Mulberry/Ponderosa (Stop Sign)
North Bound Left B B
North Bound Right A A
West Bound Left A A
Mulberry/Taft Hill (Signal) B C
As can be seen in the above table, acceptable levels of service will exist a the three intersections with
the addition of future growth and project traffic. The project as proposed will not have a negative
impact to the local circulation system
Mulberry Pedestrian Crossing
An issue that City staff raised and addressed in this traffic analysis is whether there is a need for a
Mulberry pedestrian crossing. The concern stemmed from the fact that the proposed project would
potentially generate approximately 40 children in the ages of K through 8 that may cross Mulberry
to gain access to Rogers Park, located on the south side of Mulberry to the west of Impala by the
distance of approximately one block.
According to the Manual on Uniform Traffic Control Devices, a crossing sign (WI 1A-2) should be
t used to alert vehicle operators to unexpected entries in the roadway by pedestrians and other potential
conflicts. These signs are located at unusually hazardous locations or where a crossing is not readily
apparent.
Motorists typically expect pedestrians to cross at intersections. In this situation, there are three
intersections in which a pedestrian can cross Mulberry to gain access to Rogers Park: Impala, Tyler
IStreet and the intersection to the park itself.
Given the opportunity to cross at an existing intersection and that there is no visual obstruction along
Mulberry, there is no specific need for installation of a pedestrian crossing along Mulberry.
II
II
II
10
a�
...
A
a
N 00
h
CIq "
120/56
961254
17/50
52/8
247/162 �►
2/5
Ninet
0
A
W
egend: AM/PM Peak Hour
Aknick hanspoitadon
E=�
N 1w O
h M h .
50/175
103/319
70/385
71 /46
408/180
88/87
r.
Mulberry Street
� M M
L
Figure 5
Year 2000 Plus Project Peak Hour Traffic Volumes
Akwick 7hmpomdon
Table C - Existing Phu Project Intersection Level of Service
Level of Service
Intersection AM I'm
Mulberry/impala (Stop Sign)
' South Bound Left A A
South Bound Right A A
tEast Bound Left A A
' Mulberry/Ponderosa (Stop Sign)
North Bound Left A B
North Bound Right A A
West Bound Left A A
Mulberry/Taft hill (Signal) B C
In addition to the existing and the existing plus project level of service analysis, this traffic impact
analysis also examines a year 20M condition. This 2000 year estimate is based on an increased
student population at Poudm High School to 1,WO and an annual background traffic increase of two
percent per year. The results of this forecasts is presented in Figure 5. The level of service results
are presented in Table D.
Table D - Year 2000 Phis Project Intersection Level of Service
Level of Service
Intersection AM PM
Mulberry/impala (Stop Sign)
South Bound Left B A
South Bound Right A A
East Bound Left A A
0
Aknirk hnnsl"it?don
M
00 7
M
94/46 en 38/59
85/225 85/259
15/44 59/329
40/6 57/38 •�
219/144 333/148 =now-*
2/4 N rn 72/71 mmm ,o N
? � M V'1 V1 N
N 00Men en
Mulberry Street M N
a�
T
A
Legend: AM/PM Peak Hour
Figure 4
Existing Plus Project Peak Hour Traffic Volumes
' 11Zeniclr 7}aaspo�lion
Project Impacts
' The a.m. and p.m. peak hour trip generation rates for the proposed residential units is based on the
Institute of Transportation Engineers 5th edition of the Trip Generation Manual. For purposes of this
analysis, the trip generation rate assumption for the duplex units is assumed to be the same as for
' single family residential units. The trip generation rates and resulting trip generation for the proposed
project is presented in the following table.
' Table B - Project Trip Generation
' AM AM AM PM PM PM
UNITS ADT IN OUT TOTAL 1N OUT TOTAL
' Trip Generation Rates
Residential DU 9.55 .19 .55 .74 .66 .35 1.01
Trip Generation
Access Via Impala 24 229 4 13 17 16 8 24
Access Via Mulberry 3 29 1 2 3 2 1 3
Total Project 27 258 5 15 20 18 9 27
The trip distributions for the proposed project is based in part on the location of the project within
I the City of Fort Collins and in part on the existing traffic counts. Based on these relationships it was
estimated that approximately 80 percent of the project traffic is to/from the east on Mulberry, 15
percent to/from the west on Mulberry and five percent to✓from the south on Ponderosa. Of the 80
percent of the traffic heading to/from the east on Mulberry, it was further estimated that the eighty
percent was divided between 10 percent north on Taft Bill, 50 percent east on Mulberry and 20
percent south on Taft Mill. Applying the trip distribution assumptions times the trip generation and
adding these volumes to the existing traffic counts yields the existing plus project traffic volumes as
presented in Figure 4.
The resulting existing plus project peak hour level of service for the three intersections analyzed is
Presented in Table C. As can be seen, acceptable levels of services prevail at all three intersections
in both the a.m. and p.m. peak hour conditions with the addition of project traffic.
Col
0
a�
a
a
90/33
85/225
15/44
39/4
219/144
2/4
a�
T
A
SI
0
a�
b
a
Aknick hansl"itiGon
M
R kn
00 N
Cn oft.* L
56/37
1 325/143
N o. 69/69 �O N
N 00 enM O O
Legend: AM/PM Peak Hour
Mulberry Street I "' N
Figure 3
Existing Peak Hour Traffic Volumes
i
.) Aknic k Thumporiadon
f. Existing a. m. and p.m. peak hour intersection traffic counts were conducted for this analysis at the
intersections of Mulberry at Impala and Ponderosa and are presented in Figure 3. In addition, this
f figure presents an existing turn movement traffic estimate at the intersection of Mulberry and Taft
Hill Road as presented in the December 14, 1993 Poudre High School Traffic Analysis prepared by
Matt Delich.
Intersection level of service analysis was performed at the intersections of Mulberry at Impala,
Ponderosa and Taft Hill based on existing conditions. Level of Service (LOS) is a grading system
as to how well an intersection operates, ranging from "A" which is excellent to "F" failure. LOS
of "D" or better is the City of Fort Collins threshold for being acceptable.
