Loading...
HomeMy WebLinkAboutAIR CARE COLO PDP - ENVIROTEST-INTERCHNG BUS PARK LOTS 15 & 16 REPLAT - 2-10 A - CORRESPONDENCE -Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) Final Compliance Request for a 16,683 square foot, one story masonry and steel building to be constructed on 3.149 acres forAir Care Colorado, a Colorado emissions testing facility. The proposed building will be an 8-lane facility with an administrative office. As the property is within a quarter mile of Interstate 25, it will be subject to compliance with the I-25 Corridor standards in Section 3.9 of the Land Use Code, including building placement, landscaping and building design. Located on lot 16 of the Interchange Business Park, on the South East Frontage Road, just south of the I-25 interchange with East Mulberry. The zoning is C - Commercial. Public Hearing was Published March 23, 2010 "This is a request to develop a vehicle emission testing facility on Lots 16 and a portion of Lot 15 of the Interchange Business Park. The facility would be one story in height, 16,683 square feet in size, and consist of eight inspection bays and an office. The site is 3.15 acres in size and located at the southeast quadrant of I-25 and the Southeast Frontage Road, south of the existing hotel." Vested Rights were published May 16, 2011 "Air Care Colorado, File #2-10/A. This is a request to develop a vehicle emission testing facility on Lots 16 and a portion of Lot 15 of the Interchange Business Park by Air Care Colorado. In addition to Air Care Colorado, two state agencies would be housed onsite; The Department of Public Health and Environment, and the Department of Revenue. The site is 3.15 acres in size and located at the southeast quadrant of I-25 and the Southeast Frontage Road. The parcel is zoned C, Commercial" Project Type: Project Desc: File ID: 2-10/A Planner: Emma McArdle DMS Project Num: CP102220 ID Topic Issue Status Round Comment By Initial Date 1 Electric [3/15/10] [1/20/10] Light & Power engineering will need a Commercial Service Information (C-1) form completed outlining the characteristics of the electric service. Will also need to coordinate the location for the electric transformer. Depending on the electric load, the most likely transformer will be 84" wide x 73" deep, plus 3 ft. clearance on 3 sides and 8 ft. clearance in front. Please contact Light & Power engineering at (970)221-6700 for more details. Resolved 1 Doug Martine 01/20/2010 2 Electric [1/20/10] Once the plan is approved, an AutoCad drawing of the utility plan needs to be sent to Pat Colburn. This can be sent via e-mail to PCOLBURN@FCGOV.COM. Resolved 1 Doug Martine 01/20/2010 3/7/2011 Page 1 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 3 Environmental Planner [1/20/10] No comments. Active 1 Dana Leavitt 01/20/2010 4 CDOT [1/20/10] Per email from Gloria Hice-Idler, "both accesses will require access permits." Active 1 Emma McArdle 01/20/2010 5 General [3/16/10] Comment carried forward. [1/26/10] This project is subject to any CDOT requirements and permits regarding the ROW, access points, and/or turn lanes. Resolved 1 Andrew Carney 01/26/2010 6 General [3/16/10] Comment carried forward. [1/26/10] Please refer to Transportation Planning's comments regarding sidewalk requirements. Any sidewalk will need to be in either the ROW or an access easement. If the easement is not dedicated on the plat associated with this project it will need to be dedicated by separate document and will be subject to all associated fees. Resolved 1 Andrew Carney 01/26/2010 7 General [3/16/10] Comment carried forward. I will provide the Development Construction Permit (DCP) Application with this round of review. Once completed and returned to me I will be able to begin the permit itself. As the project approaches final approval we will be able to schedule a DCP meeting which are held on Wednesday afternoons. Please refer to the DCP Application and Brochure for more information the the DCP process. [1/26/10] This project will need a Development Agreement as well as Development Construction Permit prior to starting work on site. I have provided the Development Agreement information sheet with this round of review. Once completed and returned to me I will be able to start the Development Agreement language. When the project is closer to final design, we will begin work on the Development Construction Permit. Resolved 1 Andrew Carney 01/26/2010 8 General [3/16/10] With this round of review I only received the Utility Plan Sheet from the Utility Plan Set, not the full set, so I am only able to comment on the Utility Sheet, therefore I am not able to confirm if the following comment has been addressed. [1/28/10] Please include all of the City of Fort Collins General Notes. Numbers 26, 41, 47, & 48 were not included in the Utility Plans. If they do not apply to this particular project they still must be included. Resolved 1 Andrew Carney 01/28/2010 3/7/2011 Page 2 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 9 General [3/16/10] Comment carried forward. A Grading Plan was not included with this submittal, therefore I am not able to confirm any changes have been made. [1/28/10] On the Grading Plan, please include spot elevations for all lot corners, and finish floors/top of foundation elevations. Resolved 1 Andrew Carney 01/28/2010 10 General [3/16/10] With this round of review, I will not be able to confirm if less than 750 sq. ft. is draining through the drive entrances since a grading sheet was not submitted. If the proposed swale between the parking and sidewalk is approved by Stormwater a sidewalk chase will be needed where it crosses the walk. [1/28/10] According to the Larimer Urban Area Street Standards (LCUASS), no more than 750 sq. ft. may drain across/through a drive entrance measured from behind the ROW line. It appears that with the current design, much more than 750 sq. ft. is proposed to drain through both drive entrances. If the grading can not be altered to bring the drainage area down to below 750 sq. ft. a curb/sidewalk chase will be required. Also, CDOT may also have a maximum drainage area that may be less than the 750 sq. ft. in LCUASS. Resolved 1 Andrew Carney 01/28/2010 11 General [1/28/10] Sidewalk ramps must align with each other when crossing drive entrances. Please refer to Transportation Planning’s comments regarding the sidewalk and parkway width requirements for this project. Resolved 1 Andrew Carney 01/28/2010 12 General [3/16/10] Comment carried forward. A Grading Plan was not included with this submittal; therefore I am not able to confirm any changes have been made. [1/28/10] On the grading plan, please show the entire frontage road including any existing drive entrances across the street from this project. Resolved 1 Andrew Carney 01/28/2010 13 General [3/16/10] Comment carried forward. The full Utility Set was not submitted with this round of review so I can not confirm this comment has been addressed. [1/28/10] The