HomeMy WebLinkAboutWEST RANGE FORT COLLINS - PDP - PDP120028 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPRELIMINARY DRAINAGE AND
EROSION CONTROL REPORT
WEST RANGE FORT COLLINS
Fort Collins, Colorado
October 24, 2012
Prepared for:
Epsilon Theta Corporation
200 South Avenue, Suite 10
Fort Collins, Colorado 80524
Prepared by:
200 South College Avenue, Suite 10
Fort Collins, Colorado 80524
Phone: 970.221.4158 Fax: 970.221.4159
www.northernengineering.com
Project Number: 875-001
3This Drainage Report is consciously provided as a PDF.
Please consider the environment before printing this document in its entirety.
When a hard copy is absolutely necessary, we recommend double-sided printing.
October 24, 2012
City of Fort Collins
Stormwater Utility
700 Wood Street
Fort Collins, Colorado 80521
RE: Preliminary Drainage and Erosion Control Report for
West Range Fort Collins
Dear Staff:
Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control
Report for your review. Comments from the Conceptual Review letter dated 10.17.11 have
been addressed. Written responses thereto can be found in the comprehensive response to
comments letter on file with Current Planning.
This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual
(FCSCM), and serves to document the stormwater impacts associated with the proposed
West RangeFort Collins student housing project. We understand that review by the City is
to assure general compliance with standardized criteria contained in the FCSCM.
If you should have any questions as you review this report, please feel free to contact us.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
Nicholas W. Haws, PE Herman H. Feissner, PE
Project Manager Project Engineer
West Range Fort Collins
Preliminary Drainage and Erosion Control Report
TABLE OF CONTENTS
I. GENERAL LOCATION AND DESCRIPTION ......................................................... 1
II. DRAINAGE BASINS AND SUB-BASINS ............................................................. 4
III. DRAINAGE DESIGN CRITERIA ......................................................................... 5
IV. DRAINAGE FACILITY DESIGN .......................................................................... 7
V. CONCLUSIONS............................................................................................... 9
References ............................................................................................................. 10
APPENDICES:
APPENDIX A – Hydrologic Computations
APPENDIX B – Hydraulic Computations
B.1 – Storm Sewers (reserved for future use)
B.2 – Street Flow (reserved for future use)
B.3 – Inlets (reserved for future use)
B.4 – Detention Facilities
APPENDIX C – Water Quality Design Computations (reserved for future use)
APPENDIX D – Operations and Maintenance Guidelines for Rain Gardens
(reserved for future use)
APPENDIX E – Erosion Control Report
LIST OF TABLES AND FIGURES:
MAP POCKET:
C4.00 – Drainage Exhibit
NOTE: TABLE OF CONTENTS WILL BE UPDATED/CORRECTED WITH SUBSEQUENT
REPORT ISSUANCES.
West Range Fort Collins
Preliminary Drainage and Erosion Control Report 1
I. GENERAL LOCATION AND DESCRIPTION
A. Location
1. Vicinity Map
Figure 1 – Vicinity Map
2. The West Range Fort Collins project site is located in the Northeast quarter of Section
11, Township 7 North, Range 69 West of the 6th Principal Meridian, City of Fort
Collins, County of Larimer, State of Colorado.
3. West Range Fort Collins is bordered to the north by an existing alleyway and existing
multi-family and single family developments; to the south by West Laurel Street and
Colorado State University; to the east by Meldrum Street (100' Right-of-Way); and to
the west by the Kappa Delta Sorority house.
4. There are no major drainageways within or adjacent to the site. The existing Arthurs
Ditch runs parallel to the east property line. As it approaches the north property line,
the enclosed concrete irrigation ditch alignment shifts to the northwest. The existing
irrigation ditch receives excess developed stormwater from two existing inlets near the
project site. The ditch's concrete top slab is at grade, visible and currently used for a
sidewalk along the west side of Meldrum Street.
West Range Fort Collins
Preliminary Drainage and Erosion Control Report 2
B. Description of Property
1. West Range Fort Collins is comprised of ±0.71 acre.
2. The recent existing condition (See Figure 2 - Aerial Photograph) included two (2)
fraternity houses which fronted to West Laurel Street, an associated detached garage
and a duplex which fronted to Meldrum Street. The asphalt parking lot was
constructed in the mid-1990s as a part of the Phase I condition described in the Final
Drainage and Erosion Control Report for the Pi Kappa Alpha Fraternity Expansion
(Shear Engineering or Phase I, Sheet No. 1 - Phase I Grading, Drainage and Erosion
Control Plan is provided for reference in the Map Pocket of the study). The ultimate
condition described in the drainage report was never constructed.
Figure 2 – Aerial Photograph
3. The subject property was fully developed until the late fall of 2011. At that time,
everything but the asphalt parking lot (northwest corner), concrete curb and gutter and
several mature trees were removed from the property.
The existing groundcover currently consists of weeds and bare soil. The existing on-site
excess runoff drains across flat grades (e.g., <2.00%) into West Laurel Street,
Meldrum Street and the alleyway.
4. A soils report (Soilogic Project # 08-1051) was completed by Soilogic, Inc on
September 29, 2008. The report contains the results of a complete geotechnical
subsurface exploration as well as pertinent geotechnical recommendations. According
to the summary of findings presented in the aforementioned report, the "subsurface
materials encountered in the completed site borings consisted of a thin layer of
asphaltic concrete and base course or topsoil and vegetation underlain by brown to
reddish brown lean clay with varying amounts of silt and sand. A majority of the site
West Range Fort Collins
Preliminary Drainage and Erosion Control Report 3
lean clay tested showed low volume change potential with variation in moisture
content at in situ moisture and density conditions. Lean clay with low to moderate
swell potential was encountered near surface boring location B-1 completed at the
south end of the development. Groundwater was not encountered in any of the
completed site borings at the time of drilling."
The boring logs show that USCS soil group CL is predominant on-site. These soils are
inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays and
lean clays.
