HomeMy WebLinkAboutVIALE COLLEGIO - 1-02 A - CORRESPONDENCE -Project: VIALE COLLEGIO PDP & FINAL COMPLIANCE, #1-02/A
PDP - Final Compliance
REQUEST FOR A THREE-STORY, 29,500 S.F. MIXED USE BUILDING LOCATED AT 706 SOUTH COLLEGE AVENUE, A HALF BLOCK
SOUTH OF LAUREL STREET. THE PROJECT WOULD INCLUDE 5,500 S.F. OF GROUND FLOOR RETAIL AREA, 12,200 S.F. OF OFFICE
LEASE AREA LOCATED ON THE SECOND FLOOR OF THE BUILDING AND 20 ONE-BEDROOM EFFICIENCY APARTMENT UNITS
LOCATED ON THE THIRD FLOOR OF THE BUILDING. PARKING WOULD BE PROVIDED BY A GROUND-LEVEL PARKING LOT
BEHIND THE FIRST STORY AND COVERED BY THE UPPER LEVEL OFFICE AND RESIDENTIAL UNITS. THE PARKING LOT WILL
PROVIDE 33 OFF-STREET PARKING SPACES, TWO OF WHICH WILL BE HANDICAP ACCESSIBLE. THE PROJECT WOULD BE
ACCESSED FROM COLLEGE AVENUE AND THE ADJACENT ALLEY TO THE EAST.
Project Type:
Project Desc:
File ID: 01-02/A Planner: Bob Barkeen DMS Project Num: CP021274
ID Topic Issue Status Round Comment By Initial Date
1 General NO COMMENTS Active 1 Bruce Vogel 01/08/2002
2 General Please provide a utility plan which clearly shows and labels existing utilities
(I.e. gas, electric, water and sewer).
Resolved 1 Jeff Hill 01/16/2002
3 General Repeat Comment; Show and label locations of curb stops, meter pits and
grease traps.
Resolved 1 Jeff Hill 01/16/2002
4 General Provide a grease trap for all cafes/restaurants. Resolved 1 Jeff Hill 01/16/2002
5 General Include standard general details (I.e standard water/sewer service, meter pit,
bedding, etc.)
Resolved 1 Jeff Hill 01/16/2002
6 General Repeat Comment; Include standard general notes on landscape plans which
pertain to utility/landscape separation distance and locates of utilities. SEE
SITE AND LANDSCAPE PLANS FOR OTHER COMMENTS.
Resolved 1 Jeff Hill 01/16/2002
7 Zoning Engineering may have similar comments regarding vehicle spaces but
spaces 1 thru 3 may be too close to College Ave and those first few stalls will
have sight hazards in backing out of stall(s) due to water feature, partial wall,
and trees blocking views from college.
Resolved 1 Gary Lopez 01/17/2002
8 Zoning Proposed location of motorcycle parking may not work due to narrowness
between potential vehicle and post. Min. of one space only if possible.
Resolved 1 Gary Lopez 01/17/2002
3/7/2011 Page 1
Project: VIALE COLLEGIO PDP & FINAL COMPLIANCE, #1-02/A
ID Topic Issue Status Round Comment By Initial Date
9 Zoning Veh. spaces 1 thru 9 will have to be labled long-term residential parking only
because of their 8' stall widths.
Resolved 1 Gary Lopez 01/18/2002
10 Zoning Veh. space 19 will not be able to use back up indentation along north
property line as that will need to be landscaped along with area reserved for
motorcycle parking.
Resolved 1 Gary Lopez 01/18/2002
11 Zoning correction of # 8 above, proposed motor cycle parking will not work at this
location per the above requirement for the 5' landscaping buffer located
there.
Resolved 1 Gary Lopez 01/18/2002
12 General Please provide Utility Plans per LCUASS. A Development Agreement,
Development Construction Permit and State Highway Access Permit are
required prior to starting work.