The existing level of service for the three intersections analyzed based on the 19S5 Wiigbway
Capacity Mamud is presented in Table A. The calculations sheets for this analysis is presented in
the appendix of this report. As can be seers acceptable levels of services exist for all three
intersections in both the a. m. and p. m. peak hour conditions.
Table A - Existing Intersection Level of Service
Level of Service
Intersection AM PM
Mulberry/Impala (Stop Sign)
South Bound Left A A
South Bound Right A A
East Bound Left A A
Mulberry/Ponderosa (Stop Sign)
North Bound Left A A
North Bound Right A A
West Bound Left A A
Mulberry/Taft Hill (Signal) B C
4
AkMck nampoibaon
i
EX19TMG TES
I i
IMPALA CI�Gk; %
l I OLIVE C
—ZI
i
D rD_ i
D i i i D
DFORD Cc
CIMPALA CIRCLE
P y i
WE5T MULBERRY STREET-------' ----� •�•�•-- -` --- 1
---'---
"----'•-- ""'---'--'".-'-.-- Lees____._ e3drw'io•, -liver
( tiirwo e• au,[e
E Z /
Figure 2
Site Plan
AkMck Dampimbdon
Z � c ,
c
. m
LaPorte Ave a
. .
.
•
Cemetery
st
•W.Oak
.
_ ...
Ct
0
/"
///%
"%%% �
'
Ivan
//off
-
.
all
n.IMlberry
St
..
M M =WVtvLtle
Ct
i
W ou Ile
Ct
`J
(!1
O
p
W laurel
St,
0
0
T er
��.
v
`o
Ct
►'-'
n
Y
a
.. chard PI
U)
Scale:
1"=2000'
Project Location
n
= 1
f0
Crestmore
c Ct fec
Orchard
Orchard U)PI.
Figure 1
Vicinity Map
Aknick Darsspozodon
HILL CREST DEVELOPMENT TRAFFIC IMPACT ANALYSIS
The following traffic impact analysis for the proposed Hill Crest Development located in the City of
Fort Collins has been prepared in response to a request by City of Fort Collins staff. As will be
presented, the proposed residential project is located north of Mulberry and east of Impala Drive in
the northwest section of the City of Fort Collins. Based on the request of City staff, the analysis is
to evaluate the impacts of the proposed project traffic when added to existing and forecast traffic
conditions in the future at the intersections of Mulberry Street at Impala Drive, Ponderosa Drive and
Taft Hill Road.
Because the City has recently reviewed and approved an expansion of the Poudre High School and
closure of Impala Street north of Impala Court, City staff requested that the Hill Crest Development
Traffic Impact Analysis be based in part on the Poudre High School Traffic Analysis prepared on
August 9, 1993 with supplemental analysis dated December 14, 1993 by Matthew J. Delich.
Project Description
The project site is located north of Mulberry and east of Impala Court. The project location is
presented in Figure 1. The proposed project consists of 13 duplex residential dwelling units and one
single family dwelling unit for a total 27 dwelling units. As can be seen in the site plan as presented
in Figure 2, 12 duplexes or 24 units will take access via Impala Court and Impala Drive and one
duplex and one single family unit for a trial of three dwelling units will take access off of Mulberry.
The proposed project will be located into an existing residential neighborhood comprised of single
family and duplex residential dwelling units. To the northwest of the proposed project is the Poudre
High School.
Primary access to the project will be via Impala Drive, a two lane residential street with a twenty
mile per hour posted speed limit. Primary arterial access will be via Mulberry Street, which is a four
lane arterial with bike lanes, posted at 30 miles per hour. To the east of the project is Taft Hill
Road, also a four lane arterial.
The recently approved expansion of the Poudre High School included closure of Impala Drive as a
through route between La Porte Avenue and Mulberry Street. The objective was to create two
parldng lots for the Poudre High School with no access between them. As of the date of preparing
this traffic study a "Road Closed To Through Traffic" sign has been placed at either end of Impala.
TABLE OF CONTENTS
Aknick humpnitaaon
PAGE
Project Description ............. 1
Existing Setting ................................................ I
Project Impacts .............................................. 6
Mulberry Pedestrian Crossing ....................................... 10
LIST OF FIGURES
1. Vicinity Map ............................ 2
2. Site Plan
3. Existing Peak Hour Traffic Volumes ........ 3
4. Existing Plus Project Peak Hour Traffic Volumes 5
5. Year 2000 Plus Project Peak Hour Traffic Volumes ........................ 9
LIST OF TABLES
A. Existing Intersection Level of Service ................................ 4
B. Project Trip Generation 6
C. Existing Plus Project Intersection Level of Service 8
D. Year 2000 Plus Project Intersection Level of Service , , , , , , , , , , , , , 8
.Appendix: Level of Service Analysis
14
14 .
0
II
II
II
IA
HILL CREST DEVELOPMENT
TRAFFIC IMPACT ANAL PSIS
March 14, 1994
Presented to
City of Fort Collins Housing Authority
❑❑❑
No❑❑ MERRICK
Denver/Fort Collins
Colorado
.T
PliWL(rf: IEI GoLGi^� �'lOUS/N(T 4yi")yoc 17Y HI&IGeEST
TYPE Or- MEETING.- LUE/6,ItaV6 ffddo
DATE: I'?— 7-43'1/
DID YOU nfccivi
WItIFTEN
NOTIFICATION o•
Aste YOU N you
NAME ADL)ItE•SS YES/NU OWNERRENT
?
�/lED .5lf6jp RO G/7`y 6�f+(LANI^)G
leg
�A !Lb S . V�ac/�
Is//
()A ,7� �i��1�—
C
/%-t X,
v(e
VZ---5
4
vz-,s
yC-P
Ye-5
PS
��/¢.✓ /'-G rc�/oy2�r-, �y/ 3 5i�.�-�r-+> /J /� D s/ yz/9 �os-1 c- �C y '� f
24. Will there be a F.C.H.A. employee as an onsite manager?
RESPONSE: At this time, we are planning on one of the residents
acting as manager in exchange for lower rent.
