August 06, 2012
Responses: August 23, 2012
Dave Derbes
Brinkman Partners, LLC
3003 E Harmony Rd, Suite 300
Fort Collins, CO 80528
RE: 1409 W Elizabeth St. - Fairview Shopping Center Filing Four, FDP120007, Round Number
2
Please see the following summary of comments from City staff and outside reviewing agencies for
your
submittal of the above referenced project. If you have questions about any comments, you may
contact the
individual commenter or direct your questions through the Project Planner, Courtney Levingston,
at
970-416-2283 or clevingston@fcgov.com.
Comment Summary:
Department: Current Planning
Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/31/2012
07/31/2012: 06/12/2012: please provide detail on the retaining wall.
Response: See sheet LS501
Comment Number: 3 Comment Originated: 07/31/2012
07/31/2012: There are two trees on the south end of the site that we have questions
about
regarding protection. Please see redlines.
Response: Trees have been identified for protection and are listed on sheet LP101.
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 07/31/2012
07/31/2012: Please modify note #5 on the landscape plans.
Response: Acknowledged
Comment Number: 2 Comment Originated: 07/31/2012
07/31/2012: Please remove interior floor plan of the building from the landscape and
tree
mitigation plans.
Response: Acknowledged
Comment Number: 3 Comment Originated: 07/31/2012
07/31/2012: Is the mulch rock or wood? Please note on plans. Wood is preferable.
Response: The mulch is noted on LP102 as shredded cedar.
Topic: Site Plan
Comment Number: 1 Comment Originated: 07/31/2012
07/31/2012: Please turn off all landscaping and countour lines on the site plan.
Response:
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 07/31/2012
07/31/2012: The floodplain exhibit on C4.1 of the construction plans incorrectly labels
an
attached 8' sidewalk along Elizabeth Street. Please label the general use of 10' wide
sidewalks
on the plan sets.
Response: This has been corrected. Please note, the Floodplain Exhibit is now Sheet C5.1.
Comment Number: 2 Comment Originated: 07/31/2012
07/31/2012: Please add the standard street patch note regarding limits of patch shown
on the
construction drawings.
Response: Done.
Comment Number: 5 Comment Originated: 07/31/2012
07/31/2012: Construction plan details should be added, to include a construction detail
for the
drive approaches, access ramps, sidewalk, etc.
Response: Done (see Sheets C4.0 – C4.2)
Comment Number: 6 Comment Originated: 07/31/2012
07/31/2012: Please ensure that with the final approved construction plan set that a
copy of the
plat is included in the set for reference.
Response: Done.
Topic: General
Comment Number: 3 Comment Originated: 07/31/2012
07/31/2012: The two drive approaches should have more definitive indication on the
plans
(especially the construction set) of how they intend to be modified to allow for suitable
crossing
of the sidewalk. The plans (except for one note on the site plan specific to the eastern
driveway) do not appear to have any indication of the drive approaches being rebuilt in
order
for the new sidewalk to not tie into driveways with both concrete and asphalt across this
interface. The concrete scoring indicative of the sidewalk crossing through the driveway
should
be shown on the drawings.
Response: Done. Both drive approaches have concrete extended well behind the public ROW and full
sidewalk widths, so there is no asphalt/concrete interface at the crossings.
Comment Number: 4 Comment Originated: 07/31/2012
07/31/2012: The sidewalk across the eastern driveway should be designed to anticipate
tying
into a 12' wide sidewalk to the east proposed with redevelopment of that property. The
plans
should show a widening from 10' to 12' in order to make the tie in. A note on the plans
can be
placed acknowledging a deviation of the plan could be considered in the event that
redevelopment of the property to the east is no longer apparent.
Response: The design of the Wendy’s drive-thru exit and sidewalk transition at the eastern boundary
has been revised and coordinated with the proposed redevelopment of the adjacent property. It should
be noted that the sidewalk design at the western boundary of Lot 2, Eleventh Fairview Subdivision
redevelopment will need to be adjusted slightly to account for the vertical difference of the drive-thru exit
(± flush with Elizabeth flowline) to standard sidewalk elevation (± 6” above flowline).
