HomeMy WebLinkAboutSPRADLEY BARR ISUZU NON CONFORMING USE - 16 93 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTSTEWARTMSSOCIATES
Consulting Engineers and Surveyors
March 1, 1993
Stormwater Utility
City of Fort Collins
P.O. Box 580
Fort Collins, Colorado, 80522
Gentlemen:
This is regarding the storm drainage for the Non —Conforming Use Change
at Spradley—Barr Isuzu. The site is the existing Top Hat Car Wash at 215 West
Drake Road. Spradley—Barr is proposing to change the use totheir foreign
car sales area. They will remodel the building and provide new landscaping.
The site is at the southeast corner of the intersection of Drake Road and
McClelland Drive. The site is in the far south side of the Spring Creek
Drainage Basin.
The site contains 0.76 acres and is entirely hard surfaced except for
360 square feet of landscaping at the southwest corner of the car wash.
The proposed use change will leave the existing asphalt surface except
a fifteen -foot strip along Drake Road and a ten —foot strip along McClelland
Drive. Also, six percent of the .interior parking asphalt will be removed for
landscaping. The total landscaped area in the proposed site is 0.10 acres.
The net decrease in impervious area is 3965 square feet.
Due to the decrease in impervious area, the resulting decrease in
stormwater runoff and no change in grading or flow patterns, we are not
submitting a drainage plan or report for this request.
If you have any questions regarding the site or landscape plan or the
existing drainage conditions of the site, please call.
Sincerely,
Richard A. Rutherford, P. E. & L. S.
President
jrr
James H. Stewart
and Associates, Inc.
103 S: Meldrum Street
P.O. Box 429
Ft. Collins, CO 80522
303/482-9331
Fax 303/482-9382