drive entrance proposed will be required to be built according to Standard Drawing 707 in LCUASS. Provide Drawing 707 in the utility plan set. Resolved 1 Andrew Carney 01/28/2010 3/7/2011 Page 3 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 14 General [1/28/10] On the utility set, are the water services proposed or existing? If they are proposed, please show the approximate limits of the street cut/patch and provide the following statement as a note on the Overall Utility Plan and Grading sheet: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Resolved 1 Andrew Carney 01/28/2010 15 General [1/28/10] Please label the existing ROW width on the Overall Utility Plan sheet. Resolved 1 Andrew Carney 01/28/2010 16 General [3/16/10] Comment carried forward as a reminder. [1/28/10] The proposed driveway location must be approved by CDOT and will require a CDOT access permit. Resolved 1 Andrew Carney 01/28/2010 17 General [3/16/10] Comment carried forward as a reminder. [1/28/10] Signature blocks from Elco and Boxelder may be required for their approval of the project because their services are being impacted. Also, CDOT may require a signature block on the Utility Plans. Resolved 1 Andrew Carney 01/28/2010 18 General [2/1/10] Please see the redlined Utility Plan set for complete comments. Resolved 1 Andrew Carney 02/01/2010 19 Zoning [2/2/10] The building does not meet building placement standards in LUC 3.5.3(B)(2); refer to Build-to lines. Active 1 Gary Lopez 02/02/2010 20 Zoning [2/2/10] Sign approval shall be on separate permit and based on LUC 3.8.7 Active 1 Gary Lopez 02/02/2010 21 Zoning [2/2/10] Trash enclosure wall surface will need to match building surfaces. Active 1 Gary Lopez 02/02/2010 22 Zoning [2/2/10] What is the building wall treatments …more metal, drivit Etc? And what color of all walls, fascia & roof? Mechanical screening on room must match or complement roof color. Active 1 Gary Lopez 02/02/2010 23 Zoning [2/2/10] Landscaping notes need to include language related to Cert. of Occupancy will not be issued with completion of landscaping or financial security of bond, escrow, or letter of credit for 125% of the landscaping (materials/install total). Active 1 Gary Lopez 02/02/2010 3/7/2011 Page 4 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 24 Zoning [2/2/10] All lighting, building/pole mounted, must meet LUC 3.2.4. Active 1 Gary Lopez 02/02/2010 25 Zoning [2/2/10] Two HC parking spaces required, none shown. Per LUC 3.2.2(K)(5) Active 1 Gary Lopez 02/02/2010 3/7/2011 Page 5 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 26 Fire [4/6/10] Thank you for showing the new hydrant location. Please note that PFA requires a minimum of 3 feet of clearance around a hydrant and 15 feet above the top of the hydrant (for maintenance/repair). The clearances apply to landscape and vegetation when it's newly planted but also at maturity. We recommend groundcover or plants/landscape of a similar size and height. [3/16/10] Please show the new fire hydrant location (moved away from the building) on the site plan. It's correct on Sheet C200. I realize this was a recent change so I know the plans will be updated. This is just a reminder. Thanks. WATER SUPPLY Fire hydrants, where required, must be the type approved by the water district having jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum requirements based on type of occupancy. Minimum flow and spacing requirements include: • Commercial, 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers thereafter • Residential within Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter • Residential outside Urban Growth Area, 500 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. These requirements may be modified if buildings are equipped with automatic fire sprinkler systems. Minimum clearance around a hydrant is 36 inches; this includes distance from buildings, curb face and landscaping (excluding ground cover). PLEASE NOTE: You can eliminate the hydrant shown on the far, "west" side of the structure. The other two hydrants shown on Sheet C200 WILL be required, with a slight location change for one of them. The FDC would best be located on the south side of the building, near the hydrant shown off the south corner of the building. However, that south hydrant should be moved to the other side of the drive aisle, on the landscape peninsula, so that it's on the same side of the drive as the FDC. That way, an engine can support the sprinkler system (hydrant and FDC) without blocking the drive and cutting off access to other apparatus. The hydrant is needed to support the automatic fire sprinkler system. The second hydrant, shown on the north side of the building, is needed due to the square footage of the structure. The single, existing hydrant located across the frontage road would not be adequate to Active 1 Carie Dann 02/02/2010 3/7/2011 Page 6 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date fire fire in a 15,000-SF building. 2006 International Fire Code 508.1 and Appendix B 27 Fire REQUIRED ACCESS Fire access roads (fire lanes) shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the PFA’s jurisdiction when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. This fire lane shall be visible by painting and signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements:  Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire apparatus weights. Compacted road base shall be used only for temporary fire lanes or at construction sites.  Have appropriate maintenance agreements that are legally binding and enforceable.  Be designated on the plat as an Emergency Access Easement.  Maintain the required minimum width of 20 feet throughout the length of the fire lane (30 feet on at least one long side of the building when the structures is three or more stories in height). If the building is equipped throughout with an approved automatic fire-sprinkler system, the fire code official is authorized to increase the dimension of 150 feet. NOTE: The "fire lane" location shown on the site plan is acceptable. It must also meet the above requirements for dedication, signage, construction and maintenance. 2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D Active 1 Carie Dann 02/02/2010 28 Fire HMIA AND OCCUPANCY TYPE: Thank you for submitting the Hazardous Materials Impact Analysis. The amounts, use/storage and containment will determine occupancy type (S-1 vs. H) and related requirements. Active 1 Carie Dann 02/02/2010 29 Fire SPRINKLER REQUIREMENTS This proposed building shall be fire sprinklered. 2006 International Fire Code Section 903 Active 1 Carie Dann 02/02/2010 3/7/2011 Page 7 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 30 Fire FIRE DEPARTMENT CONNECTION Fire department connections shall be installed in a pre-approved location and located on the street or fire lane side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access or as otherwise approved by the fire code official. 