PDP - Final Compliance
Request for a residential development of 53 single family detached homes on 6.78 acres in the Willow Brook development (Observatory Village).
Located at the southwest corner of Rock Creek Drive and Cinquefoil Lane. Zoning is LMN - Low Density Mixed-Use District.
This project was withdrawn (notified by Ted Shepard)
Project Type:
Project Desc:
File ID: 8-99J/K Planner: Ted Shepard DMS Project Num: CP071952
ID Topic Issue Status Round Comment By Initial Date
1 General [1/12/07] At the developers request, we will do a preliminary streetlight
design. We'd like the streetlights added to the landscape plan to confirm that
tree clearances to streetlights are met.
Active 1 Janet McTague 01/12/2007
2 General [1/12/07] All lots will be served from the street fronts. We should probably
have a utility coordination meeting to look at utility services to lots 22,23 and
42,43.
Active 1 Janet McTague 01/12/2007
3 Zoning [1/22/07] No Comments Active 1 Gary Lopez 01/22/2007
4 Site Plan [1/25/07] The site plan looks like a landscape plan. Please remove all
landscaping and contours. Dimension all sidewalks and parkways. Show,
dimension and label all easements. Remove the word "Preliminary" from the
project title.
Active 1 Susan Joy 01/25/2007
5 General [1/25/07] All plan sets - please refer to Appendix E6 for scanning
requirements and bring the plans up to standard.
Active 1 Susan Joy 01/25/2007
6 General [1/25/07] Please remove all reference to "Alley" on all plan sets, all sheets
and details. Relabel as Private Drives.
Active 1 Susan Joy 01/25/2007
7 General [1/25/07] The proposed typical street sections are incorrect and the variance
request has been denied. The city requires all new developments to have
detached walks with a 6' parkway on local streets. Rollover curb requires an
additional 1' of row because rollover curb is 1' wider than vertical curb and it
reduces the 6' parkway to 5'. To keep the parkway at 6', you are required to
dedicate the additional foot each side the rollover is used. The center island
will now be all row and there is no parkway there to worry about, so you're
fine there.
Active 1 Susan Joy 01/25/2007
3/7/2011 Page 1
Project: WILLOW BROOK, 3RD FILING PDP-(withdrawn) Type I and Final Plans
ID Topic Issue Status Round Comment By Initial Date
8 General [1/25/07] Tracts are not allowed in public row. Please remove Tract C and
leave the entire thing in row. This development is still responsible for
landscaping and maintaining the center island and the development
agreement will include a paragraph stating such. This development is also
responsible for any damage to the street caused by the irrigation system for
the center island.
Active 1 Susan Joy 01/25/2007
9 General [1/25/07] Please continue the sidewalk around the back of the culdesac. Active 1 Susan Joy 01/25/2007
10 Landscape Plan [1/25/07] Please remove the contours and show all utilities, including
individual lot services. Show, dimension and label all easements.
Active 1 Susan Joy 01/25/2007
11 Utility Plan Cover
Sheet
[1/25/07] Please place the typical street sections here, remove them from all
other sheets.
Active 1 Susan Joy 01/25/2007
12 Utility Plan Cover
Sheet
[1/25/07] Line 48 is not correct. Active 1 Susan Joy 01/25/2007
13 Utility Plan Cover
Sheet
[1/25/07] Please refer to the Soils Report. Can add as line 50. Active 1 Susan Joy 01/25/2007
14 Utility Plan Cover
Sheet
[1/25/07] Please add the DATE under the legal description. Active 1 Susan Joy 01/25/2007
15 Plat [1/25/07] Please remove the word "alley" in all locations and replace with the
words "Private Drive".
Active 1 Susan Joy 01/25/2007
16 Plat [1/25/07] Please email me at sjoy@fcgov.com for the correct plat language.
Unfortunately, the language you pulled off the web is outdated and I haven't
been able to get Tech Support to switch it out yet. Sorry!!
