HomeMy WebLinkAboutHILL CREST PUD PRELIMINARY - 6 93A - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORT100 90 80 70 U 60 U so O - 0 40 C-/) 30 C) C) 20 10 0 HILLCREST P.U.D. THIS IS THE MASS DIAGRAM FOR THE DETENTION BASIN REQUIREMENT 0 1v.v GV.v JV.v W.v Jv.v W.v W.v 1W.v lkv.v liv.. 1.1W TIME IN MINUTES Total Runoff Vol. EE Allowable Discharge Vol. NOTE: Discharge plot does not appear linear since time are not uniformly spaced THIS MASS DIAGRAM TABLE IS FOR USE IN .ESTABLISHING THE STORAGE VOLUME REQUIRED FOR THE 100 YR. STORM EVENT PRELIMINARY HILLCREST DETENTION SIZING n 4R = Runoff (c) 12.73 = Area (acres) 2.05 = Release Q(2)*** TIME min INTENSITY in/hr C*Cf*A s .ft. RUNOFF cu-ft OUTFLOW cu-ft STORAGE cu-ft 5.0 7.00 7.64 16039.8 615.0 15424.8 10.0 7.00 7.64 32079.6 1230.0 30849.6 15.0 6.10 7.64 41932.6 1845.0 40087.6 20.0 5.20 7.64 47661.1 2460.0 45201.1 25.0 4.68 7.64 53618.8 3075.0 50543.8 30.0 4.15 7.64 •57055.9 3690.0 53365.9 35.0 3.83 7.64 61432.4 4305.0 57127.4 40.0 3.50 7.64 64159.2 4920.0 59239.2 45.0 3.25 7.64 67023.5 5535.0 61488.5 50.0 3.00 7.64 68742.0 6150.0 62592.0 55.0 2.80 7.64 70575.1 6765.0 63810.1 60.0 2.60 7.64 71491.7 - 7380.0 64111.7 70.0 2.33 7.64 74745.5 8610.0 66135.5 80.0 2.05 7.64 75157.9 9840.0 65317.9 90.0 1 L88 7.64 77541.0' 1107060.66471.0' 100.0 1.70 7.64 77907.6 12300.0 65607.6 110.0 1.58 7.64 79649.1 13530.0 66119.1 120.0 1.45 7.64 79740.7 14760.0 64980.7 135.0 1.331 7.64 82284.2 16605.0 65679.2 150.0 1.201 7.64 82490.4 18450.0 64040.4 165.0 1.131 7.641 85446.31 20295.0 65151.3 180.00 1.051 7.641 86614.91 22140.0 64474.9 *** NOTE: -if C * Cf > = 1 , then C * Cf = 1 is used DEVELOPEDiCONTINUED SUBBASIN TIME OF CONCENTRATION D. Pnt. Slope °/, C * Cf verL Lengt feet Overt Tc min. han enght f Tc Chan. min. Tc Total min. COMMENTS 0-2 2.001 0.601 100.00 7.11 1 OVERLAND TIME ONLY Tc 1.001 0.601 1 275.00 14.91 22.11 OVERLAND + CHANNEL 0.60 = C (Land) 0.60 = C Chan. Pnt. Area C* Cf I (2yr.) 1 (10yr.) 1 (100yr.) Basin Q Comb. Q acres) - (in/hr) (in/hr in/hr) (cfs) (cfs —2 2.73 0.25 1.74 1.15 4i2 0.25 3.10 2.05 21'. 0.31 4.93 4.08 Al 0.60 = C . 1.00=Cf(2,10) 1.25=Cf(100) 5.50 = ACRES IN DEVELOPED BASIN, INCLUDING 50' ROW ALONG W. MULBERRY COMMENTS 2 yr. runoff 10 vr. runoff RUNOFF FROM ONSITE 11.61 2 yr. historic runoff 20.21 10 yr. historic runoff 39.51 100 yr. historic runoff 7.23 = ACRES IN DEVELOPED BASIN, ADJACENT PROPERTY OFFSITE CONTRIBUTING AREAS _ 1.8 2 yr. historic runoff 3.2 -10 yr. historic runoff 6.31 100 yr. historic runoff NOTE: ** These assumnption are for planning purposes only. Details will be added when final design is under taken. — Detention will be required in the Southeast and Northeast corner of the site. — Release will be into the existing S.D. collection system in W. Mulberry St. DEVELOPED CONTINUED SUBBASIN TIME OF CONCENTRATION D. Pnt. Slope C * Cf verL LengthOvert Tc ha .Lengh Tc Chan, Tc Total COMMENTS feet min. f min. min. 4 2.00 0.60 60.00 5.5 OVERLAND TIME ONLY Tc 1.00 0.60 185.00 12.2 17.8 OVERLAND + CHANNEL 0.60 = C (Land) 0.60 = C Chan. D. Pnt. Area C * Cf I,(2yr.) 1 (10yr.) I (100yr.) Basin Q Comb. Q UUMMLN 15 acres in/hr in/hr in/hr) (cfs) (cfs 4 0.64 0.60 1.97 3.13 3`1l 2 yr. runoff 0.60 3.41 5.42 54 10 yr. runoff 0.75 5.48 10.89 109' 100 yr. runoff 0.60 = C 1.00=Cf(2,10) 1.25 =Cf 100 4 SUBBASIN TIME OF CONCENTRATION D. Pnt. Slope %, C * Cf verL Length feet 0-1 2.001 0.25 300.00 Tc 1.001 0.25 0.25 = C Land 0.25 = C Chan. D. Pnt. Area acres 0-1 1 4. :f I (2yr.) in/hr 0.25 0.93 0.25 0.31 1.00=Cf(2,10) 21.0 590.00 37. 