2006 International Fire Code 912.2 and PFA Fire Prevention Bureau Policy Active 1 Carie Dann 02/02/2010 31 Fire KEY BOXES REQUIRED Poudre Fire Authority requires a key box (“Knox Box”) to be mounted in approved location(s) on every new building equipped with a required fire-sprinkler system or fire-alarm system. 2006 International Fire Code 506.1; PFA BUREAU POLICY 88-20 Active 1 Carie Dann 02/02/2010 32 Fire FIRE LINE REQUIREMENT Buildings that are required to be fire sprinklered shall have a minimum 6-inch fire line unless hydraulic calculations can support a smaller fire line. NFPA 13 (2007) 23.1.3 Active 1 Carie Dann 02/02/2010 33 Fire TURNING RADII The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside 2006 International Fire Code 503.2.4 and Appendix D103.3 Active 1 Carie Dann 02/02/2010 34 Fire ADDRESS NUMERALS Address numerals shall be visible from the street fronting the property, and posted with a minimum six-inch high numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). NOTE: If the address is mounted on a side of the building that does not front the road, the street name is also required to be mounted along with the numerals. 2006 International Fire Code 505.1 Active 1 Carie Dann 02/02/2010 35 Fire IDENTIFICATION OF FIRE PROTECTION EQUIPMENT Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, electrical rooms, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. 2006 International Fire Code 510.1 Active 1 Carie Dann 02/02/2010 3/7/2011 Page 8 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 36 Stormwater [2/3/10] Although the swale provides some water quality mitigation by disconnecting impervious service, it does not provide sufficient water quality treatment. Bio-swales would be better, but extended detention is the preferred treatment. Bio-swales may be more expensive and harder to maintain than extended detention and there is sufficient space for extended detention. Please contact Wes at 416-2418 to discuss. Resolved 1 Wes Lamarque 02/03/2010 37 Stormwater [2/3/10] The front quarter of the site free releases without water quality treatment. The landscaped area near the type-r inlet could be a location for water quality treatment. Please contact Wes at 416-2418 to discuss. Resolved 1 Wes Lamarque 02/03/2010 38 Site Plan [2/3/10] The title of the site plan should reflect the subdivision name. The subdivision plat name is changing. Please see revised plat. Resolved 1 Jeff County 02/03/2010 39 Site Plan [2/3/10] Please remove the data path from the vicinity map on the site plan. Resolved 1 Jeff County 02/03/2010 40 Site Plan [2/3/10] The lot number on the site plan will change. Please see the revised plat. Resolved 1 Jeff County 02/03/2010 41 Site Plan [3/16/10] There are minor line over text issues on site plan sheet A1.1 [2/3/10] There are many line over text issues on the site plan. Resolved 1 Jeff County 02/03/2010 42 Site Plan [2/3/10] Some of the smaller text & styles make it difficult to read. Resolved 1 Jeff County 02/03/2010 43 Landscape Plan [2/3/10] The landscape plan title should reflect the subdivision name. The subdivision plat name is changing. Please see revised plat. Resolved 1 Jeff County 02/03/2010 44 Landscape Plan [2/3/10] There are many line over text issues on the landscape plans. Resolved 1 Jeff County 02/03/2010 45 Landscape Plan [2/3/10] Please change the "Site Plan" text on the landscape plans. Resolved 1 Jeff County 02/03/2010 3/7/2011 Page 9 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 46 Landscape Plan [2/3/10] Autumn Blaze Maple does not survive in the soils found in Fort Collins. It should be changed to Bur Oak, Catalp, Kentucky Coffeetree, Accolade Elm or another adapted species. Shademaster Honeylocust and Skyline Honeylocust do much better than the Sunburst Honeylocust specified on this project. Landscape Note (1) should be replaced with the following: • The soil in all landscape areas, including parkways and medians, shall be thoroughly loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly incorporated into the soil of all landscape areas to a depth of at least six (6) inches by tilling, discing or other suitable method, at a rate of at least three (3) cubic yards of soil amendment per one thousand (1,000) square feet of landscape area. Active 1 Tim Buchanan 02/03/2010 47 General [2/4/10] Detached sidewalks are required. The parkway and detached sidewalk widths associated with a collector level street in the Larimer County Urban Area Street Standards is appropriate for this location. 5' detached sidewalk and an 8' parkway. Active 1 Jennifer Petrik 02/04/2010 48 General [2/4/10] Bicycle parking facilities are required. Requirements can be found in the Land Use Code section 3.2.2. Bicycle parking must be on a hard surface, convenient to the entrance, well light in a safe location and protected from the elements when possible. Resolved 1 Jennifer Petrik 02/04/2010 49 General [2/4/10] Please coordination with the Colorado Department of Transportation on this project. The right deceleration turn lane appears to direct vehicles into what the project is showing as an exit only driveway. This posses a safety hazard. CDOT contact is Gloria Hice-Idler at 970-350-2148. Active 1 Jennifer Petrik 02/04/2010 50 General [2/4/10] The detached sidewalk will need to be in either an access easement or in public right of way. This is to ensure the general public has access to utilize the sidewalk. Active 1 Jennifer Petrik 02/04/2010 3/7/2011 Page 10 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 51 General [2/4/10] Direct pedestrian connection to building is required per the Land Use Code with no vehicle use between the building and street. See section 3.5.3 of the Land Use Code for complete information on relationship of buildings to streets. See Planning Department comments and section 2.8.2 of the Land Use Code for guidance on modifications to this standard. Please provide data on the number of vehicles per day that visit the main office after exiting the air care testing lanes. This data might be obtained from existing facilities. Active 1 Jennifer Petrik 02/04/2010 52 General [2/4/10] Pedestrian and bicycle Level Of Service study is required. The Traffic Evaluation dated November 17, 2009 does not include this study. Resolved 1 Jennifer Petrik 02/04/2010 53 Stormwater [4/7/10] Reminder. [3/18/10] Reminder comment. [2/5/10] A drainage easement is required for the limits of the water quality mitigation. Active 1 Wes Lamarque 02/05/2010 54 Floodplain [2/5/10] Please see the redlined plans and the marked up 50% checklist for all comments related to the floodplain. Resolved 1 Wes Lamarque 02/05/2010 55 Traffic Study [2/10/10] Submitted TIS does not meet City/LCUASS TIS requirements. It does not evaluate the intersections of Hwy 14 and the frontage Rd, the I-25 overpass, does not determine some existing or background conditions such as LOS. This project is accessed from the CDOT frontage road and having spoke with