Resolved 1 Susan Joy 01/29/2002
13 General 1/29/02: Please complete and submit the Checklist in Appendix E-4. The
checklist requirements must be incorporated into the utility plan design. See
attached.
5/21/02: Repeat.
Resolved 1 Susan Joy 01/29/2002
14 General 1/29/02: Will need to dedicate all additional ROW and easements as
required by code. An 8' easement is required adjacent to the alley and 15'
easement along College. Provide easements or ROW by seperate document
or submit a variance request.
5/21/02: Repeat. Please dedicate the 8' utility easement by separate
document. See attached.
Resolved 1 Susan Joy 01/29/2002
15 General Contact Rick Richter at 221-6605 for alley improvement requirements. Resolved 1 Susan Joy 01/29/2002
16 General Provide a Drainage Report. Can not add any additional drainage to College
Avenue.
Resolved 1 Susan Joy 01/29/2002
17 General 1/29/02: Provide details 7-20a, 7-20b, 7-29b, 16-1, 16-2, and any other detail
as required by the design.
5/21/02: Repeat.
Resolved 1 Susan Joy 01/29/2002
3/7/2011 Page 2
Project: VIALE COLLEGIO PDP & FINAL COMPLIANCE, #1-02/A
ID Topic Issue Status Round Comment By Initial Date
18 General 50' minimum parking setback from College Avenue flowline per detail 19-03.
See redlines.
Resolved 1 Susan Joy 01/29/2002
19 General 01/29/02: See detail 19-04 for minimum parking stall lengths and widths.
Most of the parking spaces are out of compliance.
08/09/02: Please refer to detail 19-04 for minimum parking stall lenghts and
widths. 45 degree parking stalls must be 20' in length.
Resolved 1 Susan Joy 01/29/2002
20 General Need to provide adequate sight distance to and from the alley(s). Resolved 1 Susan Joy 01/29/2002
21 General 1/29/02: Show all existing features within 150' of the project limits. Clearly
define all ROW, easements, setbacks etc. See LCUASS for other
requirements.
5/21/02: Your response to issue 21 is not adequate. We need to verify how
your proposed construction matches with existing facilities, ie sidewalks, alley
paving, adjacent parking lots, etc.
Resolved 1 Susan Joy 01/29/2002
22 General Provide Handicap Ramp detail. Resolved 1 Susan Joy 01/29/2002
23 General One way drive from College Avenue must meet LCUASS Chap 7 (Sight
distance, width, etc) and 9.3.2 requirements. Also, 9.4.2 requires that the
drive be perpendicular from the edge of pavement for a minimum of 25'. The
entrance is currently only 24'.
Resolved 1 Susan Joy 01/29/2002
24 General WATER SUPPLY
A fire hydrant is required to be within 300 ft. of the building, and shall deliver
1500 gpm @ 20 psi.
Active 1 Ron Gonzales 02/05/2002
25 General ADDRESS
The building address is required to be visible from the street on which the
property fronts, minimum 8 inch numerals to be posted on a contrasting
background
Active 1 Ron Gonzales 02/05/2002
26 General FIRE SPRINKLERS
This facility is required to be fire sprinklered (due to # of units).
Active 1 Ron Gonzales 02/05/2002
3/7/2011 Page 3
Project: VIALE COLLEGIO PDP & FINAL COMPLIANCE, #1-02/A
ID Topic Issue Status Round Comment By Initial Date
27 General VENTILATION SYSTEM
A ventilation and smoke removal system shall be installed for the
underground parking lot in accordance with 97UBC.
Active 1 Ron Gonzales 02/05/2002
28 Existing Trees Contact the City Forester, Tim Buchanan, to see if any of the existing tree
that are proposed to be removed may be removed and if so, will their loss
need to be mitigated.
Resolved 1 Doug Moore 02/06/2002
29 General No other issues. Resolved 1 Doug Moore 02/06/2002
30 General Please provide inofrmation on how delivery vehicles for the retail element of
the building are to function (i.e. parking, delivery route, etc..)
