HomeMy WebLinkAboutFRONT RANGE VILLAGE - MAJOR AMENDMENT - 5-94L M - CORRESPONDENCE -Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
Final Compliance Review
A REQUEST FOR A MAJOR AMENDMENT TO THE PREVIOUSLY APPROVED SUMMIT LIFESTYLE CENTER. THE NEW REQUEST IS
FOR AN 850,000 SQ FT REGIONAL SHOPPING CENTER ON 101 ACRES. THIS PROJECT IS TO BE LOCATED AT THE NORTHWEST
CORNER OF EAST HARMONY RD AND ZIEGLER RD (NOT INCLUDING THE LSI BUILDING). ZONED HC (HARMONY CORRIDOR
DISTRICT).
Project Type:
Project Desc:
File ID: 5-94L/M Planner: Ted Shepard DMS Project Num: CP061900
ID Topic Issue Status Round Comment By Initial Date
3/7/2011 Page 1
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
1 General [8/21/06] There appears to be several offsite easements/rights-of-way
required for the project:
*For Harmony Road
- Pads at Harmony (Gino Campana) to tie the north side of Snow Mesa to the
widening of Harmony Road
- PVH for grading, sidewalk, and signal pole at the southwest corner of
Corbett and Harmony
- The Group building for grading and sidewalk at the southeast corner of
Corbett and Harmony
- (former) LSI building for road widening
- Avago for sidewalk and grading at the northeast corner of Ziegler and
Harmony
- Clark-Greenlee Properties, LLC for sidewalk, curb & gutter and signal pole
installation at the southwest corner of Ziegler and Harmony
- Intel for sidewalk and construction at the southeast corner of Ziegler and
Harmony
*For Ziegler Road
- Avago for driveway entrance reconfiguration
- David and Eunice Young for grading and sidewalk along Ziegler
- Douglas Dietz for grading and sidewalk along Ziegler
- Emmaus Orthodox Presbyterian Church for road widening along Ziegler
- James Chinn for improvements on the southeast corner of Ziegler and
Horsetooth
- English Ranch 4th for improvements on the southwest corner of Ziegler and
Horsetooth
- Stone Ridge 4th for improvements on the northwest corner of Ziegler and
Horsetooth
- Cottonwood Land and Farms for improvements on the northeast corner of
Ziegler and Horsetooth
*For the pedstrian connection to English Ranch
- English Ranch South 3rd Filing for pedestrian connection to Paddington
Road, or
Bartran Family LLC and LSI property
*An emergency access easement on LSI property
Resolved 1 Marc Virata 08/21/2006
3/7/2011 Page 2
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
The list above was based upon the information I could make out from the
submittal package. There may be additional properties. The submittal
requirements note that letters of intent must be submitted prior to scheduling
a public hearing, while this requirement has been waived by the CPES
Director, a status on the negotiations between the developer and the property
owners would be beneficial as part of the staff report for the project.
2 Plat [8/23/06] Corbett right-of-way needs to be dedicated to the north property line
boundary, not stop at the cul-de-sac termination.
Resolved 1 Marc Virata 08/23/2006
3 Zoning [12/12/06] This is now Note #5 on the Cover Sheet. However, the wording
hasn't been changed to reflect what the code requires, which is that
screening from adjacent properties is also required.
[8/23/06] Note #5 on sheet 1 of 10 should be amended to reflect what
Section 3.5.1(I)(2) states. Specifically, the code states that mechanical
equipment must be screened from " adjacent properties and public streets."
Resolved 1 Peter Barnes 08/23/2006
4 Zoning [12/12/06] The "service area" is labeled and shown for some buildings but
not all. i.e. I don't see loading/delivery for Lowes (there's one labeled in the
front for customers, but where do deliveries happen?). Also, I don't see
anything labeled for the sporting goods building.
[8/23/06] Please label the loading/delivery areas for the various buildings so
that we can see how they will function (i.e. how easy can semis and other
delivery trucks access those areas)
Resolved 1 Peter Barnes 08/23/2006
5 Zoning [12/12/06] Still don't see bike parking for home improvement and numerous
other buildings (C-2, E-7, F-3, F-4, F-7, F-8, etc)
[8/23/06] Where is the bike parking for the home improvement building?
Resolved 1 Peter Barnes 08/23/2006
3/7/2011 Page 3
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
6 Zoning [12/12/06] The "large format banners" have been removed. However, the
Lowes and Target (especially the Target logo) signs appear to be taller than
7'. It's difficult to tell since there's no scale indicated on the elevation
drawings of these two buildings, and using my scale is not exact. But sign
permits will not be issued for signs that are taller than 7'. Note #8 on the
cover sheet states that signs will comply with the sign code, so that is
adequate to cover this, but it would be a good idea if the signs on the Target
and Lowes elevations were downsized or a specific note added to those
sheets.
[8/23/06] The elevation drawings show "large format banners". They appear
to be taller than 7'. They are considered to be wall signs, and the code limits
them to 7' in height (Sec. 3.8.7(I) of the LUC).
Resolved 1 Peter Barnes 08/23/2006
7 Zoning [8/23/06] I find the plat difficult to figure out. Is the whole development really
only 1 lot? That's what it looks like.
Resolved 1 Peter Barnes 08/23/2006
8 Zoning [8/23/06] Lot lines should be shown and labeled on the site plan. Distances
from buildings to lot lines should be shown where possible. For instance,
how far is Target from the north lot line?
Resolved 1 Peter Barnes 08/23/2006
9 Zoning [12/12/06] Still not shown.
[8/23/06] If there are screen walls at the loading areas, please provide some
detail - how high, what material - and label them on the site plan.
Resolved 1 Peter Barnes 08/23/2006
10 Zoning [12/12/06] This is now Note #7 on the cover sheet, but they still aren't shown.
[8/23/06] Note #7 on sheet 1 of 10 refers to trash dumpsters. But I don't see
any shown on the site plan. If there are dumpster/enclosures proposed,
please show and label.
Resolved 1 Peter Barnes 08/23/2006
11 Zoning [12/12/06]
[8/23/06] Please show the location of parking lot light poles.
Resolved 1 Peter Barnes 08/23/2006
12 Zoning [12/12/06]
[8/23/06] The landscape plan includes a "representative plant list", but none
of the plantings are labeled. The plan needs to label what the different trees
and shrubs are so we know what is being installed.
Resolved 1 Peter Barnes 08/23/2006
3/7/2011 Page 4
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
13 General [8/23/06] The sidewalk running along the east side of Corbett heading north
of the furthest north driveway should not be built, just the access ramp.
Funds for sidewalk will then need to be provided for the 120+/- feet such that
it can be extended with future development.
Resolved 1 Marc Virata 08/23/2006
14 Stormwater -
Drainage Easements
[8/29/06] Off-site drainage easements are needed for the construction of
drainage improvements on the LSI property to the north and on the Paragon
property to the south.
