October 31, 2011
Dave Derbes
3003 East Harmony Road
Suite 300
Fort Collins, CO 80528
Re: 1409 West Elizabeth Street Student Apartments
Description of project: This is a conceptual request to demolish the existing structure at 1409 W. Elizabeth
St. and construct a new 3 story, 25,000 square foot multifamily building. The site is zoned Community
Commercial (CC) and the use is permitted subject to an administrative (type 1) public hearing (LUC 4.18(B)(2)
(a)(3)).
Please see the following summary of comments regarding the project request referenced above. The
comments offered informally by staff during the Conceptual Review will assist you in preparing the detailed
components of the project application. Modifications and additions to these comments may be made at the
time of formal review of this project. If you have any questions regarding these comments or the next steps in
the review process, you may contact the individual commenter or direct your questions through the Project
Planner, Steve Olt, at 970-221-6341 or solt@fcgov.com.
Comment Summary:
Department: Zoning
Contact: Peter Barnes, 970-416-2355, pbarnes@fcgov.com
1. The proposed use is a Type 1 review in the CC zone district.
Acknowledged
2. A minimum building height of 20' is required, so the proposed 3 stories would satisfy this. The normal
front setback for a residential use along an arterial is 30'; however, the code allows a conceptual setback
to be established based on existing setback of abutting buildings. Therefore, the front setback shown is
ok.
Acknowledged
3. The property itself is not in the TOD overlay zone; therefore, the project is required to provide the
minimum number of parking stalls based on the mix of bedroom units proposed (Sec. 3.2.2(K)(1)(a)).
This means that a minimum of 44 spaces is required (43.5 rounded up), but only 39 spaces are
provided. Either 5 more spaces will need to be included, or a modification will be required.
The unit mix has been revised and therefore 47 parking stalls are required and provided.
4. Trash enclosure not shown, but it must meet requirements of 3.2.5 and 3.5.1(I)(1).
A trash enclosure is included at the southwest corner of the site.
5. Parking lot screening required along south lot line - 6' tall fence, landscaping. The 18' stall length for the
southern stalls is allowed only if the width of the landscape setback along the south lot line is at least 6'.
Per Sec. 3.2.2(E)(4), the ends of parking aisles must be defined with a landscape island.Parking lot
screening is provided by the existing fence located along the south boundary of the site.
The width of the landscape setback along the southern stalls is 6' wide.
Department: Water-Wastewater Engineering
Contact: Roger Buffington, 970-221-6854, rbuffington@fcgov.com
1. Existing water mains and sanitary sewers near the site include a 12-inch water main and an 8-inch sewer
in Elizabeth and an 8-inch sewer in an easement along the south edge of the site.
Acknowledged
2. The existing water service to the site is a 1-inch service.
Acknowledged
3. All water and sewer services extending to these properties which are not used must be abandoned at
the main.
Acknowledged
4. The water conservation standards for landscape and irrigation will apply. Information on these
requirements can be found at: http://www.fcgov.com/standards
Acknowledged
5. In terms of water/sewer utility fees and accounts, a fraternity is classified as a commercial use. The
conversion to multi-family will result in additional development fees being due at time of building permit.
Credit will be given for the 1-inch commercial service.
Acknowledged
Department: Stormwater Engineering
Contact: Glen Schlueter, 970-224-6065, gschlueter@fcgov.com
1. This project is located in a City regulatory 100-year floodway and flood fringe in the Canal Importation
Floodplain, and must comply with Chapter 10 of City Code.
Acknowledged
2. Any and all construction activities in the flood fringe must be preceded by an approved floodplain use
permit, $25 fee, approved plans and itemized cost list for work in the flood fringe. The permit form can
be obtained at http://www.fcgov.com/utilities/what-we-do/stormwater/flooding/forms-documents.
Acknowledged
3. Permitting requirements in the floodway are the same as the flood fringe, but must also be preceded by
a no-rise certification, and followed by a no-rise recertification after completion of the project.
Acknowledged
4. A new residential structure must be elevated a minimum of eighteen-inches above the Base Flood
Elevation (BFE) for the property. A revised BFE may be used at this site based on the 2005 revised
hydraulic analysis associated with completed City capital improvement projects so long as the Utilities
Executive Director approves a floodplain waiver.
Acknowledged
5. Basements are not allowed on new construction within the flood fringe.
Acknowledged – We would like to know if a storage basement would be allowable. It would most likely
be 2000 – 3000sf and would only be used for storage.