Resolved 1 Tom Reiff 02/06/2002
31 Site Plan Provide an access ramp for the bicycle racks that are located internal to the
site adjacent to the stair well.
Resolved 1 Tom Reiff 02/06/2002
32 General Patio dining, etc, requires an encroachment permit. Apply through Lance
Newlin, Chief Inspector, 221-6605.
Resolved 1 Susan Joy 02/06/2002
33 Site Plan Please provide additional information on how the bike rack near the proposed
fountain is designed and planned to operate without circulation conflicts or if
the nearest auto parking stall needs to be removed then relocate the bike
parking into the vacated auto stall.
Resolved 1 Tom Reiff 02/06/2002
34 Site Plan Handicap parking stalls measure 8-feet in width with a 5-foot striped area for
ramp access please correct on next submittal.
Resolved 1 Tom Reiff 02/06/2002
35 Site Plan Improve pedestrian access to College Ave. and the front entrance of the retail
fronts from the parking stalls. This can be accomplished by continuing the
walkway from the parking lot to the College Ave. sidewalk (see site plan
relines). Furthermore, it is requested that the applicant explore the option of
relocating the mechanized room in order to move the stairwell further into the
building, thus increasing the walkway width for wheelchairs.
Resolved 1 Tom Reiff 02/06/2002
36 Site Plan Reduce the one-way driveway width to 20 feet, thus reducing the potential of
cars exiting from the structure onto College Ave. and improving pedestrian
ciruclation in the area.
Resolved 1 Tom Reiff 02/06/2002
3/7/2011 Page 4
Project: VIALE COLLEGIO PDP & FINAL COMPLIANCE, #1-02/A
ID Topic Issue Status Round Comment By Initial Date
37 Site Plan Continue the sidewalk treatment / design across the driveway with a break in
the driveway treatment (see site plan red lines).
Resolved 1 Tom Reiff 02/06/2002
38 Site Plan Restuarants with sidewalk cafes need to allow for pedestrian circulation, a
minimum of 7 foot sidewalk width leading to building entrances shall be
maintained and free of tables and other encumbrances.
Resolved 1 Tom Reiff 02/06/2002
39 General Please provide a grading and drainage plan and report for review. The
included letter is not adequate. Report should address how water quality
BMP's are addressed by the proposed improvements on this site. Please
include plans to be part of an overall Utility Plan set. Repeat Comments in
Bold. - 5/28/02 Also, please include more spot elevations for grading plan
and label existing and proposed. On drainage plan, provide flow arrows and
show any basin delineations with basin boundary lines ( show which flow is
still going to flow to College and what will flow to the alley).
Resolved 1 Basil Hamdan 02/11/2002
40 Erosion Control A standard erosion/sediment control plan and report should be submitted for
approval. The plan should include City standard erosion control notes with
additional notes and BMPÂ’s showing the proposed project schedule, and
indicating how the surrounding area will be protected from sediments exiting
the site during construction activities. Repeat - 5/28/02
Resolved 1 Basil Hamdan 02/11/2002
41 General Contact Ron Gonzales with PFA regarding the emergency access
requirements for the rear alley. Section 3.6.6.D.3 states that the minimum
unobstructed width shall be thirty (30) feet for access roads serving buildings
three (3) stories or more in height on at least one (1) side of the building. The
building height shall be measured from the access road grade.
PFA will not serve any building from an arterial road thus eliminating College
Avenue as the alternate access road. Does the rear alley meet the minimum
30' requirement?
03/05/02 - Note: I spoke with Ron Gonzales today and he has waived this
requirement.
Resolved 1 Susan Joy 02/13/2002
42 General The TIS numbers don't add up. Your summary states that 50% of the traffic
accesses the property from the north, 10% from College, and 20% from the
east and south. Where is the other 30%?
Resolved 1 Susan Joy 02/14/2002
3/7/2011 Page 5
Project: VIALE COLLEGIO PDP & FINAL COMPLIANCE, #1-02/A
ID Topic Issue Status Round Comment By Initial Date
43 General This project must now design and construct the alley to meet current street
standards and address existing drainage issues.