5. There are no major drainageways within or adjacent to the project site.
6. The proposed West Range Fort Collins project site will include a single backwards L-
shaped building with a plan area of approximately 8000 ft2. The completed structure
will be two stories. Other proposed improvements include: a new asphalt parking area,
an enhanced entryway and landscaping. The north-to-south portion of the proposed
building will include an open first level (i.e., breezeway) beneath which approximately
one-half of the total on-site parking will be located..
7. The existing Arthurs Ditch runs parallel to the east property line. As it approaches the
northeast corner of the subject site, the concrete box alignment shifts toward the
northwest (See Figure 3 – Existing Drainage and Irrigation Infrastructure).
Figure 3 – Existing Drainage and Irrigation Infrastructure
8. The proposed land use is residential, multi-family dwellings. This is a permitted use in
the Neighborhood Community - Buffer District (NCB).
West Range Fort Collins
Preliminary Drainage and Erosion Control Report 4
C. Floodplain
1. The subject property is not located in a FEMA regulatory or City of Fort Collins
designated floodplain. In particular, the project site is not located within a FEMA
designated 100-year floodplain per Map Number 08069C0979H (Effective date: May
2, 2012).
Figure 4 – FEMA Firmette (Map Number 08069C0979H)
II. DRAINAGE BASINS AND SUB-BASINS
A. Major Basin Description
1. West Range Fort Collins is located within the City of Fort Collins Old Town major
drainage basin. This basin is located in north-central Fort Collins and has a drainage
area of approximately 2,120 acres, including approximately 400 acres of the Colorado
State University campus. The Old Town major drainage basin generally drains from
west to east. It receives some runoff from the Canal Importation Basin directly west of
Old Town. Most of the runoff from the Old Town major drainage basin drains into the
Poudre River.
Street flooding is a common occurrence in Old Town. Several capital projects such as
the Howes Street, Locust Street and Oak Street Outfall projects have addressed the
problem and improved drainage in the area.
West Range Fort Collins
Preliminary Drainage and Erosion Control Report 5
2. As previously mentioned, the Arthurs Ditch runs parallel to the east property line. This
irrigation conveyance was historically influenced by excess developed runoff from the
project site (Shear Engineering: sub-basins 1a and 1c). Excess developed runoff from
the subject site will continue to outfall into this irrigation conveyance as described
below.
B. Sub-Basin Description
1. Shear Engineering, in the Final Drainage and Erosion Control Report for the Pi Kappa
Alpha Fraternity Expansion, described and evaluated an existing condition, Phase I
condition and Ultimate condition. The existing condition was used to establish the
historic release rate. Phase I represented an interim developed condition in which the
existing gravel parking lot was paved and used for on-site detention storage. The pond
was designed to release at the historic 2-year rate (0.50 cfs). The pond was also
designed to over detain (i.e., the total site area was used to size the pond instead of
the total area tributary to the pond). The Ultimate condition was never constructed.
2. The subject site can be historically defined by three (3) sub-basins (i.e., Ia. Ib and Ic).
From the center of each of the three (3) previously existing structures, runoff drained
in three different directions. First, runoff from the east portion (sub-basin Ib) of the
project site drained into Meldrum Street and travelled north. Second, runoff from the
south portion (sub-basin 1c) of the subject site drained into West Laurel Street. From
there, runoff traveled east, via curb and gutter, and into an existing combination inlet.
Excess runoff from the central and northwest portion of the subject site (sub-basin Ia)
currently drains across the existing asphalt parking lot and into an existing outlet
structure. This structure outfalls to the storm drain system in the alleyway.The West
Range Fort Collins development aims to preserve these existing drainage patterns and
will utilize the historic outfall location.
3. Arthurs Ditch receives developed stormwater runoff from the subject site at two
locations. First, at an existing combination inlet located on the north side of West
Laurel Street (west of Meldrum Street). This inlet is connected to the ditch with a 10”
diameter metal pipe. In addition to local developed runoff from West Laurel Street, the
combination inlet received developed stormwater runoff from the Phase I developed
condition sub-basin Ic. Developed runoff, which is similar in peak rate, will drain to
this existing inlet from sub-basin C.
The attenuated flows from the proposed on-site detention pond will outfall at 0.50 cfs
(historic 2-year release rate) into the existing public storm sewer system in the
alleyway. This system ultimately connects to the Arthurs Ditch. A more detailed
description of the project’s drainage patterns follows in Section IV, below.
4. The project site does not receive any notable runoff from off-site properties.
III. DRAINAGE DESIGN CRITERIA
A. There are no optional provisions outside of the FCSCM proposed with West Range Fort
Collins.
West Range Fort Collins
Preliminary Drainage and Erosion Control Report 6
B. The overall stormwater management strategy employed with West Range Fort Collins
utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving
waters. The following is a description of how the proposed development has incorporated
each step.
Step 1 – Employ Runoff Reduction Practices. The first consideration taken in trying to
reduce the stormwater impacts of this development is the site selection itself. By choosing
an already developed site with public storm sewer currently in place, the burden is
significantly less than developing a vacant parcel absent of any infrastructure.
West Range Fort Collins aims to reduce runoff peaks, volumes and pollutant loads from
frequently occurring storm events (i.e., water quality (80th percentile) and 2-year storm
events) by implementing Low Impact Development (LID) strategies. Wherever practical,
runoff will be routed across landscaped areas or through a grass-lined swale and bio-
retention area. This LID practice reduces the overall amount of impervious area, while
Minimizing Directly Connected Impervious Areas (MDCIA) at the same time. The
combined LID/MDCIA techniques will be implemented, where practical, throughout the
development, thereby slowing runoff and increasing opportunities for infiltration.
Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with
Slow Release.The efforts taken in Step 1 will help to minimize excess runoff from
frequently occurring storm events; however, urban development of this intensity will still
have stormwater runoff leaving the site. The primary water quality will occur in a linear
bio-retention area along the northwest property line (sub-basin A). The bio-retention area
design will be more fully developed at Final Design.
