July 05, 2012
Comments responded to
July 13, 2012
Edward Johnson
PDC Midwest, Inc.
1130 James Drive Suite 106
Heartland, WI 53029
RE:Sterling House PUD Replat - Brookdale Senior Living Major Amendment (1008 Rule Dr),
MJA120003, Round Number 1
Please see the following summary of comments from City staff and outside reviewing agencies for your
submittal of the above referenced project. If you have questions about any comments, you may contact the
individual commenter or direct your questions through the Project Planner, Courtney Levingston, at
970-416-2283 or clevingston@fcgov.com
Comment Summary:
Department: Current Planning
Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/26/2012
06/26/2012: Please show additional context to the north and west. Specifically the parking
spaces for the adjacent properties.
Acknowledged, additional information at adjacent property is shown on the revised
drawings.
Comment Number: 2 Comment Originated: 06/26/2012
06/26/2012: I noticed many existing benches on site. What benches are existing and what
benches are to remain? Are there any new benches provided?
Current benches are moveable and shall be temporarily removed from site during the
construction period. The benches are mainly used by residence to rest while walking
the sidewalks inside the community’s property. Final bench locations shall be
determined and moved as required by staff at the best location for the residence use
once the construction is complete.
Department: Current Planning
Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 06/26/2012
06/26/2012: The landscape plan is difficult to read. Please remove items such as "relocate
existing grease trap". The symbols are too similar. For example, I cannot tell the different between
the blue chip juniper and the tammy juniper.
Acknowledged, landscape plan has been revised accordingly.
Comment Number: 4 Comment Originated: 06/26/2012
06/26/2012: Please provide a color elevation.
Acknowledged, colored elevations provided in revised submittal set.
Comment Number: 5 Comment Originated: 06/26/2012
06/26/2012: The tree mitigation plan is unreadable. Please turn off additional layers. Has this tree
mitigation schedule been approved by Tim Buchanan, City Forester? There could be an issue with
the number of trees. Please revise the tree mitigation table to show total number of existing trees
on site. Total number of trees existing on site currently, the total number of existing trees to be
protected, total number of trees removed and total number of trees transplanted. The tree
mitigation plan should be full sized and a separate sheet.
Acknowledged, layers have been turned off allowing for a more clear and readable
plan. Tim Buchanan – City Forester, has met Mike Brake (Civil Engineer), Kirby Smith
(Landscape Architect) and Ed Johnson (Architect) on site to review, discuss and has
given preliminary approval on the tree mitigation process and proposed overall
landscape design.
Comment Number: 6 Comment Originated: 06/27/2012
06/26/2012: The memory care building has an existing iron fence. Please show on site plan.
Will the new facility is proposed to have any sort of fencing? If so, please provide fence detail.
Acknowledged, the existing iron fence is identified on the revised drawing.
The proposed Clare Bridge Crossing will have a secured courtyard. The courtyard
fencing shall be a stained wood fence. Fence elevation and details are shown on the
revised drawing.
Comment Number: 7 Comment Originated: 06/27/2012
06/27/2012: Please take off trees from the site plan. Proposed and existing trees should be on
the landscape and tree mitigation plan.
Acknowledged, tree layers have been turned off allowing for a more clear and
readable plan.
Comment Number: 8 Comment Originated: 06/27/2012
06/27/2012: Please provide a landscaping table that shows the number of each proposed tree
and the percentage that species comprises of the total per LUC 3.2.1(D)(3)
Acknowledged, a landscaping table is provided complying with LUC 3.2.1(D)(3)
Comment Number: 7 Comment Originated: 06/27/2012
06/27/2012: I have a concern about windows on the new north elevation and privacy. The
adjacent property to the north has a parking lot where the head in parking (and headlights) will be
directly pointed towards the development. Previously this may not have been an issue because of
the space. With the addition there needs to be additional landscaping. Section 3.5.1(D) of the
Land Use Code mandates privacy considerations.
Acknowledged, revised landscape plan is showing additional shrubs at resident unit
windows.