A little bit of history on the alley: The alley was paved for dust control several
years ago but was never designed to meet any street standard. The alley
was repaved again last year after the utility repairs rather than trying to patch
everything. There are drainage problems and that will need to be addressed
in the design.
Resolved 1 Susan Joy 02/14/2002
44 General Underground existing overhead utilities if any. Resolved 1 Susan Joy 02/14/2002
45 General Please include the sq.ft area for the lower level commercial/retail and the
anticipated uses.
Resolved 1 Bob Barkeen 02/14/2002
46 General AT&T Digital
At&T Broadband will not make any plans to service this project until a
Broadband Utility Easement, also refered to a service agreement, is
completed with our Commercial Accounts Exutive, Reneta Santro, who may
be reached at (970) 419-3106.
Resolved 1 Bob Barkeen 02/14/2002
47 General Excel Eenrgy
Any cut offs, removal, relocation or installation of gas lines will be at
developers expense.
PSCO has existing gas services to 704 South College and 708 South College
Ave. Either one or both will need to be relocated or cut-off. A larger service
maybe required depending on future load.
Depending on size of future new load, some main reoinforcement maybe
required.
Resolved 1 Bob Barkeen 02/14/2002
48 Existing Trees The large walnut tree at the southwest corner of the property is a significant
tree and should be preserved to the extent feasable.
Resolved 1 Bob Barkeen 02/14/2002
49 Existing Trees Please add two canopy trees along the south border (see attached sheet) Resolved 1 Bob Barkeen 02/14/2002
50 Existing Trees Please change the snowdrift crabapple to springsonw crabapple. Snowdrift
crabapple is succeptable to fire blight disease.
Resolved 1 Bob Barkeen 02/14/2002
3/7/2011 Page 6
Project: VIALE COLLEGIO PDP & FINAL COMPLIANCE, #1-02/A
ID Topic Issue Status Round Comment By Initial Date
51 Existing Trees Please add the standard landscape and tree protection notes (attached). Resolved 1 Bob Barkeen 02/14/2002
52 Existing Trees The planting bed along the northwest corner of the project is too narrow. Resolved 1 Bob Barkeen 02/14/2002
53 Existing Trees Lighting plan needed. Important to provide at least 1 fc 30 feet around all
entrances and stairwells.
Resolved 1 Joseph Gerdom
54 Utility Plans 5/21/02: Correct Line 19 of the General Notes to read as shown in Appendix
E1 and reference the final drainage and erosion control study for your project.
Resolved 2 Susan Joy 05/21/2002
55 Utility Plans 5/21/02: Provide the statement shown on Checklist E4, Section I, item J.
See attached.
8/14/02: Repeat comment.
Resolved 2 Susan Joy 05/21/2002
56 Utility Plans 5/21/02: Provide a grading sheet. Show existing and proposed contours at a
minimum 2' interval and label.
Resolved 2 Susan Joy 05/21/2002
57 Utility Plans 5/21/02: Contours must extend a minimum of 50' offsite and tie into existing
contours.
Resolved 2 Susan Joy 05/21/2002
58 Utility Plans 5/21/02: Provide finish grade elevations for lot coners, and finish floors/top of
foundation of buildings.
Resolved 2 Susan Joy 05/21/2002
59 Utility Plans 5/21/02: Provide the foundation elevations statement as shown in the
Checklist E4, section I, item E.
Resolved 2 Susan Joy 05/21/2002
60 Utility Plans 5/21/02: Provide drainage arrows and show positive drainage to streets or to
an approved drainage facility.
Resolved 2 Susan Joy 05/21/2002
61 Utility Plans 5/21/02: Please show all curb return radii used in accordance with Table 8-2. Resolved 2 Susan Joy 05/21/2002
62 Utility Plans 5/21/02: Unable to determine if the minimum desirable flowline grade around
curb returns of 1%, minimum allowable of .5% is being met as there were no
spot elevations given. Please provide.