Active 1 Susan Joy 01/25/2007
17 Plat [1/25/07] Remove the words "PDP/Preliminary Plat of" in the project title. Active 1 Susan Joy 01/25/2007
18 Utility Plan - Sheet 3 [1/25/07] Remove the Master Revision/Tracking Tab block. Place the title
block along the right hand side and put the city signature block in the lower
right, all sheets.
Active 1 Susan Joy 01/25/2007
19 Utility Plan - All
Sheets
[1/25/07] Place a city and district signature block in the lower right hand
corner, all sheets.
Active 1 Susan Joy 01/25/2007
3/7/2011 Page 2
Project: WILLOW BROOK, 3RD FILING PDP-(withdrawn) Type I and Final Plans
ID Topic Issue Status Round Comment By Initial Date
20 Utility Plan - Erosion
Control
[1/25/07] Please do not split the project. Keep all on one sheet. See
redlines for other comments.
Active 1 Susan Joy 01/25/2007
21 Utility Plan - All
Sheets
[1/25/07] Provide a legend. Use greyscale for existing (do not dash) and
solid dark lineweights for proposed. Your plan sheets are very hard to read,
too many lineweights are too similar and unlabeled.
Active 1 Susan Joy 01/25/2007
22 Utility Plan - Overlot
Grading
[1/25/07] Remove all typical street sections (place on the cover sheet) and
combine the two sheets so that the project is not split in half. There is no
need to do that with this small of a site.
Active 1 Susan Joy 01/25/2007
23 Utility Plan - Overlot
Grading
[1/25/07] Incomplete information shown. Also, the inverted crown section
d-d shown in the cross section is not shown on the plan view. I'm assuming it
is being used in the private drive where a crosspan is shown crossing the
public street and connecting to the private drive across the way. This can not
be allowed as shown. You may use the inverted crown, but you can not drain
across the public sidewalk like that. You'll need to grade the private drive
entrances in accordance with 706. Drainage needs to go from the back of
the walk (PL) back into the property and then from the PL back into the street.
You will need to either drop an inlet in there to drain into a storm drain (see
drawing 803) or tilt the alley to one side and drain through a sidewalk chase
into the street's curb and gutter.
Active 1 Susan Joy 01/25/2007
24 Utility Plan - All
Sheets
[1/29/07] Please design the private driveways in accordance with 706.
Sidewalks must continue through the driveway and provide concrete to the
row/PL.
Active 1 Susan Joy 01/29/2007
25 Utility Plan - Utility
Plan
[1/29/07] Triple street cut fees apply and must go either to the CL or the full
width of the street if the main lines are beyond the CL. Show approximate
limits of all street cuts and provide the note:
Limits of street cut are approximate. Final limits are to be determined in the
field by the City Engineering Inspector. All repairs to be in accordance with
City street repair standards.
Active 1 Susan Joy 01/29/2007
26 Utility Plan - SS Plan
& Profile
[1/29/07] Incomplete, not reviewed. Active 1 Susan Joy 01/29/2007
3/7/2011 Page 3
Project: WILLOW BROOK, 3RD FILING PDP-(withdrawn) Type I and Final Plans
ID Topic Issue Status Round Comment By Initial Date
27 Utility Plan - Street
Plan & Profile
[1/29/07] Minimum verticle curves are not being met, please refer to 7-17
and 7-18.
Active 1 Susan Joy 01/29/2007
28 Utility Plan - Street
Plan & Profile
[1/29/07] Proposed and existing lineweights for the WL are mixed up. Active 1 Susan Joy 01/29/2007
29 Utility Plan - Private
Drives
[1/29/07] Incomplete, not reviewed. Active 1 Susan Joy 01/29/2007
30 Utility Plan - Private
Drives
[1/29/07] Continue the CL through the intersections. Active 1 Susan Joy 01/29/2007
31 Utility Plan - Street
Plan & Profile
[1/29/07] Continue the CL through the intersections. Active 1 Susan Joy 01/29/2007
32 Plat [1/29/07] Please see redlines - corrections to the notes are required and note
6 needs to be removed. There are no such thing as "sidewalk easements".