Department: Current Planning
Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com
Topic: General
Comment Number: 8 Comment Originated: 06/27/2012
06/27/2012: irrigation plans are required. Eric Olson and Laurie D'Audney review the irrigation
plans. His contact information is 970-221-6704 and 970-221-6877, respectively.
Acknowledged, irrigation plans will be submitted to Eric and Laurie at the time of
final plans with the CD’s following Planning Commission approval.
Comment Number: 9 Comment Originated: 06/27/2012
The City's Plant List can be found online at: http://www.fcgov.com/forestry/plant_list.pdf
Additionally, please take a look at the Front Range Tree Recommendation List. This can be found
at: http://www.ext.colostate.edu/pubs/garden/treereclist.pdf
Acknowledged, an onsite meeting took place with Tim Buchanan – City Forester has
met Mike Brake (Civil Engineer), Kirby Smith (Landscape Architect) and Ed Johnson
(Architect) on site to review, discuss and has given preliminary approval on the tree
mitigation process and proposed overall landscape design.
Comment Number: 10 Comment Originated: 06/27/2012
06/27/2012: Please submit a lighting plan. The photometric plan must be calibrated such that the
light loss factor is 1.00. All fixtures must have specifications and be fully shielded and down
directional.
Acknowledged, a site photometric plan is provided in revised submittal set.
Comment Number: 11 Comment Originated: 06/27/2012
06/27/2012: The July 19th Planning and Zoning Board hearing may is not feasible at this point.
The next hearing would be Thursday, August 16, at 6:00 p.m. in Council Chambers, 300 LaPorte
Ave. Work Session for that hearing would be August 10th. You do not need to attend the work
session. All power point presentations need to be submitted to the City by Thursday, August 2nd.
Please also bring the presentation on a USB drive as back-up. City Staff can provide a wireless
mouse for the presentation. Please e-mail me prior if you are requiring that technology.
Acknowledged, we will plan for and submit materials by the deadline dates for the
August 16, Planning and Zoning Board hearing. We will present via PowerPoint and
will need a controller to advance the slides during the presentation.
Comment Number: 12 Comment Originated: 06/29/2012
06/27/2012: The City of Fort Collins has parking maximums, not parking minimums. That being
said, the project is allowed 56 parking spaces maximum pursuant to Section 3.2.2 of the City of
Fort Collins Land Use Code. Please remove 8 spaces and update the language on the table from
"required" to "maximum".
Acknowledged, the parking data chart has been revised in the submittal set. The
total bed count listed in the chart of the initial submittal was based upon an earlier
scheme and was not updated. The total number of beds including the proposed
construction is 129 beds. The employee count of 30 as shown in the initial submittal
was for current employee count and did not include the proposed new Clare Bridge
Crossing and expansion to the Sterling House. The total number of employees at
maximum shift is 44. The site plan will show the maximum parking stalls as
calculated. 129 beds x .33 = 42 spaces plus 44 employees x .5 = 22 spaces equals a
total parking count of 64 stalls for the entire community.
Department: Current Planning
Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com
Topic: General
Comment Number: 13 Comment Originated: 06/29/2012
06/29/2012: Is the employee count of 30 accurate including the potential new facility?
The employee count of 30 as shown in the initial submittal was for current employee
count and did not include the proposed new Clare Bridge Crossing and expansion to
the Sterling House. Please see Comment Number 12 response.
Comment Number: 14 Comment Originated: 06/29/2012
06/29/2012: Please address all these comments in a new submittal, which can be done via PDF
over email or uploaded to the City's FTP site (your preference). Additionally, please also provide a
pdf of this comment letter with responses on how you addressed each comment with the informal
re-submittal. Your re-submittal needs to be in back to us by the third week of July.
Acknowledged, all items have been addressed in the revised submittal set. We will
plan for and submit materials by the deadline dates for the August 16, Planning and
Zoning Board hearing. We will present via PowerPoint and will need a controller to
advance the slides during the presentation
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com
Topic: Construction Drawings
Comment Number: 5 Comment Originated: 06/26/2012
06/26/2012: Provide demolition plan with the Civil Construction Plans.
A demolition plan has been added to the civil plans and is included with this
submittal.
