Loading...
HomeMy WebLinkAboutWILLOW BROOK, 1ST FILING CLUBHOUSE, FINAL COMPLIANCE - 8-99G - CORRESPONDENCE -Project: WILLOW BROOK, 1ST FILING CLUBHOUSE, FINAL COMPLIANCE Final Compliance Review FINAL COMPLIANCE FOR A 0.5-ACRE, 2300 SQUARE FOOT CLUBHOUSE AND RECREATION CENTER. THE SITE WILL INCLUDE A POOL AND OBSERVATORY BUILDING. THE SITE IS LOCATED NORTHWEST OF KECHTER ROAD AND STRAUSS CABIN ROAD, SPECIFICALLY ON THE WEST SIDE OF CINQUEFOIL LANE BETWEEN GALILEO DRIVE AND OBSERVATORY DRIVE. THE SITE IS ZONED LMN - LOW DENSITY, MIXED-USE NEIGHBORHOOD. Project Type: Project Desc: File ID: 8-99G Planner: Ted Shepard DMS Project Num: CP021332 ID Topic Issue Status Round Comment By Initial Date 1 zoning Show building footprint dimensions on site plan. Active 1 Peter Barnes 07/18/2002 2 zoning This is in the neighborhood sign district. If they want any signage on the building, they need to indicate the proposed wall sign location on the elevation drawings. Active 1 Peter Barnes 07/18/2002 3 General Need to resolve final transformer location with developer/builder. Active 1 Janet McTague 07/24/2002 4 Drainage Please add a few more spot elevations on west property boundary to reflect grading and to show the side-lot swale. Active 1 Wes Lamarque 07/26/2002 5 General Why is the parkway narrowing along Observatory Drive approaching Cinquefoil Lane? Shouldn't a consistency be maintained along the street? The narrowing of the parkway will require a revision to the Willow Brook plans reflecting this change, this revision should also show the culvert across the sidewalk along the north side of the property. Active 1 Marc Virata 07/30/2002 6 Utility Provide utility plan approval blocks on all sheets of the utility plan. Active 1 Marc Virata 07/30/2002 7 Utility Provide District Signature blocks on pertinent sheets in addition to the cover sheet (notes and utility sheets.) Active 1 Marc Virata 07/30/2002 8 Utility Coordination should be ensured that improvements along the surrounding streets shown on the overall Willow Brook plan set are done in an orderly manner so as to not result in street cuts to accomplish construction of the clubhouse. Active 1 Marc Virata 07/30/2002 9 General Locate and identify bike racks near the entrance for the Observatory Building. Active 1 Tom Reiff 07/30/2002 3/7/2011 Page 1 Project: WILLOW BROOK, 1ST FILING CLUBHOUSE, FINAL COMPLIANCE ID Topic Issue Status Round Comment By Initial Date 10 General It is highly recommended that the Cinquefoil Lane and Galilieo Drive intersection crosswalks be striped. Active 1 Tom Reiff 07/30/2002 11 General No Issues. Active 1 Doug Moore 08/07/2002 3/7/2011 Page 2