Loading...
HomeMy WebLinkAboutSUMMITVIEW CHURCH WTF MOBILITIE - FDP190022 - SUBMITTAL DOCUMENTS - ROUND 1 - RESPONSE TO STAFF REVIEW COMMENTS06/18/2019: FOR APPROVAL: The sheets should be in the order shown in the sheet index. 05/07/2019: FOR APPROVAL: Some of the sheet titles in the sheet index do not match the sheet titles on the noted sheets. See redlines. charges necessary will apply to this development. Comment Number: 7 01 /08/2019: INFORMATION: You may contact FCU Light & Power, project engineering if you have questions. (970) 221-6700. You may reference Light & Power's Electric Service Standards at http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar ds_FI NAL_18November2016_Amendment. pdf You may reference our policies, development charge processes, and use our fee estimator at http://www.fcgov.com/utilities/business/builders-and-developers. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, *schlam@fcqov.com Topic: Erosion Control Comment Number: 2 05/01/2019: INFORMATION ONLY: No Comment from Erosion Control. Based upon the submitted Planning Materials it has been determined that this project; will disturb less than 10,000 sq. ft., is not proposed to be in a sensitive area, has no steep slopes (greater than 3H:1 V) within or adjacent to the project, and is not part of a larger common development that will or is under construction. Therefore, no Erosion Control Material submittal is needed. If this project substantially changes in size or design where the above criteria now apply, erosion control materials should be submitted. Though the project at this time requires no erosion control material submittal, the project still must be swept and maintained to prevent dirt, saw cuttings, concrete wash, trash & debris, landscape materials and other pollutants from the potential of leaving the site and entering the storm sewer at all times during the project in accordance with City Code 26-498. If complaint driven or site observation of the project seem not to prevent the pollutant discharge the City may require the project to install erosion and sediment control measures. Nearby inlets that may be impacted by the pollutants, in particular dirt, should be protected as a good preventative practice and individual lots should be protected from material escaping onto the sidewalk. If at building permit issuance any issues arise please email erosion @fcgov.com to help facilitate getting these permits signed off. Department: Technical Services Contact: Jeff County, 970-221-6588, *county@fcgov.com Topic: General Comment Number: 1 06/18/2019: FOR APPROVAL: All plan sheets must be 24"x36". 05/07/2019: FOR APPROVAL: All plan sheets must be 24"06'. 01/07/2019: FOR FINAL: All plan sheets must be 24"x36". Comment Number: 4 4 5/6/2019: FOR FINAL PLAN APPROVAL Please include a plant list that meets Land Use Code 3.2.1 requirements. The plant list should include species, quantity, size, and method of transplant (2" caliper B&B). In addition, please include the City of Fort Collins General Landscape Notes, Tree Protection Notes, Street Tree Notes,m and Street Tree Permit Note to the plans. These note sets are available from City Forestry (Molly Roche — mroche@fcgov.com). Comment Number: 4 6/11/2019: FOR FINAL PLAN APPROVAL - UNRESOLVED: Please include the tree inventory and mitigation table that was provided to the applicant directly from Molly Roche (City Forestry). The existing tree schedule should include existing species, condition, size and required mitigation trees if removed. Please reference Forestry redlines. 5/6/2019: FOR FINAL PLAN APPROVAL Please include the existing tree inventory and mitigation table to sheet ZD1.2. The table is available from Molly Roche in City Forestry. Comment Number: 5 6/11/2019: FOR FINAL PLAN APPROVAL On several pages, the two existing Ash trees that are proposed to be removed are still shown on the landscape plan. If you wish to keep the Ash trees symbols on the plan, that is fine, but please place a X over the symbol and update the note to read "EXISTING GREEN ASH TO BE REMOVED AND MITIGATED". Please note that this should be consistent among all landscape sheets.Please reference Forestry redlines. Comment Number: 6 6/11/2019: FOR FINAL APPROVAL: Thank you for showing (5) Southwestern White