Ditch company signature will be needed for the routing of the irrigation pipes
through the site. Please clearly label these pipes as irrigation lines.
Active 1 Basil Hamdan 08/29/2006
15 Water/Wastewater [8/29/06] Label all water main valves, fittings and appurtenances, and label
lengths of water main between valves, fittings, etc.
Resolved 1 Roger Buffington 08/29/2006
16 Water/Wastewater [8/29/06] Move the 8-inch water main that extends from the private drive to
the SE corner of the supercenter to the east as noted on the plans.
Resolved 1 Roger Buffington 08/29/2006
17 Stormwater-
Hydraulic Modeling
[8/29/06] The detention ponds modeled are shown in series however no
dynamic modeling was done for these ponds at preliminary level. Though it is
acceptable to model these ponds at final, please be aware that this could
entail a significant redesign of these ponds at final if they do not function
properly.
As long as the uppermost pond's size can potentially be adjusted once
modeling is provided, this issue can be dealt at final plan submittal.
At final when modeling the release rates from the ponds from this site on the
west side of Harmony and into the HP swale, the hydraulic modeling should
take into account tail water conditions.
Active 1 Basil Hamdan 08/29/2006
18 Water/Wastewater [8/29/06] Curb stops must be in easements, and meter pits must be within 2
feet of the curb stops.
Resolved 1 Roger Buffington 08/29/2006
19 Water/Wastewater [2/13/07]
[1/4/07]
[8/29/06] At locations where sewers are dead ending, the manholes may be
moved back to the last service to reduce sewer length (with the exception of
at the north and west boundaries of the project).
Resolved 1 Roger Buffington 08/29/2006
3/7/2011 Page 5
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
20 Water/Wastewater [8/29/06] Label sizes of all water/sewer services and fire lines. Resolved 1 Roger Buffington 08/29/2006
21 Water/Wastewater [8/29/06] I have a meeting scheduled with PFA Thursday PM to review
hydrant locations and will add notes on the redlined utility plans.
Resolved 1 Roger Buffington 08/29/2006
22 Stormwater- Grading [8/29/06] Please provide detailed grading at final showing how the flows from
the mobile home park site will be diverted to the north.
Provide spillway design. Pond D spillway should be designed to direct
overflow to the north.
There is grading shown on off-site properties, these will necessitate
easements.
Active 1 Basil Hamdan 08/29/2006
23 Stormwater- Utility
Plans
[8/29/06] At final please provide storm sewer profiles and 100 year HGL.
Since no vertical design was given at this point, potential conflicts cannot be
checked but there are several areas where storm crossings are at shallow
angles, please try to cross other utilities at close to a 90 degree angle
whenever possible.
All storm pipes should be identified with size and type on the overall utility
plans. Inlets need to be identified. Manholes should be labeled.
Provide a legend.
Where does the line that is paralleling Harmony Road extend to ? Please
show off-site portion.
There are lots of storm lines shown that do not correspond to the latest
grading, line work needs to be cleaned up.
Whys is the storm line in the pad at the southwest corner of Ziegler and the
HP campus entrance (outparcels H1 and H2) being installed with these plans
?
Label the proposed irrigation lines as such to differentiate form storm lines.
Active 1 Basil Hamdan 08/29/2006
3/7/2011 Page 6
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
24 Water/Wastewater [2/13/07]
[1/4/07]
[8/29/06] Standard details for water meters have been updated. Use current
details.
Resolved 1 Roger Buffington 08/29/2006
25 Water/Wastewater [2/13/07]
[1/3/07]
[8/29/06] Show irrigation taps on the utility plans.
Active 1 Roger Buffington 08/29/2006
26 Stormwater- Offsite
flows
[8/29/06] Please extend the storm line that will bring flows from the
development to the southwest through this site. Model should take into
account off-site flows. Easements should be extended for such a line to the
property line.
Active 1 Basil Hamdan 08/29/2006
27 Water/Wastewater [8/29/06] The 24-inch water main in Ziegler is cathodically protected. Add
note regarding isolation at point of connection. Show all CP test stations and
add note to protect in place. If any test stations need to be moved, add note
to contact Water Utility for assistance.
Resolved 1 Roger Buffington 08/29/2006
28 Landscape plan [8/29/06] Maintain minimum separation distances from water/sewer lines. Resolved 1 Roger Buffington 08/29/2006
29 Water/Wastewater [8/29/06] See plans for other comments. Resolved 1 Roger Buffington 08/29/2006
30 Stormwater- Storm
line maintenance
responsibility
[8/29/06] We need to discuss who will be responsible for storm lines
maintenance when the line goes from being in the right of way into the
privately owned lines.
Active 1 Basil Hamdan 08/29/2006
31 Construction
Drawings
[1/5/07] Just a concern that this doesnt look apparent for the private drive
connecting out to Ziegler.
[8/29/06] Please ensure that concrete is used at all driveway intersections
with public streets (Corbett and Ziegler).
Resolved 1 Marc Virata 08/29/2006
32 Construction
Drawings
[8/29/06] Please ensure and call out that the pedestrian crossings at the
roundabout are done in concrete. Is the intention for the crosswalks to be
enhanced here or striped?
Resolved 1 Marc Virata 08/29/2006
3/7/2011 Page 7
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
33 General [8/29/06] The emergency access easement shown on the plat and the
construction drawing emergency access route plan (C-120) shows that an
emergency access easement dead ends at the LSI property. An offsite
emergency access easement is needed.
Resolved 1 Marc Virata 08/29/2006
34 Construction
Drawings
[8/29/06] Please label the existing right-of-way/property line boundary on the
Harmony Road and Ziegler Road drawings.
Resolved 1 Marc Virata 08/29/2006
35 Construction
Drawings
[8/29/06] The striping on the offsite designs seem to show the use of angle
points. Please ensure that the design of the roadways avoids the use of
angle points.
Resolved 1 Marc Virata 08/29/2006
36 Construction
Drawings
[8/29/06] Please prepare an offsite easement/right-of-way exhibit to help
keep track of the impacts occurring outside of right-of-way.
Resolved 1 Marc Virata 08/29/2006
37 Site Plan [2/5/07] This was reflected on the construction plan set, while the site plan
lacks again information on the proposed route(s) in relationship to the existing
English Ranch neighborhood. (Depending on the discussion between and
Bayer and the City regarding the ped connection, this comment may need to
be revised accordingly.)
[1/5/07] Please ensure that more information is shown on the site plan
showing English Ranch property ownership, physical existing conditions, etc.
The site (and construction drawings) should represent how the design
impacts the surrounding area.
[8/29/06] The pedestrian connection shown somewhat on the site plan needs
to be designed to the north showing a connecting sidewalk to the south side
of Paddington.