CDOT staff regarding the TIS, they have accepted it as adequate. The project is in the City limits and therefore the TIS needs to meet LCUASS criteria. Active 1 Ward Stanford 02/10/2010 56 Traffic [2/10/10] A right turn pocket is shown on the Site Plan at the Exit driveway. That curb line should be rebuilt to eliminate the turn lane, or as a minimum striped out to keep entering motorists from being drawn to the wrong driveway. Active 1 Ward Stanford 02/10/2010 57 Traffic [2/10/10] The eastern most tree shown at the S. exit driveway showed be relocated to not cause a sight distance issue for exiting/passing motorists. Active 1 Ward Stanford 02/10/2010 58 Zoning [3/15/10] No Comments Active 2 Gary Lopez 03/15/2010 59 Elevation Plan [3/16/10] There are minor line over text issues on elevation plan A3.0 Resolved 2 Jeff County 03/16/2010 3/7/2011 Page 11 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 60 General [4/1/10] Even though the access easement for the sidewalk and the emergency access easement are being dedicated via the plat, show the limits of those easements and label them on the Utility sheet along with all of the other existing/proposed easements. [3/16/10] According to the re-submittal documents, the access easement for the proposed sidewalk will be dedicated with the plat. If this is the case, please label that easement on the Utility Plan/Set, it is not currently shown. Resolved 2 Andrew Carney 03/16/2010 61 General [3/16/10] What is the proposed grading behind the sidewalk? I did not receive a grading sheet with this submittal so I have now way of knowing what is proposed. The grade is required to be flat for at least 1 foot behind the sidewalk before any significant grade change can take place such as the proposed swale. Also, a sidewalk chase will need to be installed where the swale crosses the walk. The chase will not need to be per the City of Fort Collins Standard Detail, however we can certainly provide it if needed. Resolved 2 Andrew Carney 03/16/2010 62 General [4/1/10] Show and label the baricades and the end of the sidewalk on all sheets in the utility set. [3/16/10] The sidewalk connections to the North and South will need to be properly terminated with Type III Barricades. Please show these barricades on the Utility Plan set. Resolved 2 Andrew Carney 03/16/2010 63 General [3/16/10] On the Southern edge of the site where the proposed sidewalk dead-ends to the adjacent property it is shown through an existing CATV box. Unless you are proposing to move the box, the walk will need to be re-routed so it does not interfere with the box. Please leave a minimum of 2 feet between the sidewalk and the existing box as a shy-distance. Resolved 2 Andrew Carney 03/16/2010 64 General [3/16/10] I have provided Appendix E-4 from LCUASS. Please look very carefully at the Utility Plan requirements and note what is required prior to hearing and especially what is required at final. Since, I did not receive a utility set with this round of review, issues are more likely to arise at final, so please review the requirements to ensure a smooth final round of review. I would very much encourage a round of Final review with Engineering (at a minimum) due to the outstanding issues and concerns. Resolved 2 Andrew Carney 03/16/2010 3/7/2011 Page 12 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 65 General [3/31/10] Carried forward - not addressed on the Utility Plan sheet. The modified note (note #4) is sufficient on the grading sheet, please also use the modified note on the utility sheet. [3/16/10] Since the Frontage Road is not a city roadway and the services being affected by the street cuts are also not City lines please modify the Street cut note to the following. I apologize for the confusion; however since neither the street nor the lines are City property the note will need to be modified. "Limits of street cuts are approximate. Final limits are to be determined in the field by the appropriate governing bodies' inspector. All repairs are to be in accordance with their street repair standards." Resolved 2 Andrew Carney 03/16/2010 66 General [3/16/10] Engineering is okay with going to hearing. Resolved 2 Andrew Carney 03/16/2010 67 General [3/17/10] Bicycle parking facilities should be located nearer the entrance. The current location will not likely to be used by cyclists. Active 2 Jennifer Petrik 03/17/2010 68 General [3/17/10] conflict between sidewalk and CA TV utility vault. Please correct to show no conflict. Resolved 2 Jennifer Petrik 03/17/2010 69 General [3/17/10] Please submit striping plan for review Active 2 Jennifer Petrik 03/17/2010 70 General [3/18/10] The American Lindens used in the native seed mix area are not considered very drought tolerant. Bur Oak, Kentucky Coffeetree or Catalpa would have better long term survival. Active 2 Tim Buchanan 03/18/2010 71 Stormwater [3/18/10] Stormwater and Floodplain departments are ready for a hearing. Resolved 2 Wes Lamarque 03/18/2010 72 General [4/2/10] Add details 701 & 708 from LCUASS to the Utility set. Resolved 3 Andrew Carney 04/02/2010 73 General [4/2/10] Show both the access easement for the sidewalk as well as the emergency access easement on the Utility Sheet. If these easements are being dedicated via the plat their location should be known to include on the Utility Plan. Label them as they type of easement they are and that they are being dedicated by the associated plat. Resolved 3 Andrew Carney 04/02/2010 3/7/2011 Page 13 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 74 General [4/2/10] Show the baricades at the end of the proposed sidewalk on all sheets and label it on the Utility sheet at a minimum. Resolved 3 Andrew Carney 04/02/2010 75 General [4/5/10] On sheet C500 why is there a 6' attached sidewalk shown along with HC ramps? Remove the attached walk and only show the detached walk and HC ramps. Resolved 3 Andrew Carney 04/05/2010 76 General [4/5/10] What is the proposed radii of the South side of the North drive? I can not find it called out in any location? Resolved 3 Andrew Carney 04/05/2010 77 Elevation Plan [4/7/10] Sheet A3.0 is titled as "Site Plan - Air Care Colorado", but it is an Elevation Plan. Active 3 Jeff County 04/07/2010 78 Utility Plans [4/7/10] Please correct the subtitle on the Utility Plans cover sheet. It shows this site in the Northeast Quarter, and it should be the Northeast Quarter. Active 3 Jeff County 04/07/2010 79 Utility Plans [4/7/10] Please correct the "Lot & Subdivision Name" on the Utility Plans. It should read "Lot 2, Interchange Business Park Second Filing". Active 3 Jeff County 04/07/2010 80 Utility Plans [4/7/10] No comments on Bicycle rack location. Active 3 Jennifer Petrik 04/07/2010 81 Floodplain [4/7/10] Please see floodplain checklist and redlines for all floodplain comments. Active 3 Wes Lamarque 04/07/2010 82 Stormwater [4/7/10] Please use the standard WQ outlet structure detail for the water quality extended detention pond. Active 3 