25. F.C.H.A. should promote resident councils.
RESPONSE: This is a good comment.
26. Will there be any four bedroom units?.
RESPONSE: No.
27. Will the six foot fence be built right away? We are concerned
about blowing trash during construction season.
RESPONSE: We will consider building the privacy fence as an initial
phase of construction.
28. We are concerned about water draining onto our property.
RESPONSE: The two planned detention ponds should capture the storm
flows and keep water from draining onto your property.
RESPONSE: Our traffic study indicates this will not be the case.
The closing of Impala Drive as a through street to LaPorte Avenue
takes a lot of pressure of Impala Drive.
15. Where is the closest bus stop?
RESPONSE: The new bus stop is at the corner of Taft Hill Road and
Mulberry Street.
16. What is the setback from the rear property lines of the
existing homes on the east? Will there be a fence?
RESPONSE: The setback will be 35 feet, with a six foot wood fence.
17. What is the timing of construction?
RESPONSE: We hope to begin Phase One this Spring.
18. What is the status of PR-1 purchasing the soccer field?
RESPONSE: F.C.H.A. is negotiating with PR-1 to trade the land for
an equal amount of land the District may own in the southeast or
southwest part of the City. If a trade can be done, then proceeds
from a sale would not have to be given back to C.D.B.G. The
District is very interested. The size of the detention pond will
be key.
19. Will the large trees be saved?
RESPONSE: We are planning on trying to save all the large trees.
20. Recently, Light and Power came through.and cut substantial
portions of nearby willow trees. It looks real bad. Will more
trees be cut to bring in electric to the site?
RESPONSE: No, in keeping with City policy, new construction will be
served by underground facilities, not overhead lines.
21. I am concerned about the density along Mulberry. Of all the
options, I prefer the option with the least amount of density.
RESPONSE: Please keep in mind that F.C.H.A. needs a certain amount
of density to make the project feasible.
22. On the Mulberry lots, I prefer the option of one duplex, and
one single family home. This has the least amount of density.
23. I am concerned about water conservation? Will the F.C.H.A.
install bluegrass sod or will a more drought -tolerant sod be used?
RESPONSE: This is a good comment. We plan on installing a sod that
is a mix of grasses that will have less watering requirements than
bluegrass.
5. Would Habitat For. Humanity be governed by the P.U.D.?
RESPONSE: Yes, the P.U.D. would remain the governing document no
matter who owns or develops the Mulberry lots.
6. So if there is a mix of rentals (Housing Authority) and owner
occupied units (Habitat) both are under the control of the P.U.D.?
RESPONSE: That is correct.
7. Is the Fort Collins Housing Authority concerned about the
safety issues associated with young children and the stormwater
detention pond?
RESPONSE: No, the detention pond is for temporary storage of storm
flows. There will be no standing water on a permanent basis, only
after a rainstorm, and then this water is released, at a controlled
rate, into the storm sewer system. This is not a hazardous
situation.
8. Will the tot lot be fenced?
RESPONSE: Yes.
9. As a resident of the Tenth Green Subdivision, I prefer single
family.homes over multi -family.
10. Will there be only one driveway entrance off Mulberry?
RESPONSE: That is correct.
11. Will there be a driveway connection from Mulberry into the
interior of the project?
RESPONSE: No, only a bicycle/pedestrian connection.
12. Will Phase Two need its own detention pond? If so, is there
enough area for parking?
RESPONSE: Yes, a small detention pond is being designed on Phase
Two in order to meet the requirements of the City's Stormwater
Utility. This small detention pond will not interfere with the
parking area on Phase Two.
13. What about the ditch?
RESPONSE: The ditch is an irrigation lateral for City Park. We
have received permission from Parks and Recreation to place this
ditch in a pipe.
14. It looks like traffic from this project will get jammed up at
Impala Circle.
NEIGHBORHOOD MEETING MINUTES
PROJECT: Hill Crest Preliminary P.U.D.
DATE: February 7, 1994
APPLICANT: Fort Collins Housing Authority
CONSULTANT: Jim Bragonier
PLANNER: Ted Shepard
The meeting began with a description of the proposed project. All
units will be constructed on the premises. There are no modular
units. As proposed, there are three phases. Phase One is the
primary phase with 12 duplexes for 24 units. Primary access to
Phase One is gained from Impala Circle. The existing house that
fronts on Mulberry is part of the P.U.D. There are three options
on how many units to put in Phases Two and Three. Poudre R-1 has
expressed an interest in purchasing the northerly 4.47 acres for an
athletic field. Impala Drive will no longer connect Mulberry to
LaPorte Avenue with the expansion of Poudre High School and the re-
configuration of the parking lot.
QUESTIONSt CONCERNS, COMMENTS
1. Will the units contain two or three bedrooms?
RESPONSE: In Phase One, there will be a mix. Half will be two -
bedroom and half will be three -bedroom.
2. Is Habitat For Humanity involved?
RESPONSE: We have had some discussions with Habitat For Humanity
regarding the lots that front on Mulberry but there are no
immediate plans to bring them into the project.
3. If Habitat For Humanity were involved, would the lot be sold
to the occupants?
RESPONSE: Yes, the Habitat For Humanity program involves the
occupants becoming owners of both the building and the lot.
4. If a lot, or lots, are sold to Habitat For Humanity, do the
proceeds from the sale revert back to C.D.B.G?
RESPONSE: No, proceeds would not have to be refunded to C.D.B.G.
since Habitat promotes affordable housing.
PLANNING OBJECTIVES FOR HILL CREST P.Q.D.
The Hill Crest Planned Unit Development is a proposed low density
residential development of attached, two-family dwellings owned by
the Fort Collins Housing Authority. The site for this development
consists of ten acres located at 2240 West Mulberry Street, east of
Impala Drive with primary access off Impala Circle. Only 5.29
acres of the ten owned by the Housing Authority. Poudre R-1 has
issued a letter of intent to purchase the north 4.47 acres for use
as play fields. It is our understanding that this acreage will be
left open for recreation purposes by Poudre R-1.
This is an in -fill project contiguous to existing development on.
all sides. Utilities services are either on the site or in close
proximity.
