LT B A EB LT C C EB T/RT A B EB APPROACH B B WB LT/T/RT C C NB LT A B Lemay/Strachan-Church Access (stop sign) SB LT B A Continued on next page DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 28 Continued from previous page TABLE 6 Short Range (2017) Total Peak Hour Operation Intersection Movement Level of Service AM PM Drake/Church Access WB LT A B (stop sign) NB APPROACH B C Drake/Dorado WB LT A B (stop sign) NB APPROACH C B EB LT B B SB LT C C SB RT B B Drake/Brookwood (North Leg) (stop sign) SB APPROACH C C WB LT A B NB LT C C NB RT B B Drake/Brookwood (South Leg) (stop sign) NB APPROACH B C DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 29 TABLE 7 Long Range (2030) Total Peak Hour Operation Intersection Movement Level of Service AM PM EB LT D E EB T C D EB RT C C EB APPROACH D D WB LT C E WB T D E WB RT C C WB APPROACH D E NB LT C E NB T D C NB RT C C NB APPROACH C D SB LT D C SB T C D SB RT C C SB APPROACH C D Lemay/Drake (signal) OVERALL D D EB LT C E EB T/RT A B EB APPROACH C C WB LT D D WB T/RT B B WB APPROACH C C NB LT A C Lemay/Scotch Pines-Church Access (stop sign) SB LT B B EB LT C D EB T/RT A B EB APPROACH B C WB LT/T/RT D C NB LT A B Lemay/Strachan-Church Access (stop sign) SB LT B B Continued on next page DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 30 Continued from previous page TABLE 7 Long Range (2030) Total Peak Hour Operation Intersection Movement Level of Service AM PM Drake/Church Access WB LT B B (stop sign) NB APPROACH C C Drake/Dorado WB LT B B (stop sign) NB APPROACH C C EB LT B B SB LT C D SB RT B B Drake/Brookwood (North Leg) (stop sign) SB APPROACH C C WB LT B B NB LT C C NB RT B B Drake/Brookwood (South Leg) (stop sign) NB APPROACH C C Drake Road SHORT RANGE (2017) GEOMETRY Figure 12 DELICH ASSOCIATES Regency Lakeview TIS, April 2012 Page 31 Lemay Avenue - Denotes Lane Church Access Brookwood Drive Brookwood Drive Dorado Court Scotch Pines- Church Access Strachan- Church Access Drake Road LONG RANGE (2030) GEOMETRY Figure 13 DELICH ASSOCIATES Regency Lakeview TIS, April 2012 Page 32 Lemay Avenue - Denotes Lane Church Access Brookwood Drive Brookwood Drive Dorado Court Scotch Pines- Church Access Strachan- Church Access DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 33 Bicycle Level of Service Appendix H shows a map of the area that is within 1320 feet of the Regency Lakeview development. Based upon Fort Collins bicycle LOS criteria, the only bicycle destination is the Scotch Pines commercial areas to the west. This site connects directly to the bike lanes on Lemay Avenue and Drake Road, which achieves level of service A. Transit Level of Service This area of Fort Collins is served by Transfort Routes 5 which runs along Lemay Avenue. DELICH Regency Lakeview TIS, April 2012 ASSOCIATES Page 34 IV. CONCLUSIONS This study assessed the impacts of the Regency Lakeview on the street system in the vicinity of the proposed development in the short range (2017) and long range (2030) futures. As a result of this analysis, the following is concluded: - The development of the Regency Lakeview is feasible from a traffic engineering standpoint. At full development, the Regency Lakeview will generate approximately 1184 daily trip ends, 89 morning peak hour trip ends, and 114 afternoon peak hour trip ends. - Current operation at the Lemay/Drake, Lemay/Scotch Pines-Church Access, Lemay/Strachan-Church Access, Drake/Church Access, Drake/Dorado, Drake/Brookwood (north leg), and Drake/Brookwood (south leg) intersections is acceptable, except for the eastbound and westbound approaches at the Lemay/Drake intersection in the afternoon peak hour. An adjustment to the City’s current signal timing results in acceptable operation. - The Lemay/Drake intersection is currently signalized. Signals will not be installed at any of the key stop sign controlled intersections. - In the short range (2017) future, given development of the Regency Lakeview and an increase in background traffic, the Lemay/Drake, Lemay/Scotch Pines-Church Access, Lemay/Strachan-Church Access, Drake/Church Access, Drake/Dorado, Drake/Brookwood (north leg), and Drake/Brookwood (south leg) intersections will operate acceptably with existing control and geometry. - In the long range (2030) future, given development of the Regency Lakeview and an increase in background traffic, the key stop sign controlled intersections will operate acceptably. Selected movements at the Lemay/Drake intersection will operate at level of service E. This is expected in the long range future. - The short range (2017) and long range (2030) geometry are shown in Figures 12 and 13 respectively. - Acceptable level of service is achieved for bicycle and transit modes based upon the measures in the multi-modal transportation guidelines. For pedestrians, the directness, continuity, and street crossing factors could not achieve the desired level of service for an “activity center.” This area of Fort Collins was built prior to the current LCUASS Document being adopted. Sidewalks in the area are adjacent to the street. This is not likely to change, since this is a constrained corridor. 15/20 20/25 885/1135 5/5 1075/1210 5/5 5/5 5/5 Church Access Brookwood Drive Brookwood Drive Dorado Court Scotch Pines- Church Access Strachan- Church Access AM/PM Rounded to Nearest 5 Vehicles 13/18 17/22 764/982 3/4 930/1056 1/2 6/1 2/3 Church Access Brookwood Drive Brookwood Drive Dorado Court Scotch Pines- Church Access Strachan- Church Access AM/PM 0/10 5/15 870/1125 5/5 1070/1195 5/5 5/5 5/5 Church Access Brookwood Drive Brookwood Drive Dorado Court Scotch Pines- Church Access Strachan- Church Access AM/PM Rounded to Nearest 5 Vehicles 0/10 3/14 750/974 3/4 926/1041 1/2 6/1 2/3 Church Access Brookwood Drive Brookwood Drive Dorado Court Scotch Pines- Church Access Strachan- Church Access AM/PM 0/10 3/14 687/872 3/4 830/952 1/2 6/1 2/3 Church Access Brookwood Drive Brookwood Drive Dorado Court Scotch Pines- Church Access Strachan- Church Access AM/PM 3/14 675/849 3/4 809/952 1/2 6/1 2/3 Church Access Brookwood Drive Brookwood Drive Dorado Court Scotch Pines- Church Access Strachan- Church Access AM/PM