Engines and Energy Conversion Lab – Expansion to Old Power Plant, 430 N. College Avenue
July 18, 2012
Project Overview
Since its founding in 1992, the Engines and Energy Conversion Laboratory (EECL) has had a history of
innovation and entrepreneurship. The lab was established through a partnership with the City of Fort
Collins which provided Colorado State University access to the then vacant Fort Collins Power Plant at
403 North College Avenue. Originally constructed in 1936, the historic 24,000 s.f. building has allowed
the EECL to build unique facilities capable of conducting experimental research on engines ranging in
size from 1 to 2500 horsepower.
The EECL’s world-class laboratories have led to their expanded research and product development with
industrial partners around the globe. As a result, the City of Fort Collins, CSURF, and the EECL have
partnered together to develop expansion plans for the EECL resulting in a new, high-quality facility and a
successful adaptive reuse of the historic Power Plant building.
The Power Plant building and site have numerous characteristics that make it difficult for more ‘typical’
uses, and make successful redevelopment complicated. The site is adjacent to the Cache la Poudre River,
US Hwy 287 and an active BNSF railroad line, has housed many types of industrial uses over several
decades, contains multiple landmark designations, and is a highly visible part of downtown Fort Collins.
But the EECL, the City of Fort Collins and the design team has spent many months of coordination to
develop successful expansion plans for this significant site, building, and user.
(i) Statement of appropriate City Plan Principles and Policies achieved by the proposed plan.
Adherence to City Plan
A fundamental component of City Plan is the Triple Bottom Line Analysis. The Block One Mixed Use
redevelopment exemplifies this key principal as it “incorporates environmental, economic, and human
considerations so that principles, policies, strategies, and implementing actions were developed with
consideration of the benefits and tradeoffs across all three of these topic areas.” (City Plan page 15)
Economic - The EECL plays a key role in provide research and testing for established and emerging
industry partners. They co-locate with emerging businesses such as Envirofit, VanDyne Superturbo, and
Solix Biofuels.
Environmental - As an energy innovator, they plan to create a highly sustainable new facility and site
with ‘beyond LEED Platinum’ as a goal. They have partnered with the City and its Design Assistance
Program to help achieve this and to identify and integrate the best and most efficient practices.
Human – The EECL will add to the vibrancy of the downtown fabric as a key employer bringing research
students, faculty, industry, and hundreds of visitors each year to the world-class facility.
Many principles and policies outlined in City Plan are achieved with this project. The most significant are
listed here:
Economic Health Principles and Policies
Policy EH 1.4 – Target the Use of Incentives to Achieve Community Goals
Policy EH 3.1 – Support Programs Emphasizing Local Business
Policy EH 3.3 – Support Local and Creative Entrepreneurship
Policy EH 4.1 – Prioritize Targeted Redevelopment Areas
Policy EH 4.2 – Reduce Barriers to Infill Development and Redevelopment
Environmental Health
Policy ENV 1.1 – Protect and Enhance Natural Features
Policy ENV 1.2 – Regulate Development along Waterways
Policy ENV 2.6 – Manage Conflicts
Policy ENV 2.9 – Provide Access
Policy ENV 4.1 – Improve Connectivity
Policy ENV 4.6 – Utilize Corridors
Stormwater and Flood Management
Policy ENV 18.2 – Manage Risks
Policy ENV 18.6 – Modify Detention Requirements for Redevelopment
Policy ENV 19.2 – Pursue Low Impact Development
Policy ENV 20.3 – Utilize Public Lands
Policy ENV 20.4 – Develop Public/Private Partnerships
Poudre River Corridor
Policy ENV 24.3 – Provide Natural Area Protection Buffers
Policy ENV 24.4 – Restore and Enhance
Community and Neighborhood Livability
Policy LIV 5.1 – Encourage Targeted Redevelopment and Infill
Policy LIV 5.4 – Contribute to Public Amenities
Housing
Policy LIV 7.1 – Encourage Variety in Housing Types and Locations
Streetscapes
Policy LIV 11.2 – Incorporate Public Spaces
Policy LIV 13.3 – Establish Gateway Design
Landscape Design
Policy LIV 14.1 – Encourage Unique Landscape Features
Policy LIV 14.2 – Promote Functional Landscape
Policy LIV 14.3 – Design Low Maintenance Landscapes
Commercial Development
Policy LIV 15.1 – Modify Standardized Commercial Architecture
Districts
Policy LIV 30.4 – Reduce Visual Impacts of Parking
Policy LIV 30.6 – Reduce Land Devoted to Surface Parking Lots
Policy LIV 31.2 – Site Layout and Building Orientation
Policy LIV 31.4 – Design for Pedestrian Activity
Policy LIV 31.5 – Incorporate Public Spaces and Community Facilities
Policy LIV 31.6 – Relationship to Surrounding Neighborhoods
Policy LIV 32.5 – Maintain Visual Character
Policy LIV 32.6 – Encourage Human-Scale Architectural Elements
Policy LIV 32.7 – Allow Various Building Heights
Policy LIV 32.8 – Design for Safety
Policy LIV 32.9 – Design to Enhance Activity
Open Lands, Parks and Water Corridors
Policy LIV 44.4 – Utilize Buffers
Policy LIV 45.3 – River Segments Historic and Cultural Core Segment (College Avenue to Lemay
Avenue).