Wes Lamarque 04/07/2010 83 Stormwater [4/7/10] Please add a note on the utility plan to core drill and grout the connections between the existing inlets and the proposed storm sewers. Active 3 Wes Lamarque 04/07/2010 84 Stormwater [4/7/10] Please add curb cut detail. Active 3 Wes Lamarque 04/07/2010 85 Stormwater [4/7/10] Please add an erosion control escrow calculation in the drainage report. If you have any questions on how to calculate this, please call me at 416-2418. Active 3 Wes Lamarque 04/07/2010 3/7/2011 Page 14 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 1 Electric [3/15/10] [1/20/10] Light & Power engineering will need a Commercial Service Information (C-1) form completed outlining the characteristics of the electric service. Will also need to coordinate the location for the electric transformer. Depending on the electric load, the most likely transformer will be 84" wide x 73" deep, plus 3 ft. clearance on 3 sides and 8 ft. clearance in front. Please contact Light & Power engineering at (970)221-6700 for more details. Resolved 1 Doug Martine 01/20/2010 2 Electric [1/20/10] Once the plan is approved, an AutoCad drawing of the utility plan needs to be sent to Pat Colburn. This can be sent via e-mail to PCOLBURN@FCGOV.COM. Resolved 1 Doug Martine 01/20/2010 3 Environmental Planner [1/20/10] No comments. Active 1 Dana Leavitt 01/20/2010 4 CDOT [1/20/10] Per email from Gloria Hice-Idler, "both accesses will require access permits." Active 1 Emma McArdle 01/20/2010 5 General [3/16/10] Comment carried forward. [1/26/10] This project is subject to any CDOT requirements and permits regarding the ROW, access points, and/or turn lanes. Resolved 1 Andrew Carney 01/26/2010 6 General [3/16/10] Comment carried forward. [1/26/10] Please refer to Transportation Planning's comments regarding sidewalk requirements. Any sidewalk will need to be in either the ROW or an access easement. If the easement is not dedicated on the plat associated with this project it will need to be dedicated by separate document and will be subject to all associated fees. Resolved 1 Andrew Carney 01/26/2010 3/7/2011 Page 15 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 7 General [3/16/10] Comment carried forward. I will provide the Development Construction Permit (DCP) Application with this round of review. Once completed and returned to me I will be able to begin the permit itself. As the project approaches final approval we will be able to schedule a DCP meeting which are held on Wednesday afternoons. Please refer to the DCP Application and Brochure for more information the the DCP process. [1/26/10] This project will need a Development Agreement as well as Development Construction Permit prior to starting work on site. I have provided the Development Agreement information sheet with this round of review. Once completed and returned to me I will be able to start the Development Agreement language. When the project is closer to final design, we will begin work on the Development Construction Permit. Resolved 1 Andrew Carney 01/26/2010 8 General [3/16/10] With this round of review I only received the Utility Plan Sheet from the Utility Plan Set, not the full set, so I am only able to comment on the Utility Sheet, therefore I am not able to confirm if the following comment has been addressed. [1/28/10] Please include all of the City of Fort Collins General Notes. Numbers 26, 41, 47, & 48 were not included in the Utility Plans. If they do not apply to this particular project they still must be included. Resolved 1 Andrew Carney 01/28/2010 9 General [3/16/10] Comment carried forward. A Grading Plan was not included with this submittal, therefore I am not able to confirm any changes have been made. [1/28/10] On the Grading Plan, please include spot elevations for all lot corners, and finish floors/top of foundation elevations. Resolved 1 Andrew Carney 01/28/2010 10 General [3/16/10] With this round of review, I will not be able to confirm if less than 750 sq. ft. is draining through the drive entrances since a grading sheet was not submitted. If the proposed swale between the parking and sidewalk is approved by Stormwater a sidewalk chase will be needed where it crosses the walk. [1/28/10] According to the Larimer Urban Area Street Standards (LCUASS), no more than 750 sq. ft. may drain across/through a drive entrance measured from behind the ROW line. It appears that with the current design, much more than 750 sq. ft. is proposed to drain through both drive entrances. If the grading can not be altered to bring the drainage area down to below 750 sq. ft. a curb/sidewalk chase will be required. Also, CDOT may also have a maximum drainage area that may be less than the 750 sq. ft. in LCUASS. Resolved 1 Andrew Carney 01/28/2010 3/7/2011 Page 16 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 11 General [1/28/10] Sidewalk ramps must align with each other when crossing drive entrances. Please refer to Transportation Planning’s comments regarding the sidewalk and parkway width requirements for this project. Resolved 1 Andrew Carney 01/28/2010 12 General [3/16/10] Comment carried forward. A Grading Plan was not included with this submittal; therefore I am not able to confirm any changes have been made. [1/28/10] On the grading plan, please show the entire frontage road including any existing drive entrances across the street from this project. Resolved 1 Andrew Carney 01/28/2010 13 General [3/16/10] Comment carried forward. The full Utility Set was not submitted with this round of review so I can not confirm this comment has been addressed. [1/28/10] The drive entrance proposed will be required to be built according to Standard Drawing 707 in LCUASS. Provide Drawing 707 in the utility plan set. Resolved 1 Andrew Carney 01/28/2010 14 General [1/28/10] On the utility set, are the water services proposed or existing? If they are proposed, please show the approximate limits of the street cut/patch and provide the following statement as a note on the Overall Utility Plan and Grading sheet: Limits of street cut are approximate. Final limits are to be determined in the field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards. Resolved 1 Andrew Carney 01/28/2010 15 General [1/28/10] Please label the existing ROW width on the Overall Utility Plan sheet. Resolved 1 Andrew Carney 01/28/2010 16 General [3/16/10] Comment carried forward as a reminder. [1/28/10] The proposed driveway location must be approved by CDOT and will require a CDOT access permit. Resolved 1 Andrew Carney 01/28/2010 17 General [3/16/10] Comment carried forward as a reminder. [1/28/10] Signature blocks from Elco and Boxelder may be required for their approval of the project because their services are being impacted. Also, CDOT may require a signature block on the Utility Plans. Resolved 1 Andrew Carney 01/28/2010 3/7/2011 Page 17 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 18 General [2/1/10] Please see the redlined Utility