Loading...
HomeMy WebLinkAboutED CARROLL MOTORS - 05-98 - CORRESPONDENCE -Project: ED CARROLL MOTORS (3003 S COLLEGE) #5-98 PDP - Final Compliance #5-98 TYPE II (LUC) PDP/FC. A REQUEST FOR A 1.5789 ACRE PARKING LOT EXPANSION/ADDITION TO THE EXISTING ED CARROLL MOTOR COMPANY. THE PROPOSAL INCLUDES 134 PARKING SPACES, OF WHICH 44 ARE INTENDED FOR STORAGE AND EMPLOYEE PARKING AND THE REMAINDER FOR DISPLAY. THE PROJECT IS LOCATED AT THE CORNER OF MCCLELLAND AND WEST SWALLOW ROAD; AND ZONED C-COMMERCIAL. Project Type: Project Desc: File ID: 05-98 Planner: LEANNE HARTER DMS Project Num: CP98035300 ID Topic Issue Status Round Comment By Initial Date 1 Electric Electric Development Charges will apply at the time of development as a condition of continued electric service to Ed Carroll Motors. These charges are estimated to be $8000.00. Active 1 Doug Martine 02/14/2002 2 Landscaping The street tree shown on McClelland near the south portion of the site must be relocated to be a minimum of 40 ft. from the streetlight. Resolved 1 Doug Martine 02/14/2002 3 Landscaping Show all water and sewer lines on the landscape plans and provide the required landscape/utility separation distances. Resolved 1 Jeff Hill 03/06/2002 4 Plat Provide a 20 foot utility easement for the existing water main and a 30 foot utility for any existing sanitary sewer main. Resolved 1 Jeff Hill 03/06/2002 5 Utility Provide a profile view of the proposed storm drain. Show the existing water main crossing the storm sewer profile. Provide an 18-inch vertical separation distance and concrete encase the storm sewer if it is above the water main. Resolved 1 Jeff Hill 03/06/2002 6 Utility A water manhole is shown and labeled near the center of this site. Clearly define what this is and whether it is to be used or abandoned Resolved 1 Jeff Hill 03/06/2002 7 Utility Will an irrigation tap be required for this site? See site, landscape and utility plans for other comments. Resolved 1 Jeff Hill 03/06/2002 8 Landscaping Sheet 1 of 1 - landscape note #11 - remove reference to phasing - this site is too small to phase. Resolved 1 Jenny Nuckols 03/06/2002 54 Site/Landscape Please provide two separate sheets for the site and landscape plans. Resolved 1 Tom Reiff 03/12/2002 55 Site/Landscape Clearly label and identify existing ROW widths along McClelland. Resolved 1 Tom Reiff 03/12/2002 3/7/2011 Page 1 Project: ED CARROLL MOTORS (3003 S COLLEGE) #5-98 ID Topic Issue Status Round Comment By Initial Date 56 Drainage Please provide drainage easements for the detention pond and storm sewer. An offsite drainage easement and temporary construction easement is needed for the part of the storm sewer on the property to the north. Resolved 1 Wes Lamarque 03/14/2002 57 Drainage Please provide enough volume in the detention pond to account for the 40-hour extended detention in addition to the quantity detention. Resolved 1 Wes Lamarque 03/14/2002 58 Drainage Currently there is no freeboard for the detention pond. Please provide as much freeboard as possible for the pond. Speed bumps or raised sidewalks on the eastern drives may be an option. Resolved 1 Wes Lamarque 03/14/2002 59 Drainage Please provide TOW and BOW elevations for the concrete retaining wall on the east side of the detention pond. Resolved 1 Wes Lamarque 03/14/2002 60 Drainage Please provide the finish floor elevation for the building east of the site and show that the building would not be inundated in a spill situation from the pond. Resolved 1 Wes Lamarque 03/14/2002 61 Drainage Please investigate the possibility of using the standard water quality outlet structure for the pond. The western detention pond wall may be used as part of the structure. Resolved 1 Wes Lamarque 03/14/2002 62 Erosion/Sediment Control 1. There are no erosion control notes/schedule on the plan. 2. The BMP’s in the report don’t show on the plan. Resolved 1 Wes Lamarque 03/14/2002 63 Site/Landscape Sidewalk along McClelland should be detached on the proposed parcel for development and transition into the existing attached sidewalk to the south. Resolved 1 Tom Reiff 03/19/2002 64 Site/Landscape Install a directional access ramp on the south side of the McCleland drive aisle to align with the directional ramps on the north side. Active 1 Tom Reiff 12/18/2002 65 Utility Blow-offs are not permitted within the City of Fort Collins utilities service area. Provide a fire hydrant at the end of the abandoned line. Provide a utility easement for the required fire hydrant. Active 1 Jeff Hill 01/02/2003 66 Utility No water services are permitted beyond the last fire hydrant (including irrigation services). Place the proposed irrigation service a minimum of five feet (5') before the existing fire hydrant. Active 1 Jeff Hill 01/02/2003 3/7/2011 Page 2 Project: ED CARROLL MOTORS (3003 S COLLEGE) #5-98 ID Topic Issue Status Round Comment By Initial Date 67 Utility Provide the standard fire hydrant, thrust block and water service details on the detail sheet. See the site, landscape and utility plans for other comments. Active 1 Jeff Hill 01/02/2003 3/7/2011 Page 3