At an average density of 5.1 Units per Acre, this develop should
have little impact on the neighboring single family dwellings or
the multiple units of Ramblewood Apartments to the North. A major
objective in this submission reduces the density of housing on the
site to 76% of the that previously proposed and reduces the number
of units by more than half to twenty-seven units.
It is the mission of the Fort Collins Housing Authority to 'provide
affordable housing to Fort Collins families throughout the
community. With a continuous waiting list of potential tenants and
continued housing pressure on those least able to afford housing,
it becomes more important to place affordable housing in infill
lots throughout the city, and each year the urgency mounts.
This submission meets most of the Housing Authority's objectives,
and is believed to address the real and serious concerns of
neighborhood members present at the two prior neighborhood
meetings. Specific concerns addressed are the use of new
construction of conventionally appearing homes, reduced traffic to
the site achieved by reducing the total number of units, and
additional care undertaken in landscaping and screening of the
development. The recent rerouting of Poudre High School traffic,
particularly bus traffic, off Impala Drive has already reduced the
amount of traffic which was of concern to the neighbors.
Phase I of the project is currently funded for'24 duplexes, and is
proposed to commence this Spring '94. The additional three
residential units of Phase II and Phase III will be completed as
funding becomes available, presumably in 1994-1995. It should be
clearly stated that the total number of residential units
anticipated for the ten acre site (excluding the 0.254 Acre
existing home at 2300 W. Mulberry) will be 27 units here proposed
by the Fort Collins Housing Authority. The Housing Authority has
no additional designs on the land.
FORT COLLINS HOUSING AUTHORITY
1715 WEST MOUNTAIN AVENUE
FORT COLLINS, CO 80521
221-5484
HILL CREST
An Affordable Housing Opportunity
NEIGHBORHOOD MEETING - FEBRUARY 7, 1994
SITE INFORMATION
LAND USE DATA:
EXISTING ZONING R L (Low -Density Residential)
TOTAL AREA:
3.9 ACRES PHASE 1
0.6 ACRES PHASE II
0.45 ACRES PHASE III
4.5 ACRES UNDEVELOPED
9.46 ACRES
PHASE 1 12 - TWO - FAMILY DWELLINGS
OPTIONS AVAILABLE FOR MULBERRY STREET FRONTAGE PHASE II AND III.
OPTION A 3 - TWO - FAMILY DWELLINGS
OPTION B 2 - TWO - FAMILY DWELLINGS AND 1 - SINGLE FAMILY HOME OWNERSHIP
OPTION C 1 - TWO - FAMILY DWELLINGS AND 1 - SINGLE FAMILY HOME OWNERSHIP
OPTION D 3 - SINGLE FAMILY HOMEOWNERSHIP
9
12vY
j qM
1 ,
NOW-
N
CITY OF FORT COLLINS 1715 West Mountain, Ft. Collins, Colorado 80521 Telephone (303) 221-5484
HMING ALffH TY FAX 221-0821
MEMORANDUM
TO: Ted Shepard, Planning Department -I
FM: Jim Kline, Project manager.
RE: HILL CREST P.U.D., House Relocation.
Attached is 10 photo sheet copies of the subject house.
The Fort Collins Housing Authority has an opportunity, to utilize
an existing house that has been offered to us from the City Of
Fort Coillins Parks Department. We see lot #1 of the Ricketts
subdivision as a suitable location for the house to be placed.
Lot #1 is building location # 14 on the HILL CREST P.U.D. plat,
It would front on Mulberry St. and locate to the west of the
existing residence 2300 W. Mulberry and the Grange Hall. In order
to implement this house move efficiently,
the timing of this relocation might need to take place before
the p.u.d. procces would be completed. At present Lot # 1 of the
Ricketts Subdivision is a plated building lot.
DENSITY CHART
Maximum
ccr^ea
Critenon
CreOit
If All Dwelling Units Are Within:
Crecit
a
20%
2000?sera on enmrp or aooroaa nspnoofro ur000nq cenra
b
10%
eso rseroran asnq amnw.
C
10%
.woo rest don emmng w wmcr ec raorona rnooarq cenfa.
d
20%
iSoofesfOfMemmrp«rmory cln gnoorn0000rncommunrrvoan«comnwtirouu. OGEILs R
.20
we
10%
+000resraolu+oa.nw+lrgaams,e remennofinecomourorveaucalanaw "M'sr«eaca«aoo. Y0 H•S.
t
200e%��
J000 feetaarttoaremaayn+MrtrMta.fit 'I
O N. + 1pal fv
'2C
9
5/O
1000 fear aacniacaoa w
h
20%
TJwet•FvrcVlM
r
a,0
1
20%
MCamaE mnsl/ptnp.
A profacRr�o� Oafwoy a a0nr,afda ro asW,p ufbon ow.aofrww. Gsan mw w rlonw m ralora
0%—For «oNCYlwRpy rxoosm bar+owv nm o ro t0%mneolM. ..
J
3090
,0 b +s%—tor orofecewmofa oroosrry bourVwy nm,0 b p%aanwayly, _
0
srozox—F««owrn rrwla «oosm cow oavnm zo ro]0%con*OuRr
20 ro 2s%�•F« Drowaff rnola woosnv ba1ltaafy nm JO ro s0%canf10uM
2sro.w%—F«orolscRlwRa.orooam ootrtowvnm a0ro• %C«1tlQyfy, .
k
R RCOn waarnonrsorsc marRv «atar.Ywl raasa non+avraola energy ylaapa slaw mrdrat Ins aapmnan d a+arwln. orm
Twe Mmraugnewn w&ww conwvmw msoara wt«w marwmtopragraa wcm coca as%oarw nayweonvo
r« ewery s%reaycan n awQy ula.
I •
Ca,culora o,%bones rorwayso avmwracaanma«wsct .