Sidewalks are placed in public row and are to be maintained by the
development.
Active 1 Susan Joy 01/29/2007
33 Landscape Plan [1/29/07] Landscaped medians must include drainage facilities to handle
sprinkler runoff and nuisance flows. Refer to Appendix C and coordinate with
the utility plans.
Active 1 Susan Joy 01/29/2007
34 Utility Plan - Utility
Plan
[1/29/07] Landscaped medians must include drainage facilities to handle
sprinkler runoff and nuisance flows. Refer to Appendix C and coordinate with
the landscape plans.
Active 1 Susan Joy 01/29/2007
35 Utility Plan - Street
Plan & Profile
[1/29/07] Dimension the radii for the median and the outside curve of the
street.
Active 1 Susan Joy 01/29/2007
36 Landscape Plan [1/29/07] Label all street names. Active 1 Susan Joy 01/29/2007
37 General [1/29/07] Please refer to Chapter 3 of LCUASS for submittal requirements for
the plan sets.
Active 1 Susan Joy 01/29/2007
38 General [1/29/07] The TDRF application was $1,695 short because the per acre fee
wasn't calculated it. You can either pay now or add it on to the Final
Complinance round of review.
Active 1 Susan Joy 01/29/2007
3/7/2011 Page 4
Project: WILLOW BROOK, 3RD FILING PDP-(withdrawn) Type I and Final Plans
ID Topic Issue Status Round Comment By Initial Date
39 Fire [1/30/07] FIRE DEPARTMENT APPARATUS ACCESS: All structures on
Galaxy Lane, as shown on the submitted plans, are within fire department
apparatus access; therefore, neither a second access point nor automatic fire
sprinklers are required. The proposed structures are within access because
the cul-de-sac does not exceed 660 feet in length; it is not contingent on
Galaxy Lane featuring two-way traffic. Based on the reduced-size plans
submitted for PDR in November, it was not possible to ascertain the length of
Galaxy Lane. Furthermore, Tract D was originally shown as being larger,
which also might have made Lots 22, 23, 43 and 42 out of fire department
access.
Active 1 Carie Dann 01/30/2007
40 Fire [1/30/07] Galaxy needs to have a detached 4.5' walk around the entire
cul-de-sac
Active 1 David Averill 01/30/2007
41 Fire [1/30/07] Please designateTracts K, L, M, and N as public access
easements.
Active 1 David Averill 01/30/2007
42 Plat [1/30/07] From Technical Services: Basis of bearing don't match on plat. Active 1 Susan Joy 01/30/2007
43 Plat [1/30/07] From Technical Services: Plat closes good, area good. Active 1 Susan Joy 01/30/2007
44 Plat [1/30/07] From Technical Services: Galaxy has already been used. Will
need to reserve another name.
Active 1 Susan Joy 01/30/2007
45 Plat [1/30/07] From Technical Services: No naming of alleys or private drives
(a-1, a-2, etc). Just "Private Drive"
Active 1 Susan Joy 01/30/2007
46 Plat [1/30/07] From Technical Services: Curve data, bearing and distance data
missing.
Active 1 Susan Joy 01/30/2007
47 Fire [1/30/07] TURNING RADII: The turning radii on Galaxy Lane are required to
be a minimum of 25 feet inside, 50 feet outside.
Active 1 Carie Dann 01/30/2007
3/7/2011 Page 5
Project: WILLOW BROOK, 3RD FILING PDP-(withdrawn) Type I and Final Plans
ID Topic Issue Status Round Comment By Initial Date
48 Fire [1/30/07] FIRE HYDRANTS: Please relocate one fire hydrant shown on the
Galaxy Lane center island, so that there is a hydrant on each side of the
island. Having one hydrant on the west side and one on the east side would
be more efficient and effective from a firefighting standpoint. Also, in the
future, it would be helpful to show all fire hydrants one a single page; I had to
go through each, separate page to find the hydrants, then locate them on an
overall site plan. If they're all on one page, they're easier to find and my
drawing potentially will be more accurate.