Active 1 Marc Virata 08/29/2006
38 General [8/29/06] I've suggested additional access ramp crossing along the private
drive on the construction drawings. These are not required. The access
ramps in front of the outparcels I think may especially beneficial to tie future
development of the outparcels into the rest of the center.
Resolved 1 Marc Virata 08/29/2006
39 General [8/29/06] The project will need to provide an escrow for the future connection
of Corbett Drive to the northern boundary of the site, the removal of the
cul-de-sac bulb, the sidewalk along the west side of Corbett Drive, and
additional street trees along Corbett Drive.
Resolved 1 Marc Virata 08/29/2006
3/7/2011 Page 8
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
40 Construction
Drawings
[8/29/06] The project will need to continue a design of Corbett Drive with the
elimination of the cul-de-sac bulb and offsite design for 500 feet.
Resolved 1 Marc Virata 08/29/2006
41 Construction
Drawings
[1/5/07] This was resolved but now occurs in a new location further east
along Harmony Road [C-178 & 193]. There is also another instance of this
shown on the northwest corner of Ziegler and Harmony [C-177 & 192].
[8/29/06] An inlet is shown on the northeast corner of the Corbett Drive and
Harmony Road that sits in conflict with the sidewalk along Harmony Road.
Resolved 1 Marc Virata 08/29/2006
42 Construction
Drawings
[8/29/06] A storm pipe appears to be in conflict with the sidewalk along the
cul-de-sac bulb at the north end of the site.
Resolved 1 Marc Virata 08/29/2006
43 General [8/29/06] PFA has indicated that the private drive will need to be named for
addressing purposes.
Resolved 1 Marc Virata 08/29/2006
44 General [8/29/06] The construction drawings indicate the delineation of parcels for the
areas along Harmony Road, the plat however does not subdivide the
development into parcels or lots.
Resolved 1 Marc Virata 08/29/2006
45 Construction
Drawings
[8/29/06] The plan and profile sheets for Corbett Drive indicate an intent of
showing centerline profile and one flowline profile. The project will need to
show flowline profiles for both sides of a public street.
Resolved 1 Marc Virata 08/29/2006
46 Construction
Drawings
[8/29/06] The variance request from Stantec to Gary Diede will likely be
approved, although an original copy of the variance request with the exhibit
cited in the request was not found. Please resubmit the information for
verification of the information presented.
Resolved 1 Marc Virata 08/29/2006
47 Construction
Drawings
[8/29/06] The termination of the bikelanes approaching the roundabout on
Corbett in both directions require the use of access ramps. The termination
location of the bike lanes on the south leg of the roundabout may be of
concern with Traffic Engineering.
Resolved 1 Marc Virata 08/29/2006
48 Landscape plan [8/30/06] I'd suggest leaving an openign of landscaping along the median
within Corbett between the northern edge of parcels 3 and 4 to provide an
area that pedestrians could "unofficially" use as refuge between northbound
and southbound Corbett movements.
Resolved 1 Marc Virata 08/30/2006
3/7/2011 Page 9
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
49 Plat [8/30/06] Please ensure that 9 feet of utility easement is dedicated along the
west side of Corbett Drive to the northern property boundary.
Resolved 1 Marc Virata 08/30/2006
50 Plat [8/30/06] Rather than dedicate right-of-way for the cul-de-sac bulb at the
termination of Corbett Drive, please provide an access easement for the area
that would be vacated in the future with the continuation of Corbett Drive.
Vacating easement would be an easier process and less costly in the future
for the future development to the north.
Resolved 1 Marc Virata 08/30/2006
51 Plat [8/30/06] The site plan and construction plan documents illustrate the
creation of parcels, however the plat does not divide the property out into
parcels.
Resolved 1 Marc Virata 08/30/2006
52 Plat [8/30/06] The plat needs to show additional information to meet the
requirements of a preliminary plat.
Resolved 1 Marc Virata 08/30/2006
53 General [8/30/06] We should have some general discussion regarding how the
parcels along Harmony will be vested. If the developer does not wish for the
development agreement for the overall property to apply to these parcels,
they would need their own development agreements in addition to their
respective minor/major amendments.
Resolved 1 Marc Virata 08/30/2006
54 Fire [8/30/06] WATER SUPPLY: Fire hydrants, where required, must be the type
approved by the water district having jurisdiction and the Fire Department.
Hydrant spacing and water flow must meet minimum requirements based on
type of occupancy. Flow and spacing requirements for commercial buildings
are 1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to
the building, on 600-foot centers thereafter. It appears from the Site Plan,
page 2, that the spacing requirements are met. However, the fire hydrants
shown on this page are difficult to locate. The larger-scale drawings on the
layout plan show the hydrants more clearly, but sheet 5 (of 10) neglected to
show any hydrants. Please draw the hydrants on page 5 and more clearly
label the hydrants on the overall site plan.
97UFC901.2.2.2
Resolved 1 Carie Dann 08/30/2006
55 Fire [8/30/06] AUTOMATIC FIRE SPRINKLERS: All buildings shall be equipped
with approved automatic fire-sprinkler systems.
Resolved 1 Carie Dann 08/30/2006
3/7/2011 Page 10
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
56 Fire [1/3/07]
[8/30/06] KNOX BOX: Poudre Fire Authority requires a Knox Box to be
mounted on the front of every new building equipped with a required fire
sprinkler system or fire alarm system. 97UFC902.4; PFA BUREAU POLICY
88-20
Resolved 1 Carie Dann 08/30/2006
57 Fire [8/30/06] FDC ACCESS: The Fire Department Connections to supply
automatic fire sprinklers shall be installed in a location easily accessible to
fire apparatus: the fire lane side of a building and, when possible, in closest
proximity possible to a fire hydrant.
Resolved 1 Carie Dann 08/30/2006
58 Fire [2/13/07] Prospective addressing has been developed. Contact PFA for more
information, if desired.
[1/3/07] Per the Dec. 7 meeting with Stantec, Bayer and PFA, we will provide
you with information regarding addressing of a similar retail development.
PFA's preference is to address off public streets (Corbett and/or Harmony)
and the named private drive, with each building have its own, separate,
individual numeric address. If we use multiple street names, we'd request that
each individual building mounts not only its numerals but also street name,
e.g., 4401 CORBETT DR. on the front of the building. This would clarify
addressing for the public and emgerncy services. This is something we've
used for several projects that are bigger, "classier" developments with
buildings addressed off multiple streets.
[8/30/06] ADDRESSING: Address numerals shall be visible from the street
fronting the property, and posted with a minimum of six-inch (6) numerals on
a contrasting background. (Bronze numerals on brown brick are not
acceptable).97UFC901.4.4
Active 1 Carie Dann 08/30/2006
59 Fire [1/3/07] This pertains specifically to the Lowe's Garden Center, and any other
relative retailer that might apply.
