Loading...
HomeMy WebLinkAboutHILL CREST PUD PRELIMINARY - 6 93A - CORRESPONDENCE - STAFF'S PROJECT COMMENTS16. Does the Site Plan Indicate a pedestrian path around the north and east property lines? If so, then the walk should connect to the sidewalk on Mulberry. Please label accordingly. 17. The evergreen trees along the east property line should be shifted so that they are directly between the east property line and the closest units. It looks like with some shifting, there can be better buffering. 18. The Land Use Data Table should indicate that there is a total of 27 units. 19. The Site Plan should indicate the surrounding zoning districts. 20. The Vicinity Map should include the names of major .streets and show that Impala Drive does not connect to LaPorte Avenue. 21. A Site Plan does not need an Attorney's Certificate. The owner's signature, however, must be notarized. Be sure the notarial block contains lines for the notary's address. 22. Please delete "Director Of" in three locations -on the Planning approval block. This should be replaced with "Planning and Zoning Board" in all three locations. 23. It is not clear what is meant by an "A" or "B" unit. Please explain. 24. Architectural elevations and information should be provided on a separate sheet. Since this information is not provided, separate comments may be forthcoming at a later date. 25. After revisions, it is strongly suggested that copies of the plan, with architectural information, be mailed to those attending the neighborhood meeting. This will allow interested residents. to review the plans prior to the Preliminary hearing. This concludes Staff comments at this time. In order to remain on schedule for the April 25, 1994 Planning and Zoning Board meeting, please note the following deadlines: Plan revisions (three sets) are due April 7, 1994. P.M.T.'s, 10 prints, rendered plans are due April 18, 1994. As always, please call if there are any questions or concerns regarding these comments. Sincerely: Ted Shepard Senior Planner xc: Kerrie Ashbeck, Civil Engineer 7. Public Service Company also requests that a utility easement, minimum of 13 feet wide, be provided to connect the circular parking area in Phase One to the entry areas in Phases Two and Three. Gas lines need to be able to tie into Mulberry Street. 8. The plat must dedicate appropriate utility easements for Columbine Cablevision. Also, Columbine Cablevision would like to see the buildings wired in a "home run" system with coaxial cable meeting minimum requirements. Please contact Dennis Greenwalt at Columbine Cablevision for further details. 9. Comments from the Stormwater Utility will provided to the consulting engineer under separate cover. 10. A one lot subdivision plat will need to be prepared and routed for comments. 11. The Site Plan should indicate building envelope dimensions and setbacks from nearest property lines. Also, parking stall dimensions should be shown. 12. Please add the following note regarding landscaping: "All landscaping must be installed or secured with an irrevocable letter of credit, performance bond, or escrow account for 125% of the valuation of the materials before any certificates of occupancy are issued." 13. Dwelling units accessible and adaptable for use by the handicapped shall be provided in accordance with the Uniform Building Code Section 3103 (a) 8 as amended by the City or. Colorado Revised Statute 9-5-111, which ever is more stringent. The standard design for units that must comply with Section 3103 U.B.C. is CABO/ANSI A 117.1 - 1992. For C.R.S. 9-5-111 the standard is ANSI A117.1 - 1980. Exterior routes of travel and parking facilities shall be provided in accordance with 1991 U.B.C. Appendix Chapter 31. Public use and common use areas shall also be accessible. (For further information, please contact Sharon Getz, Plans Examiner, Building Inspection Division.) 14. The Site Plan must contain a Parking Analysis. The Zoning Code requires that parking be provided on a per unit per bedroom basis. Please indicate, in table format, the number of one, two, or three bedroom units. A one bedroom unit requires 1.5 parking spaces, two b.r. units require 1.75 parking spaces, and three b.r. units require 2.0 parking spaces. Also, please indicate the number of handicap parking spaces. Will there be separate motorcycle parking spaces? If so, please indicate. 15. Will the access off Mulberry Street allow for an emergency fire connection into the interior of the project? How do the units in Phases Two and Three comply with the access requirements of the Poudre Fire Authority? a - Community Planning and Environmental Services Planning Department City of Fort Collins April 1, 1994 Mr. Jim Kline Fort Collins Housing Authority 1715 West .Mountain Avenue Fort Collins,' CO 80521 Dear Jim: Staff has reviewed the request for Hillcre'st Preliminary P.U.D. and offers the following comments: 1. In order for the cul-de-sac, with parking, to meet the requirements of the Poudre Fire Authority, the diameter must be 114 feet. This includes 80 feet for turn -around capability and 34 feet (17 + 17) for two parking stalls on opposite sides of the circle. 2. U.S. West and Light and Power are concerned with the width of the proposed utility easements adjacent to the east and west property lines. With the existing trees located along the west property line and the proposed trees that will be located next to the east property line, the six foot wide easements will not be adequate for placing and maintaining the buried utilities. Consequently, a ten foot wide easement is requested on the east and a 15 foot wide easement is requested on the .west. (The 15 foot wide easement will allow for conversion of the existing overhead electric to be placed underground without damaging the existing row of trees. 3. U.S. West is also concerned about utility access to the three duplex structures on the north side of the project. 4. Light and Power is concerned that an existing electrical vault in the area of the entrance from Impala Circle may need to be relocated. Please be aware that such relocation would be at the developer's expense. 5. The Public Service Company requests that utility easements be platted in the fronts of the structures, adjacent to the entryways and parking areas, such that the distance from the back of walk to the rear line of the easement is 13 feet minimum. 6. Please note that trees are to be kept away from gas lines by a minimum of four feet. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6750