Active 1 Carie Dann 01/30/2007
49 Fire [1/30/07] ADDRESSING: The structures on the west side of Galaxy Lane
shall have odd-numbered addresses; the structures on the east side of
Galaxy Lane shall have even-numbered addresses.
Active 1 Carie Dann 01/30/2007
50 Stormwater [9/7/07]
[2/1/07] Stormwater is ready for a hearing.
Resolved 1 Wes Lamarque 02/01/2007
51 Stormwater [2/1/07] The on-site storm sewer is recommended to be extended west up to
the public street to reduce the flow of 30 cfs that is currently being routed.
This will reduce the impact to this area during a storm event.
Resolved 1 Wes Lamarque 02/01/2007
52 Stormwater [2/1/07] Please change note to say permanent slopes are not to exceed 4:1.
This is the City standard.
Resolved 1 Wes Lamarque 02/01/2007
53 Stormwater [3/21/08] Repeat Comment.
[9/7/07] Repeat Comment.
[2/1/07] Please include the City's Standard Erosion Control Notes dated
September 2003.
Resolved 1 Wes Lamarque 02/01/2007
54 Engineering [9/4/07] The maximum cross slope allowed on new public street construction
is 3 percent. Please revise the typical street sections on the Utility Plan cover
sheet.
Active 2 Randy Maizland 09/04/2007
55 Engineering [9/4/07] Please indicate on the Plat that Exploration Lane will be dedicated
R.O.W. Label and dimension the limits of ROW. See redlines for
clarification.
Active 2 Randy Maizland 09/04/2007
3/7/2011 Page 6
Project: WILLOW BROOK, 3RD FILING PDP-(withdrawn) Type I and Final Plans
ID Topic Issue Status Round Comment By Initial Date
56 Engineering [9/4/07] The plan set has many line over text conflicts throughout that do not
compley with LCUASS Appendix E scannability requirements. Please fix all
line over text and block out or mask out any text over hatched or shaded
areas (TYP).
Active 2 Randy Maizland 09/04/2007
57 Engineering [9/4/07] The Master Revison/Tracking tabulation block on sheet 4 will not be
used by the City for processing or approving revisions. If you must have this
block that is OK but please indicate in the title that it is for developer
reference only and remove the reference from the standard revision blocks
provided on the borded of each sheet. The Master Revision block should
also be reduced at least 50 percent. Are you expecting so many revisions ?
Active 2 Randy Maizland 09/04/2007
58 Engineering [9/4/07] Please enlarge the sheet numbering text at the bottom right corner
of all the sheets.
Active 2 Randy Maizland 09/04/2007
59 Engineering [9/4/07] Please remove all of the water mains from the Grading Plan sheets
(TYP).
Active 2 Randy Maizland 09/04/2007
60 Engineering [9/4/07] Please label the ramps at Star Dust and Cinquefoil as existing or
proposed.
Active 2 Randy Maizland 09/04/2007
61 Engineering [9/5/07] The ramps at the intersection of Galileo and Exploration should be
constructed as directional ramps rather than radial per LCUASS 1606(a).
Please show the other side of Galieo at this intersection. If there is not an
existing ped ramp on the south side of Galileo at this intersection, this
development will be responsible for installing one at this location. Please
show on the plans.
Active 2 Randy Maizland 09/05/2007
62 Engineering [9/5/07] No detailed grading information was provided for the Exploration
center median. Please show ex. And proposed contours, spot elevations
etc in the median area.
Active 2 Randy Maizland 09/05/2007
63 Engineering [9/5/07] Please provide flow line spot elevation on both sides of the street
around the north radius of Exploration. Please also provide dimensions from
the flow lines to the crown around this curve. Is the crown offset from the
centerline ? Please show information so I can review for cross slope and
compare to profile. See sheet 6 of the redlines for clarification.
