Loading...
HomeMy WebLinkAboutFAIRVIEW SHOPPING CENTER FILING FOUR (1409 W. ELIZABETH MULTI-FAMILY) - PDP - PDP120009 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTADDRESS: 200 S. College Ave. Suite 10 Fort Collins, CO 80524 PHONE: 970.221.4158 FAX: 970.221.4159 WEBSITE: www.northernengineering.com Page 1 of 2 D:\Projects\688-001\Drainage\Reports\Drainage Report\688-001_Drainage-Letter_2012-02-28.docx Drainage Letter Report Date: February 28, 2012 Project: Fairview Shopping Center Filing Four Project No. 688-001 Replat of Lot 1, Fairview Shopping Center Fort Collins, Colorado Attn: Mr. Wes Lamarque City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 Dear Wes: This letter serves to address the stormwater impacts of the above referenced multi-family redevelopment. The existing building is situated towards the western portion of the site. The site currently consists of rooftop, concrete walks and patio, asphalt parking areas, some turf, trees, and other vegetation. It presently functions similar to a ‘B’ lot, with historic drainage being split towards Elizabeth Street to the north and towards an area inlet to the south. The landscaped area adjacent to the western property line has a low point such that it too drains primarily to the south. Flows then reach an area inlet located on the C.B. & Pott’s Restaurant and Brewery Property. Historic drainage patterns will generally be preserved. The total impervious area of the existing site is approximately 22,611 square-feet. The proposed redevelopment will completely remove all existing above-grade structures and adjacent hardscape. The new project will consist of a larger apartment building, as well as a modified parking area and bioretention rain garden. Concrete pedestrian connections will be made from the units north to the Elizabeth Street sidewalk. The total impervious area of the proposed redevelopment is roughly 22,688 square-feet. The existing curb cut and concrete apron to Elizabeth Street will be slightly reconfigured to meet current code requirements. The area of pavement draining north across the Elizabeth sidewalk will be approximately 450 square-feet, which is less than the maximum 750 square-feet allowed by LCUASS. The site is located in the Old Town master drainage basin, and therefore, on-site detention is not required so long as the increase in impervious area is less than 5,000 square-feet. The total increase in impervious area proposed with this development is approximately 77 square-feet (22,688 – 22,611). A detailed breakdown of the existing and proposed impervious areas is attached to this letter. Page 2 of 2 D:\Projects\688-001\Drainage\Reports\Drainage Report\688-001_Drainage-Letter_2012-02-28.docx Although stormwater quantity detention is not required, stormwater quality mitigation will be addressed by both temporary and permanent Best Management Practices (BMPs). During construction, the Contractor will follow the appropriate and applicable City of Fort Collins standards for erosion and sediment control. Post construction water quality and erosion control will be achieved by a fully established and stabilized site. All areas disturbed during construction will receive permanent hardscape, landscape, or building structure. This portion of the Old Town basin does not receive regional water quality treatment; therefore, on-site water quality mitigation is required. Much of the existing landscaped buffers on the west side and north side of the building will be preserved as permeable areas to promote infiltration and treat surface runoff prior to entering the adjacent gutters and inlets. However, the primary water quality treatment method to be employed is the construction of an on-site