Resolved 2 Susan Joy 05/21/2002
63 Utility Plans 5/21/02: Unable to determine if drive approach slopes toward street. No
elevations were provided.
Resolved 2 Susan Joy 05/21/2002
3/7/2011 Page 7
Project: VIALE COLLEGIO PDP & FINAL COMPLIANCE, #1-02/A
ID Topic Issue Status Round Comment By Initial Date
64 Utility Plans 5/21/02: Show how much of the existing driveway cut is being removed and
replaced and add the Street Cut Note:
Limits of street cut are approximate. Final limits are to be determined in the
field by the City Engineering Inspector. All repairs to be in accordance with
City street repair standards.
Show how the proposed curb and gutter ties into the existing and what
exactly you are removing/replacing. Define the limits of construction by
shading or hatching in the approximate area of removals.
10/29/02: Please add the street cut note shown above to sheet C3 as note
#8.
Active 2 Susan Joy 05/21/2002
65 Utility Plans 5/21/02: Provide a signature block for CDOT.
8/14/02: Repeat comment. Provide signature block on the cover sheet and
the grading sheet.
10/29/02: Repeat comment. Provide signature block on the grading sheet.
Active 2 Susan Joy 05/21/2002
66 Utility Plans 5/21/02: It is difficult to determine existing facilities from proposed. Please
use a lighter (ghosted) line weight for exisiting features.
Resolved 2 Susan Joy 05/21/2002
67 Utility Plans 5/21/02: Provide stations and elevations at all PC's and driveway
intersections.
Resolved 2 Susan Joy 05/21/2002
68 Utility Plans 5/21/02: Provide a Legend on each sheet clearly identifying the symbols
used on that particular sheet.
Resolved 2 Susan Joy 05/21/2002
69 Utility Plans 5/21/02: A concrete driveway is shown to the property line, however, the city
is not responsible for the maintenance of curbs, sidewalks, gutter, and
driveways.
Resolved 2 Susan Joy 05/21/2002
70 Utility Plans 5/21/02: Detail 7-11F requires that all fences (including the wall around the
trash enclosure) must be set back a minimum of 3' from the ROW line.
Resolved 2 Susan Joy 05/21/2002
71 Landscape Plan 5/21/02: Show all utilities. Resolved 2 Susan Joy 05/21/2002
3/7/2011 Page 8
Project: VIALE COLLEGIO PDP & FINAL COMPLIANCE, #1-02/A
ID Topic Issue Status Round Comment By Initial Date
72 Landscape Plan 5/21/02: Do not use architectural scaling, use an engineering scale.
8/14/02: This is a repeat comment. Do NOT use an architectural scale -
must be an engineering scale.
Resolved 2 Susan Joy 05/21/2002
73 Landscape Plan 5/21/02: Coordinate comments from the utility plan. See redlines for further
comments.
Resolved 2 Susan Joy 05/21/2002
74 Site Plan 5/21/02: Use an engineering scale, not architectural. Resolved 2 Susan Joy 05/21/2002
75 Site Plan 5/21/02: Coordinate comments from the utility plans. Resolved 2 Susan Joy 05/21/2002
76 Utility Plans No thrust block is required on a 1.5-inch water service. Control point for
1.5-inch water service is at a 1.5-inch curb stop. No gate valves are allowed
on a 1.5-inch water service.
Resolved 2 Jeff Hill 05/28/2002
77 Utility Plans Repeat comment; Site and landscape plans do not reflect the same
information as the civil plan. Coordinate all plans to reflect the same
information.
Resolved 2 Jeff Hill 05/28/2002
78 Utility Plans As previously indicated include the standard general note (Coordinate
abandonments with City Utilities) which pertains to abandonment of existing
water and sewer service. See utility plans for other comments.