Comment Number: 7 Comment Originated: 07/31/2012
07/31/2012: Please change the title on all the drawings provided by Aller-Lingle-Massey
to
Fairview Shopping Center Filing Four to coordinate with the other drawings.
Response: The title block has been revised.
Topic: Plat
Comment Number: 8 Comment Originated: 07/31/2012
07/31/2012: Carried over from the PDP, we'll need to see the private utility, access, and
shared
parking easement recorded prior to approval of the final plan/plat.
Response: Comment acknowledged.
Department: Forestry
Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com
Topic: Landscape Plans
Department: Forestry
Contact: Courtney Levingston, 970-416-2283, clevingston@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 07/31/2012
07/31/2012: Please add the following notes to the Landscape Plan:
"The soil in all landscape areas, shall be thoroughly loosened to a depth of not less than
eight
(8) inches and soil amendment shall be thoroughly incorporated into the soil of all
landscape
areas to a depth of at least six (6) inches by tilling, discing or other suitable method, at a
rate of
at least three (3) cubic yards of soil amendment per one thousand (1,000) square feet of
landscape area."
Please include these landscape notes:
A permit must be obtained from the City forester before any trees or shrubs as noted on
this
plan are planted, pruned or removed on the public right-of-way. This includes zones
between
the sidewalk and curb, medians and other city property. This permit shall approve the
location
and species to be planted. Failure to obtain this permit may result in replacing or
relocating
trees and a hold on certificate of occupancy.
The developer shall contact the City Forester to inspect all street tree plantings at the
completion of the development. All trees need to have been installed and protected as
shown on the landscape plan. Failure to obtain approval by the City Forester for trees
shall
result in a hold on certificate of occupancy.
Response: Comment Acknowledged
Comment Number: 2 Comment Originated: 07/31/2012
Department: PFA
Contact: Ron Gonzales, 970-416-2864, rgonzales@poudre-fire.org
Topic: General
Comment Number: 1. Comment Originated: 07/31/2012
07/31/2012: The address is required to be visible from the street fronting the property.
Response: The building address will be installed on the north elevation of the building facing W.
Elizabeth Street.
Comment Number: 2. Comment Originated: 07/31/2012
07/31/2012: The unit numbers shall be visible from the fire lane, be a minimum 4
inches in
width with a 1 inch stroke posted on a contrasting background.
Response: Unit numbers to be installed will meet this criteria.
Comment Number: 3. Comment Originated: 07/31/2012
07/31/2012: This project will be fire sprinklered. The standard water supply is a 6 inch
line. A
4 inch can be used, if the hydraulic calculations support the smaller line. Calculations
must be
submitted to verify the 4 inch line.
Response: The fire line has been changed to a 6 inch line.
Comment Number: 4. Comment Originated: 07/31/2012
07/31/2012: A 3 story building requires a 30 foot wide fire lane that does not exceed
150 feet in
length; or if it is longer, a turn-around is required at the end of the fire lane.
Response: The CRT review comments we received on 10/31/11 state that a full type NFPA 13 sprinkler
system could be used to offset the deficiency of an emergency access that exceeded 150 feet based on
the site constraints that do not allow a turn around. The comment also states that the width of the
emergency access is required to be 20'. The project does in fact have a full type NFPA 13 sprinkler
system that has been included to meet this condition.
Based on these comments from the CRT, the project was designed around these parameters and the
drive aisles on the east and south sides of the buildings are designed to be 24' min. widths and there is
currently no additional space on the site to increase these to 30' without making the building footprint
smaller or losing parking spaces all of which are key to make the project work as a whole. The drive
aisles also have no easements associated with them but do connect to both CD Potts parking lot system
to the west and to the Wendys drive-thru lane to the east.
Department: PFA
Contact: Ron Gonzales, 970-416-2864, rgonzales@poudre-fire.org
Topic: General
Comment Number: 5. Comment Originated: 07/31/2012
07/31/2012:
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 07/30/2012
07/30/2012: The site disturbs more than 10,000 sq-ft so an Erosion Control Report and
Plans
need to be produced.
Response: A separate Stormwater Management Plan has been provided to address this comment.
Topic: Floodplain
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: Floodplain
Comment Number: 3 Comment Originated: 08/02/2012
08/02/2012:
1. The Plat, Site Plan and Consruction Drawings have been reviewed and red-lined
comments
added. Please make the changes noted.