Plan set for complete comments. Resolved 1 Andrew Carney 02/01/2010 19 Zoning [2/2/10] The building does not meet building placement standards in LUC 3.5.3(B)(2); refer to Build-to lines. Active 1 Gary Lopez 02/02/2010 20 Zoning [2/2/10] Sign approval shall be on separate permit and based on LUC 3.8.7 Active 1 Gary Lopez 02/02/2010 21 Zoning [2/2/10] Trash enclosure wall surface will need to match building surfaces. Active 1 Gary Lopez 02/02/2010 22 Zoning [2/2/10] What is the building wall treatments …more metal, drivit Etc? And what color of all walls, fascia & roof? Mechanical screening on room must match or complement roof color. Active 1 Gary Lopez 02/02/2010 23 Zoning [2/2/10] Landscaping notes need to include language related to Cert. of Occupancy will not be issued with completion of landscaping or financial security of bond, escrow, or letter of credit for 125% of the landscaping (materials/install total). Active 1 Gary Lopez 02/02/2010 24 Zoning [2/2/10] All lighting, building/pole mounted, must meet LUC 3.2.4. Active 1 Gary Lopez 02/02/2010 25 Zoning [2/2/10] Two HC parking spaces required, none shown. Per LUC 3.2.2(K)(5) Active 1 Gary Lopez 02/02/2010 3/7/2011 Page 18 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 26 Fire [4/6/10] Thank you for showing the new hydrant location. Please note that PFA requires a minimum of 3 feet of clearance around a hydrant and 15 feet above the top of the hydrant (for maintenance/repair). The clearances apply to landscape and vegetation when it's newly planted but also at maturity. We recommend groundcover or plants/landscape of a similar size and height. [3/16/10] Please show the new fire hydrant location (moved away from the building) on the site plan. It's correct on Sheet C200. I realize this was a recent change so I know the plans will be updated. This is just a reminder. Thanks. WATER SUPPLY Fire hydrants, where required, must be the type approved by the water district having jurisdiction and the Fire Department. Hydrant spacing and water flow must meet minimum requirements based on type of occupancy. Minimum flow and spacing requirements include: • Commercial, 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the building, on 600-foot centers thereafter • Residential within Urban Growth Area, 1,000 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter • Residential outside Urban Growth Area, 500 gpm at 20 psi residual pressure, spaced not further than 400 feet to the building, on 800-foot centers thereafter. These requirements may be modified if buildings are equipped with automatic fire sprinkler systems. Minimum clearance around a hydrant is 36 inches; this includes distance from buildings, curb face and landscaping (excluding ground cover). PLEASE NOTE: You can eliminate the hydrant shown on the far, "west" side of the structure. The other two hydrants shown on Sheet C200 WILL be required, with a slight location change for one of them. The FDC would best be located on the south side of the building, near the hydrant shown off the south corner of the building. However, that south hydrant should be moved to the other side of the drive aisle, on the landscape peninsula, so that it's on the same side of the drive as the FDC. That way, an engine can support the sprinkler system (hydrant and FDC) without blocking the drive and cutting off access to other apparatus. The hydrant is needed to support the automatic fire sprinkler system. The second hydrant, shown on the north side of the building, is needed due to the square footage of the structure. The single, existing hydrant located across the frontage road would not be adequate to Active 1 Carie Dann 02/02/2010 3/7/2011 Page 19 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date fire fire in a 15,000-SF building. 2006 International Fire Code 508.1 and Appendix B 27 Fire REQUIRED ACCESS Fire access roads (fire lanes) shall be provided for every facility, building or portion of a building hereafter constructed or moved into or within the PFA’s jurisdiction when any portion of the facility or any portion of an exterior wall of the first story of the building is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. This fire lane shall be visible by painting and signage, and maintained unobstructed at all times. A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements:  Be designed as a flat, hard, all-weather driving surface (asphalt or concrete) capable of supporting fire apparatus weights. Compacted road base shall be used only for temporary fire lanes or at construction sites.  Have appropriate maintenance agreements that are legally binding and enforceable.  Be designated on the plat as an Emergency Access Easement.  Maintain the required minimum width of 20 feet throughout the length of the fire lane (30 feet on at least one long side of the building when the structures is three or more stories in height). If the building is equipped throughout with an approved automatic fire-sprinkler system, the fire code official is authorized to increase the dimension of 150 feet. NOTE: The "fire lane" location shown on the site plan is acceptable. It must also meet the above requirements for dedication, signage, construction and maintenance. 2006 International Fire Code 503.1.1, 503.2.3, 503.3, 503.4 and Appendix D Active 1 Carie Dann 02/02/2010 28 Fire HMIA AND OCCUPANCY TYPE: Thank you for submitting the Hazardous Materials Impact Analysis. The amounts, use/storage and containment will determine occupancy type (S-1 vs. H) and related requirements. Active 1 Carie Dann 02/02/2010 29 Fire SPRINKLER REQUIREMENTS This proposed building shall be fire sprinklered. 2006 International Fire Code Section 903 Active 1 Carie Dann 02/02/2010 3/7/2011 Page 20 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 30 Fire FIRE DEPARTMENT CONNECTION Fire department connections shall be installed in a pre-approved location and located on the street or fire lane side of buildings, fully visible and recognizable from the street or nearest point of fire department vehicle access or as otherwise approved by the fire code official. 2006 International Fire Code 912.2 and PFA Fire Prevention Bureau Policy Active 1 Carie Dann 02/02/2010 31 Fire KEY BOXES REQUIRED Poudre Fire Authority requires a key box (“Knox Box”) to be mounted in approved location(s) on every new building equipped with a required fire-sprinkler system or fire-alarm system. 2006 International Fire Code 506.1; PFA BUREAU POLICY 88-20 Active 1 Carie Dann 02/02/2010 32 Fire FIRE LINE REQUIREMENT Buildings that are required to be fire sprinklered shall have a minimum 6-inch fire line unless hydraulic calculations can support a smaller fire line. NFPA 13 (2007) 23.1.3 Active 1 Carie Dann 02/02/2010 33 Fire TURNING RADII The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside 2006 International Fire Code 503.2.4 and Appendix D103.3 Active 1 Carie Dann 02/02/2010 34 Fire ADDRESS NUMERALS Address numerals shall be visible from the street fronting the property, and posted with a minimum six-inch high numerals on a contrasting background. (Bronze numerals on brown brick are not acceptable). NOTE: If the address is mounted on a side of the building that does not front the road, the street name is also required to be mounted along with the numerals. 