Loading...
HomeMy WebLinkAboutPOUDRE VALLEY PLAZA / AT&T WIRELESS TELECOMMUNICATION FACILITY ( WTF) PDP - 06-09 A - CORRESPONDENCE -Project: Poudre Valley Plaza / AT&T Wireless Telecommunication Facility (WTF) PDP - Type I PDP - Final Compliance Request to install a new equipment shelter and 55' stealth pole within a new masonry enclosure finished to match nearby buildings. Located in the parking lot of Poudre Valley Plaza which is located on the SE corner of S. Shields St. & W. Horsetooth Rd. Currently zoned NC, Neighborhood Commercial, and the proposed use is WTF, Wireless Telecommunication Facility. Project Type: Project Desc: File ID: 06-09/A Planner: Steve Olt DMS Project Num: CP092160 ID Topic Issue Status Round Comment By Initial Date 1 zoning [2/3/09] no comments Active 1 Jenny Nuckols 02/03/2009 2 zoning [2/3/09] A drainage easement exists where the building is desired to be placed. A structure can not be placed within an easement. In order for the building to be placed as shown the area underneath the building will need to be vacated. I would suggest checking with stormwater to determine if a portion of the easement can be vacated before submitting a request to do so. Engineering charges a $400 processing fee for vacating an easement. The applicant is responsible for providing a legal description (which is required to be prepared by a licensed surveyor) and the fees for filing fees. Please contact Sheri Langenberger at 221-6605 for an informational sheet on the vacation process. Active 1 Sheri Langenberger 02/03/2009 3 zoning [2/17/09] Existing transformer is 120/208 volt three phase. Active 1 Alan Rutz 02/17/2009 4 zoning [2/17/09] Electric meter must be placed on the outside of the enclosure Active 1 Alan Rutz 02/17/2009 5 zoning [2/17/09] Contact Light and Power with load requirements and billing data. Active 1 Alan Rutz 02/17/2009 6 Water/Wastewater [2/18/09] There are existing water/sewer lines in the drive adjacent to the proposed building/tower site. The water line extends east to Centennial. Add the location of these lines (based on field locates) to the site plan and maintain 10 feet of separation between the proposed facilities (including the underground electrical service) and the water/sewer lines (including the water services extending south of the water main). Active 1 Roger Buffington 02/18/2009 7 Stormwater [2/19/09] The blanket drainage easement will need to be vacated for the limits of the structure. Active 1 Wes Lamarque 02/19/2009 3/7/2011 Page 1 Project: Poudre Valley Plaza / AT&T Wireless Telecommunication Facility (WTF) PDP - Type I ID Topic Issue Status Round Comment By Initial Date 8 Stormwater [2/19/09] Drainage currently sheet flows through this area to the northeast. Drainage should be diverted around this structure. This can be done with curb & gutter. Please show on the site plan how drainage will be directed around the structure. Active 1 Wes Lamarque 02/19/2009 9 Fire PFA has no comments or concerns at this time. Active 1 Carie Dann 02/19/2009 10 General [2/20/09] Please revise the Landscape & Elevations Plans to show the existing trees and shrubs in the island at the west end of this facility. Active 1 Steve Olt 02/20/2009 11 General [2/20/09] Please add West to Horsetooth Road on the Site Plan for the entire Poudre Valley Plaza center. Please label Century Drive, along the east side of the center, on the same Site Plan. Active 1 Steve Olt 02/20/2009 12 General [2/20/09] Please put "Poudre Valley Plaza" in the middle of the center on the overall Site Plan. Active 1 Steve Olt 02/20/2009 13 General [2/20/09] Rick Lee of the Building Department is forwarding to the applicant a copy of the 2008 Commercial / Multi-Family Codes & Standards that will apply to this development request. Active 1 Steve Olt 02/20/2009 14 General [2/20/09] Technical Services indicated that a portion of theTitle Block is missing on the 11" x 17" drawings. Also, the legal description for the Poudre Valley Plaza center, and possibly the portion of the center where this WTF will be located, must be added to the Overall Site Plan. Active 1 Steve Olt 02/20/2009 15 General [2/20/09] Signature blocks for the Owner's Certification, a Notary Public (to notarize the owner's signature), and the Director of Planning must be added to the overall Site Plan. Active 1 Steve Olt 02/20/2009 16 General [5/13/09] no comments. [2/20/09] No comments. Active 1 Dana Leavitt 02/20/2009 3/7/2011 Page 2