Step 3 – Stabilize Drainageways. As stated in Section I.B.4, above, there are no major
drainageways in or near the subject site. While this step may not seem applicable to West
Range Fort Collins, the proposed project indirectly helps achieve stabilized drainageways
nonetheless. Once again, site selection has a positive effect on stream stabilization. By
repurposing an already developed, under-utilized site with existing stormwater
infrastructure, combined with LID and MDCIA strategies, the likelihood of bed and bank
erosion is greatly reduced. Furthermore, this project will pay one-time stormwater
development fees, as well as ongoing monthly stormwater utility fees, both of which help
achieve Citywide drainageway stability.
Step 4 – Implement Site Specific and Other Source Control BMPs. This step typically
applies to industrial and commercial developments.
C. Development Criteria Reference and Constraints
1. The subject property is not part of any Overall Development Plan drainage study or
similar “development/project” drainage master plan.
2. There are no known drainage studies for any adjacent properties that will have any
effect on West Range project. The Final Drainage and Erosion Control Report for the
Pi Kappa Alpha Fraternity Expansion (Shear Engineering, 1995) was referenced
during the preparation of this study. The contents of the report served as a the basis
for developing our existing drainage conditions, existing pervious/impervious areas/
historic release rate and the existing detention pond volume that was associated with
the historic development.
West Range Fort Collins
Preliminary Drainage and Erosion Control Report 7
3. The site plan will be constrained on two sides by public streets and by an alleyway on
the third. An existing and fully developed site constrains the site plan on the fourth. As
previously mentioned, the drainage outfall for Basin A is an existing manhole that ties
into an existing 12” RCP storm sewer in the alleyway. The proposed design matches
the existing historic release rate (i.e., 0.50 cfs).
D. Hydrological Criteria
1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in
Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations
associated with the West Range Fort Collins development. Tabulated data contained
in Table RA-7 has been utilized for Rational Method runoff calculations.
2. The Rational Method has been employed to compute stormwater runoff utilizing
coefficients contained in Tables RO-11 and RO-12 of the FCSCM.
3. The Rational Formula-based Federal Aviation Administration (FAA) procedure has
utilized for detention storage calculations.
4. Two separate design storms have been utilized to address distinct drainage scenarios.
The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year
recurrence interval. The second event considered is the “Major Storm,” which has a
100-year recurrence interval.
E. Hydraulic Criteria
1. The drainage facilities proposed with the West Range Fort Collins project are
designed in accordance with criteria outlined in the FCSCM and/or the Urban
Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria
Manual.
2. As stated in Section I.C.1, above, the subject property is not located in a
FEMA regulatory or a City of Fort Collins designated floodplain.
F. Floodplain Regulations Compliance
1. As previously mentioned, this project is not subject to any floodplain
regulations.
G. Modifications of Criteria
1. No modifications are requested at this time.
IV. DRAINAGE FACILITY DESIGN
A. General Concept
1. The main objective of the West Range Fort Collins drainage design is to maintain
existing drainage patterns, while not adversely impacting any adjacent properties.
2. No notable off-site runoff flows directly through the project site.
West Range Fort Collins
Preliminary Drainage and Erosion Control Report 8
3. A list of tables and figures used within this report can be found in the Table of
Contents at the front of the document. The tables and figures are located within the
sections to which the content best applies.
4. The project site has been divided into three (3) drainage sub-basins, designated as
sub-basins A, B, and C. The drainage patterns anticipated for each basin are further
described below.
Sub-Basin A
Basin A encompasses a little over of one-half of the total project site area. It is
comprised of roof area, concrete walks and asphalt parking. A large part of the parking
area in this basin will comprise the on-site detention pond (Pond 1). D.P. A is situated
at the proposed outfall. A short section of pipe will connect to an existing manhole in
the alleyway. This basin releases at a 2-year historic rate of 0.50 cfs.
Sub-Basin B
Basin B encompasses the eastern third of the project site. It is comprised of roof area,
a concrete patio and landscaping. The downspouts will direct developed runoff from
the roof into the landscaping. The excess developed runoff will primarily drain into
Meldrum Street as sheet flow (i.e., non-concentrated). The developed flows in this
basin are similar to the existing (i.e., Phase I) condition. During the 2-year and 100-
year storm events, the proposed condition increases runoff into Meldrum Street by
±0.11cfs and ±0.51cfs, respectively.
Sub-Basin C
Basin C is very similar in composition to Basin B. It is situated along the south portion
of the subject site. The excess developed runoff will primarily drain into West Laurel
Street as sheet flow. In West Laurel Street, the runoff drains into an existing
combination inlet which is connected to the Arthurs Ditch. During the 2-year and
100-year storm events, the proposed condition increases runoff into Meldrum Street
by ±0.08cfs and ±0.34cfs, respectively.
A full-size copy of the Drainage Exhibit (sheet C4.00) can be found in the Map Pocket
at the end of this report.
B. Specific Details
1. According to the Old Town Master Drainage Plan, Section R3, Redevelopment
Criteria and with respect to the required storage volume, the proposed
redevelopment can take credit for the existing on-site impervious area. The
required storage volume was estimated with the FAA method using the
procedure outlined below. We took credit for the existing Phase I (Shear
Engineering) impervious area, ±0.28 acre. The proposed development will
add ±0.24 acre of impervious area. This includes the entire site and not just
the increase in sub-basin A, which is tributary to the on-site detention pond.
An FAA method computation has been performed to determine the additional
storage volume required for the pervious area converted into impervious area,
by this development. The Phase I (computed by Shear Engineering - 1995)
volume requirement was 2756 ft3. The original storage volume calculation is
West Range Fort Collins
Preliminary Drainage and Erosion Control Report 9
based on the total site area (i.e., 0.71 acre) and the historic release rate (0.50
cfs). Therefore, the pond was originally designed to overdetain. To the Phase I
volume requirement, we added the volume required to detain the total
additional impervious area releasing at the historic rate of 0.50 cfs (i.e., 1053
ft3). Therefore, the total required storage volume is 3809 ft3 (0.0874 ac-ft).
2. During Final Design, water quality computations will be performed for the proposed
bio-retention area in sub-basin A by utilizing the UDFCD’s UD-BMP Version 3.01
“Rain Garden (RG)” Design Procedure Form.