Response: Done.
2. In addition to my notes on the site plan, please include the BFE’s, Cross Sections---
as well
as the notes from C.4.1---on the Site Plan, or reference the Floodplain Exhibit (C.4.1) in
the Site
Plan notes.
Response: Done. Please note, the Floodplain Exhibit is now Sheet C5.1
3. Is the Floodplain Use Permit going to be applied for with the development permit or
with the
building permit? If it is going to be done with the building permit, a note to that effect
needs to
be added to the Floodplain Exhibit, Sheet C.4.1
Response: The FUP will be applied for in conjunction with the DCP.
4. The Drainage Letter needs to have the information outlined in the Floodplain100%
Development Review Checklist, more particularly the following:
Response: See below.
5. Describe the site as being in the floodplain, using the floodplain name, and the fact
that it is a
City designated floodplain.
Response: Done.
6. Describe the location of the building relative to the floodplain.
Response: Done.
7. Describe how the development is in compliance with the applicable floodplain
regulations of
Chapter 10; e.g. elevation of the lowest floor is above the RFPE, floodway regulations,
no-rise
regulations, etc.
Response: Done.
8. Describe the foundation type being used for the structure.
Response: Done.
9. Include the same table as was included on the Floodplain Exhibit, with the BFE,
RFPE,
Lowest Floor Elevation, HVAC Elevation, etc.
Response: Done.
10. Include City Benchmark Datum (NGVD29)
Response: Done.
11. Note whether the floodplain use permit will be submitted now or with the building
permit.
Response: Done.
12. Note that a FEMA elevation certificate will be obtained prior to issuance of a C.O.
Response: Done (City not FEMA).
13. Note the fact that a waiver is being requested to allow this development to use the
Anderson Model, and the reason why that is being done.
Response: Done.
14. Note compliance with Chapter 10 of City Code.
Response: Done.
Topic: General
Comment Number: 2 Comment Originated: 07/30/2012
07/30/2012: Please provide all details and soil media specifications for the rain garden.
Response: Done (See Sheet C4.2).
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 3 Comment Originated: 07/30/2012
07/30/2012: Please add "Fairview Shopping Center Filing Four" to all sheets.
Response: The title block has been revised.
Topic: Lighting Plan
Comment Number: 4 Comment Originated: 07/30/2012
07/30/2012: Please add "Fairview Shopping Center Filing Four" to all sheets.
Response: The title block has been revised.
Comment Number: 5 Comment Originated: 07/30/2012
07/30/2012: Please add a north arrow to sheet E0.1.
Response: The north arrow has been added to this sheet.
Topic: Plat
Comment Number: 1 Comment Originated: 07/30/2012
07/30/2012: The Subdivision boundary closes.
Response: Noted.
Comment Number: 2 Comment Originated: 07/30/2012
07/30/2012: Please change the symbol for "found #4 rebar". It does not match the
symbol
shown at the northwest corner of the boundary.
Response: Symbols revised.
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 07/30/2012
07/30/2012: Move the curb stop and meter pit north into the landscaped area.
Response: The limits of hardscape and landscape have been revised, per Water Utilities’ redlines, such
that the curb stop and meter pit are surrounded by crusher fines and not concrete.
Comment Number: 2 Comment Originated: 07/30/2012
07/30/2012: Is the existing sewer service 4" or 6"? If 4", it is strongly suggested that
the
service be replaced with 6" to avoid potential maintenance/plugging problems at the
connection between the existing 4" and the proposed 6" coming out of the building. The
sewer
service is maintained by the property owner from the building to the sewer main in the
street
including the connection at the main.
Response: The assumption is that the existing sewer service is 4” and will be abandoned back at the
main. It is assumed that a new 6” service will be extended from the main to the building.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 07/26/2012
07/26/2012: On Site Plan remove existing Building Envelope
Response: Comment Acknowledged
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 07/26/2012
07/26/2012: Why is the existing tree in the median south of the Accessibity spaces not
protected?
Any existing tree on site that is remaining needs to be indicated as protected.
Please coordinate off site mitigation trees with City Forester and plans should document
this.
Response: Comment Acknowledged