Comment Number: 6 Comment Originated: 06/26/2012
06/26/2012: Existing line work appears to be missing from numerous sheets (i.e. site plan) and
included and in conflict with proposed line work on many other construction drawing sheets.
Existing line work has been turned on, i.e. utilities. The plans have been cleaned up so
that text and proposed line work is clearer.
Comment Number: 9 Comment Originated: 06/26/2012
06/26/2012: Please revise callouts in notes in the plan sheets that reference projects other than
Brookdale Senior Living Community.
All notes referencing other projects have been updated.
Comment Number: 10 Comment Originated: 06/26/2012
06/26/2012: Please revise and correct numerous line over text issues, cutoff text and existing line
work on top of proposed line work.
The drawings have been cleaned up so that the text and proposed line work is clearly
shown.
Comment Number: 12 Comment Originated: 06/26/2012
06/26/2012: Sheet C4 - Provide the street cut limits note on this sheet for the proposed services.
The street cut limit note has been added to this sheet.
Comment Number: 13 Comment Originated: 06/26/2012
06/26/2012: Sheet C4 - Show and label existing water, sewer and fire services on the overall
utility plan.
Existing utilities have been shown and labeled on the overall utility plan.
Comment Number: 14 Comment Originated: 06/26/2012
06/26/2012: Sheet C4 - Have existing utilities and specifically dry utilities been located along
Rule Drive. The storm sewer that is proposed along Rule Drive is shown to exist within the 9'
Utility Easement. Additional utility easements may need to be dedicated to accommodate future
utilities or the proposed storm sewer may need to be located farther to the north to accommodate
existing utilities.
All dry utility locations have been shown on the plan along Rule Drive. The proposed
storm sewer is not in conflict with the existing utilities, and an additional easement is
proposed for the new storm line and is included on the final plat.
Comment Number: 15 Comment Originated: 06/26/2012
06/26/2012: Sheet C4 - An easement will need to be provided for the waterline to the hydrant in
the middle of the site. Please provide the easement on the plat and show on the Overall Utility
Plan.
An easement for the fire hydrant water line has been added and is shown on the final
plat.
Department: Engineering Development Review
Contact: Andrew Gingerich, 970-221-6603, agingerich@fcgov.com
Topic: Construction Drawings
Comment Number: 16 Comment Originated: 06/26/2012
06/26/2012: Sheet C5 - Please clarify the pedestrian bridge note to add that the bridge is to be
constructed with this project but that the design might be "by others".
A new layout for access to public sidewalks has been incorporated into the plans;
therefore the pedestrian bridge is no longer needed.
Topic: General
Comment Number: 3 Comment Originated: 06/26/2012
06/26/2012: Development agreements currently exist for both Sterling House P.U.D. and
Wovenhearts. It is recommended that a new development agreement be drafted to update and
clean up the existing development agreements into one document.
The owner will work with the city to accommodate the development agreement.
Comment Number: 7 Comment Originated: 06/26/2012
06/26/2012: The access ramp at the intersection of Lemay Ave and Rule Drive needs to be ADA
compliant. If it is not currently constructed to current ADA requirements than it will need to be
reconstructed.
The colored section of the ramp will be removed and replaced with the truncated
dome section from the city standard.
Comment Number: 11 Comment Originated: 06/26/2012
06/26/2012: What is the purpose of the Broadband easement & right of entry that exists on Lot 1.
How is this being addressed and is there any conflicts with the building addition and the
Broadband easement?
This is an easement that was dedicated in 1997 for the installation and the
maintenance of a cable system. The proposed additions will not conflict with the
utility owner’s ability to enter the site for repairs as needed.
Comment Number: 17 Comment Originated: 06/26/2012
06/26/2012:
Topic: Plat
Comment Number: 1 Comment Originated: 06/26/2012
06/26/2012: It appears that the plat cover does not contain the most recent dedication,
maintenance, etc. language. This language has been provided to JR Engineering on 6/26/2012.
The plat dedication, maintenance, etc. language has been updated.
Comment Number: 2 Comment Originated: 06/26/2012
06/26/2012: Provide easement vacation note from the Development Review Guidelines 3(h) that
pertains to vacating existing easements per this plat unless otherwise noted.