M
Cacva»fwowcwfowot+nelaaaaanms pwa.Y+„aanaawwaroraaaa+fwfaw.an w v2ommowcormpamao«
n
Ir,rh 000ee«newm+ln ro orslwwq oamanavo,fsna own fOOCa fnatntaell Rfa GN/m•rrwn, rao+narnar+4 meua+s maaaCanropa
ama ODen lWCa aweoQap ma,arSaseroonwnowsapa anw m/aa+cawaW mabantf
O
If cc ot"ro,o oeveloo 0 touopeIato w,owtw neprowrCoo Mcoc"rw foc~wrt hwa rctoe+aMsar moww GN Coon
enter 2%oonaf«wwyswo osr a.errgvnmHesa
p
If con«metool awaoon lxo0aurc below n nsyno«now fmww ane,erv, wis onna omsrw,srwrsowcayCoon
fm s,00
dour a+% ow" way ow a-awpune w.eaaa
♦�
Q
Rac ""Ww it DwQ maw+oowawarwelNa wroanropa a ma lots rwava«ofa-.0" wm fa low /="fordo onto Rwr
oawntcwMaownsuoroamwmn,mofo0%
30
Z
Rocofrrnerwnebarq numfoaa.aoo wse6ao Coca apsams«a nmwraawrp wn «rypa'�o arvp9nonoa000ao
nouwgmcwb wmscirvofFarCww cacvasfrutznemrolw:
O
r
Typa'A•— Sl+n+w ryw
—
TroaX—tOtMnw Ty'e � .
in nocme u,fanucartonaa bawd beaaolorMon 3M .
N"Sft«eOof.Wvfmccafrymtwsron mmicbudw9w plod a bandmey an oww for Nwf o weta
3% _ F«olwan+F10«IMbOd+Oanlbr/Mwnoss laaalNarrfur+allanauaosaNSllC aea+aree taro Jaca/aeanl aaaraR.
3
DroloNWIM
3% 11106 with WO Vmom&aAc"IMu o
Fm=R"V+r+r7r WUCNserwaWtla
_
Far «pace+nawal load to Ihowftvwcw Do- - Mlio cmImpwwwwnon
owwww. om irww.
900011101I«4a,MraWraab«4rgnma rRlrpaTomNawaobpa�WovwaaW 0 w11yn Mp/Idl�«nanaawlaapogq
dnlpMl M w o=sUmv va ro RV g!Imary mUMM a band -woo owwo m iaabs
t
o% — F«ppwOrq lSx«maaatly oaMrgnasnucYUfs
6% — FmwoNo v50-74%arrMpat7+p+nomumm
o% — Fcrpoutav25-47%a+lupatlr+pnamfucf Na.
U
Rowrtrmrnansoeeprtww+ofawwaapoia+owanwne,tta aenpuewpryuarroarmawsarqunffianwraoondagi
TOTAL 13 o?6
-30-
ACTIVITY: Residential Uses
DEFINITION:
:I
All residential uses. Uses would include single family attached dwellings,
townhomes, duplexes, mobile homes, and multiple family dwellings; group
homes; boarding and rooming houses; fraternity and sorority houses; nursing
homes; public and private schools; public and non-profit quasi -public rec-
reational uses as a principal use; uses providing meeting places and places
for public assembly with incidental office space; and child care centers.
CRITERIAEach of the following applicable criteria must be
answered "yes" and implemented within the develop-
ment plan.
Yes No
1. On a gross acreage basis, is the
average residential density in the
project at least three (3) dwelling
units per acre (calculated for
residential portion of the site only)? ® ❑
2. DOES THE PROJECT EARN THE MINIMUM
PERCENTAGE POINTS AS CALCULATED ON
THE FOLLOWING "DENSITY CHART" FOR
THE PROPOSED DENSITY OF THE RESI-
DENTIAL PROJECT? THE REQUIRED EARNED
CREDIT FOR A RESIDENTIAL PROJECT © ❑
SHALL BE BASED ON THE FOLLOWING:
30-40 PERCENTAGE POINTS = 3-4 DWELLING UNITS/ACRE;
40-50 PERCENTAGE POINTS = 4-5 DWELLING UNITS/ACRE;
50-60 PERCENTAGE POINTS = 5-6 DWELLING UNITS/ACRE;
60-70 PERCENTAGE POINTS = 6-7 DWELLING UNITS/ACRE;
70-80 PERCENTAGE POINTS = 7-8 DWELLING UNITS/ACRE;
80-90 PERCENTAGE POINTS = 8-9 DWELLING UNITS/ACRE;
90-100 PERCENTAGE POINTS = 9-10 DWELLING UNITS/ACRE;
100 OR MORE PERCENTAGE POINTS = 10 OR MORE DWELLING UNITS/ACRE.
1
-29-
AeE- P (I. v
Activity A: ALL
DEVELOPMENT CRITERIA
ALL CRITERIA
APPLICABLE CRITERIA ONLY
CRITERION
Is the criterion
applicable?
Will the criterion
be satisfied?
If no, please explain
=
1 Yes
No
Al.
COMMUNITY -WIDE CRITERIA
1.1
Solar Orientation
1.2
Comprehensive Plan
1.3
Wildlife Habitat
1.4 '
Mineral Deposit
1.5
Ecologically Sensitive Areas
reserved
reserved
1.6 Lands of Agricultural Importance
1.7
Energy Conservation
1.8
Air Quality
1.9
Water Quality
1.10
Sewage and Wastes
A2.
NEIGHBORHOOD COMPATIBILITY CRITERIA
2.1
Vehicular, Pedestrian, Bike Transportation
2.2
Building Placement and Orientation
2.3
Natural Features
2.4
Vehicular Circulation and Parkin
✓
2.5
Emergency Access
2.6
Pedestrian Circulation
2.7
Architecture
a tev L
2.8
Building Height and Views
2.9
Shading
2.10
Solar Access
2.11
Historic Resources
2.12
Setbacks
2.13
Landscape
E" y
2.14
Signs
2.15
Site Lighting
2.16
Noise and Vibration
2.17
Glare or Heat
2.18
Hazardous Materials
A3.
ENGINEERING CRITERIA
3.1
Utility Capacity
3.2
Design Standards
3.3
Water Hazards
3.4
Geologic Hazards
PLANNING OBJECTIVES FOR HILL.CREST P.Q.D.
