Loading...
HomeMy WebLinkAboutPOUDRE R1 JUNIOR HIGH SCIENCE LAB ADDITIONS SITE PLAN ADVISORY REVIEW - 7 93 - CORRESPONDENCE - STORMWATER-RELATED DOCUMENTSUtility rvices Stormwa.er City of Fort Collins February 25, 1993 Mr. Ron Daggett Project Manager PR-1 School District 2407 LaPorte Avenue Fort Collins, Colorado 80521 RE: Science Room Additions for Blevins, Boltz, and Lesher Junior High Schools Dear Mr. Daggett: The stormwater impacts of the proposed science room additions to Blevins, Boltz, and Lesher Junior High Schools have been analyzed by Stewart & Associates Consulting Engineers. This approved documentation supports the following conclusions: 1. No additional runoff will be created by the science room addition at Blevins Junior High School. 2. No detention is required at Boltz Junior High -School because the small additional runoff generated by construction of the science room will have no adverse downstream impact. 3. No detention is required for the science room addition at Lesher Junior High School. The small volume of incremental runoff from the addition will be routed through a dry well and across a grassed area to reduce peak flows through infiltration and increase the runoff time of flow, mitigating impacts to street drainage and downstream stormwater conveyance. The Stormwater Utility's concerns about the runoff from the Junior High School science room additions have been addressed by Stewart & Associates' submittal. Let me know if there are any additional questions or concerns regarding storm drainage at these sites. Si c lYai KatN rs Civil Engineer II cc: Ted Shepard William Brenner 235 Mathews • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6589 • FAX (303) 221-6239