Pine on the plans. Please note that there are only (3) mitigation trees required, so you only have to upsize (3) out of the (5) Southwestern White Pines to 8' height. The other (2) pines can be 6' height (which is the standard height for conifers). If you would like to keep them all at 8' height that is okay with me. Please label (3) of the Southwestern White Pines as "MITIGATION TREES". This may be done by placing a M near the tree symbol or calling it out as a Mitigation Tree next to the symbol on the plans. Please note that this should be consistent among all landscape sheets. Comment Number: 7 6/11/2019: FOR FINAL APPROVAL: Please confirm with project planner, Kai Kleer, but I believe that the (3) southwestern white pines should be surrounding the monopine to act as a natural buffer and provide screening. Please note that this should be consistent among all landscape sheets. Response: All comments noted above have been addressed. Department: Light And Power Contact: Austin Kreager, 970-224-6152, akreager@fcgov.com Topic: General Comment Number: 6 01 /08/2019: INFORMATION: Electric Capacity Fee, Building Site charges and any system modification 3 >The new address shall be an even number which denotes north side of the street. At shall be clearly visible from the street in no less than 8" tall numerals on a contrasting background. 12/31/2018: To assist with prompt emergency response, and because the 1601 address denotes a south side of Drake location, the new address should be clearly visible from the street on the new facility. Response: A new address will need to be issued to address this. Department: Engineering Development Review Contact: Katie Andrews, 970-221-6501, kandrews@fcgov.com Topic: General Comment Number: 2 05/02/2019: INFORMATION ONLY: Thank you for adding the ramp callout. Engineering is ready for the project to go to hearing. Please note that there may be additional construction -level comments at the time of FDP. Department: Environmental Planning Contact: Kelly Smith, ksmith@fcgov.com Topic: General Comment Number: 1 05/20/2019: INFORMATION ONLY: You will need a bird survey for trees being removed if the trees will be removed during the nesting season (February 1 through July 31). Please include the following note on your landscape and tree mitigation plans: "NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1 TO JULY 31) WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. THE SURVEY SHALL BE SENT TO THE CITY ENVIRONMENTAL PLANNER. IF ACTIVE NESTS ARE FOUND, THE CITY WILL COORDINATE WITH RELEVANT STATE AND FEDERAL REPRESENTATIVES TO DETERMINE WHETHER ADDITIONAL RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY." Department: Forestry Contact: Molly Roche, 224-616-1992, mroche@fcgov.com Topic: Landscape Plans Comment Number: 3 6/11/2019: FOR FINAL PLAN APPROVAL - UNRESOLVED: In the Tree Schedule, please include the (4) proposed Kentucky Coffeetree `Espresso'. These should be listed as 2" caliper B&B. Please also change the Southwestern White Pine Method of Transplant to read B&B. Nursery stock for evergreen trees are listed in height, not caliper. Please reference Forestry redlines. 2 Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6689 970.224.6134 - fax fcgov. com/developmentrevie w June 19, 2019 Tom Johnson 31878 Del Obispo St # 118-454 San Juan Capistrano, CA 92675 RE: Summit View Church - Wireless Telecommunication Facility, PDP1800169 Round Number 3 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, please contact your Development Review Coordinator Brandy Bethurem Harras at 970.416.2744 or bbethuremharras@fcgov.com. Comment Summary: Department: Planning Services Contact: Kai Kleer, 970-416-4284, kkleer@fcgov.com Topic: General Comment Number: 6 06/14/2019: INFORMATION ONLY: Ready for hearing. Department: PFA Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.org Topic: General Comment Number: 2 06/10/2019: FOR HEARING: An case of emergency response an aerial apparatus fire lane is required which is 26ft wide or the full extent of the drive aisle through the parking lot adjacent to this facility. It appears to be shown as 12ft wide on the provided plan. Response: The revised set of plans shows the required 26' as noted above. Comment Number: 3 06/10/2019: FOR FINAL PLAN: