HomeMy WebLinkAboutNEW BELGIUM BREWERY 2ND FILING PDP - 01-95 B - CORRESPONDENCE -Project: NEW BELGIUM BREWERY, 2ND FILING #1-95B
PDP - Final Compliance
REQUEST FOR A 41,225 S.F. EXPANSION OF THE EXISTING BREWERY TO INCLUDE AN ENLARGED SITE FOR ADDITIONAL OFFICE
SPACE, TWO NEW WAREHOUSES, NEW BREWHOUSE, ADDITIONAL FERMENTATION TANKS, AND EMPLOYEE PARKING. THE
REQUEST ALSO INCLUDES A REPLAT TO INCLUDE NEWLY ACQUIRED PROPERTY. THE SITE CONTAINS 7.17 ACRES AND IS
LOCATED AT THE CORNER OF LINDEN AND BUCKINGHAM STREETS; AND ZONED I, INDUSTRIAL.
Project Type:
Project Desc:
File ID: 01-95B Planner: TED SHEPARD DMS Project Num: CP97028400
ID Topic Issue Status Round Comment By Initial Date
1 sidewalk connection is required
There seems to be some question from Dave Ruble as to whether sidewalks
will be constructed that attach to the existing system on the north side of
Buckingham. As I stated in my March 2001 comments, this development will
be responsible for adding sidewalk facilities along the north side of
Buckingham along their frontage. They will build sidewalks to Collector
standards as the development builds out. See attached aerial for photo of
existing sidewalk and its relations to the new walks to be built. (LUC3.6.2 J.5,
3.2.2 C.6)
Active 1 Mark Jackson 05/08/2001
2 Improvements to Collector design standards
Improvements to north side of Buckingham will be to Citys Collector
standard. This includes:
bike lanes (6)
parkway (8)
detached sidewalk (5)
Cross sections shown in Dave Rubles response to comments memo does
not show accurate design standards.
Active 1 Mark Jackson 05/08/2001
3/7/2011 Page 1