6. A FEMA Elevation Certificate certifying that building elevations meet code is required before a certificate
of occupancy can be issued for the new residential structure.
Acknowledged
7. Development review checklists for floodplain requirements can be obtained at
http://www.fcgov.com/utilities/what-we-do/stormwater/flooding/forms-documents. Please utilize these
documents when preparing your plans for submittal. Please contact Shane Boyle of Stormwater Master
Planning at sboyle@fcgov.com for floodplain CAD line work as required per the floodplain development
review check list.
Acknowledged
8. The Floodplain Administrator for the Canal Importation Floodplain is Brian Varrella; 970.416.2217,
bvarrella@fcgov.com. Please contact Brian or Mark Taylor, 970.416.2494, mtaylor@fcgov.com to
schedule a meeting as soon as possible.
Acknowledged
9. In the Old Town drainage basin, a drainage and erosion control report and construction plans are
required if there is an increase in impervious area greater than 5000 square feet. These must be
prepared by a Professional Engineer registered in Colorado. Only grading and erosion control plans
are required when there is between 1000 and 350 square feet of new impervious area or if site grading is
proposed.
The change in impervious area does not warrant a full Drainage and Erosion Control Report. However,
a Drainage Letter has been provided to document the existing and proposed impervious areas, as well
as the water quality BMP computations.
10. There is an existing storm sewer along the south side of Elizabeth St. and a manhole on the front of the
property that could be used as a drainage outfall. The manhole has a 15-inch line entering and a 24-inch
line on the downstream side of the manhole. If this storm sewer is on the property, there will need to be
an easement dedicated if one does not exist. It also appears that a wider building footprint may require
moving the storm sewer so it is not under the building. The narrative submitted states that the site drains
to an offsite inlet, but the City's utility map shows that the inlet is on the site. Please verify, and if it is
offsite, a drainage easement will be needed.
A drainage easement will need to be dedicated for the on-site, private storm sewer.
11. No onsite water quantity detention is required because it is not possible to increase the impervious area
more than 1000 square feet. However, since the site is being redeveloped, onsite water quality
treatment of runoff from the entire site is required. Water quality treatment methods are described in the
Urban Storm Drainage Criteria Manual, Volume 3 - Best Management Practices (BMPs). One method
that could be used is to direct the downspouts to a landscape area, or if perimeter landscape buffers or
parking lot medians are required, these could be used to treat the runoff in bio-retention areas or rain
gardens. (http://www.udfcd.org/downloads/down_critmanual_volIII.htm)
The proposed bioretention rain garden design computations are included in the drainage letter.
12. The Stormwater development fees (PIF) are $6,313.00/acre ($0.1449/sq.ft.) for new impervious area over
350 sq.-ft. and $1,045.00/acre ($0.024/sq.ft.) for project review. No fee is charged for existing impervious
area. These fees are to be paid at the time each building permit is issued. Information on fees can be
found on the City's web site at
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees or
by contacting Jean Pakech at 221- 6375. There is also an erosion control escrow required before the
Development Construction permit is issued. The amount of the escrow is determined by the design
engineer and is based on the site disturbance or erosion control measures shown on the site
construction plans. A site plan showing the existing and proposed impervious area is needed in order
to calculate the fees.
Acknowledged
Department: Fire Authority
Contact: Ron Gonzales, 970-221-6635, rgonzales@poudre-fire.org
1. The building address shall be visible from the street fronting the building.
Acknowledged
2. Emergency access is required to get to the back of the building. However, the Emergency Access
Easement required exceeds 150 feet and there is no room for the required turnaround. Due to this being
a 3 story structure, the width of the emergency access is required to be 20 ft.
Acknowledged
3. Because this is a 3-story R-Occupancy, this building is required to be fire sprinklered with a 13-R system.
But due to the deficiency of Item 2, that will be offset with the requirement for a regular 13 fire sprinkler
system.
A Type 13 system will be provided
4. The water supply for this project is one fire hydrant located within 300 feet of the building which can
supply 1500 gpm at 20 psi.
Acknowledged
5. A knox box is required to augment entry due to the fire sprinkler system.
Acknowledged
Department: Environmental Planning
Contact: Lindsay Ex, 970-224-6143, lex@fcgov.com
1. The applicant should make note of Article 3.2.1(C) that requires developments to submit plans that "...(4)
protects significant trees, natural systems, and habitat". Note that a significant tree is defined as a tree
having DBH (Diameter at Breast Height) of six inches or more. Several of the trees that the applicant is
proposing to remove appear to have a DBH of greater than six inches, and a review of the trees shall be
conducted with Tim Buchanan, City Forester (221-6361) to determine the status of the existing trees and
any mitigation requirements as the result of development impacts.