3. The detention storage information for Pond 1 is contained in Appendix B.4.
The drainage features associated with West Range Fort Collins project are
private facilities and located on private property.
4. As previously mentioned, the outfall for the West Range Fort Collins project is the
public storm sewer in the neighboring alleyway. This storm sewer flows northwest to
an existing area inlet before heading north towards Myrtle Street. As shown above in
Figure 3, this storm drain outfalls into the Arthurs Ditch due south of Myrtle Street.
There are no additional facilities or upgrades needed off-site in order to accommodate
the developed runoff from West Range Fort Collins.
V. CONCLUSIONS
A. Compliance with Standards
1. The design elements comply without variation.
2. The drainage design proposed with West Range Fort Collins complies with the City of
Fort Collins Master Drainage Plan for the Old Town Basin.
3. There are no regulatory floodplains associated with the West Range Fort Collins
development.
4. The drainage plan and stormwater management measures proposed with the West
Range Fort Collins student housing project are compliant with all applicable State and
Federal regulations governing stormwater discharge.
B. Drainage Concept
1. The drainage design proposed with this project will effectively limit potential damage
associated with its stormwater runoff. West Range Fort Collins will detain for the
pervious area converted to impervious areas to release at the 2-year historic rate
during the 100-year storm.
2. The proposed West Range Fort Collins development will not impact the Master
Drainage Plan recommendations for the Old Town Basin.
West Range Fort Collins
Preliminary Drainage and Erosion Control Report 10
References
1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities,
November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services.
2. Final Drainage and Erosion Control Report for Pi Kappa Alpha Fraternity Expansion, October
1995, Shear Engineering Corporation (Project No. 1060-02-95).
3. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No.
174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code.
4. Geotechnical Exploration Report, Pike Redevelopment, 406 West Laurel Street, Fort Collins,
Colorado, September 29, 2008, Soilogic, Inc. (Soilogic # 08-1051).
5. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation
Service, United States Department of Agriculture.
6. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control
District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008.
APPENDIX A
HYDROLOGIC COMPUTATIONS
West Range Fort Collins
CHARACTER OF SURFACE1:
Runoff
Coefficient
Percentage
Impervious Project: West Range
Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: H. Feissner
Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 100% . Date:
Concrete …….......……………….….……….………………..….…………………………………………………….0.95 90% .
Gravel ……….…………………….….…………………………..……………………………………………………… 0.50 40%
Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90%
Pavers…………………………...………………..……………………………………………………………………… 0.40 22%
Lawns and Landscaping
Sandy Soil
Flat <2% ……………………………………………………………………………………………………………… 0.10 0%
Average 2% to 7% ………………………………………………………………………………………………….0.15 0% .
Steep >7% …………………………………………………………………………………………………………… 0.20 0%
Clayey Soil
Flat <2% ……………………………………………………………………………………………………………… 0.20 0%
Average 2% to 7% ………………………………………………………………………………………………….0.25 0% .
Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25
Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11
Basin ID
Basin Area
(ac)
Area of
Asphalt
(ac)
Area of
Concrete
(ac)
Area of
Gravel
(ac)
Area of
Roofs
(ac)
Soil Type and Average
Slope
Area of
Lawns and
Landscaping
(ac)
2-year
Composite
Runoff
Coefficient
10-year
Composite Runoff
Coefficient
100-year
Composite Runoff
Coefficient
Composite
% Imperv.
Ia 0.34 0.00 0.00 0.16 0.05 Clayey | Flat <2% 0.13 0.45 0.45 0.56 32%
Ib 0.24 0.00 0.02 0.00 0.05 Clayey | Flat <2% 0.17 0.42 0.42 0.52 26%
Ic 0.13 0.00 0.01 0.00 0.03 Clayey | Flat <2% 0.09 0.43 0.43 0.54 28%
Irowb 0.34 0.26 0.02 0.00 0.00 Clayey | Flat <2% 0.06 0.82 0.82 1.00 82%
Irowc 0.13 0.08 0.02 0.00 0.00 Clayey | Flat <2% 0.03 0.78 0.78 0.97 75%
West Range Fort Collins
Overland Flow, Time of Concentration:
Project: West Range
Calculations By:
Date:
Gutter/Swale Flow, Time of Concentration:
Tt = L / 60V
Tc = T
i + Tt
(Equation RO-2)
Velocity (Gutter Flow), V = 20·S
½
Velocity (Swale Flow), V = 15·S
½
NOTE: C-value for overland flows over grassy surfaces; C = 0.25
Is Length
>500' ?
C*Cf
(2-yr
Cf=1.00)
C*Cf
(10-yr
Cf=1.00)
C*Cf
(100-yr
Cf=1.25)
Length,
L
(ft)
Slope,
S
(%)
Ti
2-yr
(min)
Ti
10-yr
(min)
Ti
100-yr
(min)
Length,
L
(ft)
Slope,
S
(%)
Velocity,
V
(ft/s)
Tt
(min)
Length,
L
(ft)
Slope,
S
(%)
Velocity,
V
West Range Fort Collins
Rational Method Equation: Project: West Range
Calculations By:
Date:
Rainfall Intensity:
Ia Ia 0.34 5 5 5 0.45 0.45 0.56 3.29 5.64 9.30 0.51 0.87 1.78 To on-site detention pond
Ib Ib 0.24 5 5 5 0.42 0.42 0.52 3.29 5.64 9.30 0.33 0.57 1.17 To Meldrum Street
Ic Ic 0.13 5 5 5 0.43 0.43 0.54 3.29 5.64 9.30 0.18 0.32 0.65 To West Laurel Street
Irowb Irowb 0.34 5 5 5 0.82 0.82 1.00 3.29 5.64 9.30 0.91 1.57 3.16 Meldrum Street
Irowc Irowc 0.13 5 5 5 0.78 0.78 0.97 3.29 5.64 9.30 0.33 0.57 1.17 West Laurel Street
C100 Notes
Intensity,
i2
(in/hr)
Intensity,
i10
(in/hr)
Intensity,
i100
(in/hr)
EXISTING CONDITIONS RUNOFF COMPUTATIONS
H. Feissner
October 24, 2012
Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8
Design
Point
Basin(s)
Area, A
(acres)
2-yr
Tc
(min)
10-yr
Tc
(min)
100-yr
Tc
(min)
Flow,
Q2
(cfs)
Flow,
Q10
(cfs)
Flow,
Q100
(cfs)
C2 C10
Q C f C i A
10/24/201212:25 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Historic_Rational_Calcs\Runoff_Exist_OLD idf
West Range Fort Collins
CHARACTER OF SURFACE1:
Runoff
Coefficient
Percentage
Impervious Project: West Range
Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: H. Feissner
Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 100% . Date:
Concrete …….......……………….….……….………………..….…………………………………………………….0.95 90% .
Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 40% .
Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90%
Pavers…………………………...………………..……………………………………………………………………… 0.40 22%
Lawns and Landscaping
Sandy Soil
Flat <2% ……………………………………………………………………………………………………………… 0.10 0%
Average 2% to 7% ………………………………………………………………………………………………….0.15 0% .
Steep >7% …………………………………………………………………………………………………………… 0.20 0%
Clayey Soil
Flat <2% ……………………………………………………………………………………………………………… 0.20 0%
Average 2% to 7% ………………………………………………………………………………………………….0.25 0% .
Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25
Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11
Basin ID
Basin Area
(ac)
Area of
Asphalt
(ac)
Area of
Concrete
(ac)
Area of
Gravel
(ac)
Area of
Roofs
(ac)
Soil Type and Average
Slope
Area of
Lawns and
Landscaping
(ac)
2-year
Composite
Runoff
Coefficient
10-year
Composite Runoff
Coefficient
100-year
Composite Runoff
Coefficient
Composite
% Imperv.
Ia 0.340 0.16 0.00 0.00 0.050 Clayey | Flat <2% 0.13 0.66 0.66 0.83 60%
Ib 0.240 0.00 0.02 0.00 0.050 Clayey | Flat <2% 0.17 0.42 0.42 0.52 26%
Ic 0.130 0.00 0.01 0.00 0.030 Clayey | Flat <2% 0.09 0.43 0.43 0.54 28%
Irowb 0.340 0.26 0.02 0.00 0.000 Clayey | Flat <2% 0.06 0.82 0.82 1.00 82%
Irowc 0.130 0.08 0.02 0.00 0.000 Clayey | Flat <2% 0.03 0.78 0.78 0.97 75%
West Range Fort Collins
Overland Flow, Time of Concentration:
Project: West Range
Calculations By:
Date:
Gutter/Swale Flow, Time of Concentration:
Tt = L / 60V
Tc = Ti + Tt (Equation RO-2)
Velocity (Gutter Flow), V = 20·S½
Velocity (Swale Flow), V = 15·S½
NOTE: C-value for overland flows over grassy surfaces; C = 0.25
Is Length
>500' ?
C*Cf
(2-yr
Cf=1.00)
C*Cf
(10-yr
Cf=1.00)
C*Cf
(100-yr
Cf=1.25)
Length,
L
(ft)
Slope,
S
(%)
Ti
2-yr
(min)
Ti
10-yr
(min)
Ti
100-yr
(min)
Length,
L
(ft)
Slope,
S
(%)
Velocity,
V
(ft/s)
Tt
(min)
Length,
L
(ft)
Slope,
S
(%)
Velocity,
V
(ft/s)
Tt
(min)
2-yr
West Range Fort Collins
Rational Method Equation: Project: West Range
Calculations By:
Date:
Rainfall Intensity:
Ia Ia 0.34 5 5 5 0.66 0.66 0.83 3.29 5.64 9.30 0.74 1.27 2.62 Modified w/Phase I
Ib Ib 0.24 5 5 5 0.42 0.42 0.52 3.29 5.64 9.30 0.33 0.57 1.17 No change w/Phase I
Ic Ic 0.13 5 5 5 0.43 0.43 0.54 3.29 5.64 9.30 0.18 0.32 0.65 No change w/Phase I
Irowb Irowb 0.34 5 5 5 0.82 0.82 1.00 3.29 5.64 9.30 0.91 1.57 3.16 No change w/Phase I
Irowc Irowc 0.13 5 5 5 0.78 0.78 0.97 3.29 5.64 9.30 0.33 0.57 1.17 No change w/Phase I
* Pond Release Rates for each basin include the 100-year flow rate from the historic impervious area plus the 2-year release rate from the historic pervious area.
Notes
PHASE I RUNOFF COMPUTATIONS
C100
Design
Point
Flow,
Q100
(cfs)
Flow,
Q2
(cfs)
10-yr
Tc
(min)
2-yr
Tc
(min)
C2
Flow,
Q10
(cfs)
Intensity,
i100
(in/hr)
Basin(s)
H. Feissner
October 24, 2012
Intensity,
i10
(in/hr)
Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8
C10
Area, A
(acres)
Intensity,
i2
(in/hr)
100-yr
Tc
(min)
Q C f C i A
10/24/201212:25 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Historic_Rational_Calcs\Runoff_Phase I_OLD idf
West Range Fort Collins
CHARACTER OF SURFACE
1
:
Runoff
Coefficient
Percentage
Impervious Project: West Range
Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: H. Feissner
Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 100% . Date: October 24, 2012
Concrete …….......……………….….……….………………..….…………………………………………………….0.95 90% .
Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 40% .
Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90%
Pavers…………………………...………………..……………………………………………………………………… 0.40 22%
Lawns and Landscaping
Sandy Soil
Flat <2% ……………………………………………………………………………………………………………… 0.10 0%
Average 2% to 7% ………………………………………………………………………………………………….0.15 0% .
Steep >7% …………………………………………………………………………………………………………… 0.20 0%
Clayey Soil
Flat <2% ……………………………………………………………………………………………………………… 0.20 0%
Average 2% to 7% ………………………………………………………………………………………………….0.25 0% .
Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25
Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11
Basin ID
Basin Area
(ac)
Area of
Asphalt
(ac)
Area of
Concrete
(ac)
Area of
Gravel
(ac)
Area of
Roofs
(ac)
Soil Type and Average
Slope
Area of
Lawns and
Landscaping
(ac)
2-year
Composite
Runoff
Coefficient
10-year
Composite Runoff
Coefficient
100-year
Composite Runoff
Coefficient
Composite
% Imperv.
