HomeMy WebLinkAboutFAIRVIEW SHOPPING CENTER FILING FOUR (1409 W. ELIZABETH MULTI-FAMILY) - PDP - PDP120009 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYELB Engineering, LLC.
Transportation Engineering Solutions
Memorandum
TO: Mr. Joe Olson, P.E., Traffic Engineer
Mr. Ward Stanford, Traffic Operations Engineer
Mr. Dave Derbes, Brinkman Partners, Inc.
FROM: Eric L. Bracke, P.E., P.T.O.E
DATE: February 13, 2010
SUBJECT: 1409 Elizabeth Apartments – Transportation Impact Memorandum
This memorandum addresses the transportation impacts of the proposed 1409 Elizabeth
Apartments Project. The project entails building a 25,924 square foot apartment building
(27 dwelling units/51 beds)) on the current site of the ΛΤΛ Fraternity House. The
proposed location is in an existing structure located near (1/4 miles west) the Colorado
State University Campus. The project site is on the south side of Elizabeth Street directly
across from the International Center Moreno House and sits between the CB & Potts
restaurant and the Wendy’s restaurant. A vicinity map of the new location is displayed in
Figure 1 on the following page.
A scoping form was sent to the City Traffic Engineer to determine the scope of the
transportation impact study. It was agreed that the project will have relatively minor (if
any) impact to the surrounding street system and that a memorandum would be sufficient
to address the related transportation impacts. Capacity analyses would not be required and
a trip generation estimate would be required along with an alternative modes analysis. The
scoping form for the transportation study can be found in Appendix A.
Existing Conditions
Elizabeth Street is classified as a 4-lane arterial on the City of Fort Collins Master Street
Plan. The cross section that is currently in place is a 5-lane roadway with two through
lanes in the east and west directions and a two-way-left-turn-lane in the center. There are
bike lanes on the roadway that connect directly to the Colorado State University as well as
to the bike system on Shields Street. Sidewalks in the area are continuous and well used
by the local student population.
ELB Engineering, LLC
5401 Taylor Lane
Fort Collins, CO 80528
Phone: 970-988-7551 | FAX: 970-225-8942
ELBEngineering@lpbroadband.net
1
The City requested that impacts regarding bikes and pedestrians be briefly discussed for
the intersections of City Park/Elizabeth and Shields/Elizabeth. Impacts caused by bikes
and pedestrians would normally be changes in signal timings. Vehicular or pedestrians
counts were not conducted as part of this study. However, the existing use was a fraternity
house with approximately 40 students residing. This project is also a student housing
project with 51 beds being provided. Based on the above, there should be minimal, if any
impact to the intersections.
The area along Elizabeth is heavily used by students. The area is also seeing additional
student housing projects come forward such as the District at Campus West located on
Plum Street. The area is designated as a pedestrian district on the Master Street Plan. The
City has made extensive improvements along the Elizabeth Street corridor to enhance the
pedestrian and bicycle environment.
Site
North
Figure 1: Vicinity Map
ELB Engineering, LLC
5401 Taylor Lane
Fort Collins, CO 80528
Phone: 970-988-7551 | FAX: 970-225-8942
ELBEngineering@lpbroadband.net
2
Elizabeth Street is posted at 30 mph and the pavement appears to be in good condition.
The area surrounding the site is primarily commercial as well as student oriented housing.
Project
As stated earlier, the project is known as the 1409 Elizabeth Apartments Project. The
project entails building a 25,924 square foot student apartment building (27 dwelling
units/51 beds)) on the current site of the ΛΤΛ Fraternity House. The developers plan to
raze the existing structure and construct the new apartment building. Access to the site will
be through a shared drive with the Wendy’s restaurant. This access is already and
constructed and served the previous use. There is also recirculation to the west in the
southern portion of the site and vehicles can enter and exit through the CB & Potts
property. The site plan is provided below in Figure 2.