A meeting with Tim Buchanan has been held to determine required mitigation and is indicated on the
proposed landscape plans.
2. With respect to landscaping and design, the City of Fort Collins Land Use Code, in Article 3.2.1 (E)(2)(3),
requires that you use native plants and grasses in your landscaping or re-landscaping and reduce
bluegrass lawns as much as possible.
Acknowledged
Department: Engineering Development Review
Contact: Andrew Carney, 970-221-6501, acarney@fcgov.com
1. Larimer County Road Impact Fees and Street Oversizing Fees are due at the time of building permit.
Please contact Matt Baker at 224-6108 if you have any questions.
Acknowledged
2. The City’s Transportation Development Review Fee (TDRF) is due at the time of submittal. For additional
information on these fees, please see: http://www.fcgov.com/engineering/dev-review.php
Acknowledged
3. Any damaged curb, gutter and sidewalk existing prior to construction, as well as streets, sidewalks,
curbs and gutters, destroyed, damaged or removed due to construction of this project, shall be replaced
or restored to City of Fort Collins standards at the Developer's expense prior to the acceptance of
completed improvements and/or prior to the issuance of the first Certificate of Occupancy.
Acknowledged
4. Please contact the City's Traffic Engineer, Joe Olson (224-6062), and the Transportation Planning
Department (416-2040) to schedule a scoping meeting and determine if a traffic study is needed for this
project.
A traffic study is included with the submittal documents.
5. Any public improvements must be designed and built in accordance with the Larimer County Urban Area
Street Standards (LCUASS). They are available online at:
http://www.larimer.org/engineering/GMARdStds/UrbanSt.htm
Acknowledged
6. This project is responsible for dedicating any right-of-way and easements that are necessary for this
project. In this location, Shields street is considered a 4 lane arterial, however this area is also in the
Campus West Plan area which calls for a reduced cross section on Elizabeth. According to the Campus
West plan a total ROW width of 98 feet in required this location, in addition, 12' to 15' sidewalks are
identified in this location along with street trees. In return for the widened sidewalk, no utility easement is
required. The Campus West Plan is available online at:
http://www.fcgov.com/advanceplanning/pdf/campus-west-doc.pdf
It is anticipated that 9’ of additional right-of-way will be dedicated along Elizabeth Street.
7. Utility plans will be required for this project and will be recorded once the project is finalized. Also
Development Agreement will be done with this project to formalize the obligations of both the developer
and the City. Lastly, a Development Construction Permit (DCP) will need to be obtained prior to starting
any work on the site.
Acknowledged
Department: Electric Engineering
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
1. Existing building is fed from a 150kva transformer that feeds and is located on the Wendy's site to the
east.
Acknowledged
2. Field locate and show all existing electric facilities on the plans. Existing 3-phase electric line between
CB Potts and Wendy's may need to be relocated to provide clearance for the proposed building.
The electric facilities have been field located and are shown on the plans. The existing 3-phase
electric line between Pott’s and Wendy’s will indeed need to be relocated.
2. Any relocation or modification to existing electric facilities will be at the owners’ expense.
Acknowledged
3. Owner will need to submit a C-1 Form and a One-Line diagram to Light & Power Engineering.
Acknowledged
5. Owner will need to coordinate a transformer location and possibly a switch cabinet location, within 10' of a
paved surface, with Light & Power Engineering.
Acknowledged
6. Electric Capacity Fees, Building Site charges and system modification charges will apply to this
development. Owner will receive credit for the existing electric service.
Acknowledged
Current Planning
Contact: Steve Olt, 970-221-6341, solt@fcgov.com
1. The development plan must demonstrate how it contributes to the overall mix of land uses within the
surrounding area LUC 4.18(D)(2).
The proposed project provides high quality apartment housing in a commercial zoning district with
many amenities such as restaurants, retail. It is also in close proximity to CSU main campus as well as
the Old Town district which will encourage multimodal forms of transportation,
2. The site plan shows 39 parking spaces, however 44 spaces are required. Therefore, a modification of
standards is necessary to meet LUC 3.2.2(K)(1). Additionally, please provide details on how this
development plans to continue to share parking with Wendy’s. What is the shared parking agreement?
Based on a meeting with Steve Olt and Noah Beals, we are proposing to keep the previous shared
parking agreement with the adjoining Wendy’s property in place which will provide the required
amount of parking for the apartment building and adequate parking for Wendy’s customers and
employees.