[8/30/06] HAZARDOUS MATERIALS: Toxic, corrosive, or reactive materials,
or flammable/combustible liquids (as defined in the Uniform Fire Code) if
used, stored, or handled on site, must have a Hazardous Materials Impact
Analysis (HMIA) completed and supplied to the Planning Department and the
Fire Department. (What do you have? How much? How do you prevent it
from being a public threat?) FCLUC3.4.5
Active 1 Carie Dann 08/30/2006
3/7/2011 Page 11
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
60 Fire [1/3/07]
[8/30/06] FIRE LINE REQUIREMENT: Buildings that are required to be fire
sprinklered shall have a minimum 6-inch fire line unless hydraulic calculations
can support a smaller fire line.
Active 1 Carie Dann 08/30/2006
61 Fire [1/3/07] Per the Dec. 7 meeting with Stantec, Bayer and PFA, PFA requires
emergency access to the rear of the buildings (the east-west drive aisle that
runs behind Target and the north-south drive aisle that is west of buildings
B-1 through B-5). These shall be added to the plat.
[8/30/06] REQUIRED ACCESS: The Emergency Access Easements as
shown on the submitted plat are acceptable. When constructed, the fire lanes
shall be visible by painting and signage, and maintained unobstructed at all
times. UFC901.2.2.1; 901.3; 901.4.2; 902.2.1
Resolved 1 Carie Dann 08/30/2006
62 Fire [8/30/06] . Active 1 Carie Dann 08/30/2006
63 Plat [2/13/07]
[8/30/06] Label width of utility easements. Minimum widths for water mains
and sanitary sewers are:
Water mains - 10 feet each side of main (20 feet total)
San sewers - 15 feet each side of sewer (30 feet total)
Curb stops and fire hydrants must also be within easements.
Resolved 1 Roger Buffington 08/30/2006
64 Construction
Drawings
[8/31/06] The ped. Connection to English Ranch Subdivsion needs to be
shown in its entirety. This should include information as to the proposed
alignment, width, and materials.
Resolved 1 David Averill 08/31/2006
65 Construction
Drawings
[8/31/06] Please designate the as-yet-unamed Private Dr. as a transit
easement (or however we've handled it in other situations) so as to ensure
that Transfort bus service could one day serve the site.
Resolved 1 David Averill 08/31/2006
66 Construction
Drawings
[8/31/06] Sheet C-186 - Ramp locations are missing or do not match the site
plan. Please see redlines.
Resolved 1 David Averill 08/31/2006
67 Construction
Drawings
[8/31/06] Sheet C-188 - Add ramps for HC parking. See redlines. Resolved 1 David Averill 08/31/2006
3/7/2011 Page 12
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
68 Construction
Drawings
[8/31/06] Sheet C-190 - Ped x'ing ramp location is missing. I'd like to see a
crossing detail and clarified ramp configurations. Why don't the HC stalls and
HC access ramp locations correspond? See redlines.
Resolved 1 David Averill 08/31/2006
69 Construction
Drawings
[8/31/06] Sheet C-191 - Ramp and ped crossing addition. Its not clear what
is proposed for the area where the Private Drive meets Ziegler See
redlines.
Resolved 1 David Averill 08/31/2006
70 Construction
Drawings
[8/31/06] Sheet C-192 - the walkway from the drive aisle out to Harmony
(roughly along the parcel line between parcels 1 and 2) needs to be in an
access easement. See redline.
Resolved 1 David Averill 08/31/2006
71 Construction
Drawings
[8/31/06] Sheet C- 193 - The walkway out to Harmony (through Parcel 5)
needs to be in an access easement. See redline.
Resolved 1 David Averill 08/31/2006
72 General [1/2/07] Some buildings (as an example, C-2 and the Super Target) still do
not show bicycle parking. Please revise.
[8/31/06] Bicycle Parking - general comment. This project is required to
provide 170 bicycle parking spaces. As it is now, this is not reflected (in full)
on the site or utility plans. This will equate to roughly 40 bicycle racks
(depending on the chosen design) that need to be spread throughout the
development. IF the applicant has a certain type of fixture in mind, they will
need to check with Transportation Planning to ensure that the proposed rack
will meet the requirements of the LUC.
Dispersion of bicycle parking throughout the site - for starters, a rack will have
to be placed proximate to each store entrance that is in plain view, is secure,
and is readily accessbile for a customer arriving by bicycle. By my count, this
will place about 25 of the required 40 racks. It goes without saying that the
areas where bicycle parking is to be provided need to be hard surfaced and
free of obstructions.
We'll need to make sure there is plenty of bicycle parking available at the
east and west ends of the Main Street portion of the private drive as well as
proximate to the proposed library entrance.
It would probably be a good idea for me to sit down for a brief meeting with
the landscape architects to iron out the appropriate locations and quantities.
Active 1 David Averill 08/31/2006
3/7/2011 Page 13
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
73 Water/Wastewater [8/31/06] Per discussions with PFA and Tony Wilkens, revise the fire hydrant
locations as noted on Sht C-185 of the utility plans.
Resolved 1 Roger Buffington 08/31/2006
74 Construction
Drawings
[9/1/06] The offsite designs need to include Corbett and Ziegler further south
of their respective Harmony intersections.
Resolved 1 Marc Virata 09/01/2006
75 Landscape plan [9/1/06] Please specify at final how the proposed detention ponds will be
landscaped and whether they will be irrigated.
Active 1 Basil Hamdan 09/01/2006
76 Plat [9/1/06] Why are storm drain lines covered by "private drainage easements"
? All easments should be designated as public drainage easements even
when they cover lines on private property, especially since many of these
lines are carrying off-site flows and flows from areas within the public rights of
way.
Please designate all areas covered by detention ponds as public drainge
easements.
Active 1 Basil Hamdan 09/01/2006
77 General [9/1/06] The sidewalk connections on outparcels 2 and 5 will need to be built
with the project and access easements need to be shown on the plat.
Resolved 1 Marc Virata 09/01/2006
78 General [2/9/07]
[1/5/07] This was apparently not addressed.
[9/1/06] Please ensure that an access easement is shown along a private
drive alignment west of the roundabout along Corbett connecting to the
western boundary of the site to tie into the property in front of the mobile
home park.
Resolved 1 Marc Virata 09/01/2006
79 General [1/5/07] This was apparently not addressed. (It is shown correctly on C-121
of the construction drawings but not on the plat).
[9/1/06] An access and transit easement needs to be dedicated for the
private drive that connects Corbett to Ziegler Road.
Resolved 1 Marc Virata 09/01/2006
3/7/2011 Page 14
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
80 Stormwater Master
Planning Comments
[12/28/06] Storm Drainage Master Plan Comments for Front Range Village
Please ensure that WQCV is not included in the rating curves for EPA or
MODSWMM
Drawing No. C-153 appears to be for inflow purposes for EPASWMM,
and if so, it should be labeled as such. If it isnt, what are the purposes of the
dummy lines to Node 270
Please provide a more representative schematic for MODSWMM/MP
condition that you are preparing, including the offsite recommendations (i.e.
