HomeMy WebLinkAboutNEW BELGIUM BREWERY MAJOR AMENDMENT - 01-95 A - CORRESPONDENCE -Project: NEW BELGIUM BREWERY, MAJOR AMENDMENT, #1-95A
Major Amendment
#1-95A. TYPE 1 (LUC). REQUEST FOR SPECIAL REVIEW OF THE PROPOSED CONSTRUCTION OF FERMENATION TANKS OVER 40
FEET HIGH; LOCATED AT THE NORTHEAST CORNER OF LINDEN STREET AND BUCHINGHAM STREET; AND ZONED I -
INDUSTRIAL.
Project Type:
Project Desc:
File ID: 01-95A Planner: TED SHEPARD DMS Project Num: CP97027000
ID Topic Issue Status Round Comment By Initial Date
1 Keep all water mains in drives. Extend proposed 8-inch water main to the
proposed stub from the wastewater process plant.
Active 2 Jeff Hill 08/15/2001
2 Provide all information necessary to build water service and fire line into
proposed addition.
Resolved 2 Jeff Hill 08/15/2001
3 Provide all approporiate details (I.e. Sanitary sewer bedding, sanitary sewer
manhole, etc) on the detail sheet.
Active 2 Jeff Hill 08/15/2001
4 the proposed meter pit may not be located in the proposed detention pond. Active 2 Jeff Hill 10/18/2001
5 Show and label all existing and proposed water/sewer lines in all appropriate
views (I.e. landscape, site, etc).
Active 2 Jeff Hill 10/18/2001
6 Show the proposed future rail spur and pipeing for the water treatment facility
on this plan set. Maintain 20 feet of separation between futrue rail spur and
proposed water main.
Active 2 Jeff Hill 10/18/2001
7 Provide 0.2 feet of fall through all manholes. Active 2 Jeff Hill 10/18/2001
8 Pothole all existing utilities now in order to finalize the civil design. Active 2 Jeff Hill 10/18/2001
9 Provide and record the utility easement vacations and dedications in the
standard City of Fort Collins Format.
Active 2 Jeff Hill 10/18/2001