2006 International Fire Code 505.1 Active 1 Carie Dann 02/02/2010 35 Fire IDENTIFICATION OF FIRE PROTECTION EQUIPMENT Fire protection equipment shall be identified in an approved manner. Rooms containing controls for air-conditioning systems, electrical rooms, sprinkler risers and valves, or other fire detection, suppression or control elements shall be identified for the use of the fire department. 2006 International Fire Code 510.1 Active 1 Carie Dann 02/02/2010 3/7/2011 Page 21 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 36 Stormwater [2/3/10] Although the swale provides some water quality mitigation by disconnecting impervious service, it does not provide sufficient water quality treatment. Bio-swales would be better, but extended detention is the preferred treatment. Bio-swales may be more expensive and harder to maintain than extended detention and there is sufficient space for extended detention. Please contact Wes at 416-2418 to discuss. Resolved 1 Wes Lamarque 02/03/2010 37 Stormwater [2/3/10] The front quarter of the site free releases without water quality treatment. The landscaped area near the type-r inlet could be a location for water quality treatment. Please contact Wes at 416-2418 to discuss. Resolved 1 Wes Lamarque 02/03/2010 38 Site Plan [2/3/10] The title of the site plan should reflect the subdivision name. The subdivision plat name is changing. Please see revised plat. Resolved 1 Jeff County 02/03/2010 39 Site Plan [2/3/10] Please remove the data path from the vicinity map on the site plan. Resolved 1 Jeff County 02/03/2010 40 Site Plan [2/3/10] The lot number on the site plan will change. Please see the revised plat. Resolved 1 Jeff County 02/03/2010 41 Site Plan [3/16/10] There are minor line over text issues on site plan sheet A1.1 [2/3/10] There are many line over text issues on the site plan. Resolved 1 Jeff County 02/03/2010 42 Site Plan [2/3/10] Some of the smaller text & styles make it difficult to read. Resolved 1 Jeff County 02/03/2010 43 Landscape Plan [2/3/10] The landscape plan title should reflect the subdivision name. The subdivision plat name is changing. Please see revised plat. Resolved 1 Jeff County 02/03/2010 44 Landscape Plan [2/3/10] There are many line over text issues on the landscape plans. Resolved 1 Jeff County 02/03/2010 45 Landscape Plan [2/3/10] Please change the "Site Plan" text on the landscape plans. Resolved 1 Jeff County 02/03/2010 3/7/2011 Page 22 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 46 Landscape Plan [2/3/10] Autumn Blaze Maple does not survive in the soils found in Fort Collins. It should be changed to Bur Oak, Catalp, Kentucky Coffeetree, Accolade Elm or another adapted species. Shademaster Honeylocust and Skyline Honeylocust do much better than the Sunburst Honeylocust specified on this project. Landscape Note (1) should be replaced with the following: • The soil in all landscape areas, including parkways and medians, shall be thoroughly loosened to a depth of not less than eight (8) inches and soil amendment shall be thoroughly incorporated into the soil of all landscape areas to a depth of at least six (6) inches by tilling, discing or other suitable method, at a rate of at least three (3) cubic yards of soil amendment per one thousand (1,000) square feet of landscape area. Active 1 Tim Buchanan 02/03/2010 47 General [2/4/10] Detached sidewalks are required. The parkway and detached sidewalk widths associated with a collector level street in the Larimer County Urban Area Street Standards is appropriate for this location. 5' detached sidewalk and an 8' parkway. Active 1 Jennifer Petrik 02/04/2010 48 General [2/4/10] Bicycle parking facilities are required. Requirements can be found in the Land Use Code section 3.2.2. Bicycle parking must be on a hard surface, convenient to the entrance, well light in a safe location and protected from the elements when possible. Resolved 1 Jennifer Petrik 02/04/2010 49 General [2/4/10] Please coordination with the Colorado Department of Transportation on this project. The right deceleration turn lane appears to direct vehicles into what the project is showing as an exit only driveway. This posses a safety hazard. CDOT contact is Gloria Hice-Idler at 970-350-2148. Active 1 Jennifer Petrik 02/04/2010 50 General [2/4/10] The detached sidewalk will need to be in either an access easement or in public right of way. This is to ensure the general public has access to utilize the sidewalk. Active 1 Jennifer Petrik 02/04/2010 3/7/2011 Page 23 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 51 General [2/4/10] Direct pedestrian connection to building is required per the Land Use Code with no vehicle use between the building and street. See section 3.5.3 of the Land Use Code for complete information on relationship of buildings to streets. See Planning Department comments and section 2.8.2 of the Land Use Code for guidance on modifications to this standard. Please provide data on the number of vehicles per day that visit the main office after exiting the air care testing lanes. This data might be obtained from existing facilities. Active 1 Jennifer Petrik 02/04/2010 52 General [2/4/10] Pedestrian and bicycle Level Of Service study is required. The Traffic Evaluation dated November 17, 2009 does not include this study. Resolved 1 Jennifer Petrik 02/04/2010 53 Stormwater [4/7/10] Reminder. [3/18/10] Reminder comment. [2/5/10] A drainage easement is required for the limits of the water quality mitigation. Active 1 Wes Lamarque 02/05/2010 54 Floodplain [2/5/10] Please see the redlined plans and the marked up 50% checklist for all comments related to the floodplain. Resolved 1 Wes Lamarque 02/05/2010 55 Traffic Study [2/10/10] Submitted TIS does not meet City/LCUASS TIS requirements. It does not evaluate the intersections of Hwy 14 and the frontage Rd, the I-25 overpass, does not determine some existing or background conditions such as LOS. This project is accessed from the CDOT frontage road and having spoke with CDOT staff regarding the TIS, they have accepted it as adequate. The project is in the City limits and therefore the TIS needs to meet LCUASS criteria. Active 1 Ward Stanford 02/10/2010 56 Traffic [2/10/10] A right turn pocket is shown on the Site Plan at the Exit driveway. That curb line should be rebuilt to eliminate the turn lane, or as a minimum striped out to keep entering motorists from being drawn to the wrong driveway. Active 1 Ward Stanford 02/10/2010 57 Traffic [2/10/10] The eastern most tree shown at the S. exit driveway showed be relocated to not cause a sight distance issue for exiting/passing motorists. Active 1 Ward