Ziegler Pond, English Ranch, Mobile Home Park, etc.)
The flows entering the HP swale, shown on Drawing No. C-152, dont
match any of the flow numbers shown in the report, or in MODSWMM.
Which are the correct numbers?
How are you getting the flows from the Mobile Home Park from Pond D
to the future development to the north?
Will the 100 year flows from the Mobile Home Park remain within the
undeveloped land north of Front Range Village, or will it impact the homes in
English Ranch? Will it overtop Timberline Road?
Please provide a rating curve for the Future Ziegler Pond (Pond No. 298).
This will include flows from the Mobile Home Park and the future
development north of Front Range Village.
Are you planning on building some sort of diversion to keep the overflow
from English Ranch out of Pond 298? If not, how are those flows going to be
routed through Pond 298? Another option would be to recommend that the
master plan be amended by an enlargement of the English Ranch Pond to
include Pond 298.
Active 2 Basil Hamdan 12/28/2006
3/7/2011 Page 15
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
81 Off-site Impacts [12/28/06] There is a concern over the impact of the new development over
the existing detention behind Ziegler Road.
It is important that modeling be presented that shows that the development
will cause no adverse impact on the property that is to the north of the
development site currently owned by LSI, and that the area that is inundated
by the effective detention behind Ziegler Road would remain within the limits
of the existing easement.
Active 2 Basil Hamdan 12/28/2006
82 Pond D Overflow [12/28/06] Please show where the overflow from Pond D will be directed and
how these flows will be spread through a weir section designed into the
spillway. Provide a design for such a spillway.
Active 2 Basil Hamdan 12/28/2006
84 Off-site easement [12/28/06] Is the proposed outfall pipe that extends north across the LSI
property within an existing drainage easement ? If not, an easement form that
property owner would be required prior to plan signature. Please add a note
specifying that all off-site areas disturbed during construction activities will be
revegetated.
Active 2 Basil Hamdan 12/28/2006
85 Erosion Control Plan [12/28/06] Please use sediment traps at the detention pond outlets.
Please specify how high will the soil stock piles shown on the plans be.
Active 2 Basil Hamdan 12/28/2006
86 Off-site grading [12/28/06] It seems that a significant amount of berming is propsed on the
LSI property to the north, a grading easement from the property owner would
be required prior to approval.
Active 2 Basil Hamdan 12/28/2006
87 Drainage Plan [12/28/06] Please provide a hydrologic summary table and pond summary
tables on the plan.
Active 2 Basil Hamdan 12/28/2006
3/7/2011 Page 16
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
88 Storm Line Profiles [1/2/07] Please indicate on the storm line profiles which line will be publically
maintained and those that will be privately maintained. Please provide a
public maintenance access easement for all publically maintained lines.
Some lines are at a 0.2 % slope, would it be possible to provide a 0.4%
minimum slope ?
Please show drainage easements on the profile sheets.
Inlet B3-1 shows a significant amount of water backing out of the inlet in the
100 year storm, this must be a drafting error.
Please call out the depth of ponding whenever it does occur on the profile
sheets. Ponding in parking lots os not ecouraged but is acceptable if it is at 6
inches or less.
Storm lines bringing flows from the outlots along Harmony should be within a
public drainage easement.
Please label irrigation line on all plans. Show irrigation line crossings of storm
lines on profiles.
Please provide a profile for the irrigation line.
Please add note that all off-site areas disturbed during the construction of
drainage facilities are to be revegetated.
Active 2 Basil Hamdan 01/02/2007
89 Grading Plans [1/2/07] Please provide spillway design and detail for all detention ponds.
Please provide erosion protection at all outlets into ponds.
Active 2 Basil Hamdan 01/02/2007
90 Utility Plans [1/2/07] Please provide storm line type and size on overall utility plans.
Please label the irrigation line that takes water from Harmony across the site
clearly. Who owns this lateral, signature from the lateral owner is required.
Please provide encasements for all water line crossings of storm sewers, 10
feet either side of crossing.
Active 2 Basil Hamdan 01/02/2007
3/7/2011 Page 17
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
91 Easements [1/2/07] Please provide a drainage easement along the rear of the outparcel
properties along Harmony to allow future owners to connect to outflow pipe
located on neighboring lots.
Active 2 Basil Hamdan 01/02/2007
92 Water quality outlet
box details
[1/2/07] Please provide a construction quality detail for all water quality outlet
boxes, including wing walls if any and an actual plate detail, rather than just a
general table for all of them.
Active 2 Basil Hamdan 01/02/2007
93 Landscape Plans [1/2/07] Please maintain 10 feet of horizontal separation between trees and
storm lines, this is relavant along the rear of the Super Target building and in
some of the parking areas.
The first street trees along the entrance from Ziegler on the north and south
side of the street are located right above inlets, these will need to be moved.
Active 2 Basil Hamdan 01/02/2007
94 Off-site construction
plans
[1/2/07] There are significant off-site easements and temporary construction
agreements that need to be obtained from the property owners prior to plan
approval.
The irrigation lateral construction on the south side of harmony will require
approval from the owner of that lateral.
Please provide erosion protection at all pipe outlet locations.
Please use wattles instead of gravel inlet filters at inlet locations, since these
tend to perform better and are less demanding of maintenance.
Please differentiate between inflow and outflow curbs in medians.
Please show that the south pipe of theexisting dual 18" pipes crossing
Ziegler is being removed. Do not extend FES as shown on plans.
Active 2 Basil Hamdan 01/02/2007
95 Drainage Report [1/2/07] Please provide stret capacity calculations for the minor storm along
Ziegler and Harmony, please note that for arterial streets , thaminor storm is
the 10 year storm and the allowable ponding, is not to exceed curb height or
not to enter roadway along Harmony.
Please relate the manhole ID used in the UDSEWER run to the manhole
numbering system used on the utility plans, through a reference table.
Active 2 Basil Hamdan 01/02/2007
3/7/2011 Page 18
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
96 Fire [1/3/07] LABELING: For consistency (and to make it easier on age 40-plus
eyes), please label, with words, all fire hydrants, instead of just showing the
hydrant symbol.
Active 2 Carie Dann 01/03/2007
97 Fire [1/3/07] CORRECTION: Sheet 9 shows two buildings labeled F-4. The F-4
building that is in the southeast corner should actually be F-6.
Active 2 Carie Dann 01/03/2007
98 Landscape plan [1/3/07] No comments. Active 2 Dana Leavitt 01/03/2007
99 Water/Wastewater [2/13/07]
[1/4/07] Connect to the existing water main which is west (or southwest) of
the LSI building.