Basin A 0.39 0.21 0.00 0.00 0.13 Clayey | Average 2% to 7% 0.05 0.87 0.87 1.00 85%
Basin B 0.20 0.03 0.00 0.00 0.10 Clayey | Average 2% to 7% 0.07 0.69 0.69 0.87 58%
Basin C 0.12 0.02 0.00 0.00 0.05 Clayey | Average 2% to 7% 0.04 0.72 0.72 0.90 62%
West Range Fort Collins
Overland Flow, Time of Concentration:
Project: West Range
Calculations By:
Date:
Gutter/Swale Flow, Time of Concentration:
Tt
= L / 60V
Tc
= Ti
+ Tt
(Equation RO-2)
Velocity (Gutter Flow), V = 20·S
½
Velocity (Swale Flow), V = 15·S
½
NOTE: C-value for overland flows over grassy surfaces; C = 0.25
Is Length
>500' ?
C*Cf
(2-yr
Cf
=1.00)
C*Cf
(10-yr
Cf
=1.00)
C*Cf
(100-yr
Cf
=1.25)
Length,
L
(ft)
Slope,
S
(%)
Ti
2-yr
(min)
Ti
10-yr
(min)
Ti
100-yr
(min)
Length,
L
(ft)
Slope,
S
(%)
Velocity,
V
(ft/s)
Tt
(min)
Length,
L
(ft)
West Range Fort Collins
Rational Method Equation: Project: West Range
Calculations By:
Date:
Rainfall Intensity:
A Basin A 0.39 5 5 5 0.87 0.87 1.00 2.85 4.87 9.95 0.96 1.63 3.85
B Basin B 0.20 5 5 5 0.69 0.69 0.87 2.85 4.87 9.95 0.40 0.69 1.76
C Basin C 0.12 5 5 5 0.72 0.72 0.90 2.85 4.87 9.95 0.24 0.41 1.04
PROPOSED RUNOFF COMPUTATIONS
C100
Design
Point
Flow,
Q100
(cfs)
Flow,
Q2
(cfs)
10-yr
Tc
(min)
2-yr
Tc
(min)
C2
Flow,
Q10
(cfs)
Intensity,
i100
(in/hr)
Basin(s)
H. Feissner
Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8
October 24, 2012
Intensity,
i10
(in/hr)
C10
Area, A
(acres)
Intensity,
i2
(in/hr)
100-yr
Tc
(min)
Q C f C i A
10/24/201212:35 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Proposed_Rational_Calcs\Runoff
West Range Fort Collins
Surface Area % Impervious
Surface Area
(sq. ft.)
Impervious Area
(sq. ft.)
Surface Area
(sq. ft.)
Impervious Area
(sq. ft.)
Surface Area
(sq. ft.)
Impervious Area
(sq. ft.)
Asphalt 100% 6970 6970 0 0 0 0
Concrete 90% 0 0 871 784 436 392
Gravel 40% 0 0 0 0 0 0
Roofs 90% 2178 1960 2178 1960 0 0
Pavers 22% 0 0 0 0 1307 287
Lawns and Landscaping 0% 5663 0 7405 0 3920 0 (sq. ft.) (acre)
8930 2744 680 12354 0.28
Surface Area % Impervious
Surface Area
(sq. ft.)
Impervious Area
(sq. ft.)
Surface Area
(sq. ft.)
Impervious Area
(sq. ft.)
Surface Area
(sq. ft.)
Impervious Area
(sq. ft.)
Asphalt 100% 9819 9819 623 623 1032 1032
Concrete 90% 0 0 0 0 0 0
Gravel 40% 0 0 0 0 0 0
Roofs 90% 5687 5118 4361 3925 2354 2119
Pavers 22% 0 0 0 0 0 0
Lawns and Landscaping 0% 1976 0 3256 0 1690 0 (sq. ft.) (acre)
17482 14937 8239 4547 5076 3151 22635 0.52
6008 1803 2471 10282 0.24
Exhibit XX. Existing Pervious Area Converted to Impervious Area with Proposed West Range Development
Increase/Decrease w/Proposed
Condition:
Phase I (Existing Condition)
Proposed Conditions (i.e., West Range)
Totals
Totals
Basin A Basin B Basin C
Ia Ib Ic
10/24/201212:35 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Proposed_Rational_Calcs\Impervious Area Added
APPENDIX B
HYDRAULIC COMPUTATIONS
B.1 – Storm Sewers (reserved for future use)
B.2 – Street Flow (reserved for future use)
B.3 – Inlets (reserved for future use)
B.4 – Detention Facilities
APPENDIX B.1
STORM SEWERS (reserved for future use)
APPENDIX B.2
STREET FLOW (reserved for future use)
APPENDIX B.3
INLETS (reserved for future use)
APPENDIX B.4
DETENTION FACILITIES
West Range Fort Collins
DETENTION POND CALCULATION | FAA METHOD w/Fort Collins IDF
Project Number: 875-001
HHF Date: 10/24/2012
Project Number: 875-001
Project Location: Fort Collins, Colorado
Calculations By: HHF Date: 10/24/2012
Pond No.: Pond 1
Calculations By:
A
Input Variables Results
Design Point A
100-yr
Design Point
Design Storm Required Detention Volume
1.00 Phase I 2756 ft2
Area (A)= 0.24 acres +New Imp. Area 1053 ft3
Developed "C" =
Area (A)= 0.24 acres +New Imp. Area 1053 ft
Max Release Rate = 0.50 cfs Total Volume 3809 ft4
0.0874 ac-ft
Time Time
Ft.Collins
100-yr Q100
Inflow
(Runoff)
Outflow
(Release) Volume
Storage
Time Time 100-yr Detention
Intensity
Q100
(Runoff)
Volume
(Release) Volume
Detention
Volume
(ft
3
) (ft
3
) (ft
3
(mins) (secs) (in/hr) (cfs) (ft )
3
) (ft
3
) (ft
3
)
5 300 9.95 2.39 716 150 566
10 600 7.72 1.85 1112 300 812
15 900 6.52 1.56 1408 450 958
20 1200 5.60 1.34 1613 600 1013
25 1500 4.98 1.20 1793 750 1043
30 1800 4.52 1.08 1953 900 1053
35 2100 4.08 0.98 2056 1050 1006
40 2400 3.74 0.90 2154 1200 954
45 2700 3.46 0.83 2242 1350 892
50 3000 3.23 0.78 2326 1500 826
West Range Fort Collins
Stage - Storage Calculation
Project Number: 875-001
HHF Date: 10/24/2012
Project Number: 875-001
Project Location: Fort Collins, Colorado
Calculations By: HHF Date: 10/24/2012
Pond No.: Pond 1
Calculations By:
A
Required Volume Water Surface Elevation (WSE)
Design Point A
10-yr At Final ft.