Stanford 02/10/2010 58 Zoning [3/15/10] No Comments Active 2 Gary Lopez 03/15/2010 59 Elevation Plan [3/16/10] There are minor line over text issues on elevation plan A3.0 Resolved 2 Jeff County 03/16/2010 3/7/2011 Page 24 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 60 General [4/1/10] Even though the access easement for the sidewalk and the emergency access easement are being dedicated via the plat, show the limits of those easements and label them on the Utility sheet along with all of the other existing/proposed easements. [3/16/10] According to the re-submittal documents, the access easement for the proposed sidewalk will be dedicated with the plat. If this is the case, please label that easement on the Utility Plan/Set, it is not currently shown. Resolved 2 Andrew Carney 03/16/2010 61 General [3/16/10] What is the proposed grading behind the sidewalk? I did not receive a grading sheet with this submittal so I have now way of knowing what is proposed. The grade is required to be flat for at least 1 foot behind the sidewalk before any significant grade change can take place such as the proposed swale. Also, a sidewalk chase will need to be installed where the swale crosses the walk. The chase will not need to be per the City of Fort Collins Standard Detail, however we can certainly provide it if needed. Resolved 2 Andrew Carney 03/16/2010 62 General [4/1/10] Show and label the baricades and the end of the sidewalk on all sheets in the utility set. [3/16/10] The sidewalk connections to the North and South will need to be properly terminated with Type III Barricades. Please show these barricades on the Utility Plan set. Resolved 2 Andrew Carney 03/16/2010 63 General [3/16/10] On the Southern edge of the site where the proposed sidewalk dead-ends to the adjacent property it is shown through an existing CATV box. Unless you are proposing to move the box, the walk will need to be re-routed so it does not interfere with the box. Please leave a minimum of 2 feet between the sidewalk and the existing box as a shy-distance. Resolved 2 Andrew Carney 03/16/2010 64 General [3/16/10] I have provided Appendix E-4 from LCUASS. Please look very carefully at the Utility Plan requirements and note what is required prior to hearing and especially what is required at final. Since, I did not receive a utility set with this round of review, issues are more likely to arise at final, so please review the requirements to ensure a smooth final round of review. I would very much encourage a round of Final review with Engineering (at a minimum) due to the outstanding issues and concerns. Resolved 2 Andrew Carney 03/16/2010 3/7/2011 Page 25 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 65 General [3/31/10] Carried forward - not addressed on the Utility Plan sheet. The modified note (note #4) is sufficient on the grading sheet, please also use the modified note on the utility sheet. [3/16/10] Since the Frontage Road is not a city roadway and the services being affected by the street cuts are also not City lines please modify the Street cut note to the following. I apologize for the confusion; however since neither the street nor the lines are City property the note will need to be modified. "Limits of street cuts are approximate. Final limits are to be determined in the field by the appropriate governing bodies' inspector. All repairs are to be in accordance with their street repair standards." Resolved 2 Andrew Carney 03/16/2010 66 General [3/16/10] Engineering is okay with going to hearing. Resolved 2 Andrew Carney 03/16/2010 67 General [3/17/10] Bicycle parking facilities should be located nearer the entrance. The current location will not likely to be used by cyclists. Active 2 Jennifer Petrik 03/17/2010 68 General [3/17/10] conflict between sidewalk and CA TV utility vault. Please correct to show no conflict. Resolved 2 Jennifer Petrik 03/17/2010 69 General [3/17/10] Please submit striping plan for review Active 2 Jennifer Petrik 03/17/2010 70 General [3/18/10] The American Lindens used in the native seed mix area are not considered very drought tolerant. Bur Oak, Kentucky Coffeetree or Catalpa would have better long term survival. Active 2 Tim Buchanan 03/18/2010 71 Stormwater [3/18/10] Stormwater and Floodplain departments are ready for a hearing. Resolved 2 Wes Lamarque 03/18/2010 72 General [4/2/10] Add details 701 & 708 from LCUASS to the Utility set. Resolved 3 Andrew Carney 04/02/2010 73 General [4/2/10] Show both the access easement for the sidewalk as well as the emergency access easement on the Utility Sheet. If these easements are being dedicated via the plat their location should be known to include on the Utility Plan. Label them as they type of easement they are and that they are being dedicated by the associated plat. Resolved 3 Andrew Carney 04/02/2010 3/7/2011 Page 26 Project: AIR CARE COLORADO PDP - TYPE I AND FINAL PLAN (aka Envirotest) (RE:INTERCHANGE BUSINESS PARK LOTS 15 & 16 REPLAT) ID Topic Issue Status Round Comment By Initial Date 74 General [4/2/10] Show the baricades at the end of the proposed sidewalk on all sheets and label it on the Utility sheet at a minimum. Resolved 3 Andrew Carney 04/02/2010 75 General [4/5/10] On sheet C500 why is there a 6' attached sidewalk shown along with HC ramps? Remove the attached walk and only show the detached walk and HC ramps. Resolved 3 Andrew Carney 04/05/2010 76 General [4/5/10] What is the proposed radii of the South side of the North drive? I can not find it called out in any location? Resolved 3 Andrew Carney 04/05/2010 77 Elevation Plan [4/7/10] Sheet A3.0 is titled as "Site Plan - Air Care Colorado", but it is an Elevation Plan. Active 3 Jeff County 04/07/2010 78 Utility Plans [4/7/10] Please correct the subtitle on the Utility Plans cover sheet. It shows this site in the Northeast Quarter, and it should be the Northeast Quarter. Active 3 Jeff County 04/07/2010 79 Utility Plans [4/7/10] Please correct the "Lot & Subdivision Name" on the Utility Plans. It should read "Lot 2, Interchange Business Park Second Filing". Active 3 Jeff County 04/07/2010 80 Utility Plans [4/7/10] No comments on Bicycle rack location. Active 3 Jennifer Petrik 04/07/2010 81 Floodplain [4/7/10] Please see floodplain checklist and redlines for all floodplain comments. Active 3 Wes Lamarque 04/07/2010 82 Stormwater [4/7/10] Please use the standard WQ outlet structure detail for the water quality extended detention pond. Active 3 Wes Lamarque 04/07/2010 83 Stormwater [4/7/10] Please add a note on the utility plan to core drill and grout the connections between the existing inlets and the proposed storm sewers. Active 3 Wes Lamarque 04/07/2010 84 Stormwater [4/7/10] Please add curb cut detail. Active 3 Wes Lamarque 04/07/2010 85 Stormwater [4/7/10] Please add an erosion control escrow calculation in the drainage report. If you have any questions on how to calculate this, please call me at 416-2418. Active 3 Wes Lamarque 04/07/2010 3/7/2011 Page 27