This note has been added to the plat.
Comment Number: 4 Comment Originated: 06/26/2012
06/26/2012: All easements, proposed or existing, shown on the plat must have bearing, distance,
curve, etc.
All proposed and existing easements have been labeled with the information
requested above.
Comment Number: 8 Comment Originated: 06/26/2012
06/26/2012: The existing drainage easement (Rec. No. 98104028) appears to be aligned for
drainage patterns from the existing site plan. Is it still needed in this specific layout based on the
new site plan? Specifically the north end that is very near the building wall. Additionally the
Proposed detention pond easement on the northeast corner appears to conflict with a building
corner.
All of the existing drainage easements will be vacated per this plat and all new
easements will be dedicated for the updated drainage improvements.
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: Landscape Plans
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 06/26/2012
06/26/2012: Please provide detailed specifications of the grass mixes proposed on site at the
time of final plans.
Acknowledged, proposed grass seed mixes will be provided on the landscape plans at
the time of final plans are submitted with the CD’s following Planning Commission
approval.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 06/27/2012
06/27/2012:
Trees to Transplant:
1.Some of the trees are near the upper threshold size to transplant successfully. The risk of
survival decreases with increased size. Consult with a tree-transplanting contractor in an onsite
inspection of the trees to verify feasibility of transplanting the 14 trees that are shown on the plans
to be moved. Provide the contractor’s evaluation and recommendation for tree spade size to be
used for each of the trees to be transplanted. Incorporate the contractor’s tree spade size
recommendations in to the tree mitigation notes or table.
Acknowledged, proposed grass seed mixes will be provided on the landscape plans at
the time of final plans are submitted with the CD’s following Planning Commission
approval.
2.Provide a tree planting detail for the transplanted trees. Typically a water basin is constructed
around large trees to facilitate irrigation. Consider adding this in the detail. The area over the ball
should be mulched.
Acknowledged, such a detail has been included on the Tree Mitigation Plan.
3.Provide an irrigation schedule (frequency) for the transplanted trees for the first growing season
or two as recommended by the transplant contractor. Also include the schedule for winter
irrigation. Indicate the recommended gallons of water per tree to be applied during each irrigation.
Acknowledged, after consulting with the potential tree transplant contractors,
proposed irrigation schedules have been added to the notes.
4.Tree number 15a is a flowering crabapple and appears too broad to move. Tree #14 is the same
species and smaller, but is shown to be removed. Consider transplanting #14 in place of #15a.
Acknowledged, this recommended substitution has been made.
5.Tree #28 is a honey locust to transplant. It is on a slope that will provide some difficulty in
transplanting. Tree 26a is a 10-inch caliper Bur oak in good condition. It also is on somewhat of a
slope. The bur oak may be a better candidate tree to transplant.
Acknowledged, this recommended substitution has been made.
6.Add these notes:
Trees proposed to be transplanted shall be moved with a tree spade of a 100 inch minimum size
or with a larger size tree spade up to 120 inch minimum size where recommended by a qualified
transplanting contractor.
An ISA Certified Arborist shall inspect all transplanted trees at a regular interval over the first two
years. Recommendations on care shall be provided to the owner.
Acknowledged, these two notes have been added.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 06/27/2012
06/27/2012: Species Selection:
1.Green ash is used as a street tree. One green ash is proposed as the north most street tree.
Green Ash is not on the City Street Tree List. Select a species from the City Street Tree list to
replace it.
Acknowledged, after consulting with Tim Buchanan, this tree species was replaced
with a Bur Oak.
2.Provide quantities and method of transplant (B&B) for each of the proposed landscape trees.
Also provide this for the shrubs using 5 gallon as the minimum shrub size.
Acknowledged, a plant list has been included on the landscape plan which lists each
proposed plant species, along with the associated quantity, size and method of
transplant (B&B, etc.).
3.Autumn Blaze Maple does not survive in the soils found in Fort Collins. The City Forester
recommends that an alternate species be selected.
Acknowledged, after consulting with Tim Buchanan, this tree species was replaced
with Texas Red Oak.