The Hill Crest Planned Unit Development is a proposed low density
residential development of attached, two-family dwellings owned by
the Fort Collins Housing Authority. The site for this development
consists of ten acres located at 2240 West Mulberry Street, east of
Impala Drive with primary access off Impala Circle. Only 5.29
acres of the ten owned by the Housing Authority. Poudre R-1 has
issued a letter of intent to purchase the north 4.47 acres for use
as play fields. It is our understanding that this acreage will be
left open for recreation purposes by Poudre R-1.
This is an in -fill project contiguous to existing development on
all sides. Utilities services are either on the site or in close
proximity.
At an average density of 5.1 Units per Acre, this develop should
have little impact on the neighboring single family dwellings or
the multiple units of Ramblewood Apartments to the North. A major
objective in this submission reduces the density of housing on the
site to 76% of the that previously proposed and reduces the number
of units by more than half to twenty-seven units.
It is the mission of the Fort Collins Housing Authority to provide
affordable housing to Fort Collins families throughout the
community. With a continuous waiting list of potential tenants and
continued housing pressure on those least able to afford housing,
it becomes more important to place affordable housing in infill
lots throughout the city, and each year the urgency mounts.
This submission meets most of the Housing Authority's objectives,
and is believed to address the real and serious concerns of
neighborhood members present at the two prior neighborhood
meetings. Specific concerns addressed are the use of new
construction of conventionally appearing homes, reduced traffic to
the site achieved by reducing the total number of units, and
additional care undertaken in landscaping and screening of the
development. The recent rerouting of Poudre High School traffic,
particularly bus traffic, off Impala Drive has already reduced the
amount of traffic which was of concern to the neighbors.
Phase I of the project is currently funded for'24 duplexes, and is
proposed to commence this Spring '94. The additional three
residential units of Phase II and Phase III will be completed as
funding becomes available, presumably in 1994-1995. It should be
clearly stated that the total number of residential units
anticipated for the ten acre site (excluding the 0.254 Acre
existing home at 2300 W. Mulberry) will be 27 units here proposed
by the Fort Collins Housing Authority. The Housing Authority has
no additional designs on the land.
P.
SCHOOL PROJECTIONS
PROPOSAL: HILLCREST PUD - Preliminary
DESCRIPTION: 13 duplexes (26 units) and 1 single family home
on 5.29 acres
DENSITY: 5.10 du/acre
General Population
27 (units) x 3.5 (persons/unit) = 94.5
School Age Population
Elementary - 27 (units) x .450 (pupils/unit) = 12.15
Junior High - 27 (units) x .210 (pupils/unit) = 5.67
Senior High - 27 (units) x .185 (pupils/unit) = 5
Design
Affected Schools Capacity Enrollment
Irish Elementary 546 552
Lincoln Junior High 740 653
Poudre Senior High 1235 1121
I
I
1
I
S�
I I LAND USE DATA
1-
x�
! u II I
r
I I I
O
TENTH Cs
DIVISION
FGR BALE jIJ 10.ifE R-1
seas �
PLANT LIST
ce��wxua artRacv. wre �avxrin BI
w'4� ••y VWAATV MAP
LEGAL DESCRIPTION
H
v
1 =h
My40
.� IR
PHASE IQ
F
' W j
RESIDENTIAL - YON€D RIL — I_
�
PONDER05A D R', � W E
- �I
-� _- - � i w
EJ
PRELIM. PLAT
va&�
--- ------ — IMPALA DRIVE
T SITE AND LANDSCAPE PLAN r
GENERAL NOTES -Ala' I• . 50,'�• I -
_ v I w
_ OWNERS CERTMATION NOTARIZATION A-1
.0e' "„��" PLANN1q AM ZONING BOARD
APPROVAL
---- -,-
- ,Y
•.IMPALA SUBDIVISI
00
1—' I
ROA ; U
-'�T 11c1 n
0
------ NAB DENG
'ZS'7EVGEE - :OtNED IQP TENTH CdTFN 8115DIVISION
__—. __ __—__ v ware
----- --- —
r-
lAY
17
��
CI \
rLm 7,
awj
— es
rFa-an A�l�n_..s I• - e.rw r>-u_ a-�o'. _.-_
LAND USE DATA
•"^� , •� o IK.._� - IMPALA SUBDIVISfOf.�
`RESi]PZNTIAL - ZONEL Rt
GENERAL NOTE&
vONYTr YAP
LEGAL DEeCRrTION
W M l a•el M W °BN b 1/l M W
L°mesa 1'. a Sa9eT 0. mrlR. M1N !u6 M rr
a w v.a, car a rr ear e..b r u°ar. n.e. a
eeb«q MiL � W a:6 Y r Ur W rrYa 1/T
yvy ! R°LY L of au •! Yr Yrl� mYW
!mu N °Ga.le a aWY.i ✓rN a. Labr VIJ f W
py°e r atl 9°YL Y °Yi ie T M!Y l W R Y!
T ma.x r e\im wn em s eras' • RTm a.�a®o
a m°a m' a nem a.< asW u. are Y r Lrl
4 I@.'a3 T M°a'm'r NTN M VI , W bae Yv. ial
Y m^esb'l UlmM 11WR6M Mlam lO9!
The VACANT -
P
\
u
RESIDENTIAL -
IMPALA DRIVE r eer
mSITE PLAN
8044: r . W'-m•
I
r PONDEROSA D QT' Co
eW-i
zE B€
e.
arrE PLAN
I m
OWNERS C RTF IC C NNOTANVAIUM A-1
PLANNING AND Z011q BOARD
00 APPROVAL
—
L. O.>
�
3 r
J t
. cc
r ��
V
N m
L 1 Z
N
`�
1
Sy
Cherry Ln
Ch rr Y
S
N
a;
Q
n
I IN
o f �`
N
v
1
8
3
V
c
v
l as
'
E
r
tn
1
x
z
z
`
�
1
1
LaPorte Ave
�-
`n
Grandview75
a
o
`�
L
y `"
Dr
Cemetery
a a
O
3
1 N
O
y
C
'�
L
J
J
'
O
>
1
V
=
vi
Olive St
Ln
1 �
1
W.Oak St
M•unicipol
4e
ro
Briarw od Ct
W.Oliv `°
o
Golf Course
rmE
St.ve8rdg431
JOW-611berroy
W,
olla
u
lSt
L
m
— tie
OU
O
CtHorr
Woo Ile
C
Ct.