1.00 ft
3
Design Point
Design Storm
Require Volume= 1.00 ft
3
Design Storm 100-yr
Required Volume= 3809 ft
3
5001.52 ft.
Require Volume=
Required Volume= 3809 ft
3
5001.52 ft.
Contour
Elevation
Contour
Area
Depth
Incremental Area
Avg. End
Cumulative Volume
Avg. End
Incremental Volume
Conic
Cummulative
Elevation Area Avg. End Avg. End Conic Volume Conic
ft
3
ft. ft
3
ft
3
ft
3
ft
3
ft ft. ft ft ft ft
4999.60 53 0.00 0 0 0 0
4999.80 127 0.20 18 18 17 17
5000.00 201 0.20 33 51 33 50
5000.20 253 0.20 45 96 45 95
5000.40 316 0.20 57 153 57 152
5000.60 817 0.20 113 266 109 261
5000.80 1776 0.20 259 526 253 515
5001.00 3180 0.20 496 1021 489 1003
5001.20 4807 0.20 799 1820 793 1796
APPENDIX C
WATER QUALITY DESIGN COMPUTATIONS (reserved for future use)
APPENDIX D
OPERATIONS AND MAINTENANCE GUIDELINES FOR RAIN GARDENS(reserved for future use)
APPENDIX E
EROSION CONTROL REPORT
West Range Fort Collins
Preliminary Erosion Control Report
EROSION CONTROL REPORT
A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included
with the final construction drawings. It should be noted, however, that any such Erosion and
Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of
the Best Management Practices (BMPs) depicted, and additional or different BMPs from those
included may be necessary during construction, or as required by the authorities having jurisdiction.
It shall be the responsibility of the Contractor to ensure erosion control measures are properly
maintained and followed. The Erosion and Sediment Control Plan is intended to be a living
document, constantly adapting to site conditions and needs. The Contractor shall update the
location of BMPs as they are installed, removed or modified in conjunction with construction
activities. It is imperative to appropriately reflect the current site conditions at all times.
The Erosion and Sediment Control Plan shall address both temporary measures to be implemented
during construction, as well as permanent erosion control protection. Best Management Practices
from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are
not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways
and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill
containment and clean-up procedures, designated concrete washout areas, dumpsters and job site
restrooms shall also be provided by the Contractor.
Grading and Erosion Control Notes can be found on Sheet C.?? of the Utility Plans. The Final Plans
will contain a full-size Erosion Controlsheet as well as a separate sheet dedicated to Erosion Control
Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of,
and adhere to, the applicable requirements outlined in the Development Agreement for West Range
Fort Collins. Also, the Site Contractor for this project will be required to secure a Stormwater
Construction General Permit from the Colorado Department of Public Health and Environment
(CDPHE), Water Quality Control Division – Stormwater Program, prior to any earth disturbance
activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive
StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The
SWMP will further describe and document the ongoing activities, inspections and maintenance of
construction BMPs.
West Range Fort Collins
Preliminary Erosion Control Report
MAP POCKET
C4.00 – DRAINAGE EXHIBIT
X
D
acres D
A
0.87 0.40
1.00
acres
B
0.67 0.19
0.84
acres
C
0.72 0.12
0.90
B
C
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
ROOF
W. LAUREL STREET
S. MELDRUM STREET
PROPOSED
MULTIFAMILY
BUILDING
LOT 1
BLOCK 1
A
POND 1
No. Revisions:
By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
10.24.12
PROJECT:
875-001
Sheet
Of 6 Sheets
WEST RANGE FORT COLLINS
T���� �������� ���
����������� �� �������
�������� �� N�������
E���������� S�������, I��.
��� ��� ��� �� �� ���� ���
��� ���� �� ������������
������ ������ ��� ������ ��
� P����������� E������� ��
��� ������ �� N�������
E���������� S�������, I��.
NOT FOR CONSTRUCTION
REVIEW SET
10.24.12
200 S���� C������ A�����, S���� 010
F��� C������, C������� 80524
E N G I N E E R I N G
� � � � � � ��
PHONE: 970.221.4158 FAX: 970.221.4159
���.�������������������.���
C4.00
DRAINAGE EXHIBIT
H. Feissner
H. Feissner
1" = 20'
NORTH
( IN FEET )
1 inch = ft.
20 0 20 Feet
20
40 60
GRAPHIC SCALE:
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
K��� ����'� �����.
C��� ������ ��� ���.
R
BENCHMARK/BASIS OF BEARING
Date
Date
Date
Date
Date
Date
APPROVED:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
City Engineer
Water & Wastewater Utility
Stormwater Utility
Parks & Recreation
Traffic Engineer
Environmental Planner
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
BENCHMARK #1:
City of Fort Collins Benchmark 6-00
Located on a catch basin at the northwest corner of Mulberry Street
and College Avenue.
Elevation = 4990.68 (NGVD 29 - Unadjusted)
BENCHMARK #2:
City of Fort Collins Benchmark CSU 2
Standard brass Larimer County Geodetic Control Disk located in the
campus of Colorado State University approzimately 240.8 feet south
from the center line of North Drive, 46.6 feet south from the center of
the delivery road to the University Club and 1.1 feet southwest from the
edge of the sidewalk.
