Loading...
HomeMy WebLinkAbout1300 RIVERSIDE DRIVE PARKING IL SITE PLAN REVIEW - 18 93 - CORRESPONDENCE - CORRESPONDENCE-CONCEPTUAL REVIEW7. If the site were to redevelop in the future, it may trigger the submittal requirements for the Stormwater Utility. The site is located in the Old Town Drainage Basin. At present, there are no development fees in this basin. In the future, it is likely that development charges will be applied in this basin by the Stormwater Utility. 8. The drive aisle on the southeast end of the building should align with the existing curb cut on Riverside Drive. Instead of 22 spaces in this parking bay, it should be reduced to align and capped with a landscaped island. This will remove the offset and make the connection closer to 90 degrees. 9. It is recommended that the parking lot surface and drive aisles be painted with directional arrows to help direct and channelize traffic. 10. The parking area on the northwest end of the building, adjacent to the Coloradoan building, should be re -designed so that the parking is parallel, ,not 90 degrees. This will also create a protective area for the proposed pedestrian connection. The aisle width should be 24 feet minimum. 11. A 22 foot wide aisle width towards the rear of building would be acceptable to the Transportation Department since these spaces would be considered "long term" for employees, not "short term" for customers. A formal variance must still be considered by the Zoning Board of Appeals. 12. It is recommended that the 24 existing spaces in front of the store be capped on the south end with a landscaped island. 13. There is no deadline by which .to submit an I-L Site Plan Review. The submittal should include a list of all affected property owners within a minimum distance of 500 feet, exclusive of public right-qf-way. CONCEPTUAL REVIEW STAFF COMMENTS MEETING DATE: March 22, 1993 ITEM: Former Collins Cashway Lumber - Parking for Coloradoan APPLICANT: Fort Collins Coloradoan c/o Ben Hermann, EDAW, 240 East Mountain Avenue, Fort Collins, CO. 80524 LAND USE DATA: Request for I-L Site Plan Review to convert a portion of the property of the former Collins Cashway Lumber, 1300 Riverside Drive, into additional parking area for employees of the Fort Collins Coloradoan. COMMENTS: 1. The request will be evaluated as an I-L Site Plan Review. Any variances that are required will be considered by the Zoning Board of Appeals, prior to the administrative hearing for the I-L Site Plan. 2. It is recommended that the vehicle overhang area for the 17 foot -long parking stalls in front of the store be a minimum of five feet. Any variance granted should then be indicated on the I-L Site Plan. 3. It is recommended that security lighting be building mounted rather than pole mounted. Since the future user of the building is unknown at this time, it would make sense to not install pole mounted fixtures that may not be needed in the long term. 4. To install parking lot security lighting, the electrical ..contractor should apply for an Electrical Permit from the City.'s Building Permits and Inspection Division. The installation will then be inspected. 5. The Poudre Fire Authority will require that there be a continuous fire lane around the entire building. All drive aisles must maintain a 20 foot inside and 40 foot outside turning radius. It is recommended that all dimensions conform to the Parking Lot Development Guide. 6. Please provide a letter that the new parking lot will not increase the amount .of impervious surface or change the drainage patterns on the site. 'Since the new parking lot will be constructed on existing hard surface area, a Drainage Report and Drainage and Grading Plan will not be required. Please be aware, however, that the site has historically drained poorly.. Commui r Planning and Environmental r -vices Planning Department City of Fort Collins March 23, 1993 Fort Collins Coloradoan c/o Ben Hermann, EDAW, Inc. 240 E. Mountain Avenue Fort Collins, CO 80524 Dear Mr. Hermann: For your information, attached is a copy of the Staff's comments concerning Former Collins Cashway Lumber - Parking for Coloradoan, presented before the Conceptual Review Team on March 22, 1993. The comments are offered informally by Staff to assist you in preparing the detailed components of the project application. Modifications and additions to these comments may be made at the time of formal review of this project. If you should have any questions regarding these comments or the next steps in the review process, please feel free to call me at 221-6750. Sincerely, Ted Shepard, AICP Senior Planner TS/gjt Attachments cc: Tom Peterson, Planning Director Kerrie Ashbeck, Civil Engineer Transportation Department Project Planner File 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (303) 221-6730