Resolved 2 Roger Buffington 01/04/2007
100 Water/Wastewater [2/13/07]
[1/4/07] Review all water main lowerings. If the water main is a looped main
and if the main can go over the sewer (storm or sanitary) while maintaining a
minimum of 4 feet of cover over the water main and 1 foot clear separation
from the sewer, eliminate the lowering.
Resolved 2 Roger Buffington 01/04/2007
101 Water/Wastewater [2/13/07]
[1/4/07] Show and label the water main lowerings on the Utility Plan sheets
(C-186 through C-194).
Resolved 2 Roger Buffington 01/04/2007
102 Water/Wastewater [2/13/07]
[1/4/07] Add a temporary F Hydrant at the end of the 8-inch main on the west
edge of the site adjacent to the Pads at Harmony.
Resolved 2 Roger Buffington 01/04/2007
103 Water/Wastewater [2/13/07]
[1/4/07] Is there a conflict with the FCLWD main where the 12-inch main
extends north from Harmony? Pothole and add information to the plans.
Resolved 2 Roger Buffington 01/04/2007
104 Water/Wastewater [2/13/07]
[1/4/07] The existing sewer on the west side of Ziegler is a 30-inch diameter.
Label the manholes to be installed at the two connection points as 60-inch
MHs.
Resolved 2 Roger Buffington 01/04/2007
105 Water/Wastewater [2/13/07]
[1/4/07] Add notes at existing MHs on the 30-inch sewer along Ziegler to
raise to finished grade. (Some may be buried at this time.)
Resolved 2 Roger Buffington 01/04/2007
3/7/2011 Page 19
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
106 Water/Wastewater [2/13/07]
[1/4/07] Provide calcs to confirm that 8-inch sewers are adequate throughout
the development.
Active 2 Roger Buffington 01/04/2007
107 Water/Wastewater [2/13/07]
[1/4/07] Show all water/sewer crossings on storm plan & profile sheets.
Resolved 2 Roger Buffington 01/04/2007
108 Water/Wastewater [2/13/07]
[1/4/07] If north/south irrigation line is to stay, add plan and profile sheet.
Resolved 2 Roger Buffington 01/04/2007
109 Water/Wastewater [2/13/07]
[1/4/07] Show concrete encasement where needed on water main/sewer
crossings.
Resolved 2 Roger Buffington 01/04/2007
110 Water/Wastewater [2/13/07]
[1/4/07] Add steel casing at each point where water or sanitary sewer mains
pass under storm sewers 24-inch and larger. Extend casing minimum of 5
feet beyond the outside of the storm pipe.
Resolved 2 Roger Buffington 01/04/2007
111 Water/Wastewater [2/13/07] Add tracer wire detail.
[1/4/07] Revise the notes for Tracer Wire (On Sht C-500) as shown in the
redlined utility plans.
Active 2 Roger Buffington 01/04/2007
112 Landscape Plans [2/13/07]
[1/4/07] Adjust trees to eliminate conflicts with F Hydrants and meter pits.
Active 2 Roger Buffington 01/04/2007
113 Plat [1/5/07] Cross access and parking easements are created with the plat. Is it
intended that these are dedicated to the City? The parking easement in
particular appears to be more of a private agreement and with the plat
dedicating all easements to the City, this may not be the intended use.
Perhaps these two easements can be defined in detail.
Resolved 2 Marc Virata 01/05/2007
114 Construction
Drawings
[1/5/07] [C-112] More design information needs to be shown on the ped
connection into English Ranch, providing a design showing physical
connection into an existing sidewalk system, showing where exactly this
takes place (legal information on parcel ownership), and grading information.
Resolved 2 Marc Virata 01/05/2007
3/7/2011 Page 20
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
115 Construction
Drawings
[1/5/07] [C-120] The specifying of a particular pavement thickness for areas
within public right-of-way needs to be removed. This will be determined with
the final pavement design report.
Resolved 2 Marc Virata 01/05/2007
116 Construction
Drawings
[2/9/07] Carried over for reference.
[1/5/07] [C-171-173] Offsite grading and drainage easements are needed
before sign off on the plans from the LSI property directly northeast for the
work shown.
Active 2 Marc Virata 01/05/2007
117 Construction
Drawings
[1/5/07] [C-173] The driveway out to Ziegler exceeds our 750 sq. ft. rule of
area draining over a sidewalk. Please look at adjusting grades or provide
inlets behind the Ziegler sidewalk. Note that theres a general lack of spot
elevation information on this and other driveway locations.
Resolved 2 Marc Virata 01/05/2007
118 Construction
Drawings
[1/5/07] [C-177] The grading of a berm along Harmony Road appears to be
in conflict of installing the sidewalk along Harmony in meeting maximum
cross slope grade for a sidewalk.
Resolved 2 Marc Virata 01/05/2007
119 Construction
Drawings
[2/7/07] Carried over pending review of the offsite plan set.
[1/5/07] [C-275] The road design information shown on this sheet doesnt
appear to match the intersection detail sheet information on C-291 of the
offsite plan set. Spot elevations and slope information dont match.
Active 2 Marc Virata 01/05/2007
120 Construction
Drawings
[1/5/07] [C-275 & 276] The median profile information doesnt appear to
show the full median.
Resolved 2 Marc Virata 01/05/2007
121 Construction
Drawings
[1/5/07] [C-506] This detail sheet shows the standard CDOT pavement joint
detail, is this intended for the roundabout internal to the site? If so, a note
should be added to [C-299] specifying this.
Resolved 2 Marc Virata 01/05/2007
122 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] Please label this plan set Front Range Village - Harmony Road and
Ziegler Road.
Active 2 Marc Virata 01/05/2007
123 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] Based upon information shown on the demo plan, it appears that
Warren Lake and/or Larimer Canal No. 2 will need to sign the plan set.
Active 2 Marc Virata 01/05/2007
3/7/2011 Page 21
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
124 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] [C-053, 057] Information seems to be missing based upon arrows
pointing to no descript locations.
Active 2 Marc Virata 01/05/2007
125 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] [C-056, 59] Signs are proposed to be protected in place though they
appear to be within the street (or in an access ramp) and should be removed
and relocated.
Active 2 Marc Virata 01/05/2007
126 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] [C-150] Similar to the onsite roundabout, is the CDOT joint pattern
detail applicable for the concrete intersection at Ziegler and Harmony, and
should this be added to this particular plan set?
Active 2 Marc Virata 01/05/2007
127 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] In general, the lane profile information should provide node points to
help discern where proposed street grade changes occur.
Active 2 Marc Virata 01/05/2007
128 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] In general, the plan view on the street design sheets should be
showing some vertical information with spot elevations, flow arrows, etc,
these shouldnt be limited to the street intersection detail sheets (more
information on the driveway intersections for example).
Active 2 Marc Virata 01/05/2007
129 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] Please label the flowline profiles as median flowline profiles to avoid
confusion with the edge of pavement. On a related note, please ignore the
redline questioning regarding 8% slopes.