Department: Light And Power
Contact: Doug Martine, 970-224-6152, dmartine@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/13/2012
06/13/2012: Light & Power Engineering (221-6700) will need a Commercial Service Information
(C-1) form completed for each new or modified electric service. Depending on the total of the new
loads, the existing transformer on the east side of the existing Sterling House MAY also be
capable of serving the new buildings. It may be necessary for Light & Power to install another
transformer for the new buildings at a location to be coordinated.
Acknowledged, the required forms will be completed once the design on all spaces is
complete and will be submitted at the time of building plan review and permitting.
Comment Number: 2 Comment Originated: 06/13/2012
06/13/2012: Electric development and system modification charges will apply.
Acknowledged
Comment Number: Comment Originated: 06/13/2012
06/13/2012:
Comment Number: Comment Originated: 06/13/2012
Department: Outside Agencies
Contact: Don Kapperman,
Topic: General
Comment Number: 1 Comment Originated: 06/27/2012
06/27/2012: Comcast comments that there needs to be a 2" conduit return from data room to
phone room to new building/data room. This must be painted to match.
Acknowledged, this conduit will be shown on the systems plan and be part of the full
building permit submittal. Any exposed conduit shall be painted to match adjacent
building material.
Department: PFA
Contact: Ron Gonzales, 970-416-2864, rgonzales@poudre-fire.org
Topic: General
Department: PFA
Contact: Ron Gonzales, 970-416-2864, rgonzales@poudre-fire.org
Topic: General
Comment Number: 1. Comment Originated: 06/26/2012
06/26/2012: These two buildings are out of access from the fire lanes; therefore fire sprinklers are
required. Knox Key Box (es) is to be provided for emergency ingress.
Acknowledged, all buildings and new additions shall be fully sprinklererd with fire
alarm system. The existing Sterling House and Clare Bridge have Knox Boxes; the
proposed new Clare Bridge Crossing shall have an approved Knox Box.
Comment Number: 2. Comment Originated: 06/26/2012
06/26/2012: The proposed new fire hydrant is out of access from the parking lot fire lane;
therefore, it shall be located south of the proposed location and made accessible from the parking
lot fire lane.
Acknowledged, Mike Brake met with PFA to discuss the location of the new fire
hydrant, an agreed upon location was established in the parking area south of the
proposed Clare Bridge Crossing.
Comment Number: 3. Comment Originated: 06/26/2012
06/26/2012: There shall be provided an emergency access sidewalk, 5 ft wide, for the safe
egress of those seeking the public way. It shall be signed and shall not be obstructed at any time,
including snow.
Acknowledged, all sidewalks are at least 5 feet wide and are connected to a public
walkway and shall be unobstructed at all times.
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/27/2012
06/27/2012: Stormwater is ready for a hearing.
Comment Number: 2 Comment Originated: 06/29/2012
06/29/2012: Comments may apply during final compliance review.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 5 Comment Originated: 06/22/2012
06/22/2012: No comments.
Topic: Construction Drawings
Comment Number: 6 Comment Originated: 06/22/2012
06/22/2012: Benchmark 6-94 has been destroyed. Benchmark 7-94 is to the north at Harmony
Road & Lemay Avenue.
The benchmark note has been updated.
Comment Number: 7 Comment Originated: 06/22/2012
06/22/2012: Please change the benchmarks on sheet C2 to match the cover sheet & the project
site.
The benchmark note has been updated.
Comment Number: 8 Comment Originated: 06/22/2012
06/22/2012: There are lines over text & text over text issues on sheets C3, C4 & C5.
All sheets have been cleaned up so that the text is readable.
Topic: Landscape Plans
Comment Number: 4 Comment Originated: 06/22/2012
06/22/2012: There are lines over text issues on sheets L-1 & L-2.
Acknowledged, landscape plan has been revised accordingly to address these issues.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Plat
Comment Number: 1 Comment Originated: 06/22/2012
06/22/2012: There was no Subdivision Plat in this review. We will need to see it next review.
The subdivision plat has been updated per comments from “Engineering Development
Review” and a revised plat is included with this submittal.