1
�^
W laurel
St.
O
o
a
Crestmore11
n
Ti er
L
°i
v
o
(t
o„
ITEM:
HILLCREST
PUD -
Preliminary
W
North
NUMBER: 6-93A
Hillcrest PUD - Preliminary, #6-93A
April 25, 1994 P & Z Meeting
Page 7
2. The density is supported by a score of 130% on the Residential
Uses Point Chart of the L.D.G.S.
3. Both the land use and project design are compatible with the
surrounding neighborhood.
4. The P.U.D. is feasible from a transportation standpoint.
Staff, therefore recommends approval of Hill Crest Preliminary
P.U.D., 6-93A, subject to the following conditions:
1. At the time of Final P.U.D., the landscape plan shall include
a detail for a typical landscape package for each structure.
2. At the time of Final P.U.D., the 12 interior structures shall
demonstrate a greater variety in rooflines, front porches,
and/or front elevations. Other techniques to promote variety
are encouraged in order to diminish the repetitive
architectural character of the P.U.D.
Hillcrest PUD - Preliminary, #6-93A
April 25, 1994 P & Z Meeting
Page 6
6. Phase Three - Option
The Fort Collins Housing Authority would like the P.U.D. to reflect
the option of relocating an existing single family house onto the
building envelope on Phase Three rather than construct a new
building. The proposed house is presently located on the future
site of McGraw Neighborhood Park and needs to be moved in order to
be preserved. The house is not of modular construction. This
option would apply to the one building envelope on Phase Three
only. A copy of a photograph of the subject house in attached.
Staff supports this option. The house to be relocated is a one
story, frame, single family house reflective of the era and
character of many of the surrounding properties. As a traditional
structure, this house would promote neighborhood compatibility.
7. Transportation:
The traffic impact analysis prepared for this P.U.D. reflects the
expansion of Poudre High School to a projected enrollment of 1,800
students and the discontinuance of Impala Drive as a through
street. According to the study, 80% of the project's traffic is
to/from the east on Mulberry Street, 15% to/from the west on
Mulberry, and 5% to/from the south on Ponderosa Drive.
The traffic impact analysis investigated the project's impact on
three intersections: Mulberry/Impala, Mulberry/Ponderosa, and
Mulberry/Taft Hill Road. The analysis finds that with the addition
of the Hill Crest P.U.D., acceptable levels of service prevail at
all three intersections during both the a.m. and p.m. conditions.
As part of the traffic impact analysis, the impacts on the street
system to the year 2,000 was also investigated. This analysis
assumed an annual background traffic increase of 2% per year.
Again, acceptable levels of service will exist at the three
intersections with addition of future growth combined with traffic
from Hill Crest P.U.D.
The Preliminary P.U.D. has been reviewed by the Transportation
Department and found acceptable.
RECOMMENDATION
In reviewing the request for Hill Crest Preliminary P.U.D., Staff
finds the following facts to be true:
1. The request satisfies the All Development Criteria of the
L.D.G.S.
Hillcrest PUD - Preliminary, #6-93A
April 25, 1994 P & Z Meeting
Page 5
B. Landscaping
The buffer are will feature a mix of conifer and deciduous trees.
For the five closest duplexes, there will be 13 evergreen trees
planted directly between the units and the property line. These
plantings will help buffer the duplexes from the three adjacent
single family homes. Along the interior drive and parking areas,
there will be deciduous street trees with evergreens setback
further into the front yard areas. Staff is concerned about adding
details on foundation and entry landscaping for each structure. In
order to enhance the aesthetic appearance of the site and
neighborhood, and to comply with All Development Criteria A-2.13,
Staff recommends the following condition of approval:
At the time of Final P.U.D., the landscape plan shall include
a detail for a typical landscape package for each structure.
C. Parking
The 27 units are divided between 15 three bedroom and 12 two
bedroom units. Total required parking, as per the Zoning Code, is
51 parking spaces. The Site Plan indicates 59 parking spaces.
There are eight parking spaces devoted to disabled persons.
D. Architecture
All duplex units will be one story in height. Exterior materials
include asphalt shingles and hardboard siding in a six inch lap
pattern. Each individual unit will have a covered front porch at
the entry measuring 48 square feet.
Staff is concerned that the appearance of the 12 interior units is
repetitious. The front elevations could be enhanced with variety
in the roofline and/or front porch design. For purposes of
neighborhood compatibility, the P.U.D. has a strong inward
orientation resulting in an emphasis on front yards, and common
areas. In order to promote increased variety and less repetition,
and to comply with All Development Criteria A-2.7, Staff recommends
the following condition of approval:
At the time of Final P.U.D., the 12 interior structures shall
demonstrate a greater variety in the rooflines, porches,
and/or front elevations. Other techniques to promote variety
are encouraged in order to diminish the repetitive
architecture of the P.U.D.
Hillcrest PUD - Preliminary, #6-93A
April 25, 1994 P & Z Meeting
Page 4
into the high school parking lot, not connecting to LaPorte Avenue.
The size of the submittal has been reduced from 56 units on 8.42
acres to 27 units on 5.29 acres. These changes were perceived by
the neighborhood as positive and promoting neighborhood
compatibility.
For the current submittal, there remains a concern among those
attending the neighborhood information meeting regarding the
proposed density, especially along Mulberry Street, next to Tenth
Green Subdivision. It was the desire of the neighborhood to have
as low a density as possible along the eastern edge of the project.
In response, the Fort Collins Housing Authority has placed as many
of units away from Tenth Green Subdivision as possible. Of the 26
duplex structures, only five are adjacent to Tenth Green
Subdivision. These duplexes are setback 35 feet from the easterly
property line. There are only three existing homes in Tenth Green
Sub that will share a property line with these five structures.
This buffer area contains a continuous six foot solid wood fence as
well as clusters of evergreen trees.