Active 2 Marc Virata 01/05/2007
130 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] [C-206, 208, 217] There are several instances in which the street
grade along Harmony is less than standard (.5%) and is combined with the
cross slope of Harmony Road at these locations are less than standard in
and below the 1.5% range. After further discussion at a meeting this
morning, I'm understanding that the area directly west of Ziegler will be
relooked at by Stantec while the City will discuss internally options.
Active 2 Marc Virata 01/05/2007
3/7/2011 Page 22
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
131 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] [C-206, 209] There are instances where vertical curves should be
used due to grade changes that exceed .4% in a crest situation.
Active 2 Marc Virata 01/05/2007
132 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] [C-220] As discussed at a meeting yesterday, please look at
extending the concrete gutter line from the median to the area inlet on
Harmony Road east of Ziegler. Show a flowline line to show how the water
leaves the median and enters the inlet. Specify a transition from catch to spill
curb.
Active 2 Marc Virata 01/05/2007
133 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] [C-290-293] Please provide additional spot elevations at these street
intersection detail sheets in accordance with LCUASS Details 7-27 and 7-28
and also indicate transition points as appropriate.
Active 2 Marc Virata 01/05/2007
134 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] [C-219] This detail sheet shows information that doesnt match the
cross section sheets as well as the onsite Corbett design drawings. 1% cross
slopes are shown when 2% is shown on the cross sections. Flow grades and
spot elevations on dont match the Corbett profile information. It seems that if
grades arent meeting standards in locations, the splitter medians can be
used to help compensate for the grade concerns.
Active 2 Marc Virata 01/05/2007
135 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] [C-313] Some of the cross-sections on this sheet should be
reflecting splitter medians per the street design.
Active 2 Marc Virata 01/05/2007
136 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] In general there are instances in which cross slope percentages
arent labeled.
Active 2 Marc Virata 01/05/2007
137 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] [C-317] The change in cross slope from positive to negative seems
to occur quite abruptly between STA 158+50 and 159+00.
Active 2 Marc Virata 01/05/2007
138 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] Please provide stationing information on the demo plan sheets.
Active 2 Marc Virata 01/05/2007
3/7/2011 Page 23
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
139 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] Proposed contours need to be shown along with property lines at a
scale to ascertain where offsite impacts are occurring.
Active 2 Marc Virata 01/05/2007
140 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] Please show spot elevation/cross section information for the median
splitter islands as verification that drainage will not pass through the access
ramps rather than stay along the flowline of the islands.
Active 2 Marc Virata 01/05/2007
141 Plat [1/5/07] Ensure that the plat provides an access easement along a pathway
from Corbett Drive to the drive aisle connecting into the Pads at Harmony
project.
Active 2 Marc Virata 01/05/2007
142 Plat [1/5/07] Ensure that an access easement is provided for the private drive
connecting Ziegler Road to Corbett Drive.
Active 2 Marc Virata 01/05/2007
143 General [1/5/07] Provide standard truncated domes details on the detail sheets of both
plan sets.
Active 2 Marc Virata 01/05/2007
144 General [1/5/07] The landscape plan does not reflect the use of landscaping for the
medians along Harmony Road. If this is intended, please provide the
information on the landscape plan set. The off-site construction drawing plan
set should then show water tap extensions as well.
Active 2 Marc Virata 01/05/2007
145 Off-site construction
plans
[2/7/07] Carried over pending review of the offsite plans.
[1/5/07] Ensure that right-of-way is shown on both sides of the street on all
cross sections as evidence of where construction falls outside of right-of-way.
Active 2 Marc Virata 01/05/2007
3/7/2011 Page 24
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
146 Plat [1/5/07] Technical Services has the following comments:
1. Legal matches plat.
2. Plat closes and area closes.
3. Outer boundary must have monument at least at 1400'.
4. Lot lines are very confusion - use a heavier line for the lot line.
5. What is a cross access easement? Please define.
6. How do lots 1-6 and additional lots get access from a legal standpoint.
Access easements are needed.
7. The emergency access easements are not locatable.
8. Scanning issues occur, see redlines.
10. On tracts B & C is shows an easement on top of the same easement?
11. How were Harmony Road and Ziegler Road dedicated?
12. What is tract A, B, C, who owns and maintains?
Resolved 2 Marc Virata 01/05/2007
147 General [1/5/07] Please see redlines for additional comments, scanability concerns,
etc.
Resolved 2 Marc Virata 01/05/2007
148 General [2/6/07] Transformer locations will need to be verified once plans are
approved.
Active 3 Janet McTague 02/06/2007
149 General [2/6/07] Upon request, we'll do a streetlight layout that can be used on the
landscape plan to verify that a conflict doesn't exist between lights and street
trees.
Active 3 Janet McTague 02/06/2007
150 General [2/7/07] For the most part, I've refrained from commenting on the site design
outside of right-of-way, however, I'm quite concerned of one aspect of the
interior site design upon further examination. The landscaped median island
that separates parking stalls running north-south from the southwest corner
of the Target store should really have breaks in the median at locations for
shopping carts and strollers to pass through. Patrons leaving a store(s) with
carts/strollers who initially go down the wrong aisle will need to backtrack to
the drive aisle along the building or the drive aisle paralleling Council Tree
Drive, or may awkwardly try to mauever their stollers/carts over the median.
Active 3 Marc Virata 02/07/2007
151 General [2/7/07] The enhanced crosswalks now shown along Corbett Drive appear to
be awkwardly aligned with the access ramps. Perhaps the outer brick pattern
band should be on private property instead of right-of-way, with Drawing 1612
on sheet C-506 being modified to show right-of-way lane information?
Active 3 Marc Virata 02/07/2007
3/7/2011 Page 25
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
152 Construction
Drawings
[2/8/07] Please provide additional concrete on the west side of the Corbett
roundabout such that concrete is placed up to the property line in order to
keep a clear demarkation of where the right-of-way is (or alternatively, modify
the right-of-way to correspond to the proposed concrete edge).
Active 3 Marc Virata 02/08/2007
153 Construction
Drawings
[2/9/07] The construction limit lines for Corbett approaching Harmony on the
plan view for sheets 275 and 276 do not match each other for the respective
west and east sides of the street. The limit line needs to match, be called out
with STA information on the profile view. It needs to be confirmed whether
this is for flowline curb and gutter only, the median, and/or the sidewalk along
Corbett interecting out to Harmony. As the City appears to be cobstructing
Harmony, exact information that corresponds to the offsite plans needs to be
solidified.
Active 3 Marc Virata 02/09/2007
154 Construction
Drawings
[2/9/07] The proposed limit lines for Corbett referenced in the previous
comment may need to be open to discussion pending whether or not the City
will be doing Hamrony Road. In such a scenario the DA will also need to be
revised to reflect that the portion of Corbett shown to be done with Harmony
Road is the Developer's obligation.