Topic: Site Plan
Comment Number: 2 Comment Originated: 06/22/2012
06/22/2012: Please add a legal description of the property to sheet TS.
Acknowledged, legal description added
Comment Number: 3 Comment Originated: 06/22/2012
06/22/2012: There are line over text issues on sheets C100 & C110.
All sheets have been cleaned up so that the text is readable.
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 06/22/2012
06/22/2012: Show existing City water and sewer mains.
All existing City lines have been shown on the plans.
Comment Number: 2 Comment Originated: 06/22/2012
06/22/2012: Show the water, sewer and fire services to the existing buildings.
Existing services to the existing buildings have been shown on the plans.
Comment Number: 3 Comment Originated: 06/22/2012
06/22/2012: Schedule a meeting with Poudre Fire Authority and Water Utilities to discuss location
of the proposed fire hydrant. Water utilities would prefer to have the hydrant located closer to
Rule Drive
The fire hydrant location has been coordinated with the fire department and the city
utility department. The hydrant has been located closer to Rule Drive per a meeting
with the utility department.
Comment Number: 4 Comment Originated: 06/22/2012
06/22/2012: Move the portion of the domestic water service near Rule Drive to the east and
locate the curb stop and meter pit in the landscaped area similar to what's shown on the redlined
utility plans (but not in the detention pond). Curb stop must be within a utility easement
The water services have been relocated as redlined on the plan along with showing
the proposed meter and curb stop locations.
Comment Number: 5 Comment Originated: 06/22/2012
06/22/2012: Fire hydrant must be within a utility easement.
An easement for the fire hydrant and the main servicing the fire hydrant has been
added and are shown on the subdivision plat.
Comment Number: 6 Comment Originated: 06/22/2012
06/22/2012: Survey existing sewer main and provide design elevations for the sewer service.
The elevations for the existing sanitary sewer and the proposed service have been
added to the plans.
Topic: Plat
Comment Number: 7 Comment Originated: 06/22/2012
06/22/2012: Provide a copy of the plat with the next submittal.
The subdivision plat has been updated per comments from “Engineering
Development Review” and a revised plat is included with this submittal.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 06/22/2012
06/22/2012: Sheet A302 Key Notes 11 states the cupola will be relocated. Plans should indicate
the new location.
Acknowledged, the revised drawings show the relocated location of the existing
cupola. The new location shall be at the new Sterling House addition.
Comment Number: 2 Comment Originated: 06/22/2012
06/22/2012: Land Use Code (LUC) 3.2.4 This section requires a Site Lighting Plan (see section
for requirements). If there was one zoning did not receive a copy.
Acknowledged, a site photometric plan is provided in revised submittal set.
Comment Number: 3 Comment Originated: 06/22/2012
06/22/2012: Plans (elevations, site plan, and landscaping plans) do not indicate any locations of
new mechanical/utility equipment (vents, flues, conduits, meters and units). These need to be
indicated with a note on how such equipment will be screened/painted.
Acknowledged, a majority of the HVAC units are located inside the buildings. The
revised set shows the HVAC equipment that are located on site as well as vents, flues,
conduits, meters and units.
Comment Number: 4 Comment Originated: 06/22/2012
06/22/2012: LUC 3.2.5 Trash/Recycling enclosures shall be constructed on a concrete cement
pad and designed with a walk-in access without having to open the main service gate and be at
least twenty ft from a public sidewalk.
Currently it appears there is no walk-in access.
Elevation drawings are required for the trash/recycling enclosure.
Acknowledged, the trash enclosures are detailed with a concrete pad with a separate
walk-in access. The revised set shows the trash enclosure elevations, the trash
enclosure shall match the materials of the Crossings.
Comment Number: 5 Comment Originated: 06/22/2012
06/22/2012: There is an existing sidewalk connection along the middle driveway this connect
should be completed and connected to the rest of the internal sidewalks.
Acknowledged, the existing sidewalk along the main driveway at the Sterling House is
connected via a new sidewalk at the Sterling House Kitchen addition as well as a
painted walkway on the asphalt drive.