bioretention rain garden. Water quality computations have been performed for this facility utilizing the UDFCD’s UD-BMP Version 3.01 “Rain Garden (RG)” Design Procedure Form. A copy of the RG worksheet is attached to this letter. The proposed grading concept closely matches existing elevations and drainage patterns, and only varies in an effort to improve the existing condition from a floodplain protection and water quality standpoint. On- site detention is proven to be unnecessary. Stormwater quality has been provided to bring the historic site into compliance in the redeveloped condition. Therefore, it is my professional opinion that the new apartment building proposed with Fairview Shopping Center Filing Four at 1409 W. Elizabeth Street satisfies all applicable stormwater criteria. Please do not hesitate to contact me if you have questions or require additional information. Sincerely, Nicholas W. Haws, PE enc. cc: Dave Derbes, LEED AP – Brinkman Construction 02.28.12 Fairview Shopping Center Filing Four Preliminary Drainage Letter Report CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Fairview Shopping Center Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Reese Asphalt ……....……………...……….....…...……………….…………………………………..0.95 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.. 50 40 Roofs …….…….………………..……………….…………………………………………….. 0.95 90 Pavers…………………………...………………..…………………………………………….. 0.40 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. H1 29,010 0.67 0.38 0.02 0.11 0.00 0.15 0.80 0.80 0.99 75.9 TOTAL 29,010 0.67 0.38 0.02 0.11 0.00 0.15 0.80 0.80 0.99 75.89 EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 February 28, 2012 D:\Projects\688-001\Drainage\Hydrology\688-001_Rational-Calcs_Existing.xlsx\C-Values Fairview Shopping Center Filing Four Preliminary Drainage Letter Report CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Fairview Shopping Center Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Reese Asphalt ……....……………...……….....…...……………….…………………………………..0.95 100 Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90 Gravel ……….…………………….….…………………………..……………………………….0.. 50 40 Roofs …….…….………………..……………….…………………………………………….. 0.95 90 Pavers…………………………...………………..…………………………………………….. 0.40 22 Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0 Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. A 1,349 0.03 0.00 0.00 0.00 0.00 0.03 0.25 0.25 0.31 0.0 B 8,731 0.20 0.00 0.00 0.20 0.00 0.00 0.95 0.95 1.00 90.0 C 4,743 0.11 0.03 0.03 0.00 0.00 0.04 0.66 0.66 0.83 56.5 D 3,284 0.08 0.04 0.02 0.00 0.00 0.01 0.85 0.85 1.00 82.3 E 10,903 0.25 0.14 0.05 0.00 0.00 0.06 0.79 0.79 0.98 74.8 TOTAL 29,010 0.67 0.22 0.10 0.20 0.00 0.15 0.80 0.80 1.00 73.73 DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 Fairview Shopping Center Filing Four Preliminary Drainage Letter Report Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 75.8 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.758 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.24 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 29,309 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = 0.30 in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = 419.4 cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = ft / ft (Use "0" if rain garden has vertical walls) Design Procedure Form: Rain Garden (RG) Andy Reese Northern Engineering February 28, 2012 Fairview Shopping Center Filing Four Fort Collins, Colorado C) Mimimum Flat Surface Area AMin = sq ft D) Actual Flat Surface Area AActual = sq ft E) Area at Design Depth (Top Surface Area) ATop = sq ft F) Rain Garden Total Volume VT= cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media City of Fort Collins Standard