Active 3 Marc Virata 02/09/2007
155 General [2/9/07] On the site, landscape, and construction drawings, please add
"(Private Drive)" after all labels of Council Tree Drive.
Active 3 Marc Virata 02/09/2007
156 Construction
Drawings
[2/9/07] North flowline profile information is missing on sheet C-283 for
Council Tree Drive.
Active 3 Marc Virata 02/09/2007
157 Construction
Drawings
[2/9/07] Similar to ID 153 and 154, the extent of street construction for
Council Tree Drive as part of the onsite plans needs to be solidified
compared to the offsite constrution of Ziegler Road.
Active 3 Marc Virata 02/09/2007
158 Site Plan [2/9/07] Please revise the information on the cover sheet to reflect that Lots
1-9 may require a minor -or- major amendment depending on the nature of
the use. Standard Note 11 reflects this correctly, however Standard Note 10
and the note below the Land Use Table only specify minor amendments.
Active 3 Marc Virata 02/09/2007
159 General [2/9/07] Depending on the resolution of ID 152 pertaining the construction
drawings, the site and landscape plans (and possibly plat) would need to be
revised accordingly.
Active 3 Marc Virata 02/09/2007
3/7/2011 Page 26
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
160 Plat [2/9/07] Please have the words "municipal" and "private" removed from all
the easement designations. I believe it should be understood that all the
easement shown are the plat are to the City (adding "municipal" is redundant
and potentially confusing) with the exception of the cross access easement.
Active 3 Marc Virata 02/09/2007
161 Plat [2/9/07] Relating to the previous comment, in the "private easements:"
section on the cover sheet, I believe the only "private" easement is a cross
access easement. I believe the utility and drainage easement designations
should be removed, I see this potentially confusing with regards to the utility
and drainage easements shown on the plat.
Active 3 Marc Virata 02/09/2007
162 Plat [2/9/07] In the private drive maintenance note on the cover sheet please add
"(including Council Tree Drive)" as redlined.
Active 3 Marc Virata 02/09/2007
163 Plat [2/9/07] In the "Grant of Emergency Access:" language please add "Poudre
Fire Authority" as redlined.
Active 3 Marc Virata 02/09/2007
164 Plat [2/9/07] The owner blocks are missing actual areas for owner(s) signatures. Active 3 Marc Virata 02/09/2007
165 Plat [2/9/07] Please add the label "Council Tree Drive (Private Drive)" to all Tract
E designations.
Active 3 Marc Virata 02/09/2007
166 Construction
Drawings
[2/9/07] The 6' attached bikelane for a portion of Corbett Drive is of concern,
please look at using a continuous concrete section here.
Active 3 Marc Virata 02/09/2007
167 Erosion Control Plan [2/13/07] It is recommended that gravel filter packs be replaced with wattles
as our experience with the gravel packs show that they tend to be difficult to
maintain in good operational condition.
Active 3 Basil Hamdan 02/13/2007
168 Grading Plans [2/13/07] Many overlapping labels that will be difficult to scan. Please
correct. Maybe less information needs to be provided for City approval
purposes.
Active 3 Basil Hamdan 02/13/2007
3/7/2011 Page 27
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
169 Utility Plans [2/13/07] Please use a different line weight and symbol to differentiate
between existing and proposed storm lines. Some of the line weights used
do not conform to the legend.
Profile sheets: correct the note, to say all storm sewers to be inspected by the
City of Fort Collins, the note should rather say all storm sewer construction
are to be inspected by the City of Fort Collins.
There is an area in the Paragon parking lot where ponding exceeds 1 foot.
The 19x30 inch pipe from inlet STINC5-1 be enlarged in order to keep
ponding below the 1 foot maximum.
Active 3 Basil Hamdan 02/13/2007
170 Fire [2/13/07] Per presubmittal meeting with the Building Department and Target
representatives, the Target structure will have its own, separate FDC,
installed remotely to the south of the building. No FDC for Target is shown on
the plan.
Active 3 Carie Dann 02/13/2007
171 Fire [2/13/07] Buildings B-1 through B-5 can share a single sprinkler system/Fire
Department Connection, IF hydraulics show this is possible. Currently, two
FDCs are shown. Also, there are labels and arrows for 6-inch fire lines for
buildings B-4 and B-5, but no actual fire lines are drawn (sheet C-189).
Active 3 Carie Dann 02/13/2007
172 Fire [2/13/07] No FDCs are shown for buildings B-11 or B-22. Active 3 Carie Dann 02/13/2007
173 Fire [2/13/07] Multiple storefronts that share a single sprinkler system require only
one Knox Box (not a separate Knox Box for each retailer). If, for example,
buildings B-1 through B-5 share a single sprinkler system, we would require
only one Knox Box, and it would be required to provide access to all the
merchants using that sprinkler system.
Active 3 Carie Dann 02/13/2007
174 Fire [2/13/07] PFA will not require all portions of the emergency access
easements to be painted red. Instead, interspaced signs that read "NO
PARKING - FIRE LANE" will be allowed. Contact PFA for specific spacing
requirements.
Active 3 Carie Dann 02/13/2007
3/7/2011 Page 28
Project: FRONT RANGE VILLAGE - MAJOR AMENDMENT AND FINAL PLANS
ID Topic Issue Status Round Comment By Initial Date
175 Easements [2/13/07] Please delineate on the plans where the existing easement on the
off-site portion of storm line E exists, and where the new ponding area will
extend to.
Please provide the off-site grading and drainage easement for 75 foot wide
berm area to the north of the site.
Active 3 Basil Hamdan 02/13/2007
176 Landscape Plans [2/13/07] Still show Hawthorne ornamental trees right on top of a proposed
storm sewer at entrance of Ziegler, please adjust.
Active 3 Basil Hamdan 02/13/2007
177 Water/Wastewater [2/13/07] Add 12-inch gate valve near north end of Corbett where noted on
redlined plans.
Active 3 Roger Buffington 02/13/2007
178 Details [2/13/07] Sidewalk chase detail should be corrected, galvanized plate needs
only to extend 1-foot beyond sidewalk.
Active 3 Basil Hamdan 02/13/2007
179 Water/Wastewater [2/13/07] Substitute typical water service detail for the "modified typical"
detail.
Active 3 Roger Buffington 02/13/2007
180 Water/Wastewater [2/13/07] Show curb stop/meter pit on ALL irrigation services. Active 3 Roger Buffington 02/13/2007
181 Water/Wastewater [2/13/07] See redlined plans for other comments. Active 3 Roger Buffington 02/13/2007
182 Grading Plans [2/14/07] Echoing stormwater comments, please look into cleaning up the
grading plan sheets as the spot elevations and contour lines are overlapping
and aren't always readable. At the time the plans are scanned, most of this
information won't likely be readable.
Active 3 Marc Virata 02/14/2007
3/7/2011 Page 29