Loading...
HomeMy WebLinkAboutGREENBRIAR VILLAGE PUD - 19 93 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTw Greenbriar Village P.U.D. Page 2 The second phase was divided into fourteen sub -basins. See attached drawing for more detailed flow patterns. The runoff and grading have been designed to maintain the integrity of the existing drainage report and the Evergreen Drainage Basin Study. Flows have been directed generally south and west to the existing detention pond and will flow in a concrete pan when slopes are less that two percent. The portion of the development east of Redwood Drive is in the Greenbriar Drainage Basin and the property is being designed to utilize the wetland area as a detention pond for this portion of the development. The Third Phase of the development is the multi -family area and will drain directly west into the existing pond. The Fourth Phase is a single family area that has been designed as a part of the Evergreen Subdivision and the drainage has been previously designed. I hope this and the accompanying drawings will suffice for our Drainage Report for the O.D.P. of the Greenbriar Village P.U.D. Sincerely, Q1uuu UT,. EZ/tk RFC•.°p :o. *i 502 .A ''��`�••' F & y' O ''TF OF ''1uuJu,n1% June 4, 1993 Mr. Glen Schlueter Stormwater Utility City of Fort Collins P.O. Box 580 Fort Collins, Colorado 80522 Dear Glen: The following is the preliminary drainage report for the Overall Development Plan (O.D.P.) of Greenbriar Village P.U.D. which is a replat of a part of Sundance Hills, Filing Two, P.U.D, and three adjacent properties.. It will be designed as a mixed use residential development and will be located as shown on the Overall Development Plan. It is located in the North 1/2 of Section 1, Township 7 North, Range 69 West of the 6th P.M. The total gross area of the site is 37.83 acres. It is predominately a single family area conforming to the requirements for the RLP zone. There is, however, an area of duplex and 4-plex housing in the extreme northwest corner of the property and a multi -family area in the southwest portion. The Subdivision is a part of areas "B" through "G" as shown on Sheet 7 of 11 of the Sundance Hills, Filing Two, P.U.D. prepared by Engineering Professionals Inc. and dated November 30, 1979. The property slopes gently from northwest to southeast and will continue to drain to the existing neighborhood detention pond that is southeast of the existing Coachlight Plaza Filing One. Since Sundance Circle is being changed to end in a cul-de-sac, the drainage will be diverted southerly along the westerly property line and then easterly along the southerly property line in a concrete pan to the existing 20-foot wide drainage easement along Coachlight Plaza to the neighborhood detention pond. The First Phase of the P.U.D. which has a final drainage report under review, has off -site flows that will pass through the second phase to the existing detention pond. The rear of the existing Coachlight Apartments also drain to an existing swale along the common property line with Greenbriar Village P.U.D. The Second Phase of the project is the single family section and consists of two (2) distinct areas on the east and west sides of Redwood Drive. STORM DRAINAGE REPORT FOR GREENBRIAR VILLAGE P.U.D. OVERALL DEVELOPMENT PLAN JUNE 411993 RECE1,, Development Services Planning Department P.O. Box 580 Fort Collins, CO 80522