Resolved 2 Jeff Hill 05/28/2002
79 Parking (Follow-up comment from 1st round comment) Normally, parking dimensions
for handicap parking stalls consist of an 8-foot wide stall and 5-foot wide
striped loading area as per the Larimer County Urban Area Street Standards
and the American with Disabilities Act. However, the City has a new method
for striping handicap parking stalls. Contact Randy Hensley in parking
services regarding the new striping plan. Please, keep in mind that the ramp
will need to be accessible from both stalls.
Resolved 2 Tom Reiff 05/28/2002
80 Site Plan (Follow-up comment to 1st round comment) Per City standards the sidewalk
is required to be continuous across a driveway with a break in the the
driveway. This signifies to the driver that they are entering a pedestrian facility
and given the high pedestrian traffic in this area, safety is paramount. Please
continue the pedestrian treatment across the driveway.
Resolved 2 Tom Reiff 05/28/2002
3/7/2011 Page 9
Project: VIALE COLLEGIO PDP & FINAL COMPLIANCE, #1-02/A
ID Topic Issue Status Round Comment By Initial Date
81 Construction
Drawings
The Tree Protection Specifications can be found under 3.2.1(G) of the Land
Use Code. These Specifications will need to be communicated on
Construction Drawings and Landscape Plans as notes, drawings, detail and
possibly elevations to clearly communicate how the existing trees will be
preserved.
Active 2 Doug Moore 05/28/2002
82 General Change architect scale to engineering scale on site plan. Resolved 2 Tom Reiff 05/28/2002
83 Parking The handicap ramp and striped loading area are constrianed by the location
of two columns. To meet ADA requirements a minimum of 3 feet clear space
around the objects is required.
Resolved 2 Tom Reiff 05/29/2002
84 Site Plan The bike parking facility near the fountain creates a constriant for people
trying to walk around the fountain. According to city standards a 5' back-out
space is required. Consider relocating the bike rack to the south wall to
improve mobility around the fountain.
Resolved 2 Tom Reiff 05/29/2002
85 Utility Plans Add a ramp for the scooter parking area for accessibility. Resolved 2 Susan Joy 05/30/2002
86 Utility Plans The sidewalk must be continuous through the driveway in accordance with
detail 16-1 and a minimum of 8" thick. See 16.2.1.F of LCUASS.
Resolved 2 Susan Joy 05/30/2002
87 Utility Plans The nearest water main is a 4-inch main in College Avenue. This main is
adequate for domestic service but may not be adequate to provide the
necessary flows to the fire sprinkler system. Discussions between the
developer and their consultants, PFA and the water utility are in progress to
identify options and work toward a solution. These discussions need to
continue until an acceptable resolution is found.
Resolved 2 Roger Buffington 05/30/2002
3/7/2011 Page 10
Project: VIALE COLLEGIO PDP & FINAL COMPLIANCE, #1-02/A
ID Topic Issue Status Round Comment By Initial Date
88 Utility Plans The applicant has requested a variance from the landscaping and setback
standards in Section 3.2.2(J) of the Land Use Code. This Section requires a
minimum of 5 feet of landscaping between a vehicle use area and an
adjacent lot line. Administrative variances to requirements within the land use
code are not permitted to be granted by staff pursuant to Section 2.8 of the
Land Use Code. Modification may only be granted by the Planning and
Zoning Board. However, based on the configuration of the parking within the
building, staff may interprite the parking area as a parking garage, rather than
a surface parking lot. Parking garages are not subject to the landscaping
requireemnts for parking lots. Parking garages would be subject to review of
Section 3.5.3 of the land use code, mixed use buildings.
Resolved 2 Bob Barkeen 06/05/2002
89 Utility Plans A 6-inch fire main is required. Active 2 Michael Chavez 07/09/2002
90 General No further comments (8-7-02) Resolved 3 Tom Reiff 08/07/2002
91 General Per our previous conversations concerning the termination point of the
proposed water main, provide the detail for the flush mount fire hydrant (see
detail attached to plans).
Resolved 3 Jeff Hill 08/13/2002
92 General Per our previous conversations concerning the water main which was
stubbed into the alley, show and label water main stub as existing.