0yr.) I (100yr.) Basin Q Or in/hr cfs 0.6 1.66 1.1 2.65 2.1 125=Cf(100)' Tc Total min. 58.2 TIME ONLY + CHANNEL 2 yr. r 10 yr. 100 yr. 3ASIN TIME OF CONCENTRATION Pnt. Slope C * Cf Ove % I 1 2.00 0.60 Tc 1.00 0.60 0.60 = C (Land) 0.60 = C Pnt. Area C * Cf I acres 1 0.92 0.60 0.60 0.75 0.60=C 1.00=CI gt OverL Tc han.Lenght (min.) 0-� 00 6.4 320.00 I (10yr.) I (100yr.) in/hr in/hr 72 3.00 4.31 1.25=Cf(100) SUBBASIN TIME OF CONCENTRATION D. Pnt. Slope C * Cf Overt- Le gt feet 2 2.00 0.60 130.00 Tc 1.00 0.60 0.60 = C Land 0.60 = C Chan. D. Pnt. C1x•'3M n OverL Tc IChao.Lenghl C * Cf I (2yr.) in/hr 0.60 1.74 0.60 0.75 1.00=Cf(2,10) SUBBASIN TIME OF CONCENTRATION D. Pnt. Slope C * Cf Overt- Length feet 3 2.00 0.60 105.00 Tc 1.00 0.60 0.60 = C Land 0.60 = C Chan. Chan. nin. 16.1 isin Q 'cfs 2.7 240.001 13.9 )yr.) 'hr I (100yr.) in/hr Basin Q cfs 2.77 3.10 4.93 4.93 9.80 1.25 =Cf 100 rL Tc in. Chan Lenght fe Tc Chan. min. 7.3 200.00 12.7 OVERLAND + CHANNEL COMMENTS 2 yr. runoff 10 yr. runoff 100 vr. runoff :al COMMENTS OVERLAND TIME 22.1 OVERLAND + CHI 10 100 OVERLAND TIME ONLY OVERLAND + CHANNEL D. Pnt. Area acres C * Cf I (2yr.) in/hr I (10yr.) in/hr 1 (100yr.) in/hr Basin Q cfs Comb. Q cfs COMMENTS 3 0.94 0.60 1.85 2.94 29 2 r. runoff 0.60 3.22 5.12 51 10 r, runoff 0.75 5.17 10.28 10.311100 r. runoff 0.60 = C 1.00=Cf(2,10) 1.25 =Cf 100 3 HISTORIG:CONTINUED SUBBASIN TIME OF CONCENTRATION D. Pnt. Slope C * Cf OverL Length feet Overt Tc min. h .Lenght Tc Chan. min. Tc Total min. COMMENTS HB-3 1.00 0.20 100.00 16.2 OVERLAND TIME ONLY Tc 1.00 0.20 790.00 45.5 61.7 OVERLAND + CHANNEL 0.20 = C (Land) 0.20 = C Chan. D. Pnt. Area C * Cf I (2yr.) 1 (10yr.) 1 (100yr.) Basin Q Comb. Q COMMENTS acres in/hr in/hr in/hr) (cfs) (cfs HB-3 4.50 0.20 0.90 0.48 .:..::::.:.::::;OrS 2 yr. runoff 0.20 1.58 0.84 08 10 yr. runoff 0.25 2.51 1 66 i.7 100 yr. runoff 0.20 = C 1.00 =Cf 2,10 1.25 =Cf 100 HB _3::: ACRES OF HISTORIC BASIN UNDER CONSIDERATION *NOTES: This runoff rate does not include released storm water from Impale Subdivision only site historic release 1.50 2 yr. runoff 2.691 10 yr. runoff 5.371 100 yr. runoff DATE: MARCH 1994 BASIN RUNOFF COMPUTATIONS FOR THE 2/ 10/ 100 YR. STORM EVENT HILLCREST STORM RUNOFF RATES HISTORIC/DEVELOPED FOR: FORT COLLINS HOUSING AUTHORITY BY: Stewart & Associates GENERAL NOTES: If C x Cf > = 1 then C x Cf = 1 (constants listed below) SUBBASIN TIME OF CONCENTRATION D. Pnt. Area (acres) C * Cf I (2yr.) (in/hr) I (I 0yr.) (in/hr) I (100yr.) (in/hr) Basin Q (cfs) Comb. 0 (cfs) - COMMENTS HB-1 2.65 0.20 1.00 0.53 1 2 yr. runoff 0.20 1.80 0.95 10 yr. runoff 0.25 2.90 1.92 �z�:91�- x-4. 