For the duplex structure along Mulberry Street, in Phase Two, the
adjacent lot to the east is presently unplatted and vacant. This
duplex is setback from the easterly property line by 40 feet.
In evaluating the neighborhood compatibility issue, Staff has found
that the proposed Preliminary P.U.D. fits in, is sensitive to and
maintains the character of the existing residential neighborhood,
Tenth Green Subdivision.
5. Design:
As a duplex project, the P.U.D. is characterized by the following
design features:
A. Buffer Area
As mentioned, the critical buffer area is along the easterly
property line where five duplexes (10 units) share a common
property line with three single family homes in Tenth Green
Subdivision. These duplexes are staggered. The setbacks from the
easterly property line range from 35 to 55 feet. The actual
property line will be fenced with a six foot high, shadow box,
cedar fence.
Hillcrest PUD - Preliminary, #6-93A
April 25, 1994 P & Z Meeting
Page 3
The general area is characterized by large unplatted lots facing
Mulberry Street which were developed as rural residential prior to
annexation into the City. The housing stock is mixed in terms of
age and density. Skyline Mobile Home Park is across the street to
the south.
3. Land Use•
The request for 27 units (13 duplexes and one single family unit)
on 5.29 acres represents a density of 5.10 dwelling units per acre.
This density is justified by the score of 130% on the Residential
Uses Point Chart of the L.D.G.S.
Points were awarded for the following:
d. Being within 3,500 feet of a neighborhood park (Rogers Park)
e. Being within 1,000 feet of a school (Poudre High School)
f. Being within 3,000 feet of a major employment center (Poudre
R-1 Administration Building and Maintenance Facility).
h. Being located in "north" Fort Collins.
j. Having contiguity with existing urban development.
q. Committing to develop 100% of the units for low income
families.
As can be seen by the score, the project satisfies a sufficient
amount of the locational criteria as well as the bonus criteria of
the Residential Uses Point Chart to justify the proposed density of
5.10 dwelling units per acre. It should noted that the provision
to reserve the units for tenants classified as "low income"
satisfies one of the goals of City Council to promote affordable
housing.
4. Neighborhood Compatibility:
A neighborhood information meeting was held on February 7, 1994.
Minutes of this meeting are attached.
It will be recalled from the 1993 submittal that the primary
concerns raised by the neighborhood were the quality of the modular
units, the traffic on Impala Drive, and the density of the project,
(56 units on 8.42 acres at 6.6 d.u./acre). In contrast, the 1994
submittal proposes onsite construction with no modular units.
Impala Drive is now discontinued as a through street terminating
Hillcrest PUD - Preliminary, #6-93A
April 25, 1994 P & Z Meeting
Page 2
COMMENTS:
1. Background•
The surrounding zoning and land uses are as follows:
N: R-M; Existing Multi -Family (Ramblewood Apartments)
S: R-L; Existing Single Family and Mobile Home Park
E: R-L & R-P; Existing Single Family (Tenth Green Subdivision)
W: R-L; Existing Single Family (Impala Sub), Poudre High
The parcel was included in the Maxwell First and Maxwell Second
Annexation approved in 1963. In 1988, the project was part of the
Ricketts Preliminary Subdivision, a request for 35 single family
lots on 10 acres, with frontage on Mulberry Street. This
Preliminary Subdivision was withdrawn and replaced by the Ricketts
Final Subdivision, a one lot subdivision on .43 acre, next to the
existing home that fronts on Mulberry Street.
In March of 1993, Impala Village Preliminary P.U.D. was approved by
the Planning and Zoning Board. This P.U.D. was a request for 56
multi -family units, office, and maintenance building on 8.42 acres.
In May of 1993, the City Council overturned the decision of the
Planning and Zoning Board on appeal.
2. Context Within the Section:
Hill Crest P.U.D. is directly west of a single family neighborhood
platted as Tenth Green Subdivision, approved in 1968. This
neighborhood consists of 50 homes on 13 acres for a density of 3.85
dwelling units per acre. The common property line with Hill Crest
is shared by nine homes in Tenth Green. There is no proposed
pedestrian or vehicular access between Hill Crest and Tenth Green.
To the north is a 4.47 acre parcel that is under consideration for
purchase by Poudre R-1 School District for athletic fields. North
of this acreage is Ramblewood Apartments, platted in 1970. There
are no proposed connections into Ramblewood Apartments.
To the west is Impala Subdivision, approved as a one lot
subdivision in 1974 consisting of 1.75 acres. There are 11 single
family units for a density of 6.28 dwelling units per acre.
To the north, Poudre High School campus is undergoing dramatic
change. Along with the building expansion, Impala Drive has been
closed as a through street with no connection between Mulberry
Street and LaPorte Avenue. The parking lot and athletic fields are
being modified.
ITEM NO. 22
MEETING DATE 4/25/94
STAFF Ted Shepard
PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Hill Crest Preliminary P.U.D., #6-93A
APPLICANT: Fort Collins Housing Authority
c/o Bragonier Architects
1913 Seminole Drive
Fort Collins, CO 80525
OWNER: Fort Collins Housing Authority
1715 West Mountain Avenue
Fort Collins, CO. 80521
PROJECT DESCRIPTION:
This is a request for Preliminary P.U.D. for 27 dwelling units (13
duplexes and one single family residence) on 5.29 acres located on
the north side of West Mulberry Street, east of Impala Circle, and
west of Tenth Green Subdivision. The property is zoned R-L, Low
Density Residential.
RECOMMENDATION: Approval With Conditions
EXECUTIVE SUMMARY:
The Preliminary P.U.D. is divided into three phases. The request
has been reviewed by the Neighborhood Compatibility Criteria and
found to compatible with the surrounding neighborhood. The P.U.D.
also satisfies the remaining All Development Criteria of the
L.D.G.S. The density of 5.10 dwelling units per acre is supported
by a score of 130% on the Residential Uses Point Chart of the
L.D.G.S. An option on Phase Three would be to move an existing
single family house (not a modular unit) onto the building
envelope. There are two conditions of approval pertaining to
landscape details and upgrading architectural variety. The P.U.D.
is feasible from a transportation standpoint.