(ii) Description of proposed open space, wetlands, natural habitats and features, landscaping,
circulation, transition areas, and associated buffering on site and in the general vicinity of the project.
The site is a previously developed industrial site adjacent to the Cache la Poudre River. An Ecological
Characterization Study and bank delineation was prepared for the site. The site and landscape plan
details have been based on the results and recommendations of these studies as well as discussions
with and recommendations by:
• Natural Resources and Maintenance staff
• Historic Preservation staff
• Current Planning staff
• Operation Services
The building expansion will occur in a triangle-shaped area south of the existing building to prevent
further encroachment in the 200’ river setback and allow visibility to the historic building from College
Avenue. The existing historic grotto and front lawn for the historic building will be retained. Site access
will be from the existing access on College Avenue, and will follow along the south edge of the building
to provide access to the new addition’s vehicle bays and service access to the existing building and new
addition. The large parking lot and paved storage areas east of the building will be removed and
restored with native landscape materials to establish and area of ‘riparian forest’ adjacent to the river. A
small parking lot is planned near College Avenue at the main building entrance and will accommodate
limited visitor parking only. Additional parking will be provided adjacent to the vehicle bay access drive
on the BNSF RR property if approved.
(iii) Statement of proposed ownership and maintenance of public and private open space areas;
applicant's intentions with regard to future ownership of all or portions of the project development plan.
The developed property including the landscaping within the 200’ setback area will be maintained by
the EECL as a condition of their lease.
(iv) Estimate of number of employees for business, commercial, and industrial uses.
EECL anticipates up to 250 employees (students, faculty and staff) utilizing the expanded facility.
(v) Description of rationale behind the assumptions and choices made by the applicant.
The proposed expansion is an extraordinary example of innovation, entrepreneurship, and successful
public/private partnership in Northern Colorado. This expansion allows the city to:
- support a globally significant employer bringing visibility to downtown Fort Collins,
- promote a high-performance, high-quality and sustainably-designed facility
- save and protect a significant historic resource for the future with successful adaptive reuse and
preservation
- enhance and restore previously disturbed habitat along the Cache la Poudre River
The design and engineering of the project has been based on a long process of collaboration with city
staff to help the City and the EECL to achieve the goals and principles of City Plan and the Land Use
Code.
(vi) The applicant shall submit as evidence of successful completion of the applicable criteria, the
completed documents pursuant to these regulations for each proposed use. The Planning
Director may require, or the applicant may choose to submit, evidence that is beyond what is required in
that section. Any variance from the criteria shall be described.
The submittal includes all items required for Basic Development Review as well as other items requested
by staff.
(vii) Narrative description of how conflicts between land uses or disturbances to wetlands, natural
habitats and features and or wildlife are being avoided to the maximum extent feasible or are
mitigated.
The Old Power Plant site currently consists of the historic building, fenced utility yard, and a large paved
area used for parking and storage. The site lacks much landscaping with the exception of the front lawn
between the existing building and College Avenue, and trees along the south end of the building.
The existing building, utility yard and parking areas are within the 200’ river setback area. While the
existing historic building will remain, the utility yard will be reduced in size and the parking area will be
removed providing the opportunity to create a significant area of restored riparian forest within the
site’s 200’ setback area. Access through the setback area is limited to service access to the existing
building.
(viii) Written narrative addressing each concern/issue raised at the neighborhood meeting(s), if a
meeting has been held.
As a Basic Development Review, no neighborhood meeting is required. And based on the site’s
configuration there are no immediately adjacent property owners. However, the EECL and design team
have held meetings and discussions with several key stakeholders including:
• BNSF RR representatives
• Natural Resources staff
• Historic Preservation staff
• Landmark Preservation Commission (3 meetings including a formal approval of plans)
• Design Assistance Program
• Utilities
• Current and Advance Planning
• City Forester
• Parks Planning
• Operations Services
• Stormwater and Floodplain Administration
(ix) Name of the project as well as any previous name the project may have had during Conceptual
Review.
none