HomeMy WebLinkAboutBREEZE THRU HEADQUARTERS - FDP190003 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSadded prior to mylars.
02/26/2019: FOR APPROVAL:
All reception numbers for documents recorded by separate document must be
added prior to mylars.
Topic: Landscape Plans
Comment Number: 9
Comment Originated: 02/25/2019
04/05/2019: FOR APPROVAL -UNRESOLVED:
Some of the sheet titles & numbers in the sheet index do not match the noted
sheets. See redlines.
02/25/2019: FOR APPROVAL:
Some of the sheet titles & numbers in the sheet index do not match the noted
sheets. See redlines.
Topic: Site Plan
Comment Number: 1
04/05/2019: FOR APPROVAL -UNRESOLVED:
Please revise the sub -title as marked. See redlines.
02/25/2019: FOR APPROVAL:
Please revise the sub -title as marked. See redlines.
Comment Number: 2
Comment Originated: 02/25/2019
Comment Originated: 02/25/2019
04/05/2019: FOR APPROVAL -UNRESOLVED:
Some of the sheet titles & numbers in the sheet index do not match the noted
sheets. See redlines.
02/25/2019: FOR APPROVAL:
Some of the sheet titles & numbers in the sheet index do not match the noted
sheets. See redlines.
Comment Number: 3
04/05/2019: FOR APPROVAL -UPDATED:
There are line over text issues. See redlines.
02/25/2019: FOR APPROVAL:
There are line over text issues. See redlines.
Comment Number: 4
Comment Originated: 02/25/2019
Comment Originated: 02/25/2019
04/05/2019: FOR APPROVAL -UPDATED:
All reception numbers for documents recorded by separate document must be
added prior to mylars.
02/25/2019: FOR APPROVAL:
All reception numbers for documents recorded by separate document must be
added prior to mylars.
link for Poudre Fire Authority's plan review application can be found at:
https://www poudre-fire org/online-services/contractors-plan-reviews-and-permit
s/new-building-plan-review-application.
Department: Technical Services
Contact: Jeff County, 970-221-6588, Icounty@fcgov.com
Topic: Building Elevations
Comment Number: 7
Comment Originated: 02/25/2019
04/05/2019: FOR APPROVAL -UNRESOLVED:
The smaller text does not scan or reproduce well. The text needs to increase in
size. See examples of text on redlines.
02/25/2019: FOR APPROVAL:
The smaller text does not scan or reproduce well. The text needs to increase in
size. See examples of text on redlines.
Topic: Construction Drawings
Comment Number: 10
Comment Originated: 02/25/2019
04/05/2019: FOR APPROVAL -UPDATED:
Please revise the Benchmark Statement as marked. See redlines.
02/25/2019: FOR APPROVAL:
The Benchmark Statement has been revised. Please provide the following
information for the Benchmark Statement in the EXACT format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS DATUM) FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM (PRIOR CITY OF FORT COLLINS
DATUM) IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION
SHOULD BE USED: NGVD29 UNADJUSTED DATUM (PRIOR CITY OF
FORT COLLINS DATUM) = NAVD88 - X.XX'.
Comment Number: 11
04/05/2019: FOR APPROVAL -UPDATED:
All Benchmark Statements must match on all sheets.
02/25/2019: FOR APPROVAL:
All Benchmark Statements must match on all sheets.
Comment Number: 14
Comment Originated: 02/25/2019
Comment Originated: 02/26/2019
04/05/2019: FOR APPROVAL -UPDATED:
All reception numbers for documents recorded by separate document must be
diagram that shows the main disconnect size and meter sequencing. A copy of
our meter requirements can be found in our electric policies practices and
procedures below.
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Comment Number: 2
Comment Originated: 02/26/2019
02/26/2019: AT BUILDING PERMIT SUBMITTAL: A commercial service
information form (C-1 form) and a one -line diagram for all commercial meters
will need to be completed and submitted to Light & Power Engineering for
review. A link to the C-1 form is below:
http://www.fcgov.com/utilities/business/builders-and-developers/development-
forms-guidelines-regulations
Comment Number: 3 Comment Originated: 02/26/2019
02/26/2019: INFORMATION: Electric capacity fees, development fees, building
site charges and any system modification charges necessary to feed the site
will apply to this development. Please contact me or visit the following website
for an estimate of charges and fees related to this project:
http://www.fcgov.com/utilities/business/bu ilde rs-and-developers/plant-i nvestmen
t-development-fees
Comment Number: 4
Comment Originated: 02/26/2019
02/26/2019: INFORMATION: Please contact Tyler Siegmund with Light &
Power Engineering if you have any questions at 970.416.2772. Please
reference our policies, construction practices, development charge processes,
electric service standards, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers
Comment Number: 5 Comment Originated: 02/28/2019
02/28/2019: AT BUILDING PERMIT SUBMITTAL: Development charges may
apply to this project. Depending on how the metering for the commercial service
is modified and by adding 10 residential units to the building, fees may apply.
Once the one -line diagram is submitted for review to see proposed meter
sequencing, I can evaluate if any fees will apply to this project. Please contact
me if you would like to discuss.
Department: PFA
Contact: Andrew Rosen, 970-416-2599, arosen@poudre-fire.orq
Topic: General
Comment Number: 1
Comment Originated: 02/22/2019
02/27/2019: FOR INFORMATION
The project team will be providing the Fire Lane signage plan at the next
submittal
02/22/2019: FOR INFORMATION
All PFA comments have been resolved at this time.
The FDC is noted on the provided plan in the correct location
The Fire -Lane No Parking signage was approved for PDP but does not appear
in the provided documents for FDP. Please provide this at next submittal.
When you submit for your building permit though the City of Fort Collins please
be advised Poudre Fire Authority is an additional and separate submittal. The
City of
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
tcgov. com/developmentre view
April 05, 2019
Jessie Stonberg
Baseline Engineering Corp.
112 N Rubey Drive
Suite 180
Golden, CO 80403
RE: Breeze Thru Headquarters, FDP190003, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Development Review Coordinator, Todd Sullivan, at 970-221-6695 or tsullivan@fcgov.com .
Comment Summary:
Department: Stormwater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/26/2019
04/03/2019: The 100-year flow from the .29 acres needs to be calculated and
this is the flow that will pass through the rain garden and into the outlet pipe.
02/26/2019: An analysis is needed to determine if the outfall offsite is stable
down to the channel/wetland area.
Comment Number: 2
Comment Originated: 02/26/2019
04/03/2019: Please provide specifications for the TRM.
02/26/2019: Please provide permanent turf reinforcement matting instead of
riprap. If riprap is to be used, it is required to be buried with temporary
reinforcement.
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tiegmund@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 02/26/2019
02/26/2019: AT BUILDING PERMIT SUBMITTAL: Please provide a one line