HomeMy WebLinkAboutREMINGTON ANNEX - PDP - PDP110017 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANS (3)PREPARED FOR: DATE SUBMITTED:
The engineer preparing these plans will not be responsible for, or
liable for, unauthorized changes to or uses of these plans. All
changes to the plans must be in writing and must be approved by
the preparer of these plans.
CAUTION
MAXIIIMO DEVELOPMENT GROUP LLC 12/7/2011
REMINGTON ANNEX
7
B11010
PRELIMINARY
PLANS
NOT FOR CONSTRUCTION
Civil Engineering & Consulting
529 Crestmore Place
(970) 217-7420
Fort Collins, CO 80521
www.bluesky-engineer.com
BLUE SKY
E n g i n e e r i n g
1. ALL EXISTING UTILITY LOCATIONS SHALL BE FIELD VERIFIED
PRIOR TO CONSTRUCTION.
2. SEE CTL THOMPSON GEOTECHNICAL REPORT FOR
RECOMMENDATIONS ON PAVEMENT SECTIONS FOR PUBLIC ALLEY.
LEGEND
NOTES
ALLEY PAVING PLAN AND PROFILE
RD01
7
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
APPROVED:
EXISTING ITEMS
PROPOSED ITEMS
PROPOSED CONCRETE
PROPOSED GRADE
@ CENTERLINE
4996
4994
4990
4992
4988
4984
4986
11+00
4998
12+00 13+00 14+00 15+00
TYPICAL ALLEY SECTION
SCALE: 1"=10'
PLAN VIEW
PROFILE VIEW HORIZONTAL SCALE: 1"=20'
VERTICAL SCALE: 1"=2'
10+00
4996
4994
4990
4992
4988
4984
4986
4998
PROPOSED ELEVATION
@ CENTERLINE