Main Driveway from Elizabeth Back Access thru CB & Potts
ELB Engineering, LLC
5401 Taylor Lane
Fort Collins, CO 80528
Phone: 970-988-7551 | FAX: 970-225-8942
ELBEngineering@lpbroadband.net
3
Figure 2: Site Plan
ELB Engineering, LLC
5401 Taylor Lane
Fort Collins, CO 80528
Phone: 970-988-7551 | FAX: 970-225-8942
ELBEngineering@lpbroadband.net
4
Trip Generation
Trip generation rates for the proposed project are based on the Trip Generation, 8th Edition
manual prepared by the Institute of Transportation Engineers. The manual presents data
from numerous trip generation studies for a variety of land uses from across the country.
ITE Code 220, apartments was used in this analysis. A trip reduction of 35% was utilized
in the trip generation analysis to account for the alternative modes of transportation that
will be used by the residents of this development. It is likely that the trip reduction will be
significantly higher than assumed rate due to the close proximity of the project to CSU.
However, the lower reduction rate will present a more conservative analysis.
Since the previous use of the site is no longer in place, it is not possible to do a trip
generation comparison between the fraternity house and the student apartment building. It
is likely, and therefore assumed, that the uses are similar.
Table 1 below summarizes the proposed trip generation for the project. For the entire
project, during the morning peak hour, 9 trip ends can be expected and 11 trip ends can be
expected from the project during the afternoon peak hours.
Table 1 – Trip Generation Estimates
AM Rate AM Trips AM Rate AM Trips PM Rate PM Trips PM Rate PM Trips
Use ITE CODE Size
Daily
Rate
Daily
TripsININOUT OUTININOUT OUT
Phase I
Student Apartments 220 27.0 6.72 181 0.1 3 0.41 11 0.4 11 0.22 6
Trip Reduction due to proximity to
CSU (40%) (63.50) (0.95) (3.87) (3.78) (2.08)
TOTAL 1182774
Alternative Modes Analysis
Section 4.5.3 (B) of the Larimer County Urban Area Street Standards requires that
projects undergo a level of service analysis for alternative modes of transportation. The
modes of transportation that must meet LOS standards are bicycles, and pedestrians.
Transit service LOS must also be analyzed at the time of development review. However,
transit LOS is not part of the Adequate Public Facilities test. The area of interest for the
alternative modes of transportation is shown below in Figure 2.
ELB Engineering, LLC
5401 Taylor Lane
Fort Collins, CO 80528
Phone: 970-988-7551 | FAX: 970-225-8942
ELBEngineering@lpbroadband.net
5
Figure 3: Multi-modal Evaluation Area (AM/PM)
Pedestrian Level of Service
The project area was evaluated for compliance with the pedestrian level of service
standards. The site is within walking distance to CSU and the commercial area located on
Elizabeth Street. Sidewalks also exist on City Park Ave. to the east of the project as well
as the on Bryan to the West. Connectivity in the area from a pedestrian perspective is
achieved.
The sidewalks in front of the site meet the current standards and are in good condition. As
stated earlier, a recent project by the City improved the bike and pedestrian opportunities
along the Elizabeth Street Corridor. The sidewalks in the neighborhoods to the north and
south of the project were constructed to an older standard.
ELB Engineering, LLC
5401 Taylor Lane
Fort Collins, CO 80528
Phone: 970-988-7551 | FAX: 970-225-8942
ELBEngineering@lpbroadband.net
6
Directness – There will be direct sidewalk connections to the commercial area to
the east and directly to CSU.
Continuity – The sidewalk system that will be in place has continuity to all
surrounding areas.
Street Crossings – The intersection of Shields/Elizabeth and Elizabeth City Park
both have crosswalks and pedestrian phases. Crosswalks and pavement markings
are at the intersection are consistent with City Standards. There are five lanes of
traffic to cross.
Visual Interest and Amenity – The area is an improved commercial area and the
landscaping is maturing. The area is considered visually appealing.
Security – The sidewalks in the area are lit and good sight distances are available.
Bicycles Level of Service
The project will meet the bicycle level of service standards for both north/south and
east/west connections. There are currently bike lanes on Elizabeth Street and connect into
the city-wide system.
Transit Level of Service
According to the LUCASS Multimodal Level of Service Manual, transit level of service for
the City of Fort Collins is based on the routes and service levels planned for the year 2015.
However, the Manual was written in 1997 and is significantly outdated and no longer
considered valid. The transit LOS analyses are therefore based on the 2010 Transfort
Strategic Plan. The analysis is based on 4 factors – hours of weekday service, weekday
frequency of service, travel time factor, and peak load factor.