100 yr. runoff 0.20 = C 1.00 =Cf(2,10) 1.25 =Cf(100 HB 1L11 SUBBASIN TIME OF CONCENTRATION D. Pnt. Slope I (%) C * Cf Overl- Lengtfi (feet) HB-2 1.00 0.20 300.00 Tc 1.00 0.20 0.20 = C (Land) 0.20 = C (Chan.) Tc �ha Lenght Tc Chan. Tc Total COMMENTS 1) (fee (min (min.) 28.11 OVERLAND TIME ONLY 1 320.00 29.0 57.0 OVERLAND + CHANNEL D. Pnt. Area (acres) C*Cf I (2yr.) (in/hr) I (10yr.) (in/hr) I (1 00yr.) (in/hr) Basin Q cfs; Comb. Q cfs COMMENTS HB-2 2.651 0.20 0.93 0 1 2 r. runoff y 0.20 1 0.20 1.69 0.90 7.7770 10 yr. runoff 0.25 2.70 100 yr. runoff 0.20 = C 1.00 =Cf(2,10) 1.25 =Cf(100) STEWARTRASSOCIATES 10 82 9 3DiRUM,FAX FO 938OLLINS, CO 80521 Consulting Engineers and Surveyors By: Tl(� Date: -I - Iq Client: C _ U�a�, i Sheet No. 1 of Project: �\Vtc O?.ac1- t'.r'( ice. Subject: t tt.,W it: &J�Z3>0 320/ fro (off Zoc'> 7Z o V�3-z z b!!5 3ov/I 3ZV i�"2o Zo 4.JSa �Ace fi Z•'13 . i Z,73acC.2�� I.QD ,►�i+y� _ �51S0-4S ot: �c « z� l�.Ec�Se SS -t- (, = Z,Dc c4z, Storm Drainage Report Hillcrest P.U.D. Page 5 CONCLUSIONS No apparent risk to property or human safety would result from allowing this project to proceed. It does appear as though the Storm Drainage Design and Construction Criteria Standards can substantially be complying with at this cursory, preliminary review. Should questions regarding this project arise during your review of this project please feel free too contact Alex Evonitz or myself at your earliest convenience. Respectfully, �.....•, hey:, Richard A. Rutherford, P.E. & L.S. #5028 z : 5 Q 2 30 • •• hilcrest.rpt Storm Drainage Report Hillcrest P.U.D. Page 4 DETENTION Two ponds are indicated on the Preliminary Grading and Drainage Plans. A detailed review of the contributing basins to the East and North of the project site will be undertaken at final design. Based on the aforementioned assumptions a detention volume of 1.53 ac-ft appears to be adequate at this detail. The two ponds indicated can provide that volume of detention. A balance will have to be made between the two ponds and •the allowable release from the southerly pond will be determined. As mentioned the release structure from that Southerly pond has not yet been determined. Storm Drainage Report Hillcrest P.U.D. Page 3 Some general assumption have been included in this analysis to establish areas of concern for final design. These are that the developed runoff coefficient by zoning is C = 0.60, for the project site, the coefficient for Impala Subdivision C = 0.48, and detention sizing was based a release rate of 2.05 cfs. Slopes for overland and channelized flows were assigned 2% and 1% respectfully. Details of this preliminary review are attached in the appendix of this report. HYDRAULICS There is an existing irrigation lateral crossing the project from West to East. This feature has been the driving issue in much of the horizontal design. Overland channelized flows will be the primary method of direct runoff control and, it is not anticipated that piped conveyance will be necessary. Connection of the pan from the Impala Subdivision to the northerly detention pond will be accomplished with a