Final Compliance Review
Request to remove an existing fort (playhouse) structure and replace it with an approx. 450 sq ft building with habitable space (will have water,
sanitary sewer and electric). This new structure will not contain a new dwelling unit. Located at 216 South Grant Avenue. Zoning is NCL
(Neighborhood Conservation, Buffer District)
Project Type:
Project Desc:
File ID: 10-07/A Planner: Steve Olt DMS Project Num: CP071988
ID Topic Issue Status Round Comment By Initial Date
1 ZONING [5/10/07] Will require a modification for the setbacks. Five foot rear and side
setbacks are required but only 2'9" is being shown
Resolved 1 Jenny Nuckols 05/10/2007
2 ZONING [5/10/07] What is the total square footage of the new building? Resolved 1 Jenny Nuckols 05/10/2007
3 ZONING [5/10/07] What is the square footage of the existing house and the lot? Resolved 1 Jenny Nuckols 05/10/2007
4 ZONING [5/10/07] Please show and note lot lines and lot dimensions
6-29-07 - do the property lines actaully go all the way out to the street?
Plesae clarify and label the property lines.
9-13-07. My question has still not been addressed. Do the lot lines go to the
street, the sidewalk etc. Please clarify. You cannot tell from either drawing
where the front lot line is located and in many instances the front property line
does not abut the sidewalk. If I measure out the 190 ft length it is 3' in from
the sidewalk. Please show this on the site plan.
Active 1 Jenny Nuckols 05/10/2007
5 ZONING [5/10/07] What is the square footage of the existing garage? Resolved 1 Jenny Nuckols 05/10/2007
6 Engineering [5/21/07] Please add this note:
"General Construction Notes #1 through 18, 20 through 39, and 42 through
46 as listed in Appendix E-1 of the Larimer County Urban Area Street
Standards (LCUASS) shall apply and be followed for this project."
"The Construction Notes under subsection Street Improvement Notes and
Traffic Signing, and Pavement Marking Construction Notes in Appendix E-2
of the LArimer County Urban Area Street Standards (LCUASS) shall apply
and be followed by this project as applicable."
Resolved 1 Susan Joy 05/21/2007
3/7/2011 Page 1
Project: 216 S. Grant Ave Accessory Building with Habitable Space - Type I and Final Plans
ID Topic Issue Status Round Comment By Initial Date
7 Engineering [5/21/07] Please dimension the existing row for both Grant and the alley,
driveway and sidewalks.
Resolved 1 Susan Joy 05/21/2007
8 Engineering [5/21/07] Please use the engineering scale (the drawing has to be scalable). Resolved 1 Susan Joy 05/21/2007
9 Water/WW [5/29/07] Show location of the existing water/sewer services to the existing
house and the new water/sewer lines extending to the accessory building.
Active 1 Roger Buffington 05/29/2007
10 Stormwater [5/29/07] No comments. Active 1 Wes Lamarque 05/29/2007
11 Tech Services [5/29/07] From Technical Services:
1. Needs lot description - (lot XX Block XX of ?? Subdivision).
2. Dimension lot and how do you know that the north fence is the lot line?
3. Dimensioning should be consistent (feet and inches or decimal feet).
From Engineering - we actually require the plans to be submitted in
engineering scale (decimal feet).
Active 1 Susan Joy 05/29/2007
12 General [5/29/07] Don Kapperman of Comcast Cable TV indicated that utility
easements (existing & proposed) should be shown in the alley way.
Active 1 Steve Olt 05/29/2007
13 Fire [5/30/07] PFA has no comments or concerns at this time. Active 1 Carie Dann 05/30/2007
14 General [9/25/07]
[6/1/07] Stormwater and Engineering has agreed that a site/landscape plan
is sufficient and we will not require a utility plan set. However, to avoid
problems pulling your building permit later, we will want to have 3 paper
copies of the final signed mylars submitted for distribution. Since no utility
plans will be filed, there is no other way for the certain departments to know
that you have submitted any plan set whatsoever so that they can release the
hold on your building permit. Thanks : )
Active 1 Susan Joy 06/01/2007
15 General [6/1/07] On May 31, 2007, the applicants submitted a request for
Modifications of Standards set forth in Sections 4.7(E)(3) and 4.7(E)(4) of the
Land Use Code dealing with side and rear lot line setbacks. This request is
being reviewed and evaluated by City staff and a recommendation will be
made to the Administrative Hearing Officer at such time an administrative
hearing date is set.
Active 1 Steve Olt 06/01/2007
3/7/2011 Page 2
Project: 216 S. Grant Ave Accessory Building with Habitable Space - Type I and Final Plans
ID Topic Issue Status Round Comment By Initial Date
16 General [6/1/07] City staff has determined that this development proposal can be
scheduled for an administrative public hearing for a time & date to be
established by the Hearing Officer, City planner, and the applicants.
Active 1 Steve Olt 06/01/2007
17 General [9/25/07] Just a couple of scanning issues (highlighted in purple) and one
misspelled word. Ready for mylars.
Active 2 Susan Joy 09/25/2007