Active 2 Randy Maizland 09/05/2007
3/7/2011 Page 7
Project: WILLOW BROOK, 3RD FILING PDP-(withdrawn) Type I and Final Plans
ID Topic Issue Status Round Comment By Initial Date
64 Engineering [9/5/07] Please use consistent line types and line weights for all of the utilities
being shown on the Overall Utility Plan Sheet. Label and dimension the limits
of ROW for all public streets being shown on the Overall Utility Plan Sheet.
Active 2 Randy Maizland 09/05/2007
65 Engineering [9/5/07] Provide one additional cross section on Exploration where the road
curves on the north end. Include the cross section on sheet 9 or on the cover
sheet with the other typical sections.
Active 2 Randy Maizland 09/05/2007
66 Engineering [9/5/07] Please label the approximate limits of street cuts on the water, sewer
and storm drain design sheets. Also provide the standard street cut note on
those sheets.
Active 2 Randy Maizland 09/05/2007
67 Engineering [9/5/07] The private drives that connect to Exploration will drain to the inlets.
Please provide details for the connection to the inlet.
Active 2 Randy Maizland 09/05/2007
68 Engineering [9/5/07] Please provide the minimum cover dimensions over the storm drain
lines in the profile on sheet 13.
Active 2 Randy Maizland 09/05/2007
69 Engineering [9/5/07] LCUASS standards require that both flow lines and centerline
profiles be shown for street design. The profiles provided for Exploration do
not include centerline and difficult to understand at the north and south
curves. It appears that there are single point grade breaks greater than the
allowable 0.4 percent at both ends. Please see the redlines for clarification
and revise the profiles as needed.
Active 2 Randy Maizland 09/05/2007
70 Engineering [9/5/07] An intersection detail must be provided for Exploration and Galileo
per LCUASS 7-27. An intersection detail is also requested for Exploration
where it merges into a loop. Provide adequate spot elevations and
dimensions in this detail to show drainage and how the three legs of the road
will transition into each other.
Active 2 Randy Maizland 09/05/2007
71 Engineering [9/5/07] Call out all access driveways to be constructed per LCUASS Dwg.
706
Active 2 Randy Maizland 09/05/2007
72 Engineering [9/5/07] How will the traffic on Exploration be controlled ? Please provide a
signage and striping detail for Exploration at the loop intersection.
Active 2 Randy Maizland 09/05/2007
73 Engineering [9/5/07] Please call out the siedewalk chase drains draining to Rock Creek
Drive with the LCUASS standard.
Active 2 Randy Maizland 09/05/2007
3/7/2011 Page 8
Project: WILLOW BROOK, 3RD FILING PDP-(withdrawn) Type I and Final Plans
ID Topic Issue Status Round Comment By Initial Date
74 Engineering [9/5/07] It appears that ramps may be missing on the internal sidewalk
through the development crossing the private drives. Please verify ramps
won't be needed in these locations.
Active 2 Randy Maizland 09/05/2007
75 Engineering [9/5/07] All LCUASS standard details must be included at final compliance
for C&G, sidewalks, drianage structures, ramps, driveways etc . These
standard details are available online through the City website.
Active 2 Randy Maizland 09/05/2007
76 Engineering [9/5/07] Please refer to the redlines for additional minor comments related to
labeling and drafting throughout the plan set.
Active 2 Randy Maizland 09/05/2007
77 Engineering [9/5/07] Please revise the Site and Landscape plans as needed to reflect
changes on the Utility Plan set.
Active 2 Randy Maizland 09/05/2007
78 Stormwater [9/7/07] Please provide spot elevations along the flowline of Exploration Lane
at the curve and the inlet locations.
