HomeMy WebLinkAboutBUCKING HORSE FIRST FILING - FDP - FDP120008 - MAPS/GRAPHICS - ELEVATIONS (24)A7 A3
A1
A5
A2
A9
A9
A39
A2 A39
A39
A41 A42
A2 A1
A2
A1
A1
A5 A4 A1 A4 A1
A7
A2
A2 A9
A5
A2 A9 A8 A8 A2
A5 A7
A4
PROJECT
DATE
DRAWN
712 WHALERS WAY SUITE, B-100
FORT COLLINS, CO 80525
(970) 223-1820
www.aller-lingle-massey.com
PRINTED FILE NAME:
NOT FOR CONSTRUCTION
7/5/2012 11:57:46 AM
FORT COLLINS, COLORADO
C ALLER-LINGLE-MASSEY 2012
1140-JESSUP-SD.rvt
BARN ELEVATIONS
1140
MDN
07/05/12
FDP 5
BELLISIMO INCORPORATED
JESSUP FARM ARTISAN VILLAGE
BARN
NORTH EAST SOUTH WEST
1/8" = 1'-0"
1
BARN - EAST ELEVATION - EXISTING
1/8" = 1'-0"
2
BARN - EAST ELEVATION - PROPOSED
1/8" = 1'-0"
3
BARN - NORTH ELEVATION - EXISTING
1/8" = 1'-0"
4
BARN - SOUTH ELEVATION - EXISTING
1/8" = 1'-0"
5
BARN - WEST ELEVATION - EXISTING
KEY NOTES
NOTE DESCRIPTION
A1 (E) WD. FRAME WINDOW TO BE REHABILITATED OR REPLACED W/ IN-KIND MATERIALS TO MATCH (E), PAINT
A2 (E) DOOR AND HARDWARE TO BE REHABILITATED OR REPLACED W/ IN-KIND MATERIALS AND FIXED IN OPEN POSITION. OPENING TO BE INFILLED W/ ALUM. STOREFRONT SYSTEM
A3 (E) DOOR AND HARDWARE TO BE REHABILITATED OR REPLACED W/ IN-KIND MATERIALS AND FIXED IN OPEN POSITION. OPENING TO BE INFILLED W/ WD. FRAME DBL. GLAZED
DIVIDED LIGHT WINDOW
A4 (E) DROP SIDING AND WINDOW TRIM TO REMAIN, BROKEN/ MISSING PIECES TO BE REPLACED W/ IN-KIND MATERIAL, PAINT
A5 (E) METAL ROOF TO BE REMOVED, ORIGINAL SKIP SHEATHING TO REMAIN BROKEN/ MISSING PIECES TO BE REPLACED W/ IN-KIND MATERIAL. INSTALL NEW 1/2" PLYWOOD W/ 5"
RIGID INSULATION OVER ROOF PAPER W/ 3/4" EXTERIOR GRADE PLYWD. NAILER LAMINATED TO INSULATION AND ATTATCHED TO RAFTER. NEW CORRUGATED METAL ROOFING
PANELS OVER ICE AND WATER SHEILD
A7 (E) HOIST BEAM AND HARDWARE TO BE REHABILITATED, PAINT
A8 NEW ALUMINUM CLAD DIVIDED LIGHT WD. WINDOW W DBL. INSULATED GLAZING IN ORIGINAL OPENING
A9 (E) DOOR AND HARDWARE TO BE REHABILITATED OR REPLACED W/ IN-KIND MATERIALS, PAINT
A39 NEW ALUMINUM STOREFRONT SYSTEM IN NEW OPENING
A41 ELECTRIC METERS - PAINT TO MATCH SIDING
A42 GAS METERS - PAINT TO MATCH SIDING
1/8" = 1'-0"
6
BARN - NORTH ELEVATION - PROPOSED
1/8" = 1'-0"
7
BARN - SOUTH ELEVATION - PROPOSED
1/8" = 1'-0"
8
BARN - WEST ELEVATION - PROPOSED
9
VIEW - FROM SE
10
VIEW - FROM NW