HomeMy WebLinkAboutGREENBRIAR VILLAGE PUD - 19 93 - CORRESPONDENCE - STAFF'S PROJECT COMMENTScomments after that meeting. It is important to contact the
Stormwater Utility and get their current requirements. Additional
of the following dates and deadlines to assure your ability to stay
on schedule for the June 28, 1993 Planning and Zoning Board
hearing:
Plan revisions are due June 9, 1993 by 12:00 noon. Please contact
me for the number of folded revisions required for each document.
PMT's, renderings, and 8 folded copies of final revisions (for the
Planning and Zoning Board packets) are due June 21, 1993.
Final documents (including the signed development agreement,
applicable mylars and utility plans) are due June 24, 1993 by 12:00
noon.
Please contact me at 221-6750 if you have questions or concerns
related to these comments. I would like to schedule a meeting with
you as soon as possible, if necessary, to discuss these comments.
7S' e erely,
t Olt
Project Planner
xc: Kerrie Ashbeck
Sherry Albertson -Clark
Advance Planning
Stormwater Utility
Transportation
Jeff Laughren
Stewart & Associated
file/Project Planner
credit, escrow or performance bond for 125% of the
valuation as indicated on this plan prior to the issuance
of the first certificate of occupancy in that phase".
All of the street trees on both sides of Butch Cassidy Court
must be installed with Phase One.
3. The project phases, Phases One and Two, must be defined on
this plan. Will all the sidewalks (on both sides of the
street) be completed with Phase One?
4. Butch Cassidy Court must be identified on this plan.
5. Note 19 referring to the fencing is too ambiguous, open-ended
and is not acceptable. This note does not clearly define where
fencing can and will occur. The plan does define the areas to
be fenced but Note 19 then contradicts maybe even doing any
fencing. Also, Note 19 as written* does not commit the
developer of Greenbriar Village P.U.D., First Filing to
construct the perimeter fencing as shown. The Neighborhood
Compatibility criteria in the All Development Chart of the
Land Development Guidance System (page 5) states that "When a
use is the first to develop on two adjacent vacant parcels,
the first use shall provide the necessary buffer to any
reasonable future use as determined by the City". The
Greenbriar Village P.U.D. - Overall Development Plan
identifies single family residential as the proposed use to
the north and east of the •First Filing. It is the
responsibility of the more intensive use to provide adequate
buffering between the two different uses. The more intensive
use in this case is the multi -family residential in the First
Filing.
Building Elevations
1. The title of this sheet should be Greenbriar Village P.U.D.,
First Filing. We are reviewing this architectural drawing for
the entire First Filing that includes two phases. In order to
avoid any misunderstanding in the future it should be clear
that an approval would be for this one building type for all
10 buildings containing 40 dwelling units. Phase One could be
interpreted to be only buildings 1 through 6 as shown on the
Site Plan.
2. This drawing, for the architect's construction purposes, is
obviously part of a set of construction documents that
includes 6 drawings. For the City's purposes this is drawing
1 of 1 and should titled as such.
This completes the review comments at this time. This letter
reflects, essentially, the Planning Department's comments to make
the Site and Landscape Plans current. Please be aware of the
Engineering Department's comments and -equirements that were
outlined at our meeting on May 25, 1993. You received the written
2. Note 12 must be eliminated, or it could be rewritten to say
that "The developer reserves the right to request minor
adjustments". The only "rights" are those provided in the
L.D.G.S., which requires City approval.
3. What is meant by Note 6? What kind of "outside storage", other
than what will be stored in the storage buildings, is being
proposed that would necessitate screening?
4. By virtue of the fact that this will now be a combined
Preliminary & Final the following two recommended conditions
of approval for the preliminary plan that was postponed by the
Planning and Zoning Board on May 24th must be addressed with
your revisions (re -submittal):
* The cul-de-sac at the east end of Butch Cassidy Court
must conform to the City's street design standards or the
applicant must submit a variance request to the
Engineering Department with the Final P.U.D. submittal
clearly describing the function of the cul-de-sac and
showing proof of the ability for a narrow -street width to
operate safely under all circumstances.
* The off-street parking provisions for both Phases One
and Two must meet the minimum off-street parking
requirements as set forth in the City Code or the
applicant must adjust the number of dwelling units to
enable compliance with City Code .prior to gaining final
approval from the Planning and Zoning Board.
5. Note 9 references the RP and RAMP Zoning Districts. Please
enlighten me. What is the RAMP district and what is allowed?
6. What will be the building material and color .of the trash
enclosures doors?
7. A note must be added stating that all proposed project fencing
is shown on the Final Landscape Plan.
Landscape Plan
1. The title of this drawing should be "Preliminary & Final
Landscape Plan". The most recent landscape plan in the City's
file is dated May 17, 1993 and appears to be the most
complete. It would seem logical that revisions from this point
forward be made to this document.
2. Landscape Notes 8 and 15 are not consistent. Note 15 does not
allow any certificates of occupancy to be issued until all the
landscaping shown on the entire plan is installed. A single,
correct note should read ...
"All landscaping for each phase of the project will be
completed or secured with an irrevocable letter of
Commu_-ry Planning and Environmental _trvices
Planning Department
City of Fort Collins
May 25, 1993
Ed Zdenek
ZTI Group
1220 South College Avenue
Fort Collins, CO. 80524
Dear Ed,
I would like to take this opportunity to express the concerns and
comments of City staff relating to the Greenbriar village P.U.D. -
overall Development Plan and the Greenbriar Village P.U.D., First
Filing - Preliminary & Final that you are intending to take to the
Planning and Zoning Board on June 28, 1993 for a decision. As a
result of the decision by the Board on May 24th night to postpone
any action on the O.D.P. and the First Filing, Preliminary until
June 28th, and your intent to gain final approval from the City to
allow construction on this site, it is important to make you aware
of the critical dates in the City's review process and the concerns
that have to be addressed prior to submittal of revisions for this
development. Staff's comments are as follows:
Greenbriar Village P.U.D. - Overall Development Plan
1. The most recent O.D.P. in the City's file is dated May 17,
1993 and appears to be in good form.
2. The reference to an HB Zone north of Willox Lane is incorrect.
That zoning district does not exist in that area.
3. Reference to the zoning districts affected by this development
should be stated in the SITE STATISTICS. It is unclear what
districts some of the phases are in.
Greenbriar Village P.U.D., First Filing - Preliminary & Final
Site Plan
1. The title of this drawing should be "Preliminary & Final Site
Plan". The most recent site plan in the City's file is dated
May 17, 1993 and appears to be the most complete. It would
seem logical that revisions from this point forward be made to
this document.