Loading...
HomeMy WebLinkAbout224 WOOD STREET - ACCESSORY BUILDING WITH HABITABLE SPACE PDP - TYPE I AND FINAL PLAN - 8-10 A - CORRESPONDENCE -Project: 224 WOOD STREET - ACCESSORY BUILDING WITH HABITABLE SPACE PDP - TYPE I AND FINAL PLAN Final Compliance Request to construct a 600 square foot, two story detached garage to the rear of the lot with an existing single family residence with space for a one car garage and home office/guest suite with bathroom and 90 square foot second story deck. The new Accessory Building with Habitable Space will not be utilized as a dwelling unit and will be accessed via an alley. The applicant is also requesting a Modification of Standard for setback modifications. Located at 224 Wood Street. The zoning is NCM - Neighborhood Conservation, Medium Density District. Public Hearing Published May 05, 2010 "This is a request for an accessory structure with habitable space located on the rear of a lot at 224 Wood Street. The property is located in the Neighborhood Conservation Medium Density (NCM) zone district. The first floor (approximately 350 square feet) of the proposed structure will be used as a one car garage, and the second floor (approximately 250 square feet) will have a personal workspace and bathroom. The City Land Use Code (LUC) defines “habitable space” as “any building with water and/or sewer service” in the NCM zone district." 08/06/2010 Vested Right was published in the Coloradoan as follows: "This is a request for an accessory structure with habitable space located on the rear of a lot at 224 Wood Street. The property is located in the Neighborhood Conservation Medium Density (NCM) zone district. The first floor (approximately 350 square feet) of the proposed structure will be used as a one car garage, and the second floor (approximately 250 square feet) will have a personal workspace and bathroom. The City Land Use Code (LUC) defines “habitable space” as “any building with water and/or sewer service” in the NCM zone district." Project Type: Project Desc: File ID: 8-10/A Planner: Emma McArdle DMS Project Num: CP102238 ID Topic Issue Status Round Comment By Initial Date 1 Zoning [4/21/10] There is not enough information to conclude this bldg. is 1.5 stories. Interior elevation drawings and floor plans are required. Per LUC 5.1 Def. Story, half "shall mean a space under a sloping roof which as the line of intersection of the roof and wall face not more than three (3) feet above the floor level, and in which space the posible floor area with head room of five (5) feet or less occupies at least forty (40) percent of the total floor area of the story directly beneath." Resolved 1 Gary Lopez 04/21/2010 2 General [4/22/10] We have no comments. Active 1 Jeff County 04/22/2010 3/7/2011 Page 1 Project: 224 WOOD STREET - ACCESSORY BUILDING WITH HABITABLE SPACE PDP - TYPE I AND FINAL PLAN ID Topic Issue Status Round Comment By Initial Date 3 Fire Authority If the structure will ever be used as a sleeping area (Residential Occupancy Type), the following requirements must be met: WATER SUPPLY Fire hydrants, where required, must be the type approved by the water district having jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum requirements based on type of occupancy. Minimum flow and spacing requirements include: Residential within Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter These requirements may be modified if buildings are equipped with automatic fire sprinkler systems. PLEASE NOTE: In response, to Bryan Soth's question, I don't have flow records for that area but Roger Buffington from FC Water might. The closest hydrant is at 240 Wood St. REQUIRED ACCESS Fire access roads (fire lanes) shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the PFA’s jurisdiction when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. This fire lane shall be visible by painting and signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements:  Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire apparatus weights. Compacted road base shall be used only for temporary fire lanes or at construction sites.  Have appropriate maintenance agreements that are legally binding and enforceable.  Be designated on the plat as an Emergency Access Easement.  Maintain the required minimum width of 20 feet throughout the length of the fire lane (30 feet on at least one long side of the building when the structures is three or more stories in height). If the building is equipped throughout with an approved automatic fire-sprinkler system, the fire code official is authorized to increase the dimension of 150 feet. PLEASE NOTE: The proposed structure is approximately 165 feet from the Active 1 Carie Dann 04/26/2010 3/7/2011 Page 2 Project: 224 WOOD STREET - ACCESSORY BUILDING WITH HABITABLE SPACE PDP - TYPE I AND FINAL PLAN ID Topic Issue Status Round Comment By Initial Date edge of Wood Street. Also, PFA does not "count" alleys as a means of emergency vehicle access. 2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D ADDRESS NUMERALS Address numerals shall be visible from the street fronting the property, and posted with a minimum six-inch high numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). 