swale and concrete pan. The two detention ponds, North and South will be connected by an earthen swale and concrete pan. Release rates will be imposed at the Southerly pond where either a swale would discharge into the curb line of Mulberry or a pipe section will junction with the existing piped collection system in Mulberry. Field data will establish what option will be available for this detail. S Storm Drainage Report Hillcrest P.U.D. Page 2 HYDROLOGY The site is currently covered in a heavy growth of rangeland grasses and weeds. The topography is gently sloping to the East with two distinct natural occurring swales on the North end and the South ends of the project site. The direct runoff from this site is toward the Tenth Green Subdivision on the East boundary. This has not presented itself as a problematic circumstance, though reduction of this undetained and undirected storm runoff will be an objective of this project design. This will be accomplished by undertaking a grading plan that will serve to generally level the site. Also, two detention ponds are proposed as part of the design proposal. This combination of elements will accomplish the goal of correcting an undesirable condition as it exists currently, while addressing the needs of the proposed intensified usage. The historic conditions on the site leads to a runoff coefficient of C = 0.20 for use in the Rational Method. This in accordance with the City of Fort Collins Storm Drainage Design Criteria and Standards (SDDCCS). This assumption has led to a 2 year allowable release rate of 1.5 cfs, and does not consider the flows directed toward this project from Impala Subdivision. I PRELIMINARY STORM DRAINAGE REPORT FOR HILLCREST P.U.D. GENERAL SITE The proposed multi -family development is located in the City of Fort Collins in the Southeast 1/4 of Section 9, Township 7 North, Range 69 West of the 6th P.M. The site is approximately 500 feet west, of the intersection of West Mulberry Street (Mulberry) and South Taft Hill Road (Taft). The P.U.D. is proposing 14.duplex.buildings for a total of 28 dwelling units on the approximately 5.5 acres. The tract lying North of the site (± 4.5 acres) is under consideration for sale to the Poudre R-1 School District (District). For this report, the entire 10.02 acres will be included in the storm water management design with the aforementioned 4.5 acres included as park & recreational use. This is the use being contemplated by the District. A second site specific detail will not be specifically detailed for the preliminary analysis, the release from the existing Impala Subdivision will require greater attention than that put forth in a preliminary report. An existing concrete pan directing storm flows from Impala Circle to the project site have not been completely assessed at this stage of design. It is not seen as a driving force for the overall project design however. Preliminary Storm Drainage Report for Hillcrest P.U.D. March 1994 STEWART&ksso ATES Consulting En3ineers arx1 Surveyors 103 South l'le&lu m Si eet To/it CoLti S, Co eolado 80521 3031482-9331