Planting media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 0.5 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 419 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 0.63 in Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO 688-001_UD-BMP_v3_01.xls, RG 2/28/2012, 3:34 PM Fairview Shopping Center Filing Four Preliminary Drainage Letter Report Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON THE FLAT SURFACE A) Will the rain garden be irrigated? Notes: February 28, 2012 Fairview Shopping Center Filing Four Fort Collins, Colorado Design Procedure Form: Rain Garden (RG) Andy Reese Northern Engineering Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO 688-001_UD-BMP_v3_01.xls, RG 2/28/2012, 3:34 PM X X X X X X X X X X X X X X T T T T T T T T T T T T T T T S S CO W E FH DI LP S S TV T T W WV WV X X X X X X X X X X W ST ST ST ST ST ST ST ST D S ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST C.B. & POTTS RESTAURANT & BREWERY WENDY'S CONCRETE DRIVE THRU LANE ASPHALT PARKING AREA EXISTING ASPHALT PARKING AREA ASPHALT PARKING AREA CONC. LOADING AREA ASPHALT PARKING AREA EXISTING CONCRETE SIDEWALK WEST ELIZABETH STREET (40' RIGHT OF WAY) 12' DRAINAGE & UTILITY EASEMENT ASPHALT PARKING AREA TRASH ENCLOSURE TRASH ENCLOSURE 10' UTILITY EASEMENT PROPOSED APARTMENT X X X X X X X X X X X X X X S S CO W E FH DI LP S S TV T T W WV WV X X X X X X X X X X W ST ST ST ST ST ST ST ST / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / D S ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST C.B. & POTTS RESTAURANT & BREWERY WENDY'S CONCRETE DRIVE THRU LANE ASPHALT PARKING AREA EXISTING ASPHALT PARKING AREA ASPHALT PARKING AREA CONC. LOADING AREA ASPHALT PARKING AREA EXISTING CONCRETE SIDEWALK WEST ELIZABETH STREET (40' EXISTING RIGHT-OF-WAY) 12' DRAINAGE & UTILITY EASEMENT ASPHALT PARKING AREA 10' UTILITY EASEMENT TRASH ENCLOSURE TRASH ENCLOSURE 10' UTILITY EASEMENT RAIN GARDEN EXISTING 5' ATTACHED SIDEWALK 8' ATTACHED SIDEWALK 8' ATTACHED SIDEWALK PROPOSED APARTMENT BUILDING 1685 5035 5038 5034 5037 5033 5036 1645 No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Feb. 28, 2012 PROJECT: 688-001 Sheet Of 7 Sheets FAIRVIEW SHOPPING CENTER FILING FOUR T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 02/28/12 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� C4.1 FLOODPLAIN EXHIBIT A. Reese A. Reese 1"=20' NORTH ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING STORM SEWER PROPOSED STORM SEWER ST PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER EXISTING FEMA FLOODWAY NOTES: PROPOSED STORM INLET PROPOSED CONCRETE CROSS PAN (TYP.) PEDESTRIAN ACCESS RAMPS / / / / / / / / / / / / / / / / / / / / / / / / / / / PROPERTY BOUNDARY FOR STORMWATER REVIEW ONLY NOT FOR CONSTRUCTION 1.REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS, UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION. 2.ALL ELEVATIONS DEPICTED IN PLAN VIEW AND BENCHMARKS LISTED HEREON ARE PER THE CITY OF FORT COLLINS VERTICAL CONTROL DATUM (NGVD 29 - UNADJUSTED). ADD 3.0 FEET TO CONVERT TO THE NAVD 88 DATUM. SEE NOTE #3 FOR ADDITIONAL INFORMATION. 3.REFER TO THE FLOOD INSURANCE STUDY FOR LARIMER COUNTY, COLORADO AND INCORPORATED AREAS, VOLUME 1 OF 4, REVISED: JUNE 17, 2008 FOR LARIMER COUNTY VERTICAL DATUM OFFSET (TABLE 3) TO CONVERT BETWEEN NAVD 88 AND NGVD 29. 4.THE LOWEST FLOOR (INCLUDING ANY BASEMENT OR CRAWL SPACE) AND ALL HVAC EQUIPMENT AND THE FINISH FLOOR AND LOWEST FLOOR ELEVATION FOR ANY BUILDING IN THE FLOODPLAIN SHALL BE ELEVATED ABOVE THE REGULATORY FLOOD PROTECTION ELEVATION. 5.A FLOODPLAIN USE PERMIT SHALL BE REQUIRED FOR EACH STRUCTURE AND EACH SITE CONSTRUCTION ELEMENT (DETENTION PONDS, BIKE PATHS, PARKING LOT, UTILITIES, ETC.) IN THE FLOODPLAIN. 