2006 International Fire Code 505.1 4 General [6/18/10] [4/27/10] If the transformer needs to be relocated ( it looks like it was placed outside of the easement), this will be done at L&P expense. If service is taken from the house, we have no further comments. If additional power is needed, service will come from the existing transformer and normal fees will apply. Active 1 Janet McTague 04/27/2010 5 Stormwater [4/27/10] Please provide a grading plan for the rear third of the lot per conceptual review comments. The distance to the south lot line is very minimal. The drainage of this new structure can not have a negative impact to the property and structure to the south. A concrete pan may be needed to direct the water to the alley or to the front. Resolved 1 Wes Lamarque 04/27/2010 6 Stormwater [4/27/10] Please direct the down spouts to grassy surfaces for water quality treatment. Resolved 1 Wes Lamarque 04/27/2010 7 Water/Wastewater [4/27/10] The water and sewer services for the house connect to water and sewer mains in Wood Street. There are no water/sewer mains in the alley. Active 1 Roger Buffington 04/27/2010 8 Engineering [4/27/10] Please submit a Utility Plan set in accordance with LCUASS. Resolved 1 Susan Joy 04/27/2010 9 Engineering [4/27/10] Please submit a completed checklist from Appendix E4 with the next submittal and include all required items on your plan sets. Resolved 1 Susan Joy 04/27/2010 10 Engineering [4/27/10] The driveway off the alley must be paved. Resolved 1 Susan Joy 04/27/2010 3/7/2011 Page 3 Project: 224 WOOD STREET - ACCESSORY BUILDING WITH HABITABLE SPACE PDP - TYPE I AND FINAL PLAN ID Topic Issue Status Round Comment By Initial Date 11 Engineering [5/19/10] I was not routed a Landscape plan. I was only given a Site plan. Was this to be a combined Site and Landscape Plan? If so, please label as such. [4/27/10] Show all utilities on the landscape plan. Resolved 1 Susan Joy 04/27/2010 12 Engineering [4/27/10] All easements must be labeled with what type it is and if it is proposed or exisiting. For example: Existing 9' Utility Easement or Proposed 9' Utility Easement. Resolved 1 Susan Joy 04/27/2010 13 Engineering [4/27/10] Please see LCUASS for all of the required information that must be shown on the utility plan set and coordinate the utility, site and landscape plans. Resolved 1 Susan Joy 04/27/2010 14 Modification of Standards [4/28/10] The modification of standards request needs to identify which criteria the request is meeting in 2.8.2 of the LUC, there are 4 criteria, please site the once you are using, it would most likely be the criteria describing hardship. Resolved 1 Emma McArdle 04/28/2010 15 Site Plan [4/28/10] Please add standard signature blocks to the site plan, I can give you an example of what these look like and say. Resolved 1 Emma McArdle 04/28/2010 16 Site Plan [4/28/10] Please start off with Title on top - "224 Wood Street - Accessory Building with Habitable Space," the legal description should follow below. Resolved 1 Emma McArdle 04/28/2010 17 Site Plan [4/28/10] Please add/change the following on the Site Plan: - change scale to engineer's scale, - show height of bld, - add 1/2 lot line for FAR reference, - show full ROW and dimensions (including separated out sidewalk, parkway, curbline), - add existing and proposed utility lines (water, sewer, electric), - clarify easements, - proposed improvious surface in s.f. - change SYSB to spell out Side Yard Setback, FYSB, etc., - change gravel to paved surface used, - add lines of neighboring property lines to show some context, - are there existing trees in the parkway? If so please show them. Resolved 1 Emma McArdle 04/28/2010 3/7/2011 Page 4 Project: 224 WOOD STREET - ACCESSORY BUILDING WITH HABITABLE SPACE PDP - TYPE I AND FINAL PLAN ID Topic Issue Status Round Comment By Initial Date 18 Site Plan [4/28/10] Please add the following notes to the site plan: This structure is considered an "accessory structure with habitable space," it is not a dwelling unit and may not be used as a dwelling unit in the future without further review by the City and Poudre Fire Authority. If the structure is used for sleeping quarters by a resident of the primary structure, which is considered "residential occupancy" by Poudre Fire Authority, the structure will need to meet the specified requirements of Poudre Fire Authority regarding emergency vehicle access, firefighting water supply and structure addressing. Resolved 1 Emma McArdle 04/28/2010 19 Engineering [5/19/10] Please dimension in engineering scale, not architectural. Resolved 2 Susan Joy 05/19/2010 20 Engineering [5/19/10] Please dimension all sidewalks and parkway along Wood Street. Resolved 2 Susan Joy 05/19/2010 21 Engineering [5/19/10] Please label the existing curb type on Wood Street. Resolved 2 Susan Joy 05/19/2010 22 Engineering [5/19/10] Please see Appendix E6 for scanning requirements. The Vicinty map will not scan. Please change to a one-line map, to scale (1" = 1000-1,500'), without any shading. Resolved 2 Susan Joy 05/19/2010 23 Engineering [5/19/10] Please add the following note: "General Construction Notes #1 through 18, 20 through 39, and 42 through 46 as listed in Appendix E-1 of the Larimer County Urban Area Street Standards (LCUASS) shall apply and be followed for this project." "The Construction Notes under subsection Street Improvement Notes and Traffic Signing, and Pavement Marking Construction Notes in Appendix E-2 of the Larimer County Urban Area Street Standards (LCUASS) shall apply and be followed by this project as applicable. Resolved 2 Susan Joy 05/19/2010 24 Engineering [5/19/10] Please add the following details: 701 (or 702 depending on whether Wood St has Rollover or VC), 706, 1601, 1602. Resolved 2 Susan Joy 05/19/2010 25 Zoning [6/18/10] No comment Active 3 Gary Lopez 06/18/2010 3/7/2011 Page 5 Project: 224 WOOD STREET - ACCESSORY BUILDING WITH HABITABLE SPACE PDP - TYPE I AND FINAL PLAN ID Topic Issue Status Round Comment By Initial Date 26 Electric [6/18/10] If the habitable space qualifies as a dwelling unit (any cooking facilities), it must have it's own electric meter and electric development charges will apply. If not a dwelling unit and no additional capacity is needed at the existing meter, no charges will apply from Light & Power. Active 3 Doug Martine 06/18/2010 27 Stormwater [7/1/10] No comments. Active 3 Wes Lamarque 07/01/2010 3/7/2011 Page 6