Resolved 2 Wes Lamarque 09/07/2007
79 Stormwater [9/7/07] Please see redlines for the possible rerouting of the proposed storm
sewer out to the existing storm line in Galileo Drive. This will provide a better
maintenance situation with the storm sewer not being located on private lots,
which we highly discourage.
Resolved 2 Wes Lamarque 09/07/2007
80 Stormwater [3/21/08] Repeat Comment.
[9/7/07] Please provide eroision control escrow calculations.
Resolved 2 Wes Lamarque 09/07/2007
81 Stormwater [9/7/07] Please use City's standard MH detail for the storm sewer. Resolved 2 Wes Lamarque 09/07/2007
82 Fire [9/10/07] PFA has no additional comments or concerns at this time. Active 2 Carie Dann 09/10/2007
83 Engineering [3/19/08] Notes 47 and 48 of the standard General Notes are missing.
Please add them to the cover sheet. I have attached the General Notes to
the redlines for reference.
Active 3 Randy Maizland 03/19/2008
84 Engineering [3/19/08] Please update the month and year on the cover sheet and revise
the sheet index per the redlines. Please move all of the standard
construction notes to the end of the plan set. The intersection details should
come before the construction details.
Active 3 Randy Maizland 03/19/2008
3/7/2011 Page 9
Project: WILLOW BROOK, 3RD FILING PDP-(withdrawn) Type I and Final Plans
ID Topic Issue Status Round Comment By Initial Date
85 Engineering [3/19/08] Plat The sidewalk/pedestrian connections to the north onto Rock
Creek need to be located within dedicated public access easements. Please
dedicate these public access easements on the Plat. See redlines for
clarification.
Active 3 Randy Maizland 03/19/2008
86 Engineering [3/19/08] Plat There are Open Space areas being dedicated in separate
tracts C-H, J-N and P & Q. I am not sure what the intent of these open space
areas is other than landscaping ? If you truly want these dedicated as a
separate tract it would be a good idea to add some notes defining what can
or cannot be done within these areas. The term open space does not have
any real meaning as shown and does not impose any true limitations unless
defined. Additionally, it appears that the street tress are proposed behind the
sidewalk (rather than in the parkway) at the Exploration intersection with
Galileo. Please consult with Planning to verify this is acceptable. Planting the
street trees in the dedicated utility easement and Open Space tract may not
be the best idea ? I will defer to Planning for any further comments regarding
this.
Active 3 Randy Maizland 03/19/2008
87 Engineering [3/19/08] There are two different sheet numbering conventions being used.
The plans make several references to details and sheet numbers but it is not
consistent. It would be much better to have only one sheet numbering
convention and have that used consistently throughout.
Active 3 Randy Maizland 03/19/2008
88 Engineering [3/19/08] Please add the standard Erosion Control Notes to sheet 4 of the
plan set.
Active 3 Randy Maizland 03/19/2008
89 Engineering [3/19/08] At the intersection of Exploration and Galileo, please remove the
north-south directional ramp on the NE corner (should only cross over
Exploration). The Galileo crossing will take place on the NW corner. The
proposed ramp on the south side of Galileo needs to be lined up better with
the intersection so that the crossing is not skewed. Please also call out the
ramp with the correct detail. See redlines for clarification.
Active 3 Randy Maizland 03/19/2008
90 Engineering [3/19/08] Please show the high point grade breaks on the private drives on
the Grading Plan sheets.
Active 3 Randy Maizland 03/19/2008
3/7/2011 Page 10
Project: WILLOW BROOK, 3RD FILING PDP-(withdrawn) Type I and Final Plans
ID Topic Issue Status Round Comment By Initial Date
91 Engineering [3/19/08] Please remove any text from the standard revision blocks on each
sheet. The revision blocks should be blank at the time of plan approval and
will only be used for revisions after the plans have been approved. Any other
tracking can be done on the tracking block on sheet 4.
Active 3 Randy Maizland 03/19/2008
92 Engineering [3/19/08] Please be sure to show and label all proposed street cuts needed
for utility service connections and the construction of the Exploration Galileo
intersection. Please also reference the standard street cut note for each
proposed cut.