3. In terms of the setback, elevations will be critical in evaluating the appropriateness of the building location.
Articulation, architecture and design will play a large role in helping define the building's relationship to the
street and the resident / pedestrian experience.
Acknowledged
4. West Elizabeth Street is shown on the Master street plan as a 4 lane arterial and a 30' setback is required.
However, the proposed new building location can be evaluated against the Contextual Setbacks
requirement set forth in Section 3.10.4(B) of the Land Use Code. A modification of standard to LUC
Section 3.5.2(D)(1) would not be required. Please refer back to the previous comment regarding building
articulation and resident / pedestrian experience.
Acknowledged
5. Since the building may exceed 40' in height, the special building height review in Section 3.5.1(G) could be
applicable. If so, a shadow and visual analysis as well as a summary of the key conclusions from these
analysis and steps to be taken to comply with review standards is required at submittal LUC 3.5.1(G)(1)(b).
The shadow analysis is not required since the proposed building is less than 40 feet in height.
6. The applicant must do the interior landscaping (6%) calculations and illustrate those calculations on the
Landscape Plan in table format LUC Section 3.2.1(E)(5)
The proposed landscape plan meets the 6% minimum interior landscaping criteria.
7.The proposed development project is subject to a Type 1 review and public hearing, the decision maker
for Type 1 hearings is an Administrative Hearing Officer. The applicant for this development request is
not required to hold a neighborhood meeting for a Type 1 hearing, but if you would like to have one to
notify your neighbors of the proposal, please let me know and I can help you in setting a date, time and
location for a meeting. Neighborhood Meetings are a great way to get public feedback and avoid
potential hiccups that may occur later in the review process.
NA – no neighborhood meeting will be provided
8. Please see the Development Review Guide at www.fcgov.com/drg. This online guide features a color
coded flowchart with comprehensive, easy to read information on each step in the process. This guide
includes links to just about every resource you need during development review.
Acknowledged
9. This development proposal will be subject to all applicable standards of the Fort Collins Land Use Code
(LUC), including Article 3 General Development Standards. The entire LUC is available for your review on
the web at http://www.colocode.com/ftcollins/landuse/begin.htm.
Acknowledged
10. If this proposal is unable to satisfy any of the requirements set forth in the LUC, a Modification of Standard
Request will need to be submitted with your formal development proposal. Please see Section 2.8.2 of
the LUC for more information on criteria to apply for a Modification of Standard.
There are no proposed Modifications to LUC Standards; however, an administrative engineering
variance request letter to LCUASS has been submitted for parking setback distance.
11. Please see the Submittal Requirements and Checklist at:
http://www.fcgov.com/developmentreview/applications.php.
Acknowledged
12. The request will be subject to the Development Review Fee Schedule that is available in the Community
Development and Neighborhood Services office. The fees are due at the time of submittal of the required
documents for the appropriate development review process by City staff and affected outside reviewing
agencies. Also, the required Transportation Development Review Fee must be paid at time of submittal.
Acknowledged
13. When you are ready to submit your formal plans, please make an appointment with Community
Development and Neighborhood Services at (970)221-6750.
Acknowledged
Pre-Submittal Meetings for Building Permits
Pre-Submittal meetings are offered to assist the designer/builder by assuring, early on in the
design, that the new commercial or multi-family projects are on track to complying with all of the
adopted City codes and Standards listed below. The proposed project should be in the early to
mid-design stage for this meeting to be effective and is typically scheduled after the Current
Planning conceptual review meeting.
Applicants of new commercial or multi-family projects are advised to call 416-2341 to schedule a
pre-submittal meeting. Applicants should be prepared to present site plans, floor plans, and
elevations and be able to discuss code issues of occupancy, square footage and type of
construction being proposed.
Construction shall comply with the following adopted codes as amended:
2009 International Building Code (IBC)
2009 International Residential Code (IRC)
2009 International Energy Conservation Code (IECC)
2009 International Mechanical Code (IMC)
2009 International Fuel Gas Code (IFGC)
2009 International Plumbing Code (IPC) as amended by the State of Colorado
2008 National Electrical Code (NEC) as amended by the State of Colorado
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2003.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1.Single Family; Duplex; Townhomes: 2009 IRC Chapter 11 or 2009 IECC Chapter 4
2.Multi-family and Condominiums 3 stories max: 2009 IECC Chapter 4.
3.Commercial and Multi-family 4 stories and taller: 2009 IECC Chapter 5.