6.A FEMA ELEVATION CERTIFICATE SHALL BE COMPLETED AND APPROVED BEFORE THE CERTIFICATE OF OCCUPANCY IS ISSUED FOR ANY STRUCTURE IN THE FLOODPLAIN. 7.NO STORAGE OF MATERIALS OR EQUIPMENT SHALL BE ALLOWED IN THE FLOODWAY, WHETHER TEMPORARY (DURING CONSTRUCTION) OR PERMANENT. LANDSCAPING SHALL ALSO MEET THE REQUIREMENTS FOR NO RISE IN THE FLOODWAY. {8.REFER TO THE "DRAINAGE REPORT LETTER FOR FAIRVIEW SHOPPING CENTER FILING FOUR" BY NORTHERN ENGINEERING, DATED FEBRUARY 28, 2012 FOR ADDITIONAL INFORMATION. } LOWEST FLOOR ELEVATION = C BASE FLOOD ELEVATION (BFE) = A MINIMUM HVAC EQUIPMENT ELEVATION BASE = FLOOD B ELEVATION (BFE) = A 18" MIN. 18" MIN. DETAIL NTS FIELD SURVEY BY: BENCHMARKS: Washburn Land Surveying, Inc. Project No. 2010-0018 Date: November 18, 2010 ADDITIONAL FIELD SURVEY(S): January 2012 BENCHMARK #1: City of Fort Collins Benchmark 20-97 Elevation= 5046.97 BENCHMARK #2: City of Fort Collins Benchmark 19-97 Elevation= 5022.56 CROSS-SECTION (CSL) SLAB-ON-GRADE BASE FLOOD ELEVATION (BFE) EXISTING 100-YR FEMA FLOODPLAIN BOUNDARY 5000 {5000} ELEVATION NAVD 88 {5003} ELEVATION NGVD 29 (UNADJUSTED) BUILDING SUMMARY EL. DESIGNATION NAVD 88 NGVD 29 (UNADJUSTED) A 5038.00 FT 5035.00 FT B 5039.50 FT 5036.50 FT C 5039.67 FT 5036.67 FT REGULATORY FLOOD PROTECTION ELEVATION 5039.50 FT 5036.50 FT 20554 PROPOSED RAIN GARDEN BUILDING E 10' UTILITY EASEMENT D C B A RAIN GARDEN C 0.11 ac B 0.20 ac A 0.03 ac E 0.25 ac D 0.08 ac No. Revisions: By: Date: REVIEWED BY: N. Haws DESIGNED BY: DRAWN BY: SCALE: DATE: Feb. 28, 2012 PROJECT: 688-001 Sheet Of 7 Sheets FAIRVIEW SHOPPING CENTER FILING FOUR T���� �������� ��� ����������� �� ������� �������� �� N������� E���������� S�������, I��. ��� ��� ��� �� �� ���� ��� ��� ���� �� ������������ ������ ������ ��� ������ �� � P����������� E������� �� ��� ������ �� N������� E���������� S�������, I��. NOT FOR CONSTRUCTION REVIEW SET 02/28/12 200 S���� C������ A�����, S���� 010 F��� C������, C������� 80524 E N G I N E E R I N G � � � � � � �� PHONE: 970.221.4158 FAX: 970.221.4159 ���.�������������������.��� C4.0 DRAINAGE EXHIBIT A. Reese A. Reese 1"=20' NORTH ( IN FEET ) 1 inch = ft. 20 0 20 Feet 20 40 60 Date Date Date Date Date Date APPROVED: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: City Engineer Water & Wastewater Utility Stormwater Utility Parks & Recreation Traffic Engineer Environmental Planner City of Fort Collins, Colorado UTILITY PLAN APPROVAL CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R LEGEND: 4953 PROPOSED CONTOUR 93 PROPOSED STORM SEWER PROPOSED SWALE EXISTING CONTOUR PROPOSED CURB & GUTTER NOTES: PROPOSED INLET A DESIGN POINT FLOW ARROW DRAINAGE BASIN LABEL BASIN DESIGNATION BASIN AREA (AC) DRAINAGE BASIN BOUNDARY FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION 1.REFER TO THE "DRAINAGE LETTER REPORT FOR FAIRVIEW SHOPPING CENTER FILING FOUR" BY NORTHERN ENGINEERING, DATED {FEBRUARY 28, 2012} FOR ADDITIONAL INFORMATION. {2.REFER TO THE FLOODPLAIN EXHIBIT FOR CROSS-SECTION LOCATIONS, BASE FLOOD ELEVATIONS, AND FLOODPLAIN NOTES. } PROPOSED SWALE SECTION 1 1 B2 1.45 ac BIO-RETENTION RAIN GARDEN SUMMARY PERCENT IMPERVIOUS WATER QUALITY CAPTURE VOLUME (IN.) WATERSH ED AREA REQUIRED WATER QUALITY VOLUME (CU. FT.) VOLUME PROVIDED (CU. FT.) 75.80 0.24 29309 593 654 DESIGN POINT BASIN ID TOTAL AREA (�����) C2 C100 2-�� T� (���) 100-�� T� (���) Q2 (���) Q10 (���) Q100 (���) A A 0.03 0.25 0.31 8.4 7.4 0.0 0.0 0.1 B B 0.20 0.95 1.00 5.0 5.0 0.5 0.9 2.0 C C 0.11 0.66 0.83 5.0 5.0 0.2 0.4 0.9 D D 0.08 0.85 1.00 5.0 5.0 0.2 0.3 0.8 E E 0.25 0.79 0.98 5.0 5.0 0.6 1.0 2.4 RUNOFF SUMMARY PROPOSED RAIN GARDEN February 28, 2012 D:\Projects\688-001\Drainage\Hydrology\688-001_Rational-Calcs.xlsx\C-Values