Elevation = 5003.12 (NGVD 29 - Unadjusted)
Basis of Bearings
Considering the west property line of Lot 6, Block 87 of the Plat of the
Town of Fort Collins which bears North 00�19'39' East.
LEGEND:
4953
PROPOSED CONTOUR 93
PROPOSED STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
PROPOSED CURB & GUTTER
PROPERTY BOUNDARY
PROPOSED INLET
A
DESIGN POINT
FLOW ARROW
DRAINAGE BASIN LABEL
BASIN
DESIGNATION
BASIN
AREA (AC)
DRAINAGE BASIN BOUNDARY
PROPOSED SWALE SECTION
1 1
B2
1.45 ac
PROPOSED 100-YEAR WATER SURFACE ELEVATION
NOTES:
1.REFER TO THE "PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR WEST RANGE FORT COLLINS" BY NORTHERN ENGINEERING, DATED
{OCTOBER 24, 2012} FOR ADDITIONAL INFORMATION.{
}
PROPOSED BIO-RETENTION
5001.40 6448 0.20 1125 2945 1121 2918
5001.60 8089 0.20 1454 4399 1451 4369
Stage-Storage Curve
5002.00
Stage-Storage Curve
5002.00
5001.50
5001.00
Contour Elevation
5000.50
Contour Elevation
5000.00
4999.50
0 500 1000 1500 2000 2500 3000 3500 4000 4500
Cummulative Volume, cu. ft.
10/24/20121:45 PM D:\Projects\875-001\Drainage\Detention\875-001__Detention Pond.xls\Stage_Storage
55 3300 3.03 0.73 2400 1650 750
60 3600 2.86 0.69 2471 1800 671
65 3900 2.72 0.65 2546 1950 596
10/24/20121:29 PM D:\Projects\875-001\Drainage\Detention\875-001__Detention Pond.xls\FAA_Current idf_Add Vol
Slope,
S
(%)
Velocity,
V
(ft/s)
Tt
(min)
2-yr
Tc
(min)
10-yr
Tc
(min)
100-yr
Tc
(min)
A Basin A No 0.87 0.87 1.00 1 2.00% 0.3 0.3 0.1 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5
B Basin B No 0.69 0.69 0.87 1 2.00% 0.6 0.6 0.3 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5
C Basin C No 0.72 0.72 0.90 1 2.00% 0.6 0.6 0.3 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5
* Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins.
PROPOSED TIME OF CONCENTRATION COMPUTATIONS
H. Feissner
October 24, 2012
Design
Point
Basin
Overland Flow Gutter Flow Swale Flow Time of Concentration
(Equation RO-4)
3
1
1 . 87 1 . 1 *
S
Ti C Cf L
10/24/201212:35 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Proposed_Rational_Calcs\Tc
TOTAL (Site ONLY ) 0.71 0.26 0.00 0.00 0.28 Clayey | Average 2% to 7% 0.16 0.79 0.79 0.99 73%
1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis
PROPOSED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS
Composite Runoff Coefficient with Adjustment
10/24/201212:35 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Proposed_Rational_Calcs\Composite Runoff Coeff
Tc
(min)
10-yr
Tc
(min)
100-yr
Tc
(min)
Ia Ia No 0.66 0.66 0.83 1 2.00% 0.6 0.6 0.4 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5
Ib Ib No 0.42 0.42 0.52 1 2.00% 1.0 1.0 0.9 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5
Ic Ic No 0.43 0.43 0.54 1 2.00% 1.0 1.0 0.8 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5
Irowb Irowb No 0.82 0.82 1.00 1 2.00% 0.4 0.4 0.1 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5
Irowc Irowc No 0.78 0.78 0.97 1 2.00% 0.5 0.5 0.2 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5
* Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins.
PHASE I TIME OF CONCENTRATION COMPUTATIONS
H. Feissner
October 24, 2012
Design
Point
Basin
Overland Flow Gutter Flow Swale Flow Time of Concentration
(Equation RO-4)
3
1
1 . 87 1 . 1 *
S
Ti C Cf L
* Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins.
10/24/201212:25 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Historic_Rational_Calcs\Tc_Phase 1
TOTAL (Site ONLY ) 0.710 0.16 0.03 0.00 0.130 Clayey | Flat <2% 0.39 0.54 0.54 0.67 43%
1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis
PHASE I COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS
October 24, 2012
Composite Runoff Coefficient with Adjustment
10/24/201212:25 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Historic_Rational_Calcs\Composite Runoff Coeff_Phase I
(ft/s)
Tt
(min)
2-yr
Tc
(min)
10-yr
Tc
(min)
100-yr
Tc
(min)
Ia Ia No 0.45 0.45 0.56 1 2.00% 1.0 1.0 0.8 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5
Ib Ib No 0.42 0.42 0.52 1 2.00% 1.0 1.0 0.9 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5
Ic Ic No 0.43 0.43 0.54 1 2.00% 1.0 1.0 0.8 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5
Irowb Irowb No 0.82 0.82 1.00 1 2.00% 0.4 0.4 0.1 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5
Irowc Irowc No 0.78 0.78 0.97 1 2.00% 0.5 0.5 0.2 1 0.50% 1.41 0.0 1 0.50% 1.06 0.0 5 5 5
* Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins.
EXISTING CONDITIONS TIME OF CONCENTRATION COMPUTATIONS
Gutter Flow Swale Flow
Design
Point
Basin
Overland Flow
H. Feissner
October 24, 2012
Time of Concentration
(Equation RO-4)
3
1
1 . 87 1 . 1 *
S
Ti C Cf L
* Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins.
10/24/201212:25 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Historic_Rational_Calcs\Tc_Exist
TOTAL (Site ONLY ) 0.71 0.00 0.03 0.16 0.13 Clayey | Flat <2% 0.39 0.44 0.44 0.55 29%
1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis
EXISTING CONDITIONS COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS
October 24, 2012
Composite Runoff Coefficient with Adjustment
10/24/201212:25 PM D:\Projects\875-001\Drainage\Hydrology\875-001_Historic_Rational_Calcs\Composite Runoff Coeff_Exist