The 2010 transit plan and current service shows that the site has immediate access to routes
2, 3, and 11. These routes have excellent connectivity to the University as well as to
downtown.
Hours of Weekday Service: Since Route 2, 3, and 11 take folks directly to CSU,
it is assumed that the site will be served by 18 hours of service on an average
weekday. The standard can be assumed to be met.
ELB Engineering, LLC
5401 Taylor Lane
Fort Collins, CO 80528
Phone: 970-988-7551 | FAX: 970-225-8942
ELBEngineering@lpbroadband.net
7
Weekday Frequency of Service: Since the site is relatively close to an identified
route of high frequency transit service, the minimum of 15-minute service is met.
Travel Time Factor: The travel time factor is portal-to-portal travel time divided
by auto travel time (peak hour). The standard for the criteria is for the travel time
in bus to be no more than two times that of the automobile. This standard is met.
Table 2
Transit Travel Time Comparisons
Destination Mode
Distance
(miles)
Travel
Speed
(mph)
Travel
Time
(hours)
Walk/Park
Time (hours)
Transfer/
Wait Time
(hours)
Total
Travel
Time
(hours)
Time
Differential
(bus/auto)
LOS
Standard
Met?
Downtown Bus 2 20 0.10 0.05 0.15 0.30 1.88 Yes
automobile 2 25 0.08 0.08 0.16
Foothills Mall Bus 4.5 20 0.23 0.08 0.15 0.46 1.75 Yes
automobile 4.5 25 0.18 0.08 0.26
FC High School Bus 5 20 0.25 0.10 0.15 0.50 1.79 Yes
automobile 5 25 0.20 0.08 0.28
CSU Campus Bus 0.3 20 0.02 0.01 0.10 0.13 1.36 Yes
automobile 0.3 25 0.01 0.08 0.09
Peak Load Factor: The standard for the peak load factor is calculated by dividing
the number of passengers by the peak time of day by the available seats. The
standard requires that this value be ≤ 1.2. Based on the LOS Manual, for all future
routes, the presumed peak load factor is 1.0 and therefore the standard is satisfied.
Based on the above, the transit LOS achieved 4 out of the 4 criteria and is therefore the
LOS is calculated at “C”, which is acceptable.
ELB Engineering, LLC
5401 Taylor Lane
Fort Collins, CO 80528
Phone: 970-988-7551 | FAX: 970-225-8942
ELBEngineering@lpbroadband.net
8
Conclusion
This memorandum documented the transportation impacts associated with the 1409
Elizabeth Apartments project. The project is located on Elizabeth Street approximately 1/3
mile due west of the CSU campus. Based on the analyses, investigations, and findings
documented in the various sections of this Transportation Impact Study, the following can
be concluded.
• The project will not present a significant impact to the surrounding roadway
system.
• The project will produce similar trips when compared to the fraternity house that is
presently on the site.
• The project is expected to produce approximately 118 daily vehicular trips. During
the morning peak hour, 9 trip ends can be expected and 11 trip ends can be
expected from the project during the afternoon peak hours. It is likely that the trips
produced by 1409 Elizabeth Apartments are nearly identical to the previous use on
the site.
• Multi-modal level of service is acceptable.
• Bicycle and pedestrian impacts will be minimal, if any.
Statement of Adequacy: The transportation facilities will be adequate and available to
serve this development as contained in the Larimer County Urban Area Street Standards.
All applicable LOS standards will be met since all transportation facilities are in place or
will be in place upon issuance of a certificate of occupancy.
ELB Engineering, LLC
5401 Taylor Lane
Fort Collins, CO 80528
Phone: 970-988-7551 | FAX: 970-225-8942
ELBEngineering@lpbroadband.net
9
APPENDIX A
ELB Engineering, LLC
5401 Taylor Lane
Fort Collins, CO 80528
Phone: 970-988-7551 | FAX: 970-225-8942
ELBEngineering@lpbroadband.net
10
ELB Engineering, LLC
5401 Taylor Lane
Fort Collins, CO 80528
Phone: 970-988-7551 | FAX: 970-225-8942
ELBEngineering@lpbroadband.net
11