See site, landscape and utility plans for other comments
Resolved 3 Jeff Hill 08/13/2002
93 General No More Comments. Active 3 Wes Lamarque 08/13/2002
94 General Coordinate removal of existing trees along College Avenue with City Forester. Active 3 Pete Wray 08/14/2002
95 General 8/14/02: The seating area in front of the building will require an
encroachment permit from the City Chief Inspector.
Resolved 3 Susan Joy 08/14/2002
96 Utility Plans 8/14/02: List all the variances in line 48 of the General Notes. Resolved 3 Susan Joy 08/14/2002
97 Utility Plans 8/14/02: Provide the Construction Notes, Appendix E2. Resolved 3 Susan Joy 08/14/2002
3/7/2011 Page 11
Project: VIALE COLLEGIO PDP & FINAL COMPLIANCE, #1-02/A
ID Topic Issue Status Round Comment By Initial Date
98 Utility Plans 8/14/02: The alley must be patched/repaired to city standards and will require
a 2" mill and overlay at minimum. Please contact Dave Stringer in
Development Review if you have any questions.
Correct the street cut note to read as shown in comment #64.
10/29/02: Repeat. Correct the street cut note - see redlines.
Active 3 Susan Joy 08/14/2002
99 Utility Plans 8/14/02: Sheet C5 still shows the fountain being installed in front of the
building. Please correct to match the other plan sets.
Resolved 3 Susan Joy 08/14/2002
100 Site Plan The cover sheet of the site plan was not included with the latest submittal.
This will need to be included. The aerial photo may be omitted from this page.
A signature block for the Current Planning Director and property owner will
need to be included on this page. The site data, title, and narrative is included
as well.
The final mylar set will need to include the cover page, site plan. landscape
plan and building elevations.
Active 3 Bob Barkeen 08/22/2002
101 Site Plan Please remove the 1/8" scale from the landscape plan. A chart or similar
description will need to be included on the landscape plan denoting which
trees will be removed and which of those trees will require mitigation.
Resolved 3 Bob Barkeen 08/22/2002
102 Utility Plans Include the 3/4 and 1-inch interior meter setter detail on the detail sheet. Resolved 4 Jeff Hill 11/04/2002
103 General No Comments (11-3-02) Resolved 4 Tom Reiff 11/04/2002
104 Utility Plans Provide 8" x 6" reducer where fire hydrant connects to 8" water main. Revise
utility plan and detail drawing.
Active 4 Roger Buffington 11/06/2002
105 Utility Plans This submittal was received between the monthly meetings scheduled with
CDOT. Our next meeting is the 21st of November. The utility drawings will
be submitted for CDOTs review at that time and the resulting redlines and
comments will be returned on the 22nd. All remaining comments can be
addressed with the mylar submittal. A CDOT permit, excavation permit, and
DA will be required.
Active 4 Susan Joy 11/13/2002
3/7/2011 Page 12
Project: VIALE COLLEGIO PDP & FINAL COMPLIANCE, #1-02/A
ID Topic Issue Status Round Comment By Initial Date
106 Site Plan The baike rack shown in front of the building has been removed from this
latest submittal. This will need to be included on the site plan.
Active 4 Bob Barkeen 11/15/2002
107 Utility Plans/fire The 6" fire sprinkler line shall not be installed under the parking lot or under
the building. See Utility Plans sheet C5.
If this sprinkler supply goes through a structure, it shall be properly protected
from freezing and any other damage in accordance with the appropriate
NFPA standard for the installation of underground fire service mains.
Active 4 Ron Gonzales 11/15/2002
108 Utility Plans/fire The fire hydrant detail shown does not meet the City Standard nor the PFA
standard. If this is for "blow off" purposes only, then another appertenance
shall be utilized to prevent any confusion as to the purpose of the hydrant.
See Utility Plans C6 for hydrant detail
Active 4 Ron Gonzales 11/15/2002
109 General No comments (11-19-02) Active 4 Tom Reiff 11/19/2002