Active 3 Randy Maizland 03/19/2008
93 Engineering [3/19/08] There are still many line over text conflicts throughout the plan set
that do not comply with our LCUASS Appendix E scanability requirements.
Please go through the plan set thoroughly and fix these conflicts. The street
and utility profiles especially will not scan very well as shown.
Active 3 Randy Maizland 03/19/2008
94 Engineering [3/19/08] There are mid-block ramps being shown on Stardust and
Cinquefoil. Please show that there are existing or proposed ramps on the
opposite side of the street to connect or maybe even consider removing
these mid block crossings altogether.
Active 3 Randy Maizland 03/19/2008
95 Engineering [3/19/08] Please label all easements for sewer and water as UTILITY
EASEMENT to be consistent with the Plat dedication language for those
easements.
Active 3 Randy Maizland 03/19/2008
96 Engineering [3/19/08] The LCUASS standards do NOT require you to provide plan and
profile designs for the private drives. I think the City would actually prefer that
these private drive design sheets be removed from the Utility Plan set. These
private drives do not need to meet LCUASS standards for horizontal and
vertical alignment. If you really want to keep them in the plan set that is
probably OK. I have made a few comments related to scanability and
drafting on these sheets. I will verify with my supervisor that the City will sign
the approval blocks on these sheets.
Active 3 Randy Maizland 03/19/2008
97 Engineering [3/19/08] The minimum clearance for utility pipes under the street ROW is 2
feet, measured from top of pipe to top of street subgrade (not including base
or asphalt section). Please provide minimum pipe clearance dimensions in
the profile for the storm drain line shown on sheet 13.
Active 3 Randy Maizland 03/19/2008
3/7/2011 Page 11
Project: WILLOW BROOK, 3RD FILING PDP-(withdrawn) Type I and Final Plans
ID Topic Issue Status Round Comment By Initial Date
98 Engineering [3/19/08] Please provide additional centerline profile information for
Exploration between the loop and Galileo. See Exploration design redlines
for clarification. Please provide additional dimension information for sidewalks
and parkways on Exploration design plan view.
Active 3 Randy Maizland 03/19/2008
99 Engineering [3/19/08] Do not use clouding anywhere in the plan set. Clouding will only be
used for any future revisions.
Active 3 Randy Maizland 03/19/2008
100 Engineering [3/19/08] Please use LCUASS 2001 standard construction details for all
ROW improvements. There are several details missing as well. See redlines
for clarification. All of the construction details should be located at the end of
the plan set. Please move the intersection details in front of the construction
details and revise the index accordingly.
Active 3 Randy Maizland 03/19/2008
101 Engineering [3/19/08] Please provide the necessary spot elevations, slopes and crown
transition information for the intersection detail for Exploration and Galileo
(sheet 19A) per LCUASS 7-27.
Active 3 Randy Maizland 03/19/2008
102 Technical Services [3/19/08] Need to dedicate access easements for sidewalk connections to
the north.
Active 3 Randy Maizland 03/19/2008
103 Stormwater [3/21/08] Please include the Drainage Plan in the Utility Plan Set. Resolved 3 Wes Lamarque 03/21/2008
104 Stormwater [3/21/08] Please include the HGL on the storm sewer profiles. Resolved 3 Wes Lamarque 03/21/2008
105 Stormwater [3/21/08] Since the private alleys are conveying the 100-year storm, a
drainage easement is required for the limits of the 100-year flows. This can
be done by just relabeling the proposed water and sanitary easements to
include drainage dedicated to the City of Fort Collins.
Active 3 Wes Lamarque 03/21/2008
106 Stormwater [3/21/08] Please label concrete channels and sidewalk chases located on
Rock Creek Drive and Exploration Lane and provide a concrete channel
detail.
Resolved 3 Wes Lamarque 03/21/2008